Search NASA⌕ Search

SEARCH · Search NASA

Results for “reliability standards”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Observations on the Reliability of Rubidium Frequency Standards on Block 2/2A GPS Satellites

Currently, the block 2/2A Global Positioning System (GPS) satellites are equipped with two rubidium frequency standards. These frequency standards were originally intended to serve as the back-ups to two cesium frequency standards. As the constellation ages, the master Control Station is forced to initialize and increasing number or rubidium frequency standards. Unfortunately the operational use of these frequency standards has not lived up to initial expectations. Although the performance of these rubidium frequency standards has met and even exceeded GPS requirements, their reliability has not. The number of unscheduled outage times and the short operational lifetimes of the rubidium frequency standards compare poorly to the track record of the cesium frequency standards. Only a small number of rubidium frequency standards have actually been made operational. Of these, a large percentage have exhibited poor reliability. If this trend continues, it is unlikely that the rubidium frequency standards will help contribute to the navigation payload meeting program specification.

Dieter, Gary L.↗

Expert system verification and validation study. Delivery 3A and 3B: Trip summaries

Key results are documented from attending the 4th workshop on verification, validation, and testing. The most interesting part of the workshop was when representatives from the U.S., Japan, and Europe presented surveys of VV&T within their respective regions. Another interesting part focused on current efforts to define industry standards for artificial intelligence and how that might affect approaches to VV&T of expert systems. The next part of the workshop focused on VV&T methods of applying mathematical techniques to verification of rule bases and techniques for capturing information relating to the process of developing software. The final part focused on software tools. A summary is also presented of the EPRI conference on 'Methodologies, Tools, and Standards for Cost Effective Reliable Software Verification and Validation. The conference was divided into discussion sessions on the following issues: development process, automated tools, software reliability, methods, standards, and cost/benefit considerations.

French, Scott↗

Semiconductor Reliability Testing Data Management

iT2 Technologies is a startup developing analytical software and creating automated workflow environment in the area of big data in IC reliability. The main beneficiaries of the iT2 software will be the semiconductor companies as they will see significant savings in terms of time and cost. They will be able to efficiently perform the analysis of large amount of reliability data. A better standard of reliability and quality will also lead to the improvement in public safety in consumer, automotive, medical, and military applications. Smarter and thorough testing will reduce the risk of faulty hardware getting into the hands of the end users. The software is being developed and designed within the United States and will help keep the prominence of US in the cutting edge of high tech space. iT2 is establishing strong relations with its potential customers thanks to its key players being involved in this industry for the past several years and, thus, having a deep understanding of the market. The target clients will be all major semiconductor suppliers such as Intel, Qualcomm, Texas Instruments, OnSemi, and Broadcom and their customers including Apple, Cisco, IBM, HP, and Dell. The iT2 software will be used in a business-to-business environment for sharing engineering data and communicating results between these two classes of customers - some of which are participating in the beta testing of the iT2 software.

99 GENERAL AND MISCELLANEOUS↗

Challenges of Interpreting and Applying New IPC-J-STD-001 Cleanliness Standards in High-Reliability Applications

The electronics industry has rapidly and widely embraced the replacement of ROSE testing with an SIR-focused approach to testing for certification of a qualified manufacturing plan. These new cleanliness documentation standards, housed in IPC J-STD-001 Rev. H, have just begun to impact electronics manufacturers as design and production teams work through how to meet them. This research focuses on the particular challenges of applying these new standards in high-reliability product applications, through the lens of interpreting SIR test results and what they mean for process capability, repeatability and diagnosing a need for process changes. The experiments examined a variety of factors that influence SIR results and suggest areas where SIR test plans can be greatly improved.

Capen, William↗

Frequency shifts in a rubidium frequency standard due to coupling to another standard

Highly reliable timing system, such as used on board satellites, may incorporate a hot standby atomic clock besides the active one. RF couplings between them may affect the performance of the active clock. The effect of such couplings between two rubidium atomic clocks was investigated, and it was found that they will add an oscillatory term to the Allan Variance of the active clock, degrading its frequency stability, and that under certain circumstances they may also shift the active clock's operating frequency. These two effects are discussed in detail, and the level of isolation required to render them negligible is established.

