Search NASA⌕ Search

SEARCH · Search NASA

Results for “status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

STS-114: Discovery Day 9 Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director, Mark Ferring, STS-114 Lead ISS Flight Director and Cindy Begley, STS-114 Lead EVA Officer is shown during this 9th day of the Space Shuttle Mission to the International Space Station. Paul Hill talks about the status of the transfers of critical items to the International Space Station and transfers back from the International Space Station into the Multi-Purpose Logistics Module (MPLM). Hill also presents footage of the crew cabin blanket survey procedure. Mark Ferring talks in detail about the primary International Space Station task on the External Stowage Platform (ESP). The status of the external stowage platform installation, removal of grapple fixture, gap filler removal task, and Materials International Space Station Experiment (MISSE) 5 payload installation is discussed by Cindy Begley. She also presents footage of Steve Robinson's spacewalk before the gap filler task and during the removal of the gap filler. The Capture of ESP-2 is also presented. The presentation ends with a question and answer period from the news media

Source record↗

STS-114: Discovery Mission Status Briefing

This STS-114 Discovery Mission Status Briefing begins with Eileen Collins, Commander of the STS-114 Discovery, and crewmembers in orbit talking with mission control after launch of the Space Shuttle Discovery. Collins gives tribute to the crewmembers of the Space Shuttle Columbia and their families. Phil Engelauf, STS-114 Mission Operations Representative presents his mission status briefing and John Shannon, Space Shuttle Flight Operations and Integration Manager talks about the processing of radar data taken of the Space Shuttle Discovery during ascent. A video presentation from the Solid Rocket Booster Camera is shown by John Shannon. The video includes: 1) Piece of orbiter tile and origins of debris; 2) Pictures of debris after SRB separation; 3) TYVEK covers; and 4) Bird impacts external tank nose cone. Questions from the news media about tile shearing, vehicle damage and debris from the external tank are answered.

Source record↗

Status, Plans, and Initial Results for Crew Launch Vehicle Aerodynamics

Following the completion of NASA s Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Exploration Launch Office at the NASA Marshall Space Flight Center began design and development of the first vehicle in the architecture, the Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar missions. The primary elements of the CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of CLV aerodynamics as the project was preparing for the CLV Systems Requirements Review. Following a status of the current activities and a discussion of the specific interactions with other technical panels, the plans for aerodynamic support of the CLV until the initial crewed flights will be presented. The paper will conclude with a review of initial results acquired since project inception, including engineering-code vehicle assessment, computational fluid dynamics analysis, and wind tunnel test data.

Huebner, Lawrence D.↗

Status, Plans, and Initial Results for ARES 1 Crew Launch Vehicle Aerodynamics

Following the completion of NASA's Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Exploration Launch Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented.

Huebner, Lawrence D.↗

Status of the L2 and Lunar Charged Particle Environment Models

The L2 Charged Particle Environment (L2-CPE) model is an engineering tool which provides free field charged particle environments for distant magnetotail, magnetosheath, and solar wind environments. L2-CPE is intended for use in assessing contributions from low energy radiation environments (4.1 keV to few MeV) to radiation dose in thin materials used in construction of spacecraft to be placed in orbit about the Sun-Earth L2 point. This paper describes the status of the current version of the L2-CPE model including structure of the model used to organize plasma environments into solar wind, magnetosheath, and magnetotail environments, the algorithms used to estimate radiation fluence in sparsely sampled environments, the updated graphical user interface, and output options for flux and fluence environments. In addition, we describe the status and plans for updating the model to include environments relevant to lunar programs.

Minow, Joseph I.↗

Status, Plans and Initial Results for Ares I Crew Launch Vehicle Aerodynamics

Following the completion of NASA s Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Ares Projects Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented. Keywords: Ares I Crew Launch Vehicle, aerodynamics, wind tunnel testing, computational fluid dynamics

Huebner, Lawrence D.↗

Nutritional Status in Humans during Long-Duration Bed Rest

Bed rest is a valuable ground-based model for many of the physiological changes associated with space flight. A series of studies was undertaken to evaluate nutritional changes during and after 60 or 90 days of -6 head-down-tilt bed rest. A total of 11 subjects (8 M, 3 F; age 26-55 y) participated in the studies. Blood and urine were collected twice before bed rest and once per month during bed rest. Samples were analyzed in batch at the end of each study. Data were analyzed using repeated-measures ANOVA. Markers of bone resorption (such as n-telopeptide excretion, p less than 0.05) increased during bed rest, and 25-OH vitamin D status tended to decline (p=0.06). During bed rest oxidative damage markers, such as superoxide dismutase increased (p less than 0.01) and 8-(OH)-2'-deoxyguanosine tended to increase (p=0.07); whereas total antioxidant capacity decreased (p less than 0.02). Iron status indices showed patterns of increased iron stores, with decreased transferrin receptors (p less than 0.001). Biochemical markers revealed a tendency toward a loss of muscle mass, by lower excretion of creatinine and 3-methyl-histidine during bed rest. All of these changes are very similar to those observed during space flight, and further document the utility of bed rest as a model of space flight.

