Search NASA⌕ Search

SEARCH · Search NASA

Results for “prototypes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Development of a Supermarket Prototype Building Model

The U.S. Department of Energy supports the development of commercial building energy codes and standards by participating in industry reviews, update processes, and providing technical analyses to support both published model codes and potential changes. In support of ANSI/ASHRAE/IES Standard 90.1 and the International Energy Conservation Code, 16 commercial prototype building models were developed that cover 80% of the commercial building floor area in the United States for new construction, including both commercial buildings and mid- to high-rise residential buildings, across all U.S. climate zones. However, the current set of commercial prototype building models does not include a supermarket building type, which is one of major building types defined in the Energy Information Administration’s Commercial Building Energy Consumption Survey. As part of an ongoing effort to expand the current Commercial Building Prototype Model suite, this paper presents the procedure used to develop the prototype supermarket building model based on multiple studies as well as a previously developed reference building model. The final set of prototype models includes 68 models for different vintages of ASHRAE Standard 90.1 (i.e., 2004, 2007, 2010, and 2013) and for 17 ASHRAE climate zones.

Im, Piljae↗

A Computuerized Operator Support System Prototype

A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Computuerized Operator Support System Prototype

A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Prototype Courthouse Building Energy Model: Building Characteristics and Energy Simulation Results

To coordinate commercial building energy research activities, the US Department of Energy uses a suite of commercial prototype building models, which includes 16 building types and covers 80% of US commercial floorspace. Efforts are underway to expand this suite by developing prototype models for additional building types, including a courthouse. Informed by building design guides, databases, documented projects, and personal communication with courthouse design experts, a 3-story, 4-courtroom, 69,324 ft 2 building was considered as the prototype courthouse to represent an average-sized courthouse in the United States. This report documents the building and system characteristics of the prototype courthouse model combined with climate-specific and construction vintage–specific requirements for the building envelope and systems from ASHRAE Standard 90.1. The energy simulation results are presented for 4 construction vintages (2004, 2007, 2010, and 2013) and 15 ASHRAE climate zones. To verify the energy simulation results, energy use statistics of existing courthouses from different building database are also presented. Based on the simulated energy use, the site energy use intensity of the prototype courthouse ranged from 45 to 159 kBtu/ft 2 compared with the average energy use intensity of 94.7 kBtu/ft 2 for the courthouse building type in the 2012 Commercial Building Energy Consumption Survey (CBECS) Data.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Prototype Supermarket Building Energy Model

The U.S. Department of Energy supports the development of commercial building energy codes and standards by participating in industry reviews, update processes, and providing technical analyses to support both published model codes and potential changes. In support of ANSI/ASHRAE/IES Standard 90.1 and the International Energy Conservation Code, 16 commercial prototype building models were developed that cover 80% of the commercial building floor area in the United States for new construction, including both commercial buildings and mid- to high-rise residential buildings, across all U.S. climate zones. However, the current set of commercial prototype building models does not include a supermarket building type, which is one of major building types defined in the Energy Information Administration’s Commercial Building Energy Consumption Survey. As part of an ongoing effort to expand the current Commercial Building Prototype Model suite, this report presents the procedure used to develop the prototype supermarket building model based on multiple studies as well as a previously developed reference building model. The final set of prototype models includes 60 models for different vintages of ASHRAE Standard 90.1 (i.e., 2004, 2007, 2010, and 2013) and for 15 ASHRAE climate zones.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Explainable Artificial Intelligence Recommendation System by Leveraging the Semantics of Adverse Childhood Experiences: Proof-of-Concept Prototype Development

