Search NASASearch

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Remote Power Distribution Prototyping for Bergoz ACCT

The objective of this project focuses on the design and construction of remote power distribution to the Bergoz ACCT amplifier module. Responsibilities included designing a prototype amplifier placeholder using SketchUp, 3D printing it using PrusaSlicer, and mounting the placeholder inside a junction box with 35 mm DIN rail. Wiring was run through a penetration in a wall inside the accelerator building to the Tevatron to keep all electronics outside the radioactive enclosure. A Power over Ethernet switch was set up for remote power distribution to the amplifier. This project ensures that the amplifier module can be effectively integrated and managed within Fermilab's infrastructure once it is procured.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

Power Purchase Agreements: Overview

Overview guidance for the Better Buildings, Better Plants, and Better Climate Challenge programs on the types of power purchase agreements available for renewable energy procurement.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Assessment and Coordination of EVSE Cybersecurity Standards

Cybersecurity certification programs for Electric Vehicle Supply Equipment (EVSE) are fragmented due to no single certification covering all aspects of the device and additionally the existence of multiple programs and under different levels of regulation. These devices are also confronted by the intricate assembly of product software, firmware, and hardware. Devices contain both logical and physical interfaces. These multifaceted devices have vulnerabilities at many levels and interconnect with other potentially vulnerable systems including the electric vehicle, the cloud where data and payment information are stored, and the electric grid and electric grid equipment including utilities. Of the EVSE certification programs that are found, none are directly for the cybersecurity of EVSE. Many standards are for safety, specifically battery safety, some are cybersecurity standards for other types of equipment and can be modeled for EVSE. In specific, ISA/IEC 62443 is found to be significantly in line with EVSE security needs and will be used in future testing to certify EVSE and help guide the project to demonstrate where gaps exist, where strengths lie in the standard and how this can be used to lead the certification efforts in harmonizing EVSE cybersecurity standards. In addition, there are multiple efforts that are currently seeking to build EVSE standards or revise existing standards to address gaps. This effort is seeking to establish a cybersecurity program for EVSE that will inform customers and help increase the level of security across products and state EVSE procurements to achieve consistency across different jurisdictions.

33 ADVANCED PROPULSION SYSTEMS

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends with Washed and Unwashed Legacy Coals and Other Waste Fuels to Generate White Hydrogen

The objective of this effort, primarily funded by the United States Department of Energy (DOE), and led by the Electric Power Research Institute, Inc. (EPRI), with support by Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), has been to qualify coal, biomass, and plastic waste blends based on performance testing of selected fuel pellet compositions in a pilot-scale updraft moving-bed (UDMB) gasifier. The testing provided relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are the focus. The gasifier used for testing is HMI’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips (biomass). However, mixtures of these fuels with plastic wastes have not been prepared and gasified together. The three feedstocks were densified and pelletized by California Pellet Mill (CPM) to meet the feedstock size required by Sotacarbo’s 30mm ID UDMB gasifier, under contract to HMI. The technical tasks and results from this two-year research project included: (1) Feed Procurement and Preparation: Nine different tri-fuel pellets were prepared from varying compositions of fresh mined PRB coal, corn stover biomass, and car fluff waste plastics. Tri-fuel pellets were produced by CPM and shipped to Sotacarbo’s test facility in Carbonia, Sardinia, Italy. (2) Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different UDMB gasification tests to be performed in Sotacarbo’s 12-inch ID pilot scale gasifier, the process monitoring instrumentation used, and the extractive samples recovered for analysis of the total gasification process mass and energy balance. (3) Gasifier Testing: Nine different gasification runs were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstock compositions generated from varying mixtures of PRB coal, biomass, and plastic wastes. The testing generated performance data on gasification reaction efficiency and performance, yielding relevant data for models used to scale up the gasifier design. This task also included work to refurbish and reassemble the pilot gasifier at Sotacarbo and perform a baseline 100% PRB coal run. (4) Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results are reported in the project’s final report, published in March 2024. The results show that all tri-fuel pellets gasified well and maintained structural integrity throughout the gasification process. The syngas generated can be shifted to hydrogen by using commercial syngas shifting technologies. (5) High Fidelity computational fluid dynamics (CFD) Simulation: The National Energy Technology Laboratory (NETL) team performed CFD simulations of the UDMB gasifier for two of the tri-fuel pellets gasified in Sotacarbo’s pilot scale gasifier. The kinetic mechanisms for the pyrolysis of each constituent, PRB coal, corn stover biomass, and waste plastics are based on thermogravimetric analysis performed by Sotacarbo. The gasification model was validated by comparing the predicted syngas composition at the exit of the gasifier with the measured syngas composition. In addition, the reactor’s measured internal temperature profile agreed well with the predicted internal reactor temperature profile. These results validate that the model can be used to predict the performance of the updraft moving bed gasifier for different feedstocks and operating conditions. This paper summarizes the results of the completed work in which the pelletizing procedure was validated to ensure the viability of the tri-fuel pellets for the gasification runs performed at Sotacarbo’s 30 mm UDMB gasifier. The gasification performance data from this series of nine runs will enable modeling of a full-scale HMI industrial scale gasifier supporting both combined heat and power, and Hydrogen production from coal (both fresh mined and legacy) combined with various biomass and waste plastics. Additionally, plans and progress on a follow-up project, being executed by the same project team, will be presented. In this project, a total of twenty (20) different feedstocks are being prepared from varying compositions of biomass (both woody biomass and corn stover) with a mixture of legacy coal waste, plastic waste, and refuse-derived fuel (RDF). The testing will provide information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design to 50 megawatt electric (MWe) (equivalent hydrogen production). Tests will also be performed on a bench-scale fluidized-bed gasifier for comparison purposes. The results of this testing will be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends.

