Search NASASearch

SEARCH · Search NASA

Results for “risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Long-term risk analysis associated with nuclear waste disposal in space

An assessment and verification of previous analytic results on the long term risk of earth reentry for hazardous payloads is presented. The two areas were studied: (1) stability of nominal, near-circular storage orbits in the regions between Venus and earth and between earth and Mars, and (2) probability of earth reentry for off-nominal planet-crossing orbits resulting from deployment system failures. In the first area, numerical integrations of the equations of motion are compared with stability predications based on secular perturbation theory. The agreement is good in terms of the heliocentric distances covered and the general behavior of the orbital history, although certain near-resonance situations can lead to difficulty. In the second area, a Monte Carlo simulation of orbital evolution is used and the results compared with Opik's analytic theory of planetary encounters and collision statistics, with data verified to within a close order-of-magnitude.

Friedlander, A. L.

System, cost, and risk analysis for access to space

This paper proposes the use of a new tool more quickly develop initial cost and risk estimates of alternative flight options for both single missions and the partnering of missions into a single space flight. this work is particularly useful for small missions that require low-cost opportunities for accessing space.

small payloads

Radiation-Related Risk Analysis for Atmospheric Flight Civil Aviation Flight Personnel

Human data on low dose rate radiation exposure and consequent effects are not readily available, and this fact generates groundtruth concerns for all risk assessment techniques for possible health effects induced by the space radiation environment, especially for long term missions like those foreseen now and in the near future. A large amount of such data may be obtained through civil aviation flight personnel cohorts, in the form of epidemiological studies on delayed health effects induced by the cosmic-ray generated atmospheric radiation environment, a high- LET low dose and low dose rate ionizing radiation with its typical neutron component, to which flight personnel are exposed all throughout their work activity. In the perspective of worldwide studies on radiation exposure of the civil aviation flight personnel, all the available results from previous studies on flight personnel radiation exposure have been examined in various ways (i.e. literature review, meta-analysis) to evaluate possible significant associations between atmospheric ionizing radiation environment and health risks, and to assess directions for future investigations. The physical characteristics of the atmospheric ionizing radiation environment make the results obtained for atmospheric flight personnel relevant for space exploration.

DeAngelis, G.

It Depends - An Overview of Probabilistic Risk Analysis Concepts

How do you understand the data and assumptions in your probabilistic analysis? The PRA analyst needs to understand the data and input assumptions to effectively communicate the system/mission's risks. The decision maker also needs to understand conservatisms and how to interpret uncertainty in the PRA results. Properties such as assumptions on the distributions, uncertainty, use of test data, and common cause modeling can be the subject of much discussion, but often are the leading drivers of a risk profile.

risk assessment

Risk Analysis Associated with Loss of Toxic Gases During Orion Landing and Recovery Operations

Mission, landing and recovery operations for the Orion crew module involve reentry into the Earth's atmosphere and the deployment of three Nomex parachutes to slow the descent before landing along the west coast of the United States. Orion may have residual fuel (hydrazine, N2H4) or coolant (ammonia, NH3) on board which are both highly toxic to crew in the event of exposure. These risks were evaluated using a first principles analysis approach through fluid dynamics modeling. Plume calculations were first performed with the ANSYS Fluent computational fluid dynamics code. Data were then extracted at locations relevant to crew safety such as the snorkel fan inlet and the egress hatch. Mixing calculations were performed to quantify exposure concentrations within the crew bay before and during egress and departure. Finally, results included herein were used to inform the Orion post-landing Concept of Operations (ConOps) so that strategies could be formulated to maintain crew safety in the event of the loss of fuel or coolant.

