Search NASA⌕ Search

SEARCH · Search NASA

Results for “spares”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Ultra Reliable Closed Loop Life Support for Long Space Missions

Spacecraft human life support systems can achieve ultra reliability by providing sufficient spares to replace all failed components. The additional mass of spares for ultra reliability is approximately equal to the original system mass, provided that the original system reliability is not too low. Acceptable reliability can be achieved for the Space Shuttle and Space Station by preventive maintenance and by replacing failed units. However, on-demand maintenance and repair requires a logistics supply chain in place to provide the needed spares. In contrast, a Mars or other long space mission must take along all the needed spares, since resupply is not possible. Long missions must achieve ultra reliability, a very low failure rate per hour, since they will take years rather than weeks and cannot be cut short if a failure occurs. Also, distant missions have a much higher mass launch cost per kilogram than near-Earth missions. Achieving ultra reliable spacecraft life support systems with acceptable mass will require a well-planned and extensive development effort. Analysis must determine the reliability requirement and allocate it to subsystems and components. Ultra reliability requires reducing the intrinsic failure causes, providing spares to replace failed components and having "graceful" failure modes. Technologies, components, and materials must be selected and designed for high reliability. Long duration testing is needed to confirm very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The system must be designed, developed, integrated, and tested with system reliability in mind. Maintenance and reparability of failed units must not add to the probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass should start soon since it must be a long term effort.

Jones, Harry W.↗

Supportability for Beyond Low Earth Orbit Missions

Exploration beyond Low Earth Orbit (LEO) presents many unique challenges that will require changes from current Supportability approaches. Currently, the International Space Station (ISS) is supported and maintained through a series of preplanned resupply flights, on which spare parts, including some large, heavy Orbital Replacement Units (ORUs), are delivered to the ISS. The Space Shuttle system provided for a robust capability to return failed components to Earth for detailed examination and potential repair. Additionally, as components fail and spares are not already on-orbit, there is flexibility in the transportation system to deliver those required replacement parts to ISS on a near term basis. A similar concept of operation will not be feasible for beyond LEO exploration. The mass and volume constraints of the transportation system and long envisioned mission durations could make it difficult to manifest necessary spares. The supply of on-demand spare parts for missions beyond LEO will be very limited or even non-existent. In addition, the remote nature of the mission, the design of the spacecraft, and the limitations on crew capabilities will all make it more difficult to maintain the spacecraft. Alternate concepts of operation must be explored in which required spare parts, materials, and tools are made available to make repairs; the locations of the failures are accessible; and the information needed to conduct repairs is available to the crew. In this paper, ISS heritage information is presented along with a summary of the challenges of beyond LEO missions. A number of Supportability issues are discussed in relation to human exploration beyond LEO. In addition, the impacts of various Supportability strategies will be discussed. Any measure that can be incorporated to reduce risk and improve mission success should be evaluated to understand the advantages and disadvantages of implementing those measures. Finally, an effort to model and evaluate Supportability for beyond LEO missions will be described.

Crillo, William M.↗

ADEPT SR-1 Development and Testing

The Adaptable Deployable Entry and Placement Technology (ADEPT) Sounding Rocket One (SR-1) fight test will be the first sub-orbital flight of Nano-ADEPT. Nano-ADEPT is a deployable heatshield for secondary payload missions desiring to re-enter the Earth's atmosphere or deliver small science payloads to Mars or Venus. Two units have been built and tested in preparation of launch: one designated the "Spare" unit and one the "Flight" unit. The general development approach has been to perform all procedures on the Spare prior to performing them on Flight. This approach has served the project well, allowing for procedures to be rapidly developed and tested on spare hardware where mistakes are less consequential. Conversely, when schedule constraints have come up, the approach has allowed the project to rapidly pivot to an approach where Flight drives the critical path rather than Spare. This approach has enabled relatively rapid development of Flight where technical risk is balanced with schedule realism. This presentation will describe the various tests that have been performed on Nano-ADEPT Spare and Flight units to prepare for the sub-orbital flight. The purpose is to communicate the development approach we took for this low-cost, moderate-risk flight test and hopefully engage the EDL community in a wider discussion of risk-balanced approaches toward flight hardware development of secondary payload atmospheric entry systems.