08 HYDROGEN

Hydrogen Production Cost with Anion Exchange Membrane Electrolysis

Rigorous stakeholder-vetted techno-economic analysis was performed to assess the cost of hydrogen (H 2 ) produced using state-of-the-art Anion Exchange Membrane (AEM) electrolysis. Projected high-volume, untaxed and unsubsidized levelized cost of hydrogen (LCOH)1 range from 2020 $\$$1.78 to $\$$3.68/kg H 2 depending on technology year, process design, and electrolyzer project scale, assuming an electricity price of $\$$0.03/kWh and a capacity factor of 97%. The total installed capital cost for an AEM electrolysis plant was estimated from bottom-up stack and process plant cost models. The stack cost model accounts for manufacturing equipment, equipment maintenance, material, tooling, cycle time, yield, labor, utilities and general overhead. The process plant cost model accounts for purchased equipment, installation costs, site preparation, and general overhead costs. For this study, the AEM electrolysis plant is assumed to be a stick-built, greenfield project developed by an engineering, procurement, and construction (EPC) firm with electrolysis stacks purchased directly from an electrolysis stack manufacturer. The price of the electrolysis stacks is based on a bottom-up cost assessment with business markup for the electrolysis company fabricator. Methods from the Hydrogen Analysis (H2A) production model, a peer-reviewed national laboratory-developed discounted cash flow (DCF) model, were used to calculate the production LCOH in 2020 $\$$/kg H 2 . The baseline electricity price case ($\$$0.03/kWh) corresponds to average wholesale electricity prices currently possible in U.S. markets with plentiful wind. Similar low-cost electricity pricing is possible from solar Power Purchase Agreements (PPA) although these prices are typically limited by renewable energy capacity factors.

08 HYDROGEN

High Yield Xray Imager Final Design Review

The High Yield Xray Imager (HYXI) is a new NIF target diagnostic system currently under development. The goal of HYXI is to provide high-fidelity, high temporal resolution x-ray imaging capability on high yield NIF implosions at 10MJ and above. The HYXI instrument design concept is based on the combination of two technologies that have been successfully utilized at the NIF on previous instruments, electron pulse-dilation and hybrid-CMOS sensor imaging. The combination of these two techniques will give HYXI sufficient data quality to ascertain differences in hot spot formation dynamics between high and low yield implosions. This information will highlight the critical hot spot conditions needed for ignition and burn. The HYXI design leverages the successful operation of the PDIXI x-ray imager at the NIF on multi MJ yield shots. A new radiation tolerant CMOS imaging array (HYPERION) is being developed to eliminate the significant background noise which limits the data quality of PDIXI. We successfully placed the contract with Advanced hCMOS Systems (AHS) to develop the HYPERION sensor, which fulfils our criteria to place long lead time item procurements by end of FY24. The HYXI Final Design Review was completed at the end of Q4 FY24 (Sep 24 th and Sep 30 th ). The HYXI project is a multi-year effort with a phased approach to be bring up system functionality over time in parallel with the development and fabrication effort of the HYPERION CMOS imaging array. In Phase 1, time-integrated x-ray images on NIF DT experiments will be collected starting in Q3 FY25. In Phase 2 of the project, time-resolved imaging with HYXI utilizing a spare microchannel plate detector back-end will begin in Q3 FY26. Phase 3 concludes the project with the installation of the HYPERION sensor array and the final performance qualification of the HYXI instrument which is scheduled for Q3 FY27 as discussed in the PDR and MRT report on this project in FY23.

