Search NASA⌕ Search

SEARCH · Search NASA

Results for “solar array deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Design and Early In-flight Performance of the Tropical Rainfall Measuring Mission (TRMM) Power Subsystem

Maryland built the spacecraft in-house with four U.S. instruments and one Japanese instrument, the first space flown Precipitation Radar (PR). The TRMM Observatory was successfully launched from Tanegashima Space Center in Japan on an H-2 Expendable Launch Vehicle on November 27, 1997. This paper presents an overview of the TRMM Power System including its design, testing, and in flight performance for the first 70 days. Finally, key lessons learned are presented. The TRMM power system consists of an 18.1 square meter deployed solar array fabricated by TRW with Tecstar GaAs/Ge cells, two (2) Hughes 50 Ampere-Hour (Ah) Super NiCd' batteries, each with 22 Eagle-Picher cells, and three (3) electronics boxes designed to provide power regulation, battery charge control, and command and telemetry interface.

Moran, Vickie Eakin↗

Validation of Lithium-ion cell technology for JPL's 2003 Mars Exploration Rover Mission

n early 2004 JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling >300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20 C to +40 C), withstanding long storage periods (e.g., cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the viability of Lithium-ion technology to meet these stringent requirements, a comprehensive test program was implemented aimed at demonstrating the performance capability of prototype cells fabricated by Lithion, Inc. (Yardney Technical Products, Inc.). The testing performed includes, determining the (a) room temperature cycle life, (b) pulse capability as a function of temperature, (e) self-discharge and storage characteristics mission profile capability, (f) cycle life under mission simulation conditions, (g) impedance characteristics, (h) impact of cell orientation, and (i) performance in 8-cell engineering batteries. As will be discussed, the Lithium-ion prototype cells and batteries were demonstrated to meet, as well as, exceed the requirements defined by the mission.

2003 Mars Exploration Rover (MER)↗

Ground testing of the Li-ion batteries in support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20(deg)C to +4O(deg)C), withstand long storage periods (e.g., cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the viability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit (RBAU), consisting of two 8-cell 8 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The testing performed includes, (a) performing initial characterization tests (discharge capacity at different temperatures), (b) simulating the launch conditions, (c) simulating the cruise phase conditions (including trajectory corrections), (d) simulating the entry, decent, and landing pulse load profile (if required to support the pyros) (e) simulating the Mars surface operation mission simulation conditions, as well as, (f) assessing performance capacity loss and impedance characteristics as a function of temperature and life. As will be discussed, the lithium-ion batteries (fabricated by LithiodYardney, Inc.) were demonstrated to far exceed the requirements defined by the mission, and are projected to support an extended mission (> 2 years) with margin to spare.

Li-ion batteries↗

An Update of the Ground Testing of the Li-ion Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration (>9 months), both Rovers are equipped with rechargeable Lithium-ion batteries, which have enabled operation for over 854 and 834 Sols of operation, respectively, to date. Given that the batteries were required to support the mission for 90 Sols of operation by design, it is significant that the batteries have demonstrated over a nine fold increase in life over mission objectives. In addition to supporting the surface operations in conjunction with a triple-junction deployable solar arrays, the batteries were designed to aid in the launch and the EDL pyros, and allow for anomalies during cruise. In summary, the requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20 C to +30 C), withstand long storage periods (e.g., cruise period), operate in an inverted orientation, and support high current pulses (e.g., firing pyro events). In order to determine the viability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit (RBAU), consisting of two 8-cell 10 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The testing includes, (a) performing initial characterization tests (discharge capacity at different temperatures), (b) simulating the launch conditions, (c) simulating the cruise phase conditions (including trajectory correction maneuvers), (d) simulating the entry, decent, and landing (EDL) pulse load profile (required to support the pyros) (e) simulating the Mars surface operation mission simulation conditions, as well as, (f) assessing capacity loss and impedance characteristics as a function of temperature and life. This paper provides further detail to previously reported results1 of the RBAU testing program, especially with regard to the life characteristics. To date, the lithium-ion batteries (fabricated by Lithion/Yardney, Inc.) have been demonstrated to far exceed the requirements defined by the mission, both on Mars and on the ground, and are projected to support an extended mission (> 4 years).