Jaduszliwer, Bernardo↗

Choice of APCS for NPP Based on a Set of Reliability and Risk Criteria

The normative documents for calculating reliability and risk indices when designing and operating APCS are analyzed. The primary groups of standards concerning reliability and risk are examined. It is concluded that the basic criteria for choosing and validating the use of APCS equipment for NPPs need to be reexamined. A set of indices which are expedient for describing automation systems, validating the choice of structure, and using specifi c equipment is formulated on the basis of the analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparison of IC and MEMS packaging reliability approaches

This paper reviews the current status of IC and MEMS packaging technology with emphasis on reliability, compares the norm for IC packaging reliability evaluation and identifies challenges for development of reliability methodologies for MEMS, and finally, proposes the use of COTS MEMS in order to start generating statistically meaningful reliability data as a vehicle for future standardization of reliability test methodology for MEMS packaging.

microelectromechanical systems (MEMS) chip scale p↗

Considerations when Implementing Shift Work in Nuclear Operations

Many domestic and international nuclear facilities have processes that require personnel to work on some type of shift. Shift work has many different schedules such as night, morning, swing, and rotating shift. Some common shifts are DuPont, Pitman, and Panama. There are many psychological and physiological impacts to a person working shifts. These impacts can affect work performance, safety, and security within an organization. A well-established nuclear organization relies on a strong security culture that implements a trustworthiness or reliability program. The IAEA defines this type of program as individuals meeting the highest standards of reliability, trustworthiness, and physical and mental suitability. Psychological and physiological impacts that apply to a Trustworthiness Program are reliability (an individual’s ability to adhere to security and safety rules and regulations) and physical and mental suitability. If shift work isn’t properly implemented in Facility Operations, then several issues or human factors can arise. An employee that suffers from a poorly designed shift, gets overworked, or doesn’t have the proper rest period implemented, may suffer from shift work disorder, acute fatigue, or cumulative fatigue. Introducing fatigue into Facility Operations can have severe consequences to security, safety, production, and cost. Another challenge of shiftwork within a facility is laziness and complacency. Creating an atmosphere where the employee is willing to admit fatigue to his or her supervisor is a challenge. It is up to the organization to do the needed research on shift work and to implement the best shift for their facility and personnel.

Stockwell, Brandon↗

Gamma-ray bursts, supernovae Ia, and baryon acoustic oscillations: A binned cosmological analysis

Abstract Cosmological probes at any redshift are necessary to reconstruct consistently the cosmic history. Studying properly the tension on the Hubble constant, H0, obtained by supernovae type Ia (SNe Ia) and the Planck measurements of the cosmic microwave background radiation would require complete samples of distance indicators at any epoch. Gamma-ray bursts (GRBs) are necessary for the aforementioned task because of their huge luminosity that allows us to extend the cosmic ladder to very high redshifts. However, using GRBs alone as standard candles is challenging, because their luminosity varies widely. To this end, we choose a reliable correlation for GRBs with a very small intrinsic scatter: the so-called fundamental plane correlation for GRB afterglows corrected for selection biases and redshift evolution. We choose a well defined sample: the platinum sample, composed of 50 long GRBs. To further constrain the cosmological parameters, we use baryon acoustic oscillations (BAOs) given their reliability as standard rulers. Thus, we have applied GRBs, SNe Ia, and BAOs in a binned analysis in redshifts so that the GRB contribution is fully included in the last redshift bin, which reaches z = 5. We use the fundamental plane correlation (also known as the 3D Dainotti relation), together with SNe Ia and BAOs, to constrain H0 and the density matter today, ΩM. This methodology allows us to assess the role of GRBs combined with SNe Ia and BAOs. We have obtained results for H0 and ΩM using GRBs+SNe Ia+BAOs with better precision than SNe Ia alone for every bin, thus confirming the beneficial role of BAOs and GRBs added together. In addition, consistent results between GRBs+SNe Ia+BAOs are obtained when compared with SNe Ia+BAOs, showing the importance of GRBs since the distance ladder is extended up to z = 5 with a similar precision obtained with other probes without including GRBs.