The study of adverse childhood experiences and their consequences has emerged over the past 20 years. Although the conclusions from these studies are available, the same is not true of the data. Accordingly, it is a complex problem to build a training set and develop machine-learning models from these studies. Classic machine learning and artificial intelligence techniques cannot provide a full scientific understanding of the inner workings of the underlying models. This raises credibility issues due to the lack of transparency and generalizability. Explainable artificial intelligence is an emerging approach for promoting credibility, accountability, and trust in mission-critical areas such as medicine by combining machine-learning approaches with explanatory techniques that explicitly show what the decision criteria are and why (or how) they have been established. Hence, thinking about how machine learning could benefit from knowledge graphs that combine “common sense” knowledge as well as semantic reasoning and causality models is a potential solution to this problem. In this study, we aimed to leverage explainable artificial intelligence, and propose a proof-of-concept prototype for a knowledge-driven evidence-based recommendation system to improve mental health surveillance. We used concepts from an ontology that we have developed to build and train a question-answering agent using the Google DialogFlow engine. In addition to the question-answering agent, the initial prototype includes knowledge graph generation and recommendation components that leverage third-party graph technology. To showcase the framework functionalities, we here present a prototype design and demonstrate the main features through four use case scenarios motivated by an initiative currently implemented at a children’s hospital in Memphis, Tennessee. Ongoing development of the prototype requires implementing an optimization algorithm of the recommendations, incorporating a privacy layer through a personal health library, and conducting a clinical trial to assess both usability and usefulness of the implementation. This semantic-driven explainable artificial intelligence prototype can enhance health care practitioners’ ability to provide explanations for the decisions they make.

adverse childhood experiences↗

Power API Prototype

The software serves two purposes. The first purpose of the software is to prototype the Sandia High Performance Computing Power Application Programming Interface Specification effort. The specification can be found at http://powerapi.sandia.gov . Prototypes of the specification were developed in parallel with the development of the specification. Release of the prototype will be instructive to anyone who intends to implement the specification. More specifically, our vendor collaborators will benefit from the availability of the prototype. The second is in direct support of the PowerInsight power measurement device, which was co-developed with Penguin Computing. The software provides a cluster wide measurement capability enabled by the PowerInsight device. The software can be used by anyone who purchases a PowerInsight device. The software will allow the user to easily collect power and energy information of a node that is instrumented with PowerInsight. The software can also be used as an example prototype implementation of the High Performance Computing Power Application Programming Interface Specification.

Source record↗

Counting Calories: Light Yield Studies with ADRIANO2 Calorimeter Prototype

Precision in measuring particle energies is crucial to understand the intricacies of high-energy physics beyond the standard model. For the REDTOP experiment to detect η/η´ mesons potentially decaying into dark-matter particles not yetdiscovered, it is essential to have accurate measurements through sophisticated and innovative detector technology built with special properties. The ADRIANO2 (A Dual Readout Integrally Active Non-segmented Option) Calorimeter Prototype plays a pivotal role in advancing detection capabilities, offering the potential to enhance the particle identification procedure. This study delves into the characterization of the ADRIANO2 prototype’s light yield with the ultimate goal of contributing to broader high-energy physics objectives. To estimate the light yield for the ADRIANO2 prototype, we must calibrate the light sensors as well as collect data from beams of known properties. Several prototypes of the ADRIANO2 detector have been tested at the Mtest Facility at Fermi National Accelerator Laboratory in the last few years. This paper attempts to summarize the calibration of one such ADRIANO2 prototype to estimate its experimental performance.

43 PARTICLE ACCELERATORS↗

A Methodology to Create Prototypical Building Energy Models for Existing Buildings: A Case Study on U.S. Religious Worship Buildings

Prototypical building energy models are of great significance because they are the starting point in conducting analyses for various applications, such as building energy saving potential analysis, building design, building energy market evaluation, and building energy policy-making. However, current prototypical building energy models only represent limited types of buildings in certain countries. To fill the gap, this paper proposes a methodology to systematically create prototypical building energy models. First, a six-step methodology is introduced: model input identification, data collection, data cleaning, data conversion, model simulation, and model calibration. Then, the methodology is demonstrated by a case study of creating 30 prototypical energy models for U.S. religious worship buildings, representing buildings in 15 climate zones and 2 vintages (pre- and post-1980). Finally, to show the applications of the models, the building energy saving potentials from six efficiency measures are analyzed for pre-1980 U.S. religious worship buildings in three ASHRAE Climate Zones. The results show that the maximum energy saving potentials are approximately 30% for the religious worship buildings in all three climate zones investigated.

prototype building model, building simulation, Bui↗

Development of Prototypical District-Scale Models

The U.S. has set the climate goal to achieve net-zero greenhouse gas emissions by 2050. District-scale solutions, which include scale-specific opportunities for energy and emissions savings, can be investigated and implemented to help accelerate decarbonization and progress toward this goal. However, there is currently a lack of district-scale models of buildings and community energy systems that can be used to evaluate potential district-scale technologies and strategies across a range of representative community types. This initial work aims to define and develop prototype district models that can be adapted to support the planning, design, and operation of buildings and energy systems in districts considering the complexity and interactions of diverse building loads, weather impacts, distributed energy resources (e.g., PV, EV, electric and thermal energy storage), electric and thermal grid systems, and pricing signals. An overall workflow for developing these prototype district models is established. Stakeholders and potential users of the prototype district models provided technical feedback. The specifications of the selected high priority districts were defined and documented in a scorecard format. An example prototype district model was implemented with the URBANopt platform workflows. A case study was performed to demonstrate the model application.

