Search NASA⌕ Search

SEARCH · Search NASA

Results for “permit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

HWMA RCRA Storage and Treatment Permit for the Material and Fuels Complex on the Idaho National Laboratory

Owners and operators of facilities that treat, store, and dispose of hazardous waste must obtain an operating permit required by Subtitle C of the Resource Conservation and Recovery Act (RCRA). The operating permit for the Materials and Fuels Complex is the Hazardous Waste Management Act (HWMA)/RCRA Storage and Treatment Permit. The permit defines the conditions and requirements that apply to the treatment and storage of hazardous waste managed at the treatment, storage and disposal facilities (TSDF). The regulations governing the permitting process are found at 40 CFR Pa 124 and 270.

99 GENERAL AND MISCELLANEOUS↗

The National Solar Permitting Database

"The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

Gunderson, Renic↗

Permit Injectors and New Observation Wells at Early Test Site (SECARB Phase III (Early) Project at Cranfield)

At Cranfield field well permitting was part of a routine operation that Denbury conducted on behalf of the University of Texas and the SECARB Project. Denbury permits injection and production wills through the Mississippi Oil and Gas Board (MO&GB). The MO&GB permitted the two observation wells as production wells, although they are not in the oil-productive part of the field (being deliberately located down-dip of the oil-water contact). The well permits issues April 15, 2009 for the observation wells are attached in appendix A. Denbury also permitted 8 injection wells to support the High Volume Injection Test (HiVIT); four of these are drilled unusually far downdip to support the sequestration experiment. These permits are held by Denbury as part of their normal operations.

54 ENVIRONMENTAL SCIENCES↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Illinois Storage Corridor, CarbonSAFE Phase III: UIC Class VI Permitting Plan

The Illinois Storage Corridor (ISC) project evaluated two distinct sites to determine the feasibility of commercial-scale CO₂ storage at each. The project leveraged the region's exceptional geological characteristics, particularly the well-characterized Cambro-Ordovician Storage Complex, to enable permanent geological storage of more than 50 million tonnes of CO₂ over 30 years. The two storage sites are located at One Earth Energy (OEE) facility in northcentral Illinois and Prairie State Generating Company (PSGC) in southcentral Illinois. Once operational, these facilities will combine to capture and store more than 6.5 million tonnes of CO₂ per year, positioning the ISC among the largest carbon storage regions globally. Preliminary homogeneous dynamic modeling based on regional and site-specific reservoir characteristics indicates promising injection capabilities at both locations. For the OEE site, modeling predicts a maximum allowable injection rate of 3.7 MTPA, with a baseline scenario of 1.7 MTPA over 30 years producing a CO₂ plume radius of 1.4 miles at end of injection. For the PSGC site, incorporating recent well data, modeling indicates a single-well maximum injection rate of 2.1 MTPA, with a plume radius of 4.2 miles at end of injection for the 60 MT over 30 years scenario. The primary objective of this CarbonSAFE Phase III project is to develop and submit Class VI Underground Injection Control (UIC) permit applications to the U.S. Environmental Protection Agency Region 5. The permitting plan outlines comprehensive site characterization, Area of Review delineation, monitoring programs, well construction designs, financial responsibility provisions, and post-injection site care procedures necessary to demonstrate safe, permanent CO₂ storage protective of underground sources of drinking water. Three UIC Class VI permit applications for the OEE site were submitted to EPA in October 2022 and are progressing through technical review, with final permit decision projected by June 2026. Through five rounds of Requests for Additional Information and responses, the applications have been refined to address computational modeling, area of review delineation, well integrity, monitoring protocols, and financial assurance requirements. For the PSGC site, finalized characterization and permitting documentation was delivered directly to the facility in July 2023 due to business constraints precluding formal federal regulatory submission. This comprehensive permitting effort builds upon extensive prior subsurface evaluations and demonstration projects that have confirmed the feasibility of widespread commercial-scale carbon storage in the region.

01 COAL, LIGNITE, AND PEAT↗

The National Solar Permitting Database

"The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

Gunderson, Renic↗

Air Permitting Implications of a Biorefinery Producing Raw Bio-Oil in Comparison with Producing Gasoline and Diesel Blendstocks

A biorefinery, considered a chemical process plant under the Clean Air Act permitting program, could be classified as a major or minor source based on the size of the facility and magnitude of regulated pollutants emitted. Our previous analysis indicates that a biorefinery using fast pyrolysis conversion process to produce finished gasoline and diesel blendstocks with a capacity of processing 2,000 dry metric tons of biomass per day would likely be classified as a major source because several regulated pollutants (such as particulate matter, sulfur dioxide, nitrogen oxide) are estimated to exceed the 100 tons per year (tpy) major source threshold, applicable to chemical process plants. Being subject to a major source classification could pose additional challenges associated with obtaining an air permit in a timely manner before the biorefinery can start its construction. Recent developments propose an alternative approach to utilize bio-oil produced via the fast pyrolysis conversion process by shipping it to an existing petroleum refinery, where the raw bio-oil can be blended with petroleum-based feedstocks (e.g., vacuum gas oil) to produce gasoline and diesel blendstocks with renewable content. Without having to hydro-treat raw bio-oil, a biorefinery is likely to reduce its potential-to-emit to below the 100 tpy major source threshold, and therefore expedite its permitting process. We compare the PTE estimates for the two biorefinery designs with and without hydrotreating of bio-oils and examine the air permitting implications on potential air permit classification and discuss the best available control technology requirements for the major source biorefinery utilizing hydrotreating operation. Our analysis is expected to provide useful information to new biofuel project developers to identify opportunities to overcome challenges associated with air permitting.