Dainotti, Maria Giovanna↗

Implementation Requirements for Nasa Approved Workmanship Standards

This NASA technical standard provides uniform engineering and technical requirements for processes, procedures, practices, and methods that have been endorsed as standard for NASA facilities, programs, and projects, including requirements for selecting, applying, and designing hardware for manufacturability and reliability. This standard establishes NASA workmanship requirements, and clarifications, additions, and exceptions to requirements specified in NASA adopted industry consensus standards identified as required for use by NPR 8735.2, Hardware Quality Assurance Program Requirements for Programs and Projects

workmanship standards↗

Collective outflow from a small multiple stellar system

The formation of high-mass stars is usually accompanied by powerful protostellar outflows. Such high-mass outflows are not simply scaled-up versions of their lower-mass counterparts, since observations suggest that the collimation degree degrades with stellar mass. Theoretically, the origins of massive outflows remain open to question because radiative feedback and fragmentation of the accretion flow around the most massive stars, with M > 15 M {sub ☉}, may impede the driving of magnetic disk winds. We here present a three-dimensional simulation of the early stages of core fragmentation and massive star formation that includes a subgrid-scale model for protostellar outflows. We find that stars that form in a common accretion flow tend to have aligned outflow axes, so that the individual jets of multiple stars can combine to form a collective outflow. We compare our simulation to observations with synthetic H{sub 2} and CO observations and find that the morphology and kinematics of such a collective outflow resembles some observed massive outflows, such as Cepheus A and DR 21. We finally compare physical quantities derived from simulated observations of our models to the actual values in the models to examine the reliability of standard methods for deriving physical quantities, demonstrating that those methods indeed recover the actual values to within a factor of two to three.

79 ASTRONOMY AND ASTROPHYSICS↗

Improved time-domain accuracy standards for model gravitational waveforms

Model gravitational waveforms must be accurate enough to be useful for detection of signals and measurement of their parameters, so appropriate accuracy standards are needed. Yet these standards should not be unnecessarily restrictive, making them impractical for the numerical and analytical modelers to meet. The work of Lindblom, Owen, and Brown [Phys. Rev. D 78, 124020 (2008)] is extended by deriving new waveform accuracy standards which are significantly less restrictive while still ensuring the quality needed for gravitational-wave data analysis. These new standards are formulated as bounds on certain norms of the time-domain waveform errors, which makes it possible to enforce them in situations where frequency-domain errors may be difficult or impossible to estimate reliably. These standards are less restrictive by about a factor of 20 than the previously published time-domain standards for detection, and up to a factor of 60 for measurement. These new standards should therefore be much easier to use effectively.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Operation and Maintenance of PV Systems: Data Science, Analysis, and Standards

This effort improves the effectiveness and reduce uncertainty in O&M cost through four primary objectives/tasks: 1) institutionalize standards for reliability and availability reporting for large PV power plants; 2) bridge systemic O&M knowledge gaps around important topics affecting O&M; 3) characterize systemic failure modes and patterns and accelerate O&M experiential learning cycles using field data; and 4) establish a baseline understanding of UPVS O&M cost drivers. Key results of this effort include publication of IEC standards, published topical papers on O&M topics, training, and characterize field data for climate- and service-related patterns (additional details below). Integrating these results serves to reduce performance risk and facilitate improvement in the way solar projects are operated and maintained. Results are well received and two publications are among the most successful SETO publications at NREL ("Model of Operation and Maintenance Costs for Photovoltaic Systems with over 40,000 downloads and "Best Practices in Operation and Maintenance of PV Systems, 3rd Ed." with over 90,000 downloads).

14 SOLAR ENERGY↗