building energy modeling↗

A Process for Defining Prototype Building Models: Courthouse Case Study for U.S. Commercial Energy

Buildings currently consume 36% of the world’s energy and contribute nearly 40% of CO 2 emissions. Many countries desire to generate virtual models of their nation’s buildings in order to coordinate research activities and inform market opportunities for a more sustainable built environment. The United States Department of Energy uses a suite of Commercial Prototype Building Models, which currently includes 16 building types and covers 80% of US commercial floorspace. Efforts are underway to expand this suite by developing prototype models for additional building types. In this paper, we outline a systematic approach to defining the building, collecting relevant information and creating a flexible model while doing so in the pragmatic context of a courthouse building. Informed by building design guides, databases, documented projects and inputs from courthouse design experts, we define a small, 69,324 ft 2 (6440 m 2 ), four-courtroom, low-rise courthouse as the prototype to represent an average-size courthouse in the US. We present building characteristics relevant for energy model development and provide the rationale for their selection. These details combined with climate- and construction-vintage-specific requirements for the building envelope and systems from building standards will be used for developing the courthouse model for the Commercial Prototype Building Models suite. The comprehensive information presented will also guide model modification to capture the dynamics of smaller or larger courthouses more accurately for building or system size-specific research.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance of a Prototype Heliostat Having a Twisting Mechanism to Maintain Focus Throughout the Day

A prototype heliostat has been designed and built with a rectangular reflector whose shape is altered automatically through the day, to maximize concentration at the receiver. The shape changes needed to form solar disc images, which give the highest possible concentration, can be realized by twisting the reflector from its corners, provided that a target-oriented, dual-axis mount is used. Then a cam mechanism connected to the second (cross) axis drive, turning with the angle of incident sunlight, may be used to twist the reflector as needed. Our prototype reflector comprises a single glass mirror, 2.4 m x 3.3 m, attached to a steel frame. Four diagonal back struts extend from the central mechanism out to the rectangular frame corners. The glass mirror of the prototype is attached to the steel frame by 58 screw actuators. Before twisting the frame, the glass shape is adjusted to the biconic shape needed to form a 1 m diameter disc image on a 113 m distant target when sunlight is incident at 60°. To form disc images over the full range of angles of incidence from 0° (normal incidence) to 70°, the struts push the corners up and down by up to 17 mm. A reflectometry metrology system has been used to set the 58 adjustment screws for the initial shape to an accuracy of ≤ 0.6 mrad, and to measure the accuracy of the different twisted shapes. The prototype will be tested at NSTTF early next year.

14 SOLAR ENERGY↗

Development of Prototypical District-Scale Models: Preprint

The U.S. has set the climate goal to achieve net-zero greenhouse gas emissions by 2050. District-scale solutions, which include scale-specific opportunities for energy and emissions savings, can be investigated and implemented to help accelerate decarbonization and progress toward this goal. However, there is currently a lack of district-scale models of buildings and community energy systems that can be used to evaluate potential district-scale technologies and strategies across a range of representative community types. This initial work aims to define and develop prototype district models that can be adapted to support the planning, design, and operation of buildings and energy systems in districts considering the complexity and interactions of diverse building loads, weather impacts, distributed energy resources (e.g., PV, EV, electric and thermal energy storage), electric and thermal grid systems, and pricing signals. An overall workflow for developing these prototype district models is established. Stakeholders and potential users of the prototype district models provided technical feedback. The specifications of the selected high priority districts were defined and documented in a scorecard format. An example prototype district model was implemented with the URBANoptTM platform workflows. A case study was performed to demonstrate the model application.

district↗

Prototypes and system test stands for the Phase 1 upgrade of the CMS pixel detector