09 BIOMASS FUELS↗

Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

99 GENERAL AND MISCELLANEOUS↗

Air Dispersion Modeling for the Idaho National Laboratory Permit to Construct P-2020.0045 Facility Emission Cap Revision Request

The U.S. Department of Energy Idaho Operations Office (DOE-ID) is seeking to modify permit to construct (PTC) P-2020.0045 issued to U S Dept. of Energy – Idaho National Laboratory (INL) on January 29, 2021 by the Idaho Department of Environmental Quality (DEQ). This PTC allowed the INL to become a synthetic minor source of air pollutants using a facility emission cap (FEC). Air dispersion modeling was performed as part of the permit revision application process to demonstrate that the modifications will comply with the National Ambient Air Quality Standards (NAAQS). This report documents the modeling methodology and complete results for the air dispersion impact analysis and is supplied as an appendix to the permit revision request, Idaho National Laboratory Permit to Construct P-2020.0045 (INL 2025). All criteria air pollutants (CAPs) regulated under Section 109 of the Clean Air Act were modeled with the exception of lead (Pb) and ozone which are not required to be modeled by DEQ. Consistent with the original permit application, modeling was not performed for toxic air pollutants (TAPs) as uncontrolled emissions did not exceed screening emission levels for carcinogenic and non-carcinogenic TAPs. Acceptable model design values (concentrations) for each CAP and averaging period were summed with average background concentrations and compared to NAAQS. The results demonstrate the impacts of requested FEC limits for CAPs are less than applicable standards and demonstrate emissions up to FEC limits will not cause a violation of ambient air quality standards.

54 ENVIRONMENTAL SCIENCES↗

Streamline, Organizational, Legislative and Administrative Response to Permitting, PV Market Share, and Solar Energy Costs (Broward Go SOLAR)

Broward County and its partners (the Go SOLAR Team), operating under a Department of Energy Rooftop Solar Challenge Agreement, designed, developed and implemented an online permitting system for rooftop solar PV systems. This is a single web based system with a single permit fee that will issue a permit, with a set of design plans preapproved by partner building officials, within one hour. The system is currently available at gosolar.broward.org for use within any of the partner Authorities Having [permitting] Jurisdiction (AHJ). Additionally, the Go SOLAR Team researched, developed and to the extent feasible, implemented three best management practices to make a fertile environment for the new online permit system. These included Net Metering and Interconnection Standards, Solar-Friendly Financing, and Planning and Zoning Ordinances. Finally, the team implemented a substantial outreach effort to advocate for the development of solar in Broward County, with an emphasis on Solar Rights, concluding with a Go SOLAR Fest day and a half conference with over 1,200 attendees and 50 exhibitors. The Go SOLAR project was completed on time, under DOE’s budgeted amount, and all project objectives were met or exceeded.

14 SOLAR ENERGY↗

Air Dispersion Modeling for the Idaho National Laboratory Permit to Construct P-2015.0023 Facility Emission Cap Revision Request

The U.S. Department of Energy Idaho Operations Office (DOE-ID) is seeking to modify permit to construct (PTC) P-2015.0023 issued to U S Dept. of Energy – Idaho National Laboratory (INL) on January 11, 2018 by the Idaho Department of Environmental Quality (DEQ). This PTC allowed the INL to become a synthetic minor source of air pollutants using a facility emission cap (FEC). Air dispersion modeling was performed as part of the permit revision application process to demonstrate that the modifications will comply with the National Ambient Air Quality Standards (NAAQS). This report documents the modeling methodology and complete results for the air dispersion impact analysis and is supplied as an appendix to the permit revision request, Idaho National Laboratory Permit to Construct P-2015.0023 Facility Emission Cap Revision Request (DOE-ID 2020). All CAPs regulated under Section 109 of the Clean Air Act were modeled with the exception of lead (Pb) and ozone which are not required to be modeled by DEQ. Consistent with the original permit application, modeling was not performed for toxic air pollutants (TAPs) as uncontrolled emissions did not exceed screening emission levels for carcinogenic and non-carcinogenic TAPs. Acceptable model design values (concentrations) for each CAP and averaging period were summed with average background concentrations and compared to NAAQS. The results demonstrate the impacts of requested FEC limits for CAPs are less than applicable standards and demonstrate emissions up to FEC limits will not cause a violation of ambient air quality standards.