Smith, Brandon↗

The case for a centralized repair depot for Space Shuttle

The first priority of the NSTS program is to make the Space Shuttle system fully operational and cost effective in providing routine access to space. In support of this priority an integrated logistics support system was planned, structured and is being implemented to support a launch-on-time goal of 95 percent. In achieving a 95 percent spares 'fill rate' in an environment of small fleet size, highly unique and high cost assets, significant spares cost can be incurred. A major portion of these costs are for the additional spares required when repair or acquisition times are lengthy. This paper provides a fundamental analysis of the costs and other factors involved in the spare and repair process and provides an optimized cost and process solution for the Space Shuttle program - a centralized repair depot located at KSC.

Enlow, R. D.↗

Reconfigurable tree architectures using subtree oriented fault tolerance

An approach to the design of reconfigurable tree architecture is presented in which spare processors are allocated at the leaves. The approach is unique in that spares are associated with subtrees and sharing of spares between these subtrees can occur. The Subtree Oriented Fault Tolerance (SOFT) approach is more reliable than previous approaches capable of tolerating link and switch failures for both single chip and multichip tree implementations while reducing redundancy in terms of both spare processors and links. VLSI layout is 0(n) for binary trees and is directly extensible to N-ary trees and fault tolerance through performance degradation.

Lowrie, Matthew B.↗

Reconfigurable tree architectures using subtree oriented fault tolerance

An approach to the design of reconfigurable tree architectures is presented in which spare processors are allocated at the leaves. The approach is unique in that spares are associated with subtrees, and sharing of spares between these subtrees can occur. The subtree-oriented fault-tolerance approach is more reliable than previous approaches capable of tolerating link and switch failures for both single-chip and multichip tree implementations while reducing redundancy in terms of both spare processors and links. VLSI layout is O(n) for binary trees and is directly extensible to N-ary trees and fault tolerance through performance degradation.

Lowrie, Matthew B.↗

Intelligent Systems for Self-Healing Electronics

For long duration missions it is imperative to be able to monitor and record critical information. The data acquisition systems used must therefore be fault tolerant. This usually meant having redundant copies of critical channels. Since each channel usually consists of various components, the parts count, cost, weight and complexity of the system could be very high. The Advanced Data Acquisition System (ADAS) has been developed as a proof of concept. The purpose was to demonstrate an architecture where individual spare parts can replace defective ones to repair a channel. By so doing entire channels do not need replication. This reduces the need of total redundancy and reduces the parts count. This has the added feature that in addition to spare parts, good components of a failed channel can be used as spares in another channel. In addition to reducing parts count and cost, this configuration, with an intelligent decision maker, can improve the reliability of the overall system. Another unique feature of ADAS is that it uses reconfigurable analog filters. These components can be programmed, by the smart system to meet the specific needs of the part they are to replace. This way one part can serve as spare for many different components. The hardware was built and now serves as a platform for developing intelligent algorithms. Another related project was a wireless data acquisition system. I was invited to participate in the meetings and issue suggestions. A brief description of this system will also be included.

Latino, Carl D.↗

Supportability Issues and Approaches for Exploration Missions

Maintaining and repairing spacecraft systems hardware to achieve required levels of operational availability during long-duration exploration missions will be challenged by limited resupply opportunities, constraints on the mass and volume available for spares and other maintenance-related provisions, and extended communications times. These factors will force the adoption of new approaches to the integrated logistics support of spacecraft systems hardware. For missions beyond the Moon, all spares, equipment, and supplies must either be prepositioned prior to departure from Earth of human crews or carried with the crews. The mass and volume of spares must be minimized by enabling repair at the lowest hardware levels, imposing commonality and standardization across all mission elements at all hardware levels, and providing the capability to fabricate structural and mechanical spares as required. Long round-trip communications times will require increasing levels of autonomy by the crews for most operations including spacecraft maintenance. Effective implementation of these approaches will only be possible when their need is recognized at the earliest stages of the program, when they are incorporated in operational concepts and programmatic requirements, and when diligence is applied in enforcing these requirements throughout system design in an integrated way across all contractors and suppliers. These approaches will be essential for the success of missions to Mars. Although limited duration lunar missions may be successfully accomplished with more traditional approaches to supportability, those missions will offer an opportunity to refine these concepts, associated technologies, and programmatic implementation methodologies so that they can be most effectively applied to later missions.

