Search NASA⌕ Search

SEARCH · Search NASA

Results for “spacecraft systems performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Microwave Anisotrophy Probe Launch and Early Operations

The Microwave Anisotropy Probe (MAP), a follow-on to the Differential Microwave Radiometer (DMR) instrument on the Cosmic Background Explorer (COBE), was launched from the Kennedy Space Center at 19:46:46 UTC on June 30, 2001. The powered flight and separation from the Delta II appeared to go as designed, with the launch placing MAP well within sigma launch dispersion and with less than 7 Nms of tip-off momentum. Because of this relatively low momentum, MAP was able to acquire the sun within only 15 minutes with a battery state of charge of 94%. After MAP's successful launch, a six week period of in-orbit checkout and orbit maneuvers followed. The dual purpose of the in-orbit checkout period was to validate the correct performance of all of MAP's systems and, from the attitude control system (ACS) point of view, to calibrate the performance of the spacecraft ACS sensors and actuators to maximize system performance. In addition to the checkout activities performed by the MAP team, the other critical activity taking place during the first six weeks after launch were a series of orbit maneuvers necessary to get the spacecraft from its launch orbit out to its desired orbit about L2, the second Earth-Sun Lagrange point. As MAP continues its standard operations, its ACS design is meeting all of its requirements to successfully complete the mission. This paper will describe the launch and early operations summarized above in greater detail, and show the performance of the attitude control and attitude determination system versus its requirements. Additionally, some of the unexpected events that occurred during this period will be discussed, including two events which dropped the spacecraft into its Safehold Mode and the presence of an "anomalous force" observed during each of the perigee orbit maneuvers that had the potential to cause these critical maneuvers to be prematurely aborted.

ODonnell, James R., Jr.↗

Voyager spacecraft attitude control propulsion system post-launch performance requirements changes

A test program aimed at the re-qualification of the 0.2-lbf attitude control thruster of the Voyager 2 spacecraft was carried out while the spacecraft was in flight on an interplanetary trajectory to Uranus. The objective of the program was to determine if the 0.2-lbf thruster could be successfully and repeatedly fired at pulse widths of less than the standard minimum pulse width of 10 milliseconds with no degradation. It was demonstrated that the thruster was qualified for short pulse operation at pulse widths of 4 ms or greater. Pulse widths of 4.0 ms provide an impulse bit of approximately 45 percent of the impulse provided by a 10-ms pulse, and the pulse-to-pulse and unit-to-unit variation is approximately plus or minus 10 percent.

Groudle, T. A.↗

Optimization of actuator and sensor placement for on-orbit identification in large flexible spacecraft

There has been considerable research on choosing actuator and sensor locations in large flexible spacecraft in order to optimize the controllability and observability of the system, or to maximize some objective function of control system performance. Future large flexible spacecraft may require on-orbit identification of the structure to tune the control system, because such tests cannot be performed in a one-g environment before launch. This indicates that the choice of actuator and sensor locations must serve a dual purpose, for control and for identification. This paper develops concepts for a degree of identifiability and studies placement of actuators and sensors on a free-free beam to optimize such objective functions. The results in this simple situation suggest that in free-free spacecraft structures in orbit, placement for control and placement for identification may often be consistent objectives rather than conflicting objectives.

Bergmann, Martin↗

SERT II 1979 extended flight thruster system performance

The SERT II spacecraft, launched in 1970, has been maintained in an operational, but intermittently active status since 1971. Periodic thruster status has been reported while waiting for normal orbit precession to return the spacecraft to continuous sunlight in 1979. Now, the thruster has been operated for 600 hours in the first quarter of 1979. Thruster startup and operation in 1979 is unchanged after 9 years in space. The ion thruster was gimbaled and used to maintain spin stabilization of the spacecraft. Minor components of the spacecraft have failed, but have not interfered with the functional status of the spacecraft.