99 GENERAL AND MISCELLANEOUS↗

Environmental Permitting and Compliance Cost Reduction Strategies for the MHK Industry: Lessons Learned from Other Industries

The marine and hydrokinetic (MHK) industry plays a vital role in the U.S. clean energy strategy by providing a renewable, domestic energy source that may offset the need for traditional energy sources. The first MHK deployments in the U.S. have incurred very high permitting costs and long timelines for deploying projects, which increases project risk and discourages investment. A key challenge to advancing an economically competitive U.S. MHK industry is reducing the time and cost required for environmental permitting and compliance with government regulations. Other industries such as offshore oil and gas, offshore wind energy, subsea power and data cables, onshore wind energy, and solar energy facilities have all developed more robust permitting and compliance pathways that provide lessons for the MHK industry in the U.S. and may help inform the global consenting process. Based on in-depth review and research into each of the other industries, we describe the environmental permitting pathways, the main environmental concerns and types of monitoring typically associated with them, and factors that appear to have eased environmental permitting and compliance issues.

other industries↗

Economic Impact of Permitting Timelines on Produced Geothermal Power

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive.

15 GEOTHERMAL ENERGY↗

A phased workflow to define permit‐ready locations for large volume CO 2 injection and storage

Abstract To‐date, only two UIC Class VI permits have been issued by the US Environmental Protection Agency. We illustrate a four‐phase workflow to first identify regional storage resources and then down‐select sites to yield permit‐ready locations that can accept and store large volumes of CO 2 . Specific permit requirements should guide objectives and define deliverables of respective workflow phases. In the first phase we used available regional data and screened structure and injection zones to locate resources that match CO 2 volumes planned to be captured. Available data were also used to assess presence and depth of usable groundwater, the key resource being protected via permitting. We then used advanced, closed‐form, analytical solutions (EASiTool) to estimate CO 2 injectivity into each hydrologically connected injection compartment. In the second phase we acquired and conditioned additional wireline logs and leased available seismic datasets. We interpreted the depositional systems from wireline well‐log character and mapped sandbody geometry to interpolate injection and confining‐zone distribution. Using available data, we mapped faults and locations of freshwater and overpressure (or other capacity‐limiting geologic parameters) in more detail. In the third phase, we used the augmented geologic data to develop a static model for the selected area, extracted the areas of highest interest, and generated and ran dynamic (flow) models. In a fourth phase, we reduced major uncertainties identified in earlier phases. Our case study indicates that to complete preparation of a permit application requires (1) improved lithologic characterization information (thicknesses and horizontal and vertical connectivity) and (2) better definition of poorly defined local faults. © 2023 The Authors. Greenhouse Gases: Science and Technology published by Society of Chemical Industry and John Wiley & Sons Ltd.

58 GEOSCIENCES↗

SolarAPP+ ® (Solar Automated Permit Processing Plus) [SWR-19-51]

SolarAPP+ ®: Safe and affordable home solar through permitting automation. NREL has launched a collaborative effort with key code officials, authorities having jurisdiction (AHJs), and the solar industry to develop an instant online solar permitting platform for code compliant residential systems. SolarAPP (Solar Automated Permit Processing) will: -Provide a flexible, web-based PV-permitting tool for residential systems at no-cost to AHJs. -Enable standardization of instant permitting processes. -Evaluate applications for safety and code compliance. -Offer opportunities to incorporate energy storage and expand to other market segments.

Cook, Jeffrey↗

Request for Exemption and Permit Modification for S-6008: Sewer Diversion Complex

Lawrence Livermore National Laboratory (LLNL) operates its Sewer Diversion Complex (SDC) under two relevant permits: discharges to air are controlled by Condition 5533 of LLNL’s BAAQMD permit for Source 6008, and discharges to the municipal sewer system are controlled by LLNL’s Wastewater Discharge Permit (Permit #1250). LLNL intends to modify the SDC by changing the currently permitted tanks to new models. Generally, this change will increase the volume of the tanks, update the abatement carbon system to suit the larger volume, and switch to a set of taller but thinner tanks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements

Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory and Permitting Information Desktop (RAPID) Toolkit (Poster)

The Regulatory and Permitting Information Desktop (RAPID) Toolkit combines the former Geothermal Regulatory Roadmap, National Environmental Policy Act (NEPA) Database, and other resources into a Web-based tool that gives the regulatory and utility-scale geothermal developer communities rapid and easy access to permitting information. RAPID currently comprises five tools - Permitting Atlas, Regulatory Roadmap, Resource Library, NEPA Database, and Best Practices. A beta release of an additional tool, the Permitting Wizard, is scheduled for late 2014. Because of the huge amount of information involved, RAPID was developed in a wiki platform to allow industry and regulatory agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users. In 2014, the content was expanded to include regulatory requirements for utility-scale solar and bulk transmission development projects. Going forward, development of the RAPID Toolkit will focus on expanding the capabilities of current tools, developing additional tools, including additional technologies, and continuing to increase stakeholder involvement.

15 GEOTHERMAL ENERGY↗