Watson, J. K.↗

Developing Ultra Reliable Life Support for the Moon and Mars

Recycling life support systems can achieve ultra reliability by using spares to replace failed components. The added mass for spares is approximately equal to the original system mass, provided the original system reliability is not very low. Acceptable reliability can be achieved for the space shuttle and space station by preventive maintenance and by replacing failed units, However, this maintenance and repair depends on a logistics supply chain that provides the needed spares. The Mars mission must take all the needed spares at launch. The Mars mission also must achieve ultra reliability, a very low failure rate per hour, since it requires years rather than weeks and cannot be cut short if a failure occurs. Also, the Mars mission has a much higher mass launch cost per kilogram than shuttle or station. Achieving ultra reliable space life support with acceptable mass will require a well-planned and extensive development effort. Analysis must define the reliability requirement and allocate it to subsystems and components. Technologies, components, and materials must be designed and selected for high reliability. Extensive testing is needed to ascertain very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The systems must be designed, produced, integrated, and tested without impairing system reliability. Maintenance and failed unit replacement should not introduce any additional probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass must start soon if it is to produce timely results for the moon and Mars.

Jones, Harry W.↗

Adding a Second Ku-Band Antenna to the International Space Station

The International Space Station, as originally developed, used the Ku-Band Tracking and Data Relay Satellite System communications link to transmit non-critical data to the ground. Since becoming operational, the use for the link evolved to include additional services that, although also not critical, were deemed to be necessary for the crew. The external Ku-Band Antennas were designed for transport to the ISS in the shuttle cargo bay and thus are not suitable for manifesting on any current cargo vehicle. The original intent was to stow two spare antennas on orbit in a protective container until such time as they were needed to replace a failing unit which is a long and complicated process due to the complexity of the removal and replacement procedure. The Boeing Company proposed manifesting one of those spare antennas in an operable configuration eliminating the need for an Extravehicular Activity (EVA) to correct the first failure and as such minimizing the time to hours rather than weeks required to restore the Ku-Band communications link after failures. After the first failure, an EVA would be scheduled to replace the failed antenna with the stowed spare antenna. Because the hot spare is activated internal to the ISS, the replacement of the failed unit can be done when convenient rather than in haste. This paper describes the methodology used to locate a suitable site to add a new antenna mast to the ISS as well the process followed to fabricate, deliver and install the new interface hardware. Because this was not planned when the ISS was originally designed, structural, power, data and Intermediate Frequency signal connections had to be found for use. With the movement of the P6 solar array element from the initial location in the center zenith location of the ISS to the end of the port side of the truss and concurrent relocation of one string of S-Band communications assets, there were candidate power, data and structural connections available on the Z1 Truss. The engineering team evaluated these residual interfaces for use and designed cabling and structural elements for the candidate interfaces. The antenna was recently installed on ULF-4 and has completed a preliminary checkout. Included in this check out were evaluation of the power level received from the TDRS and evaluation of the gimbal position feedback for consideration in the static bias pointing matrix. This process demonstrates the ability to modify and upgrade manned space vehicles as either need or technology requires.

DuSold, Chuck↗

Trades Between Opposition and Conjunction Class Trajectories for Early Human Missions to Mars

Candidate human missions to Mars, including NASA's Design Reference Architecture 5.0, have focused on conjunction-class missions with long crewed durations and minimum energy trajectories to reduce total propellant requirements and total launch mass. However, in order to progressively reduce risk and gain experience in interplanetary mission operations, it may be desirable that initial human missions to Mars, whether to the surface or to Mars orbit, have shorter total crewed durations and minimal stay times at the destination. Opposition-class missions require larger total energy requirements relative to conjunction-class missions but offer the potential for much shorter mission durations, potentially reducing risk and overall systems performance requirements. This paper will present a detailed comparison of conjunction-class and opposition-class human missions to Mars vicinity with a focus on how such missions could be integrated into the initial phases of a Mars exploration campaign. The paper will present the results of a trade study that integrates trajectory/propellant analysis, element design, logistics and sparing analysis, and risk assessment to produce a comprehensive comparison of opposition and conjunction exploration mission constructs. Included in the trade study is an assessment of the risk to the crew and the trade offs between the mission duration and element, logistics, and spares mass. The analysis of the mission trade space was conducted using four simulation and analysis tools developed by NASA. Trajectory analyses for Mars destination missions were conducted using VISITOR (Versatile ImpulSive Interplanetary Trajectory OptimizeR), an in-house tool developed by NASA Langley Research Center. Architecture elements were evaluated using EXploration Architecture Model for IN-space and Earth-to-orbit (EXAMINE), a parametric modeling tool that generates exploration architectures through an integrated systems model. Logistics analysis was conducted using NASA's Human Exploration Logistics Model (HELM), and sparing allocation predictions were generated via the Exploration Maintainability Analysis Tool (EMAT), which is a probabilistic simulation engine that evaluates trades in spacecraft reliability and sparing requirements based on spacecraft system maintainability and reparability.