42 ENGINEERING

Offshore Wind Turbine Blade (85 to120meters ultra-long blade) static and fatigue test

Offshore blades are not just longer, they are wider, heavier and more flexible. These longer blades are a key component of larger wind turbines and for turbines to be more efficient in low wind speeds. These longer blades help reduce the LCOE further and make offshore wind even more competitive. As described earlier, it is essential for the blades to be fully tested to verify and validate the blade designs and manufacturing processes to ensure a reliable product is installed in the field. Through this project WTTC developed and procured new testing equipment required to test longer blades with larger deflections and higher loads. R&D’s BCDA system commissioned was the largest fatigue test exciter system in the world and set the bar for other blade testing facilities worldwide.

17 WIND ENERGY

HPC Center of the Future: R&D Acquisition Intent

This document contains intended technical requirements for an anticipated future procurement for Lawrence Livermore National Laboratory (LLNL), hereafter referred to as “LLNL” or “the Laboratory”, which seeks to fund a few new and innovative proposals for developing concepts and performing studies that would lead to products available in the 2029-2030 timeframe. Our interest is to incentivize explorations and evaluations of technical capabilities in support of our vision for a High Performance Computing (HPC) center of the future at Livermore Computing (LC), the HPC center at LLNL. To realize this vision a new approach to our approach to acquisition is being considered by LC. The approach is designed to decrease risks for the vendors, while encouraging a broader set of vendors able and we hope willing to partner with LLNL and LC. The future HPC Center vision and acquisition approach was conceived to meet the future mission needs of the Advanced Simulation and Computing (ASC) Program within the National Nuclear Security Administration (NNSA).

97 MATHEMATICS AND COMPUTING

Solar Design/Install Labor Quantification (Cooperative Research and Development Final Report)

The goals of this project were to quantify the rate and/or total expected labor expenditure of engineers designing solar arrays and electricians installing solar across a spectrum of project sizes and configurations. Specifically, procuring and analyzing labor data from solar engineering firms relating to the amount of time it takes an engineer to design a solar project, the amount of time it takes an engineer to perform a wiring or stringing design, the amount of time it takes an electrician to install a solar project and the amount of time it takes electricians to install the strings of a solar array. Then these details could be analyzed to evaluate labor intensity for solar design/installation. These goals were unable to be completed because the participant was unable to collect the necessary data for analysis.

14 SOLAR ENERGY

DOE’s National Solar Thermal Test Facility Operations and Maintenance

This report details operations and maintenance (O&M) activities performed across Fiscal Years 2022 through 2024 in support of the continued capabilities of the National Solar Thermal Testing Facility (NSTTF) at Sandia National Laboratories. The NSTTF O&M project is funded by the U.S. Department of Energy Solar Energy Technologies Office (SETO) to support research activities and testing on behalf of external customers at the facility under award number CPS 38491. During the project period, the NSTTF made progress in the areas of site metrics, site maintenance and utilization tracking, and customer engagement. The O&M project also supported special initiatives including procurement of a heat exchanger for particle concentrating solar thermal processes and a scoping and cost study for refurbishment and repair of component in the NSTTF heliostat field.

14 SOLAR ENERGY

Extracted Radar Columns and In Situ Sensors (RadCLss) Value-Added Product Report

In order to validate precipitation, in 2010 the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility procured 3- and 5-cm wavelength radars for documenting the macrophysical, microphysical, and dynamical structure of precipitating systems. To maximize the scientific impact, ARM supported the development of an application chain to correct for various phenomena in order to retrieve the “point” values of moments of the radar spectrum and polarimetric measurements. In estimation from ARM radars, a workflow was created to directly compare radar “point” values with various in situ observations at the surface.

54 ENVIRONMENTAL SCIENCES

Colorado State University (CSU) X-Band Precipitation Radar Plan Position Indicator Data Processed with Corrected Moments in Antenna Coordinates (CMAC) Value-Added Product Report

In 2010 the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility procured 3- and 5-cm wavelength radars for documenting the macrophysical, microphysical, and dynamical structure of precipitating systems. To maximize the scientific impact, ARM supported the development of an application chain to correct for various phenomena in order to retrieve the “point” values of moments of the radar spectrum and polarimetric measurements. We have now used the lessons learned from the processing of the 3- and 5-cm wavelength radars obtained by ARM to help process X-band radar data from the Surface Atmospheric Integrated Field Laboratory (SAIL) field campaign. This report details the motivation, science, and progress to date as well as charting a path forward.