Orion

Risk analysis of earth return options for the Mars rover/sample return mission

Four options for return of a Mars surface sample to Earth were studied to estimate the risk of mission failure and the risk of a sample container breach that might result in the release of Martian life forms, should such exist, in the Earth's biosphere. The probabilities calculated refer only to the time period from the last midcourse correction burn to possession of the sample on Earth. Two extreme views characterize this subject. In one view, there is no life on Mars, therefore there is no significant risk and no serious effort is required to deal with back contamination. In the other view, public safety overrides any desire to return Martian samples, and any risk of damaging contamination greater than zero is unacceptable. Zero risk requires great expense to achieve and may prevent the mission as currently envisioned from taking place. The major conclusion is that risk of sample container breach can be reduced to a very low number within the framework of the mission as now envisioned, but significant expense and effort, above that currently planned is needed. There are benefits to the public that warrant some risk. Martian life, if it exists, will be a major discovery. If it does not, there is no risk.

Source record

Probabilistic Risk Analysis and Margin Process for a Flexible Thermal Protection System

Atmospheric entry vehicle thermal protection systems are margined due to the uncertainties that exist in entry aeroheating environments and the thermal response of the materials and structures. Entry vehicle thermal protections systems are traditionally over-margined for the heat loads that are experienced along the entry trajectory by designing to survive stacked worst-case scenarios. Additionally, the conventional heat shield design and margin process offers very little insight into the risk of over-temperature during flight and the corresponding reliability of the heat shield performance. A probabilistic margin process can be used to appropriately margin the thermal protection system based on rigorously calculated risk of failure. This probabilistic margin process allows engineers to make informed aeroshell design, entry-trajectory design, and risk trades while preventing excessive margin from being applied. This study presents the methods of the probabilistic margin process and how the uncertainty analysis is used to determine the reliability of the entry vehicle thermal protection system and associated risks of failure.

Tobin, Steven A.

Integrated Hybrid System Architecture for Risk Analysis

A conceptual design has been announced of an expert-system computer program, and the development of a prototype of the program, intended for use as a project-management tool. The program integrates schedule and risk data for the purpose of determining the schedule applications of safety risks and, somewhat conversely, the effects of changes in schedules on changes on safety. It is noted that the design has been delivered to a NASA client and that it is planned to disclose the design in a conference presentation.

Moynihan, Gary P.

PROBABALISTIC RISK ANALYSIS AND THERMAL MARGIN PROCESS FOR AN INFLATABLE AEROSHELL

Atmospheric entry vehicle thermal protection systems (TPS) are margined due to the uncertainties that exist in entry aeroheating environments and the thermal response of the materials and structures. Traditional approaches typically over-margin TPS and offer very little insight into the risk of over-temperature during flight. A probabilistic margin process can be used to apply thermal margin to an aeroshell based on a rigorously calculated risk of failure. This probabilistic margin process allows engineers to make informed aeroshell design, entry-trajectory modifications, and risk trades while preventing excessive margin from being applied. This methodology can also be applied to other TPS applications, hot structures, and other engineering disciplines.

Steven A Tobin

Probabalistic Risk Analysis and Thermal Margin Process for an Inflatable Aeroshell