Mattfeld, Bryan↗

Developing Reliable Life Support for Mars

A human mission to Mars will require highly reliable life support systems. Mars life support systems may recycle water and oxygen using systems similar to those on the International Space Station (ISS). However, achieving sufficient reliability is less difficult for ISS than it will be for Mars. If an ISS system has a serious failure, it is possible to provide spare parts, or directly supply water or oxygen, or if necessary bring the crew back to Earth. Life support for Mars must be designed, tested, and improved as needed to achieve high demonstrated reliability. A quantitative reliability goal should be established and used to guide development t. The designers should select reliable components and minimize interface and integration problems. In theory a system can achieve the component-limited reliability, but testing often reveal unexpected failures due to design mistakes or flawed components. Testing should extend long enough to detect any unexpected failure modes and to verify the expected reliability. Iterated redesign and retest may be required to achieve the reliability goal. If the reliability is less than required, it may be improved by providing spare components or redundant systems. The number of spares required to achieve a given reliability goal depends on the component failure rate. If the failure rate is under estimated, the number of spares will be insufficient and the system may fail. If the design is likely to have undiscovered design or component problems, it is advisable to use dissimilar redundancy, even though this multiplies the design and development cost. In the ideal case, a human tended closed system operational test should be conducted to gain confidence in operations, maintenance, and repair. The difficulty in achieving high reliability in unproven complex systems may require the use of simpler, more mature, intrinsically higher reliability systems. The limitations of budget, schedule, and technology may suggest accepting lower and less certain expected reliability. A plan to develop reliable life support is needed to achieve the best possible reliability.

life support↗

Dormancy Should Be Avoided for Mars and Deep Space Recycling Life Support

Mars is the crucial goal of human exploration beyond the Earth-moon system. The Mars round trip transit vehicle has been expected to use a regenerative Life Support System (LSS) similar to the one on the International Space Station (ISS). It often assumed that the Mars transit LSS will be operated on the outward trip to Mars, placed in dormancy while the full crew explores the surface, and then restored to operation for the return trip to Earth. The major difference between Mars missions and operations in the Earth-moon system is the need for much higher reliability for Mars missions, since rapid resupply of parts and materials or a quick crew return to Earth are not possible. Mars systems must achieve intrinsic high reliability by design, test, failure analysis, and redesign and then increase operational robustness by providing spare parts and redundant systems. Further requiring the LSS to be capable of dormancy and restoration to operation greatly increases the difficulty of design, test, and verification. The process of implementing dormancy and then restoring operation would add significant risk to the mission. Dormancy should be avoided for Mars and can be avoided several ways. First and most obvious, some crew can remain continually on board. If no crew can remain onboard, dormancy can still be avoided if an unused spare LSS is activated for the return trip, rather than restarting the used out bound system. Systems similar to the ISS LSS would have a significant probability of failure on a Mars trip and therefore would require two or three spares. Another full spare LSS could be provided as the return trip system, rather than refurbishing a used LSS.

dormancy↗

International Space Station Operational Experience and Its Impacts on Future Mission Supportability

Operational experience gained on the International Space Station (ISS) has enabled significant improvements in failure rate estimates for various Orbital Replacement Units (ORUs). These improved estimates, in turn, allow more efficient and accurate spare parts allocations for future missions, enabling significant reductions in both logistics mass and risk. This paper examines the value of ISS experience to date in terms of its impact on supportability for future missions. A supportability model is presented that assesses the spares required as a function of mission endurance and risk, taking into account uncertainty in failure rate estimates. Changes in ISS Environmental Control and Life Support (ECLSS) ORU failure rate estimates are described and discussed, both in terms of the overall population of ORUs and the evolution of failure rate estimates over time for a particular item. The value of those updated failure rate estimates is assessed by calculating the estimated spares mass requirements for two cases, using the initial, pre-ISS estimates and using the estimates informed by on-orbit experience. Hidden risk resulting from underestimated failure rates is also assessed. These results indicate that, for a 1,200-day Mars mission, ISS experience has enabled a 3.9 t to 6.0 t reduction in ECLSS spares mass required and uncovered failure rate underestimates that would have resulted in an order of magnitude increase in risk had they not been discovered and corrected. The implications of these results for system development and mission planning are discussed, including approaches to accelerate the rate of failure rate refinement and the risks associated with making changes or introducing new systems. Overall, test time is a critical factor that must be carefully considered in system development, and new systems must budget appropriate time for testing in a relevant environment or accept higher risk and logistics requirements on future missions.

