Search NASA⌕ Search

SEARCH · Search NASA

Results for “sequencing test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence 9 - Raw Data

Sequences 8 and 9: Downwind Sonics (F,P) and Downwind Sonics Parked (P) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 25 m/s. Yaw angles of 0° to 60° were achieved. The blade tip pitch was 3°. The rotor rotated at 72 RPM during Sequence 8, but it was parked during Sequence 9. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. Sonic anemometers were mounted on a strut downwind of the turbine. The strut was mounted to the T-frame, which was rotated to align the anemometers aft of the 9% and 49% radius locations at hub height. Because of this configuration, the tunnel balance data are considered invalid. Sequence 9 was designed to compare the downwind sonic anemometer readings with the upwind sonic anemometers without interference from the turbine. The rotor was parked with the instrumented blade at 0° azimuth. All pressure measurements obtained in Sequence 9 are invalid because sufficient time for temperature stabilization did not occur, thus all associated data values were flagged as not applicable by setting the measured values in the data file to 0.0000 Pa. This test is further described in Appendix G.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence N - Raw Data

Sequence N: Sin AOA, Rotating (P) This sequence was designed to quantify the blade 3-D unsteady aerodynamic response in the presence of rotational influences by varying blade pitch angle. Test sequence N used an upwind, rigid turbine with a 0° cone angle. The wind speed was 15 m/s, and the yaw angle was 0° throughout the sequence. The rotor rotated at 72 RPM. Blade and probe pressure measurements were collected. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. Sinusoidal angle-of-attack histories were designed to emulate 2-D S809 dynamic data obtained at the Ohio State University (OSU) wind tunnel (Reuss Ramsey et al. 1995) and the 1P yawed flow angle-of-attack variations the turbine could be expected to encounter in routine operation. The reduced frequency (K), mean angle of attack (αm), and oscillation amplitude (αω) were computed for each of the five primary span locations. The file lengths varied according to the time required to complete 40 oscillations at the specified frequency. The file name convention used the sequence designation N, followed by two digits for the span location (30, 47, 63, 80, or 95), followed by two digits representing the condition specified in the test matrix, followed by the repetition digit. Due to time constraints, most of the test conditions corresponding to the 63% span location were eliminated. Test points with a static pitch angle of 3° were collected throughout the sequence to ascertain instrumentation fidelity.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence O - Raw Data

Sequence O: Sin AOA, Parked (P) This sequence was designed to quantify the blade 3-D unsteady aerodynamic response in the absence of rotational influences by varying blade pitch angle. This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 18.9 m/s to 39.3 m/s, and the yaw angle was 0° throughout the sequence. The rotor was parked with the instrumented blade fixed at 0° azimuth, and the rotor lock was installed (see Appendix A). Blade and probe pressure measurements were collected. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to -99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. Sinusoidal angle-of-attack histories were designed to emulate 2-D S809 dynamic data obtained at the OSU wind tunnel (Reuss Ramsey et al. 1995) as well as 1P yawed flow angle-of-attack variations the turbine could be expected to encounter in routine operation. The reduced frequency (K), mean angle of attack (αm), and oscillation amplitude (αω) were computed for each of the five primary span locations. The file lengths varied according to the time required to complete 40 oscillations at the specified frequency. The file name convention used the sequence designation O, followed by two digits for the span location (30, 47, 80, or 95), followed by two digits representing the condition specified in the test matrix, followed by the repetition digit. Due to time constraints, the test conditions corresponding to the 63% span location were eliminated. Test points with a static pitch angle of 3° were collected throughout the sequence to ascertain instrumentation fidelity.

17 WIND ENERGY↗

Technology development and demonstration of a low thrust resistojet thruster

Three thrusters were fabricated to definitized thruster drawings using new rhenium vapor deposition technology. Two of the thrusters were operated using ammonia as propellant and one was operated using hydrogen propellant for performance determination. All demonstrated consistent operational specific impulse performance while demonstrating thermal performance better than the development units from which they evolved. Two of the thrusters were subjected to environmental structural testing including vibration, acceleration and shock loading to specifications. Both of the thrusters subjected to the environmental tests passed all required tests. The third, spare, thruster was introduced into the life test portion of the program. Two thrusters were then subjected to a life cycling test program under typical spacecraft operating power levels. During the life test sequence, the hydrogen thruster accrued 720 operating life test cycles, more than 370 on-off cycles and 365 hours of powered up time. The ammonia accrued approximately 380 on-off cycles and 392.2 on time hours of operation during the 720 cycling hour test. Both thrusters completed the scheduled operational life test in reasonably good condition, structurally integral and capable of indefinite further operation.