Kerslake, W. R.↗

Apollo 11 Mission Report, Supplement 5: Performance of Lunar Module Reaction Control Systems

Spacecraft velocity data and crew reports indicated that RCS engine performance was nominal. It is estimated that the RCS engines accumulated a total of 1060 seconds on-time and 12,000 firings during the mission. The quad temperatures ranged from 132 to 232 F during the period when the heaters were active, within predicated ranges. The total propellant consumption from the RCS tanks was about 319 pounds, compared to a predicted value of 253 pounds. An additional 69 pounds of propellant were used from the ascent propulsion system tanks during interconnect feed operations associated with APS lift-off, following periods of rapid propellant usage. The only problems noted were two thrust chamber pressure switch failures on the quad one down-firing engine and on the quad 2 aft-firing engine. Engine performance was nominal on both engines, and the switch failures had no effect on the mission.

Blevins, D. R.↗

SHARP: A multi-mission AI system for spacecraft telemetry monitoring and diagnosis

The Spacecraft Health Automated Reasoning Prototype (SHARP) is a system designed to demonstrate automated health and status analysis for multi-mission spacecraft and ground data systems operations. Telecommunications link analysis of the Voyager II spacecraft is the initial focus for the SHARP system demonstration which will occur during Voyager's encounter with the planet Neptune in August, 1989, in parallel with real-time Voyager operations. The SHARP system combines conventional computer science methodologies with artificial intelligence techniques to produce an effective method for detecting and analyzing potential spacecraft and ground systems problems. The system performs real-time analysis of spacecraft and other related telemetry, and is also capable of examining data in historical context. A brief introduction is given to the spacecraft and ground systems monitoring process at the Jet Propulsion Laboratory. The current method of operation for monitoring the Voyager Telecommunications subsystem is described, and the difficulties associated with the existing technology are highlighted. The approach taken in the SHARP system to overcome the current limitations is also described, as well as both the conventional and artificial intelligence solutions developed in SHARP.

Lawson, Denise L.↗

SHARP - A multi-mission AI system for spacecraft telemetry monitoring and diagnosis

The Spacecraft Health Automated Reasoning Prototype (SHARP) is a system designed to demonstrate automated health and status analysis for multi-mission spacecraft and ground data systems operations. Telecommunications link analysis of the Voyager II spacecraft is the initial focus for the SHARP system demonstration which will occur during Voyager's encounter with the planet Neptune in August, 1989, in parallel with real-time Voyager operations. The SHARP system combines conventional computer science methodologies with artificial intelligence techniques to produce an effective method for detecting and analyzing potential spacecraft and ground systems problems. The system performs real-time analysis of spacecraft and other related telemetry, and is also capable of examining data in historical context. A brief introduction is given to the spacecraft and ground systems monitoring process at the Jet Propulsion Laboratory. The current method of operation for monitoring the Voyager Telecommunications subsystem is described, and the difficulties associated with the existing technology are highlighted. The approach taken in the SHARP system to overcome the current limitations is also described, as well as both the conventional and artificial intelligence solutions developed in SHARP.

Lawson, Denise L.↗

Reduced gravity and ground testing of a two-phase thermal management system for large spacecraft

Experiments were performed aboard the NASA-JSC KC-135 aircraft to study the effect of reduced gravity on two-phase (liquid/vapor) flow and condensation. A prototype two-phase thermal management system for a large spacecraft was tested. Both visual observation and photography of the flow regimes were made. Ground test simulations of the KC-135 flight tests were conducted for comparison purposes. Two-phase pressure drops were predictable by the Heat Transfer Research Institute (HTRI) method, or the Friedel correlation.

Hill, D. G.↗

A study of total space life performance of GSFC spacecraft

The space life performance of 57 Goddard Space Flight Center spacecraft is given. The time distribution of 449 malfunctions, of which 248 were classified as failures, is presented. Test data were available for 39 of the spacecraft and permitted a comparison of system test performance with the first-day, first-month, and total space life performance. The failures per spacecraft for the system environmental tests and the three time periods in space were 12, 0.9, 1.7, and 5.0, respectively. Relevance of the data to the pre-shuttle and shuttle eras is discussed. Classifications of failures by type of device and spacecraft subsystem are included. A continuation of the Goddard philosophy of requiring a system-level environmental test program is justified.