Uncertainties always exist in atmospheric entry aeroheating environments and the thermal response of thermal protection system (TPS) material. These uncertainties are mitigated in the design by ap-plying margin and factors of safety to the TPS. Entry vehicle TPS is often conservatively over-sized for the heat loads that are experienced along the entry trajectory by stacking worst-case scenarios together. Additionally, the current TPS design and margin process used by NASA offers very little insight into the risk of over-temperature during flight and the reliability of the heat shield performance [1,3]. A probabilistic margin process can be used to calculate the amount of TPS margin necessary to survive a given entry heat load at a specified level of risk [2,3,4]. The vehicle’s initial entry state (entry velocity, flight path angle, and entry mass) determines the expected atmospheric entry environmental conditions and resulting heat load that the entry vehicle will experience. If there is flexibility in the entry state, then this process can be used to select an appropriate combination of entry state parameters and TPS size to target a desired reentry reliability. This probabilistic margin process allows engineers to make informed aeroshell design, entry-trajectory design, and TPS performance risk trades while preventing excessive TPS margin from being applied. The probabilistic TPS margin process has been performed to determine TPS thickness and entry heating constraints given an acceptable risk level for the Low Earth Orbit Flight Experiment of an Inflatable Decelerator (LOFTID) flight project. The process is used in a manner to size the entry heat load for a given flexible TPS (FTPS) thickness so that it meets project reliability standards while allowing the FTPS and the underlying inflatable structure (IS) to be pushed to adequately high temperatures. Since the LOFTID project is an experimental flight demonstration, it is de-sired to drive the FTPS and IS to temperatures that cover a large range of their thermal response models’ applicability. This will allow the thermal response models to be better improved and validated post-flight using LOFTID’s extensive instrumentation embedded within the aeroshell. The presentation demonstrates how uncertainty analysis is carried out using an end-to-end Monte Carlo process where three separate Monte Carlo simulations are run in sequence. The first Monte Carlo simulation operates on the entry trajectory model to generate trajectory parameter dispersions that are fed into the second Monte Carlo simulation. The second Monte Carlo simulation operates on the aerothermodynamics model to generate aeroheating parameter dispersions that are fed into the third Monte Carlo simulation. The third Monte Carlo simulation operates on the FTPS material thermal response model to generate the final FTPS/IS thermal response dispersions. The end-to-end Monte Carlo simulation propagates the uncertainties of each model into the next to quantify the resulting uncertainty of the FTPS/IS thermal response. The fractional contributions of the uncertain parameters in the trajectory, aerothermal, and thermal response models to the variance in the FTPS/IS thermal response is determined as a byproduct of the Monte Carlo analysis. The structural uncertainty of the FTPS thermal response model is evaluated by flight relevant ground testing and model error analysis using test measurements. This probabilistic TPS margin process had never been applied to an entry vehicle and it is one of the LOFTID project’s goals to demonstrate its merits.

Steven A. Tobin

Risk Analysis

A National Academies panel says the Hubble Space Telescope is too valuable ;or gamblingon a long-shot robotic mission to extend its service life, and urges Directly contradicting Administrator Sean O'Keefe, who killed a planned fifth shuttle servicing mission to the telescope on grounds it was too dangerous for a human crew in the post-Challenger environment, the expert committee found that upgrades to shuttle safety actually should make it less hazardous to fly to the telescope than it was before Columbia was lost. Risks of a telescope-servicing mission are only marginally greater than the planned missions to the International Space Station (ISS) O'Keefe has authorized, the panel found. After comparing those risks to the dangers inherent in trying to develop a complex space robot in the 39 months remaining in the Hubble s estimated service life, the panel opted for the human mission to save one of the major achievements of the American space program, in the words of Louis J. Lanzerotti, its chairman.

Morring, Frank, Jr.

REFSafE: A RAG-Enabled Framework for Predictive Risk Analysis and Automated Safety Report Generation in Mission-Critical Environments

Operational safety in mission-critical environments requires AI systems that are accurate, interpretable, and resistant to hallucination. We present an agentic Retrieval-Augmented Generation (RAG) framework, REFSafe, for grounded hazard analysis and automated safety report generation. The system integrates Large Language Models (LLMs) with structured operational data, historical incident repositories, policy documents, and external authoritative sources. Through iterative agentic reasoning, the framework retrieves, verifies, and synthesizes evidence prior to generation, enforcing citation-backed outputs with explicit source attribution (documents, links, and prior events) to ensure traceability and trust. To mitigate hallucinations and unsupported claims, all risk assessments and forecasts are constrained to retrieved evidence, with confidence signals derived from retrieval relevance and source consistency. A transparent pipeline enables subject matter experts (SMEs) to validate predictions, and provide structured feedback, forming a continuous performance calibration loop. Preliminary deployment demonstrates improved reliability in hazard detection and safety/vulnerability report generation. This work advances trustworthy, evidence-grounded AI for predictive safety intelligence in mission-critical operations.