Pfeifer, G. R.↗

Continuation of surge life of transient voltage suppressor

Efforts expended in testing, analyzing and the development of a meaningful definition of the mean number of peak pulses before failure (mp2bf) levels of a family of transient voltage suppressor devices were documented. Tests were done to determine the ability of the transient suppressor to effectively and reliably protect against severe short term, millisecond range, and transient voltages of the types resulting from inductive load switching and induced lightning. Existing pulse testing instrumentation was utilized, interfaced to an automatic sequencing test rack accommodating up to 50 devices. Tests were performed in step stress increments of 25% beginning at 25% and extending thru 100% rated I(pp) for each voltage category. The four voltage types test were the 6.8V, 33V, 91V, and 190V. Engineering efforts addressed the problem of improving the reliability of the 190V types.

Clark, O. M.↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence Q - Raw Data

Sequence Q: Dynamic Inflow (P) This sequence was designed to characterize the dynamic inflow variation using the five-hole probes that extend upwind of the leading edge of the blade. This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speeds ranged from 5 m/s to 15 m/s, and data were collected at a 0° yaw angle. The rotor rotated at 72 RPM. Blade and probe pressure measurements were collected. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to -99999.99 Nm. The teeter link load cell was pretensioned to 40,000 N. The blade pitch angle was changed from the initial tip pitch angle to the final tip pitch angle at the maximum rate of 67°/s. This angle was maintained for the specified delay time duration. Then the blade was pitched back to the initial pitch angle and held for the specified hold time. This was repeated 20 times. The campaign at 15 m/s was aborted early due to excessive low-speed shaft torque loads. The file length varied depending on the time required to obtain 20 pitch cycles for the specified range of angles. The name convention was the standard format, except for the short campaigns collected to ascertain the functionality of the instrumentation. These points were collected at a 3° pitch angle and use the characters REF in the four digits that normally represent yaw angle.

17 WIND ENERGY↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: AMSU-A1 EOS Instrument, (S/N 202) Qualification Level Vibration Tests of August/September 1998, (S/O 565632, OC-417) Plus Addendum A

The purpose of this report is to present a qualification level vibration testing performed on the S/N 202, EOS AMSU-A1 Instrument was vibration tested to qualification levels per the Ref. 1 shop order. The instrument withstood the 8 g sine sweep test, the 7.5 Grms random vibration test, and the 18.75 g sine burst test in each of the three orthogonal axes. Some loss of transmissibility, however, is seen in the lower reflector after Z-axis random vibration. The test sequence was not without incidence. Failure of Channel 7 in the Limited Performance Test (LPT) performed after completion of the 1 st (X-axis) axis vibration sequence, required replacement of the DRO and subsequent re-testing of the instrument. The post-vibration comprehensive performance test (CPT) was successfully run after completion of the three axes of vibration with the replacement component installed in the instrument. Passing the CPT signified the successful completion of the S/N 202 A1 qualification vibration testing.

Heffer, R.↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence L - Raw Data

Sequence L: Step AOA, Parked (P) This sequence was designed to quantify the 3-D blade static angle-of-attack response in the absence of rotational influences by varying the blade pitch angle. This test sequence used an upwind, rigid turbine with a 0° cone angle. Wind speeds of 20 m/s and 30 m/s were used, and all data were collected at a yaw angle of 0°. The rotor was parked with the instrumented blade fixed at 0° azimuth, and the rotor lock was installed (see Appendix A). Blade and probe pressure measurements were collected. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to -99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. The blade pitch angle ramped continuously at 0.18°/s over a wide range of increasing and decreasing pitch angles. A step sequence was also performed. The blade pitch was stepped 5°, the flow was allowed to stabilize, and the pitch angle was held for 8 seconds. Then the pitch angle step was repeated. Again, a wide range of pitch angles was obtained, both increasing and decreasing. The file lengths for this sequence varied from 5 to 10 minutes, depending on the pitch angle range. The file name convention used the initial letter L followed by two digits specifying wind speed, followed by 00 for yaw angle, followed by RU, RD, or ST, followed by the repetition digit. The angle-of-attack motion was differentiated by RU (ramp up), RD (ramp down), and ST (step down, then step up). This sequence is related to sequences K and R.

17 WIND ENERGY↗

Permanent and separable aerospace tubing/ fitting evaluation program, volume 1

The tube fitting evaluation program was conducted to develop a standard overall test program including methods, procedures, and equipment as well as recommended test sequences for qualifying fitting/tubing assemblies. The program consisted of testing the MS flareless (separable) fitting and utilizing the results as baseline data from which all other fittings will be evaluated. Five separable designs and five permanent designs were tested in three sizes with two types of tubing materials. The basic design requirements were 4,000 psi operating pressure within the temperature range of minus 65 F to plus 450 F while also being compatible with 21-6-9 and titanium 3Al-2.5V tubing alloys.