Timmins, A. R.↗

The Interaction of Spacecraft Cabin Atmospheric Quality and Water Processing System Performance

Although designed to remove organic contaminants from a variety of waste water streams, the planned U.S.- and present Russian-provided water processing systems onboard the International Space Station (ISS) have capacity limits for some of the more common volatile cleaning solvents used for housekeeping purposes. Using large quantities of volatile cleaning solvents during the ground processing and in-flight operational phases of a crewed spacecraft such as the ISS can lead to significant challenges to the water processing systems. To understand the challenges facing the management of water processing capacity, the relationship between cabin atmospheric quality and humidity condensate loading is presented. This relationship is developed as a tool to determine the cabin atmospheric loading that may compromise water processing system performance. A comparison of cabin atmospheric loading with volatile cleaning solvents from ISS, Mir, and Shuttle are presented to predict acceptable limits to maintain optimal water processing system performance.

Perry, Jay L.↗

Recent radiation effects activities at JPL: Coping with COTS

Radiation effects and testing programs on commercial off-the-shelf (COTS) devices and circuits, which are important for NASA programs, are discussed. Demands for increased performance levels in spacecraft systems is stimulating the use of electronic and photonic devices. Some advances in electronics to reach high performance will result in the miniaturization of devices, which will lead to increased radiation vulnerability.

Barnes, C.↗

Sensitivity Analysis of ProSEDS (Propulsive Small Expendable Deployer System) Data Communication System

This paper discusses analytical approaches to evaluating performance of Spacecraft On-Board Computing systems, thereby ultimately achieving a reliable spacecraft data communications systems. The sensitivity analysis approach of memory system on the ProSEDS (Propulsive Small Expendable Deployer System) as a part of its data communication system will be investigated. Also, general issues and possible approaches to reliable Spacecraft On-Board Interconnection Network and Processor Array will be shown. The performance issues of a spacecraft on-board computing systems such as sensitivity, throughput, delay and reliability will be introduced and discussed.

Park, Nohpill↗

Where am I: Determining the attitude of spacecraft parts

In the preliminary design of spacecraft, spreadsheets are often used to scale and size components. While offering some benefits, using spreadsheets does have some drawbacks. In particular, since time is typically not one of the input values, overly conservative designs can result because scheduling issues are not considered. To overcome this problem, the Space Systems Concepts Division is developing a time dependent, virtual spacecraft simulation system. Since the performance of many components on the spacecraft are sensitive to the attitude of the spacecraft, a method or function is needed to determine the attitude of a part. Thus, the primary goal of this research was to develop a software module that calculates the attitude of an arbitrary part on the spacecraft. This module is then used by subsystem engineers, e.g. the power subsystem, to compute the attitude relative to the spacecraft, the sun, the Earth, or a user specified target.

Hanson, Mark L.↗

A unified process for systems identification based on performance assessment

Many modern spacecraft are complex multi-body dynamic systems where the bodies are connected by several active control systems for pointing and isolation. Mission requirements indicate that many structural modes and possibly some nonlinear effects will require characterization. Thus, even characterization at the subsystem level will become more difficult than usual. System level characterization difficulties will be compounded by the fact that only limited ground testing will be possible on the full up system, and flight testing will be restricted by an extremely limited measurements set. The object of the present discussion is the application of matrix majorant theory to the problem of assessing dynamic system performance when knowledge of the system is uncertain. We show how majorants provide an effective tool to relate required performance output to system identification test quality in terms of residual uncertainty in input-output relations, parameter values, nonlinearities, and interactions. The underlying machinery consists of the block-norm matrix which is a nonnegative matrix each of whose elements is the norm of a block of a suitably partitioned matrix. A matrix which bounds the block-norm matrix in the sense of nonnegative matrices, i.e., element by element is known as a majorant.