Mars Exploration Rovers (MER) Mission↗

Performance Testing of Lithium Li-ion Cells and Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20(super 0)C to +40(super 0)C), withstand long storage periods (e.g., including pre-launch and cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the inability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit RBAU), consisting of two 8-cell 8 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The primary focus of this paper is to communicate the latest results regarding Mars surface operation mission simulation testing, as well as, the corresponding performance capacity loss and impedance characteristics as a function of temperature and life. As will be discussed, the lithium-ion batteries (fabricated by Yardney Technical Products, Inc.) have been demonstrated to far exceed the requirements defined by the mission, being able to support the operation of the rovers for over three years, and are projected to support an even further extended mission.

low temperature electrolytes↗

Austere Human Missions to Mars

The Design Reference Architecture 5 (DRA 5) is the most recent concept developed by NASA to send humans to Mars in the 2030 time frame using Constellation Program elements. DRA 5 is optimized to meet a specific set of requirements that would provide for a robust exploration program to deliver a new six-person crew at each biennial Mars opportunity and provide for power and infrastructure to maintain a highly capable continuing human presence on Mars. This paper examines an alternate architecture that is scaled back from DRA 5 and might offer lower development cost, lower flight cost, and lower development risk. It is recognized that a mission set using this approach would not meet all the current Constellation Mars mission requirements; however, this 'austere' architecture may represent a minimum mission set that would be acceptable from a science and exploration standpoint. The austere approach is driven by a philosophy of minimizing high risk or high cost technology development and maximizing development and production commonality in order to achieve a program that could be sustained in a flat-funded budget environment. Key features that would enable a lower technology implementation are as follows: using a blunt-body entry vehicle having no deployable decelerators, utilizing aerobraking rather than aerocapture for placing the crewed element into low Mars orbit, avoiding the use of liquid hydrogen with its low temperature and large volume issues, using standard bipropellant propulsion for the landers and ascent vehicle, and using radioisotope surface power systems rather than a nuclear reactor or large area deployable solar arrays. Flat funding within the expected NASA budget for a sustained program could be facilitated by alternating cargo and crew launches for the biennial Mars opportunities. This would result in two assembled vehicles leaving Earth orbit for Mars per Mars opportunity. The first opportunity would send two cargo landers to the Mars surface to preposition a habitat, supplies, and exploration equipment. The next opportunity, two years later, would send to Mars orbit 1) a lander with a Mars Ascent Vehicle (MAV) and 2) a crewed Mars Transit Habitat with an Orion CEV for Earth return. The following opportunity, two years after the first crew, would go back to cargo-only launches. This alternation of cargo and crew opportunities results in a sustainable launch rate of six Ares V launches every two years. It is notable that four of the six launches per Mars opportunity are identical, build-to-print, Tran-Mars Injection stages. This type of production rate could lend itself well to a COTStype service provider, and would make it feasible to have a live spare in place in the event of a single launch failure.

landers↗

FeatherSail - Design, Development and Future Impact

To the present day, the idea of using solar sails for space propulsion is still just a concept, but one that provides a great potential for future space exploration missions. Several notable solar propulsion missions and experiments have been performed and more are still in the development stage. Solar Sailing is a method of space flight propulsion, which utilizes the light photons to propel spacecrafts through the vacuum of space. This concept will be tested in the near future with the launch of the NanoSail-D satellite. NanoSail-D is a nano-class satellite, <10kg, which will deploy a thin lightweight sheet of reflective material used to propel the satellite in its low earth orbit. Using the features of the NanoSail-D architecture, a second-generation solar sail design concept, dubbed FeatherSail, has been developed. The goal of the FeatherSail project is to create a sail vehicle with the ability to provide steering from the sails and increase the areal density. The FeatherSail design will utilize the NanoSail-D based extendable boom technology with only one sail on each set of booms. This design also allows each of the four sails to feather as much as ninety degrees. The FeatherSail concept uses deployable solar arrays to generate the power necessary for deep space missions. In addition, recent developments in low power, low temperature Silicon-Germanium electronics provide the capability for long duration deep space missions. It is envisioned that the FeatherSail conceptual design will provide the impetus for future sail vehicles, which may someday visit distant places that mankind has only observed.