Ursell, C. R.↗

Acceptance and qualification test results of the 20 km electromechanical tether for TSS-1

Acceptance and qualification tests have been performed on the TSS-1 flight tether and its associated qualification tether. Acceptance testing during production included periodic measurement of conductor resistance, off-line breakstrength tests on strength member samples, continuous measurement of the insulation layer voltage withstand capability, and a continuous mechanical proof-loading procedure during the tether jacketing operation. The qualification test sequence consisted of thermal vacuum, voltage withstand and breakstrength tests on samples taken from the production runs for both the qualification and flight tethers. This paper will analyze the acceptance and qualification test data, respectively. Results indicate that the completed flight tether exceeds the design requirements for the TSS-1 mission.

Marshall, L. S.↗

Thermal verification testing of commercial printed-circuit boards for spaceflight

A method developed to verify commercial printed-circuit boards for a Shuttle orbital flight is discussed. The test sequence is based on early fault detection, desire to test the final assembly, and integration with other verification testing. A component thermal screening test is performed first to force flaws in design, workmanship, parts, processes, and materials into observable failures. Temperature definition and vibration tests are performed next. Final assembly testing is performed to simulate the Shuttle flight. An abbreviated thermal screening test is performed as a check after the vibration test, and then a complete thermal operational test is performed. The final assembly test finishes up with a burn-in of 100 h of trouble-free operation. Verification is successful when all components and final assemblies have passed each test. This method was very successful in verifying that commercial printed-circuit boards will survive in the Shuttle environment.

Foster, William M., II↗

Post-test data report for the space shuttle full-scale AFRSI sequence of environments test (OS-305-1 to -5) in the NASA/Ames Research Center 11x11-foot wind tunnel

The Advanced Flexible Reusable Surface Insulation (AFRSI) test article was wind tunnel tested. The AFRSI was exposed to a simulated ascent airloads environment and data was obtained which could be used to support the AFRSI certification program. The AFRSI sequence of environments also included radiant heating (1500 degrees Fahrenheit) and wind/rain environments. The test article was wind/rain conditioned before each wind tunnel entry and was thermally conditioned after each wind tunnel entry. The AFRSI failed and the test was aborted before reaching the ascent environment. The AFRSI test article sequentially exposed to 50 wind/rain and 49 simulated entry thermal missions, as well as four wind tunnel entries equivalent to 40 ascent missions.

Marshall, B. A.↗

Solar Airplanes and Regenerative Fuel Cells

A solar electric aircraft with the potential to "fly forever" has captured NASA's interest, and the concept for such an aircraft was pursued under Aeronautics Environmental Research Aircraft and Sensor Technology (ERAST) project. Feasibility of this aircraft happens to depend on the successful development of solar power technologies critical to NASA's Exploration Initiatives; hence, there was widespread interest throughout NASA to bring these technologies to a flight demonstration. The most critical is an energy storage system to sustain mission power during night periods. For the solar airplane, whose flight capability is already limited by the diffuse nature of solar flux and subject to latitude and time of year constraints, the feasibility of long endurance flight depends on a storage density figure of merit better than 400-600 watt-hr per kilogram. This figure of merit is beyond the capability of present day storage technologies (other than nuclear) but may be achievable in the hydrogen-oxygen regenerative fuel cell (RFC). This potential has led NASA to undertake the practical development of a hydrogen-oxygen regenerative fuel cell, initially as solar energy storage for a high altitude UAV science platform but eventually to serve as the primary power source for NASAs lunar base and other planet surface installations. Potentially the highest storage capacity and lowest weight of any non-nuclear device, a flight-weight RFC aboard a solar-electric aircraft that is flown continuously through several successive day-night cycles will provide the most convincing demonstration that this technology's widespread potential has been realized. In 1998 NASA began development of a closed cycle hydrogen oxygen PEM RFC under the Aeronautics Environmental Research Aircraft and Sensor Technology (ERAST) project and continued its development, originally for a solar electric airplane flight, through FY2005 under the Low Emissions Alternative Power (LEAP) project. Construction of the closed loop system began in 2002 at the NASA Glenn Research Center in Cleveland, Ohio. System checkout was completed, and testing began, in July of 2003. The initial test sequences were done with only a fuel cell or electrolyzer in the test rig. Those tests were used to verify the test apparatus, procedures, and software. The first complete cycles of the fully closed loop, regenerative fuel cell system were successfully completed in the following September. Following some hardware upgrades to increase reactant recirculation flow, the test rig was operated at full power in December 2003 and again in January 2004. In March 2004 a newer generation of fuel cell and electrolyzer stacks was substituted for the original hardware and these stacks were successfully tested at full power under cyclic operation in June of 2004.