Das, Sanjay [ORNL] (ORCID:0009000542591915)

Collision Avoidance Short Course: Conjunction Assessment Risk Analysis - NASA Robotic CARA: Theory - Part I:

Satellite conjunction assessment is perhaps the fastest growing area in space situational awareness and protection with military, civil and commercial satellite owner-operators embracing more and more sophisticated processes to avoid the avoidable - namely collisions between high value space assets and orbital debris. NASA and Centre National d'Etudes Spatiales (CNES) have collaborated to offer an introductory short course on all the major aspects of the conjunctions assessment problem. This half-day course will cover satellite conjunction dynamics and theory. Joint Space Operations Center (JsPOC) conjunction data products, major risk assessment parameters and plots, conjunction remediation decision support, and present and future challenges. This briefing represents the NASA portion of the course.

Conjunction

Probabilistic risk analysis of flying the space shuttle with and without fuel turbine discharge temperature redline protection

An exact mathematical model is presented of the Space Shuttle Main Engine computer voting logic in the presence of High Pressure Fuel Turbine (HPFT) overtemperature events and fuel turbine temperature sensor failures. The model provides estimates of the probability of erroneous engine shutdown and the probability of not detecting a HPFT overtemperature event. Because it is believed that the likelihood of sensor failures and overtemperature events in the HPFT greatly overshadows those in the High Pressure Oxygen Turbine (HPOT), this modeling effort focused on the HPFT. However, because the redline protection logic is the same for both turbines, estimation of the model parameters using relevant HPOT data would provide estimates of the risk of erroneous engine shutdown and an undetected overtemperature event in the HPOT. Because of the complexity of the model, it was necessary to program the solution which thus makes it feasible to accommodate a changing data base. This is considered to be of great interest because of the subjective nature in determining the relevancy of certain failures and the fact that the data base is constantly changing as a result of the frequent engine tests.

Howell, Leonard

Risk Analysis of On-Orbit Spacecraft Refueling Concepts

On-orbit refueling of spacecraft has been proposed as an alternative to the exclusive use of Heavy-lift Launch Vehicles to enable human exploration beyond Low Earth Orbit (LEO). In these scenarios, beyond LEO spacecraft are launched dry (without propellant) or partially dry into orbit, using smaller or fewer element launch vehicles. Propellant is then launched into LEO on separate launch vehicles and transferred to the spacecraft. Refueling concepts are potentially attractive because they reduce the maximum individual payload that must be placed in Earth orbit. However, these types of approaches add significant complexity to mission operations and introduce more uncertainty and opportunities for failure to the mission. In order to evaluate these complex scenarios, the authors developed a Monte Carlo based discrete-event model that simulates the operational risks involved with such strategies, including launch processing delays, transportation system failures, and onorbit element lifetimes. This paper describes the methodology used to simulate the mission risks for refueling concepts, the strategies that were evaluated, and the results of the investigation. The results of the investigation show that scenarios that employ refueling concepts will likely have to include long launch and assembly timelines, as well as the use of spare tanker launch vehicles, in order to achieve high levels of mission success through Trans Lunar Injection.

Cirillo, William M.

Impact of Non-Gaussian Error Volumes on Conjunction Assessment Risk Analysis

An understanding of how an initially Gaussian error volume becomes non-Gaussian over time is an important consideration for space-vehicle conjunction assessment. Traditional assumptions applied to the error volume artificially suppress the true non-Gaussian nature of the space-vehicle position uncertainties. For typical conjunction assessment objects, representation of the error volume by a state error covariance matrix in a Cartesian reference frame is a more significant limitation than is the assumption of linearized dynamics for propagating the error volume. In this study, the impact of each assumption is examined and isolated for each point in the volume. Limitations arising from representing the error volume in a Cartesian reference frame is corrected by employing a Monte Carlo approach to probability of collision (Pc), using equinoctial samples from the Cartesian position covariance at the time of closest approach (TCA) between the pair of space objects. A set of actual, higher risk (Pc >= 10 (exp -4)+) conjunction events in various low-Earth orbits using Monte Carlo methods are analyzed. The impact of non-Gaussian error volumes on Pc for these cases is minimal, even when the deviation from a Gaussian distribution is significant.

Ghrist, Richard W.