54 ENVIRONMENTAL SCIENCES

Printed Metal Molds for Mainstream Automotive Production

The main focus of this work was to evaluate additive manufacturing of metal molds, with significantly reduced cost and/or procurement lead time, for production of large composite components for mainstream (> 100k units/yr) automobiles. A two-component large tool with conformal heating channels was designed, optimized, printed, machined, and tested in production. The resulting analysis indicates that large scale AM is suitable for manufacturing complex geometry large scale metal molds.

36 MATERIALS SCIENCE

Bridging the Gap on Data and Analysis for Distribution System Planning: Information That Utilities Can Provide Regulators, State Energy Offices and Other Stakeholders

Electric utilities conduct planning annually to ensure their distribution system meets technical standards, policies, and regulations; addresses forecasted grid conditions; satisfies customer needs; and advances utility priorities. The plan identifies grid deficiencies, analyzes potential solutions, and prioritizes capital investments and other expenditures. About 20 U.S. states and jurisdictions require regulated utilities to file some type of distribution system plan with the public utility commission for review. Requirements for sharing distribution system data and analyses vary widely, from few specific requirements to a detailed list of information that must be provided. While utilities conduct extensive analysis to develop distribution system plans, in most jurisdictions regulators and stakeholders do not know what data are available and how the utility uses the data in planning and investing. This report aims to bridge the gap by increasing understanding of the types of data and analyses utilities employ to develop distribution system plans and how the information affects their decision-making. The report describes information that states and stakeholders can ask for related to 11 data categories: -Forecasting loads and distributed energy resources (DERs) -Scenario analysis -Worst-performing circuits -Asset management strategy -Hosting capacity analysis -Value of DERs -Grid needs assessment -Cost-effectiveness framework for investments -Distribution system investment strategy and implementation -Geotargeted programs -Non-wires alternatives procurements.

24 POWER TRANSMISSION AND DISTRIBUTION

Analysis of Supply Chain Challenges in the U.S. Solar Industry: Focus on Build America, Buy America Act and Inverter Supply Issues

The United States (U.S.) solar industry has been undergoing significant transformation, driven largely by meeting U.S. climate goals while simultaneously maintaining national security. At the forefront of this movement is the Inflation Reduction Act (IRA) and the Build America, Buy America (BABA) Act. The IRA has driven investment in clean energy generation deployments while the BABA Act, enacted under Division G, Title IX of the Infrastructure Investment and Jobs Act (IIJA) establishes domestic content procurement preference for all federal financial assistance obligated for infrastructure projects. While these pieces of legislation aim to reduce reliance on foreign-made solar components and increase domestic production, the sector continues to face notable supply chain challenges. These are particularly pronounced with inverters, a critical component in solar photovoltaic (PV) systems. This report explores the current state of these supply chain challenges, with a specific focus on the impact of the BABA requirements and the associated complexities in inverter manufacturing and supply.

14 SOLAR ENERGY

Development and Assessment of Deployed Sensors and Technologies Supporting Molten Salt Loop Operations

During FY24, Argonne conducted a variety of activities to develop and assess new monitoring and control technologies towards enabling long-duration operations of molten salt reactor systems. The first objective of the work completed this year was to deploy technologies capable of reliably and rapidly monitoring the operational health of a molten salt loop. To achieve this, the project focused on specific tasks, including: (1) electroanalytical technique development for use in deployed sensors, and (2) operations of sensors on the Facility to Alleviate Salt Technology Risks (FASTR) loop at Oak Ridge National Laboratory. The second objective of the work this year focused on creating a pumped actinide flow loop to enable long-duration salt chemistry and corrosion studies using uranium-bearing fuel salts. Toward that end, we designed and procured a loop capable of being installed into a radiological glovebox at Argonne. A corrosion control system was also designed for integration into this loop. These combined systems will enable the feasibility of corrosion control and management systems to be investigated with complex chloride fuel salt mixtures.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Rescue of Unique Liquid IP-2 Portable Tanks at Savannah River Site

Introduction • Savanah River Site procured six large IP-2 portable tanks capable of transporting liquids in 2003 to support layup of F Canyon at SRS. • Tanks are being rescued and recertified to support eventual disposition of up to 171,000 L of contaminated solvent solutions from H Canyon at SRS and to potentially transport Depleted Uranium solutions to support the ABD Program.

Fee, Nathaniel C. [Savannah River Nuclear Solution