Alhorn, Dean C.↗

CASTOR: Cathode/Anode Satellite Thruster for Orbital Repositioning

The purpose of CASTOR (Cathode/Anode Satellite Thruster for Orbital Repositioning) satellite is to demonstrate in Low Earth Orbit (LEO) a nanosatellite that uses a Divergent Cusped Field Thruster (DCFT) to perform orbital maneuvers representative of an orbital transfer vehicle. Powered by semi-deployable solar arrays generating 165W of power, CASTOR will achieve nearly 1 km/s of velocity increment over one year. As a technology demonstration mission, success of CASTOR in LEO will pave the way for a low cost, high delta-V orbital transfer capability for small military and civilian payloads in support of Air Force and NASA missions. The educational objective is to engage graduate and undergraduate students in critical roles in the design, development, test, carrier integration and on-orbit operations of CASTOR as a supplement to their curricular activities. This program is laying the foundation for a long-term satellite construction program at MIT. The satellite is being designed as a part of AFRL's University Nanosatellite Program, which provides the funding and a framework in which student satellite teams compete for a launch to orbit. To this end, the satellite must fit within an envelope of 50cmx50cmx60cm, have a mass of less than 50kg, and meet stringent structural and other requirements. In this framework, the CASTOR team successfully completed PDR in August 2009 and CDR in April 2010 and will compete at FCR (Flight Competition Review) in January 2011. The complexity of the project requires implementation of many systems engineering techniques which allow for development of CASTOR from conception through FCR and encompass the full design, fabrication, and testing process.

Mruphy, Gloria A.↗

Survey of Propulsion Technologies Applicable to Cubesats

At present, no Cubesat has flown in space featuring propulsion. This was acceptable as long as CubeSats were flown mostly as university experiments. As CubeSats become of interest to other users in the government and industry communities as well, a larger range of capabilities may be required than exhibited so far, while maintaining the uniqueness of the Cubesat platform. Propulsion capability is crucial in increasing mission capabilities of future CubeSats, such as orbit change and raising, formation flying, proximity operations, fine attitude control, or drag-make-up and de-orbit. While some of these tasks may be accomplished with propellantless devices, their applications are limited, applicable mostly to a single task, and bear their own risks. In this study, a survey was conducted of propulsion technologies applicable to CubeSats. Only few off-the-shelf design solutions exist today. The survey was thus expanded to such devices as well that are under significant development, and are approaching the required design envelope for CubeSats with respect to mass, volume, and power. In some cases, such as electric propulsion devices, CubeSat architectures themselves may need to be adapted, required to feature deployable solar arrays to increase power capabilities. Given the vast scope of this survey, only thruster technologies could be surveyed. However, valves and other feed system components, as well as their integration, are equally important, but have to be left to a future survey. Three major propulsion technology areas applicable to CubeSats emerged when conducting this review: (1) Existing technologies, such as butane systems, pulsed plasma thrusters, and vacuum arc thrusters are applicable to CubeSats today with no or only minor changes, (2) New thruster technologies under significant development, such as hydrazine monopropellant systems, ion engines, or colloid thrusters could be adapted to CubeSats with some further development, especially also in other subsystem areas such as feed systems and power processing units. They will also require increased power capabilities, and (3) emerging technologies, such as micro electrospray arrays and micro cavity discharge arrays that offer even higher flexibility due to scalability for CubeSats, and enable compact integration.

micropropulsion↗

Expanding CubeSat Capabilities with a Low Cost Transceiver

CubeSats have developed rapidly over the past decade with the advent of a containerized deployer system and ever increasing launch opportunities. These satellites have moved from an educational tool to teach students about engineering challenges associated with satellite design, to systems that are conducting cutting edge earth, space and solar science. Early variants of the CubeSat had limited functionality and lacked sophisticated attitude control, deployable solar arrays and propulsion. This is no longer the case and as CubeSats mature, such systems are becoming commercially available. The result is a small satellite with sufficient power and pointing capabilities to support a high rate communication system. Communications systems have matured along with other CubeSat subsystems. Originally developed from amateur radio systems, CubeSats have generally operated in the VHF and UHF bands at data rates below 10 kbps (kilobits per second). More recently higher rate UHF systems have been developed, however these systems require a large collecting area on the ground to close the communications link at 3 Mbps (megabits per second). Efforts to develop systems that operate with similar throughput at S-Band (2-4 GHz (gigaherz)) and C-Band (4-8 GHz (gigaherz)) have also recently evolved. In this paper we outline an effort to develop a high rate CubeSat communication system that is compatible with the NASA Near Earth Network and can be accommodated by a CubeSat. The system will include a 200 kbps (kilobits per second) S-Band receiver and a 12.5 Mbps (megabits per second).X-Band transmitter. This paper will focus on our design approach and initial results associated with the 12.5 Mbps (megabits per second) X-band transmitter.

Avionics↗

Global Precipitation Measurement Mission Launch and Commissioning

During launch and early operation of the Global Precipitation Measurement (GPM) Mission, the Guidance, Navigation and Control (GNC) analysis team encountered four main on orbit anomalies. These include: (1) unexpected shock from Solar Array deployment, (2) momentum buildup from the Magnetic Torquer Bars (MTBs) phasing errors, (3) transition into Safehold due to albedo-induced Course Sun Sensor (CSS) anomaly, and (4) a flight software error that could cause a Safehold transition due to a Star Tracker occultation. This paper will discuss ways GNC engineers identified and tracked down the root causes. Flight data and GNC on board models will be shown to illustrate how each of these anomalies were investigated and mitigated before causing any harm to the spacecraft. On May 29, 2014, GPM was handed over to the Mission Flight Operations Team after a successful commissioning period. Currently, GPM is operating nominally on orbit, collecting meaningful scientific data that will significantly improve our understanding of the Earth's climate and water cycle.