Bents, David J.↗

Space Launch System Core Stage Green Run Base Heating: Anomaly, Mitigation and Flight Redesign

The NASA Space Launch System (SLS) vehicle is composed of four RS-25 liquid oxygen and hydrogen rocket engines in the Core Stage (CS). The SLS Core Stage went through Green Run hot-fire testing at NASA Stennis Space Center’s B-2 test facility in 2021. The main goal of this testing was to confirm Core Stage tanking, propulsion and thrust vector control systems operations and performance to verify with predicted models. Two hot-fire (HF) test sequences were performed with the first one (HF1) in January for a test duration of 70 seconds and the second (HF2) testing completed in March for a test duration of 500 seconds. This paper focuses on the base heating anomalies observed during HF1 and HF2 where an extensive fire was observed along the Core Stage base heat shield during test operations. This environment was not anticipated and led to extensive unplanned damage to the thermal protection system which was augmented for flight. Green Run observations also led to a reassessment of flight environments for Artemis I. This paper discusses the potential cause of the anomalies, the flow physics, the reconstructed base environments, and mitigation plans for HF2 and flight.

aerothermodynamics↗

Space Launch System Core Stage Green Run Base Heating: Anomaly, Mitigation and Flight Redesign

The NASA Space Launch System (SLS) vehicle is composed of four RS-25 liquid oxygen and hydrogen rocket engines in the Core Stage (CS). The SLS Core Stage went through Green Run hotfire testing at NASA Stennis Space Center’s B-2 test facility in 2021. The main goal of this testing was to confirm Core Stage tanking, propulsion and thrust vector control systems operations and performance to verify with predicted models. Two hot-fire (HF) test sequences were performed with the first one (HF1) in January for a test duration of 70 seconds and the second (HF2) testing completed in March for a test duration of 500 seconds. This paper focuses on the base heating anomalies observed during HF1 and HF2 where an extensive fire was observed along the Core Stage base heat shield during test operations. This environment was not anticipated and led to extensive unplanned damage to the thermal protection system which was augmented for flight. Green Run observations also led to a reassessment of flight environments for Artemis I. This paper discusses the potential cause of the anomalies, the flow physics, the reconstructed base environments, and mitigation plans for HF2 and flight.

aerothermodynamics↗

Advancing reliability assessments of photovoltaic modules and materials using combined-accelerated stress testing

Previously undiscovered failure modes in photovoltaic (PV) modules continue to emerge in field installations despite passing protocols for design qualification and quality assurance. Failure to detect these modes prior to widespread use could be attributed to the limitations of present-day standard accelerated stress tests (ASTs), which are primarily designed to identify known degradation or failure modes at the time of development by applying simultaneous or sequential stress factors (usually two at most). Here, we introduce an accelerated testing method known as the combined-accelerated stress test (C-AST), which simultaneously combines multiple stress factors of the natural environment. Simultaneous combination of multiple stress factors allows for improved identification of failure modes with better ability to detect modes not known a priori. A demonstration experiment was conducted that reproduced the field-observed cracking of polyamide- (PA-) and polyvinylidene fluoride (PVDF)–based backsheet films, a failure mode that was not detected by current design qualification and quality assurance testing requirements. In this work, a two-phase testing protocol was implemented. The first cycle (“Tropical”) is a predominantly high-humidity and high-temperature test designed to replicate harsh tropical climates. The second cycle (“Multi-season”) was designed to replicate drier and more temperate conditions found in continental or desert climates. Testing was conducted on 2 × 2-cell crystalline-silicon cell miniature modules constructed with both ultraviolet (UV)–transmitting and UV-blocking encapsulants. Cracking failures were observed within a cumulative 120 days of the Tropical condition for one of the PA-based backsheets and after 84 days of Tropical cycle followed by 42 days of the Multi-season cycle for the PVDF-based backsheet, which are both consistent with failures seen in fielded modules. In addition to backsheet cracking, degradation modes were observed including solder/interconnect fatigue, various light-induced degradation modes, backsheet delamination, discoloration, corrosion, and cell cracking. The ability to simultaneously apply multiple stress factors may allow many of the test sequences within the standardized design qualification procedure to be performed using a single test setup.

14 SOLAR ENERGY↗

Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program

The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.

Hartwell, T.↗

Extended life testing evaluation of complementary MOS integrated circuits

The purpose of the extended life testing evaluation of complementary MOS integrated circuits was twofold: (1) To ascertain the long life capability of complementary MOS devices. (2) To assess the objectivity and reliability of various accelerated life test methods as an indication or prediction tool. In addition, the determination of a suitable life test sequence for these devices was of importance. Conclusions reached based on the parts tested and the test results obtained was that the devices were not acceptable.

Brosnan, T. E.↗