Hyland, C.↗

Artemis I Orion ESM Propulsion System Engine Performance

NASA's Orion spacecraft transports humans and cargo into cislunar space for the Artemis program. The European Service Module (ESM), supplied by ESA and its European industry partners, provides Orion with power and in-space propulsion. The Orion-ESM propulsion system is a bipropellant hypergolic propulsion system using monomethyl hydrazine (MMH) and nitrogen tetroxide (MON-3). Primary translational propulsion is provided by the Orbital Maneuvering System Engine (OMS-E), with backup translational propulsion provided by eight Auxiliary thrusters (AUX). Attitude control and small translational maneuvers are provided by twenty-four Reaction Control System (RCS) engines. The 2022 Artemis I mission was the first integrated flight test of the Orion-ESM spacecraft and its propulsion system. The OMS-E used on Artemis I was a refurbished Space Shuttle OMS-E that previously flew on nineteen missions ranging from STS-41G in 1984 to STS-112 in 2002. The Auxiliary engines are modified Aerojet Rocketdyne R4D-11 engines produced specifically for the Orion program. The RCS engines are Ariane Group engines originally used for the Automated Transfer Vehicle (ATV) program. This paper will discuss the unique operational requirements for each engine on Orion and the development and qualification effort sat both the engine and system-level that were completed to enable a successful Artemis I mission. Next the paper will evaluate the in-f light performance of the engines during the Artemis I mission showing nominal performance as expected. Additionally, comparisons to models will be presented showing very good correlation. Finally, the paper will address the plan for the engines on future Orion missions and the evolution of the system operation.

liquid propulsion systems↗

Artemis I Orion ESM Propulsion System Engine Performance

NASA's Orion spacecraft transports humans and cargo into cislunar space for the Artemis program. The European Service Module (ESM), supplied by ESA and its European industry partners, provides Orion with power and in-space propulsion. The Orion-ESM propulsion system is a bipropellant hypergolic propulsion system using monomethyl hydrazine (MMH) and nitrogen tetroxide (MON-3). Primary translational propulsion is provided by the Orbital Maneuvering System Engine(OMS-E), with backup translational propulsion provided by eight Auxiliary thrusters (AUX). Attitude control and small translational maneuvers are provided by twenty four Reaction Control System (RCS) engines. The 2022 Artemis I mission was the first integrated flight test of the Orion-ESM spacecraft and its propulsion system. The OMS-E used on Artemis I was a refurbished Space Shuttle OMS-E that previously flew on nineteen missions ranging f rom STS-41G in 1984 to STS-112 in 2002. The Auxiliary engines are modified Aerojet Rocketdyne R4D-11 engines produced specifically for the Orion program. The RCS engines are Ariane Group engines originally used for the Automated Transfer Vehicle (ATV) program. This paper will discuss the unique operational requirements for each engine on Orion and the development and qualification effort sat both the engine and system-level that were completed to enable a successful Artemis I mission. Next the paper will evaluate the in-f light performance of the engines during the Artemis I mission showing nominal performance as expected. Additionally, comparisons to models will be presented showing very good correlation. Finally, the paper will address the plan for the engines on future Orion missions and the evolution of the system operation.

liquid propulsion systems↗

Conceptual spacecraft systems design and synthesis

An interactive systems design and synthesis is performed on future spacecraft concepts using the Interactive Design and Evaluation of Advanced Systems (IDEAS) computer-aided design and analysis system. The capabilities and advantages of the systems-oriented interactive computer-aided design and analysis system are described. The synthesis of both large antenna and space station concepts, and space station evolutionary growth designs is demonstrated. The IDEAS program provides the user with both an interactive graphics and an interactive computing capability which consists of over 40 multidisciplinary synthesis and analysis modules. Thus, the user can create, analyze, and conduct parametric studies and modify earth-orbiting spacecraft designs (space stations, large antennas or platforms, and technologically advanced spacecraft) at an interactive terminal with relative ease. The IDEAS approach is useful during the conceptual design phase of advanced space missions when a multiplicity of parameters and concepts must be analyzed and evaluated in a cost-effective and timely manner.

Wright, R. L.↗