Guidance Navigation and Control↗

Global Precipitation Measurement Mission Launch and Commissioning

During launch and early operation of the Global Precipitation Measurement (GPM) Mission, the Guidance, Navigation, and Control (GN&C) analysis team encountered four main on-orbit anomalies. These include: (1) unexpected shock from Solar Array deployment, (2) momentum buildup from the Magnetic Torquer Bars (MTBs) phasing errors, (3) transition into Safehold due to albedo induced Course Sun Sensor (CSS) anomaly, and (4) a flight software error that could cause a Safehold transition due to a Star Tracker occultation. This paper will discuss ways GN&C engineers identified the anomalies and tracked down the root causes. Flight data and GN&C on-board models will be shown to illustrate how each of these anomalies were investigated and mitigated before causing any harm to the spacecraft. On May 29, 2014, GPM was handed over to the Mission Flight Operations Team after a successful commissioning period. Currently, GPM is operating nominally on orbit, collecting meaningful scientific data that will significantly improve our understanding of the Earth's climate and water cycle.

Guidance Navigation and Control↗

Propulsion Technology Demonstrator

NASA's Pathfinder Technology Demonstrator (PTD) project will test the operation of a variety of novel CubeSat technologies in low- Earth orbit, providing significant enhancements to the performance of these small and effective spacecraft. Each Pathfinder Technology Demonstrator mission consists of a 6-unit (6U) CubeSat weighing approximately 26 pounds (12 kilograms) and measuring 12 inches x 10 inches x 4 inches (30 centimeters x 25 centimeters x 10 centimeters), comparable in size to a common shoebox. CubeSats are a class of nanosatellites that use a standard size and form factor. The standard Cube- Sat size uses a "one unit" or "1U" measuring 4 inches x 4 inches x 4 inches (10x10x10 centimeters) and is extendable to larger sizes by "stacking" a number of the 1U blocks to form a larger spacecraft. Each PTD spacecraft will also be equipped with deployable solar arrays that provide an average of 44 watts of power while in orbit.

CubeSat↗

Additional Mission Applications for NASA's 13.3-kW Ion Propulsion System

NASA's Space Technology Mission Directorate has been recently developing critical technologies for high-power solar electric propulsion (SEP), including large deployable solar array structures and high-power electric propulsion components. An ion propulsion system based on these developments has been considered for many SEP technology demonstration missions, including the Asteroid Redirect Robotic Mission (ARRM) concept. These studies and the highpower SEP technology developments have generated excitement within NASA about the use of the ARRM ion propulsion system design for other types of potential missions. One application of interest is for Mars missions, especially with the types of orbiters now under consideration for flights in the early 2020's to replace the aging Mars Reconnaissance Orbiter. High-power SEP can deliver large payloads to Mars with many additional capabilities, including large orbital plane changes and roundtrip missions, compared to chemically-propelled spacecraft. Another application for high-power SEP is for exo-planet observation missions, where a large starshade spacecraft would need to be repositioned with respect to its companion telescope relatively frequently and rapidly. SEP is an enabling technology for the ambitious science goals of these types of missions. This paper will discuss the benefits of high-power SEP for these concepts based on the STMD technologies now under development.

Space Technology Mission Directorate↗

Operations of the Optical Communications Demonstration for the Orion EM-2 Mission