The CMS pixel phase-1 upgrade project replaces the current pixel detector with an upgraded system with faster readout electronics during the extended year-end technical stop of 2016/2017. New electronics prototypes for the system have been developed, and tests in a realistic environment for a comprehensive evaluation are needed. A full readout test stand with either the same hardware as used in the current CMS pixel detector or the latest prototypes of upgrade electronics has been built. The setup enables the observation and investigation of a jitter increase in the data line associated with trigger rate increases. This effect is due to the way in which the clock and trigger distribution is implemented in CMS. A new prototype of the electronics with a PLL based on a voltage controlled quartz crystal oscillator (QPLL), which works as jitter filter, in the clock distribution path was produced. With the test stand, it was confirmed that the jitter increase is not seen with the prototype, and also good performance was confirmed at the expected detector operation temperature ($-$20 °C).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Performance and results of the LBNE 35 ton membrane cryostat prototype

We report on the performance and commissioning of the first membrane cryostat to be used for scientific application. The Long Baseline Neutrino Experiment (LBNE) has designed and fabricated a membrane cryostat prototype in collaboration with Ishikawajima-Harima Heavy Industries Co., Ltd. (IHI). LBNE has designed and fabricated the supporting cryogenic system infrastructure and successfully commissioned and operated the first membrane cryostat. Original goals of the prototype are: to demonstrate the membrane cryostat technology in terms of thermal performance, feasibility for liquid argon and leak tightness; to demonstrate that we can remove all the impurities from the vessel and achieve the purity requirements in a membrane cryostat without evacuation; to demonstrate that we can achieve and maintain the purity requirements of the liquid argon using mol sieve and copper filters. The purity requirements of a large liquid argon detector such as LBNE are contaminants below 200 parts per trillion (ppt) oxygen equivalent. LBNE is planning the design and construction of a large liquid argon detector. This presentation will present requirements, design and construction of the LBNE 35 ton membrane cryostat prototype, and detail the commissioning and performance. The experience and results of this prototype are extremely important for the development of the LBNE detector.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

DESIGN, ANALYSIS AND TEST CONCEPT FOR PROTOTYPE CRYOLINE OF ITER

The ITER cryo-distribution and cryoline is a part of the in-kind supply for India. The design of the systems is in progress. The topology of torus and neutral beam cryoline is defined as six process pipes along with thermal shield at 80 K and outer vacuum jacket. In order to develop confidence in the concept and to establish the high level of engineering and manufacturing technology, a prototype testing has been proposed. The prototype test will be carried out on 1:1 model in terms of dimension. However, the mass flow rate of the supercritical helium at 4.5 K and gaseous helium at 80 K will be on a 1:10 scale. The prototype cryoline has been designed and analyzed for thermal, structural and hydraulic parameters. The objective of this prototype test is to verify mechanical behavior due to thermal stress and pressure force, thermal and hydraulic performances. The concept of test facility has been realized along with the Piping and Instrumentation (P and I) diagram, instrumentation, controls, data acquisition, 80 K helium generation system along with supply and return valve boxes and interfacing hardware. The design concept, methodology for analysis and results, as well as the test facility have been discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

CMS phase-2 DAQ and timing hub prototyping results and perspectives

This paper describes recent progress on the design of the DAQ and Timing Hub, or DTH, an ATCA (Advanced Telecommunications Computing Architecture) hub board intended for the phase-2 upgrade of the CMS experiment. Prototyping was originally divided into multiple feature lines, spanning all different aspects of the DTH functionality. The second DTH prototype merges all R&D and prototyping lines into a single board, which is intended to be the production candidate. Emphasis is on the process and experience in going from the first to the second DTH prototype, which included a change of the chosen FPGA as well as the integration of a commercial networking solution.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Quantity and management of spent fuel from prototype and research reactors in Germany

Within the scope of an R and D project (project identification number FKZ 02 S 8679) sponsored by BMBF (Federal Ministry of Education and Research), the current state of storage and management of fuel elements from prototype and research reactors was established, and an approach for their future storage/management was developed. The spent fuels from prototype and research reactors in Germany that require disposal were specified and were described in regard to their repository-relevant characteristics. As there are currently no casks licensed for disposal in Germany, descriptions of casks that were considered to be suitable were provided. Based on the information provided on the spent fuel from prototype and research reactors and the potential casks, a technical disposal concept was developed. In this context, concepts to integrate the spent fuel from prototype and research reactors into existing disposal concepts for spent fuel from German nuclear power plants and for waste from reprocessing were developed for salt and clay formations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