Owens, Andrew C.↗

Mechanical Design and Vacuum Pressure Impregnation of Combined Function Electromagnets

There are 96 combined function magnets, 48 focusing and 48 defocusing, that have been in operation in the Fermi NAL Booster without a critical failure requiring replacement for over 50 years. The Proton Improvement Plan-II (PIP-II) poses risk to these magnets and Fermilab does not currently have the tooling or knowledge of process to fabricate spares. Two new variants of these magnets are needed to reduce beam loss by having a larger aperture (Booster Gradient Defocusing Wide, or BGDS) and create space for a new injection system (Booster Gradient Defocusing Short, or BGDS). Risk of failure and need for spares will increase substantially with the implementation of PIP-II in consequence of a frequency increase from 15 Hz to 20 Hz and a 30 percent increase in peak to ground voltage. The BGDS and BGDW magnets will be fabricated in the same way as the current booster magnets so that future combined function magnet spares can be produced using learned processes.

Szabo, B. [Fermilab]↗

The principle of commonality and its application to the Space Station Freedom Program

The principle of commonality has achieved wide application in the communication, automotive, and aircraft industries. By the use of commonality, component development costs are minimized, logistics are simplified, and the investment costs of spares inventory are reduced. With space systems, which must be maintained and repaired in orbit, the advantages of commonality are compounded. Transportation of spares is expensive, on-board storage volume for spares is limited, and crew training and special tools needed for maintenance and repair are significant considerations. This paper addresses the techniques being formulated to realize the benefits of commonality in the design of the systems and elements of the Space Station Freedom Program, and include the criteria for determining the extent of commonality to be implemented.

Hopson, George D.↗

ETARA PC version 3.3 user's guide: Reliability, availability, maintainability simulation model

A user's manual describing an interactive, menu-driven, personal computer based Monte Carlo reliability, availability, and maintainability simulation program called event time availability reliability (ETARA) is discussed. Given a reliability block diagram representation of a system, ETARA simulates the behavior of the system over a specified period of time using Monte Carlo methods to generate block failure and repair intervals as a function of exponential and/or Weibull distributions. Availability parameters such as equivalent availability, state availability (percentage of time as a particular output state capability), continuous state duration and number of state occurrences can be calculated. Initial spares allotment and spares replenishment on a resupply cycle can be simulated. The number of block failures are tabulated both individually and by block type, as well as total downtime, repair time, and time waiting for spares. Also, maintenance man-hours per year and system reliability, with or without repair, at or above a particular output capability can be calculated over a cumulative period of time or at specific points in time.

Hoffman, David J.↗

Ongoing nickel-hydrogen energy storage device testing at George C. Marshall Space Flight Center

The primary objective of the testing is to characterize Ni-H2 cells for successful integration into the electrical power system (EPS) of the Hubble Space Telescope (HST). A broad spectrum of Ni-H2 design technology is encompassed by the testing configurations; tests include cells with dates of manufacture as early as 1976. The database includes cells of varied storage times, capacity, plate design, stack design, terminal configuration, pressure vessel thickness, separator material, potassium hydroxide (KOH) concentration, and thermal control. Currently, 196 Ni-H2 cells are being tested, grouped as follows: 12 RNH-35-3, 14 RNH-30-1, 22 HST cells (1 battery, flight spare lot), 132 HST cells (6 batteries, test modules 1 and 2, called TM1 and TM2), 12 HST cells (3 four-cell packs, TM1, TM2, flight spare module FSM), and 4 HST cells (engineering lot). In addition to the characterization and life testing, an extensive thermal vacuum and purge test was conducted in November 1989 and February 1990 using the HST FSM (3 batteries composed of 69 HST cells from the flight spare lot) to help verify thermal design. A report is presented of the progress, significant findings, and future objectives of the testing.

Lowery, John E.↗