The GSFC implementation of an Optical Communication System to demonstrate an operational optical communication link for Orion EM-2. It will serve as a base for providing an operational optical communications capability for future Orion missions. GSFC plans to maintain a development path for the optical communication flight terminal to allow commercialization and implementation on future Orion missions. The Orion optical module part of the optical communications flight terminal and its control electronics have a common architecture with the ILLUMA-T optical terminal provided by GSFC for use on the ISS. The plan is to flow data from Orion through the Optical Communication Fight Terminal to the Optical Communication Ground Terminal and reverse. NASA's Orion spacecraft is an exploratory vehicle designed for longer-duration flights beyond the Moon. Following Orion's Exploration Mission-1 (EM-1), during which the spacecraft will travel beyond the Moon, enter a distant retrograde orbit around the Moon and return to Earth unmanned, Exploration Mission-2 (EM-2) will see a crewed spacecraft complete a slightly different flight path. First crewed test flight of the Orion spacecraft, currently targeting a June 30, 2022 launch. The mission involves: One revolution in Low Earth Orbit (LEO) parking orbit to verify basic Orion systems functionality and deploy solar arrays. A single 42-hour Highly Elliptical Orbit (HEO) intermediate checkout orbit allows characterization of the Orion vehicle system performance prior to committing to a cis-lunar flight. Trans Lunar Injection (TLI) burn using Orion Service Module (SM) main engine, which sends Orion on a lunar flyby and free return. Skip reentry at lunar return velocities to splashdown off the coast of San Diego. Total mission duration is approximately 10 days. EM-2 is the first crewed mission of the Orion Spacecraft that crew brings more video up/downloads, file transfers, and real-time chats with family back home and high-rate communications enables live HD streaming for Crew conferences, Public Affairs Office (PAO) events, and significant mission events. Also still collecting vehicle data on numerous Orion subsystems via Development Flight Instrumentation (DFI) allows large data volume returns sooner for DFI and future science payloads, as opposed to waiting for end-of-mission. O2O is a demonstration of operational utility system tested as a Developmental Test Objective (DTO) and not required to meet mission requirements/success/ Flight Test Objectives (FTO). EM-2 architecture is as close to future mission operational architecture as possible.Orion subsystems (video, DFI, etc.) expected to generate ~250 GB of data in the first 24 hours of flight. Total data generated over the mission estimated to be more than 400 GBUsing S-Band alone, Orion limited to ~ 6GB of data downlink per day. Because of this limitation, Orion is planning to limit live video downlinks on EM-1 in order to downlink high priority fileswith 1 hour/day of Optical Communication, Orion could downlink ~6x more data per day (~ 36GB/day).The optical communication system is capable of multiple data rates up to at least 80 Mbps downlink for the transfer of Orion data to Earth while Orion is operating in the lunar vicinity.

Optical Communication↗

Common Power and Energy Storage Solutions to Support Lunar and Mars Surface Exploration Missions

Future human exploration missions on the moon and Mars will require a new generation of power sources to sustain crew members and leverage in-situ resources. Long-duration human missions to the lunar and Martian surface will likely include large-scale landers, crew habitats, pressurized rovers, and in-situ propellant production plants. The power demands for these surface elements, whether on the moon or Mars, will be similar starting with robotic precursor missions in the multi-kilowatt range scaling to 10s of kilowatts as the crew presence expands and local propellant production is established. While the power requirements may be similar, the vastly different environments on the two surfaces present unique challenges for power generation and storage systems. Candidate technologies to satisfy the surface power needs include deployable solar arrays, regenerative fuel cells, and small fission reactors. This paper presents strategies for power system architectures with elements that can be used on the moon and are extensible to Mars with features that make them resilient to either environment.

Mason, Lee↗

TPSAS-NF1676L-13643-DND

This briefing provides an overview recent NASA activities in the development of deployable space structures technology. NASA?s interest in innovative technologies that support human and robotic exploration are discussed followed by an emphasis on expandable structures technology. Recent work in inflatable habitats and large deployable solar arrays to support solar electric propulsion are discussed. Joint efforts by NASA and DLR in the application of additive manufacturing to augment the damage tolerance of thin film space systems such as solar sails are also described. Through this briefing and future interchanges we wish to maintain a dialogue with our international colleagues to advance expandable structures technology.

W Keith Belvin↗

An Adaptive Dynamic Agrivoltaic Production Tool

In the pursuit of sustainable and land-use-efficient solutions to mitigate climate change, the concept of agrivoltaic systems, which integrate renewable solar energy into conventional agriculture, has emerged. By deploying solar arrays above the crop field, these systems are designed to maximize the land use efficiency or, in other words, the value of generated electricity and crop yield per unit area. While power generation has been extensively studied and modeled, research gaps persist in simulating crop performance [1], [2]. Early studies utilized generalized relationships between photosynthetically active radiation (PAR) and crop production. However, significant variations in crop performance due to other factors, such as weather and soil, can compromise the reliability of the results [2]. Current studies focus on comprehensive process-based crop models, such as DSSAT [3] and STICS [4]. Nevertheless, the validation status varies greatly across different species, and the validation process requires well-designed experiments to adjust specific processes. For less common shade-tolerant crops with limited validation, such as cabbage, physiological behaviors can be difficult to predict [5]. This study investigates an adaptive dynamic agrivoltaic production tool (ADAPT) with few data requirements and minimal on-site calibration that can be easily applied in real applications.

Long, Qirui↗