Smith, Scott M.↗

ALSSAT Development Status

The development of the Advanced Life Support (ALS) Sizing Analysis Tool (ALSSAT) using Microsoft(Registered TradeMark) Excel was initiated by the Crew and Thermal Systems Division (CTSD) of Johnson Space Center (JSC) in 1997 to support the ALS and Exploration Offices in Environmental Control and Life Support System (ECLSS) design and studies. It aids the user in performing detailed sizing of the ECLSS for different combinations of the Exploration Life support (ELS) regenerative system technologies. This analysis tool will assist the user in performing ECLSS preliminary design and trade studies as well as system optimization efficiently and economically. The latest ALSSAT related publication in ICES 2004 detailed ALSSAT s development status including the completion of all six ELS Subsystems (ELSS), namely, the Air Management Subsystem, the Biomass Subsystem, the Food Management Subsystem, the Solid Waste Management Subsystem, the Water Management Subsystem, and the Thermal Control Subsystem and two external interfaces, including the Extravehicular Activity and the Human Accommodations. Since 2004, many more regenerative technologies in the ELSS were implemented into ALSSAT. ALSSAT has also been used for the ELS Research and Technology Development Metric Calculation for FY02 thru FY06. It was also used to conduct the Lunar Outpost Metric calculation for FY08 and was integrated as part of a Habitat Model developed at Langley Research Center to support the Constellation program. This paper will give an update on the analysis tool s current development status as well as present the analytical results of one of the trade studies that was performed.

Yeh, H. Y. Jannivine↗

Nutritional Status Assessment

Nutritional Status Assessment (Nutrition) is the most comprehensive inflight study done by NASA to date of human physiologic changes during long-duration space flight; this includes measures of bone metabolism, oxidative damage, nutritional assessments, and hormonal changes. This study will impact both the definition of nutritional requirements and development of food systems for future space exploration missions to the Moon and Mars. This experiment will also help to understand the impact of countermeasures (exercise and pharmaceuticals) on nutritional status and nutrient requirements for astronauts.

Smith, Scott M.↗

JWST OTE Development Status

This slide presentation reviews the status of the optical telescope element (OTE) for the James Webb Space Telescope (JWST). Information about the cryotests that have been performed, and the test of the Primary Mirror Segment Assembly (PMSA) is included. Also views of the progress on the secondary, tertiary Mirror Segment Assembly and the fine steering motor are included. Information is included about the status of other structures. The critical design audit (CDA) of the OTE is scheduled for October of 2009.

Keski-Kuha, Ritva↗

Autonomous Precision Landing and Hazard Avoidance Technology (ALHAT) Project Status as of May 2010

This paper includes the current status of NASA s Autonomous precision Landing and Hazard Avoidance Technology (ALHAT) Project. The ALHAT team has completed several flight tests and two major design analysis cycles. These tests and analyses examine terrain relative navigation sensors, hazard detection and avoidance sensors and algorithms, and hazard relative navigation algorithms, and the guidance and navigation system using these ALHAT functions. The next flight test is scheduled for July 2010. The paper contains results from completed flight tests and analysis cycles. ALHAT system status, upcoming tests and analyses is also addressed. The current ALHAT plans as of May 2010 are discussed. Application of the ALHAT system to landing on bodies other than the Moon is included

Striepe, Scott A.↗

Status of the Combined Cycle Engine Rig

Status for the past year is provided of the turbine-based Combined-Cycle Engine (CCE) Rig for the hypersonic project. As part of the first stage propulsion of a two-stage-to-orbit vehicle concept, this engine rig is designed with a common inlet that supplies flow to a turbine engine and a dual-mode ramjet / scramjet engine in an over/under configuration. At Mach 4 the inlet has variable geometry to switch the airflow from the turbine to the ramjet / scramjet engine. This process is known as inlet mode-transition. In addition to investigating inlet aspects of mode transition, the rig will allow testing of turbine and scramjet systems later in the test series. Fully closing the splitter cowl "cocoons" the turbine engine and increases airflow to the scramjet duct. The CCE Rig will be a testbed to investigate integrated propulsion system and controls technology objectives. Four phases of testing are planned to 1) characterize the dual inlet database, 2) collect inlet dynamics using system identification techniques, 3) implement an inlet control to demonstrate mode-transition scenarios and 4) demonstrate integrated inlet/turbine engine operation through mode-transition. Status of the test planning and preparation activities is summarized with background on the inlet design and small-scale testing, analytical CFD predictions and some details of the large-scale hardware. The final stages of fabrication are underway.

Saunders, Dave↗

ISS/STS Ground Status at KSC

This slide presentation reviews the status of several shuttle missions. It includes a timeline for three STS missions (i.e., OV-103, OV-104, and OV-105), and specific information about each mission, and the status of the shuttle that is to be used

Kirkpatrick, Paul↗

Status of the James Webb Space Telescope Integrated Science Instrument Module System

The Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope (JWST) is discussed from a systems perspective with emphasis on development status and advanced technology aspects. The ISIM is one of three elements that comprise the JWST space vehicle and is the science instrument payload of the JWST. The major subsystems of this flight element and their build status are described.

Greenhouse, Matthew A.↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of June 2012, and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of May 2011, and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Nutritional Status Assessment (SMO -16E)

The Nutritional Status Assessment Supplemental Medical Objective was an experiment initiated to expand nominal pre- and postflight clinical nutrition testing, and to gain a better understanding of the time course of changes during flight. The primary activity of this effort was collecting blood and urine samples 5 times during flight for analysis after return to Earth. Samples were subjected to a battery of tests, including nutritional, physiological, general chemistry, and endocrinology indices. These data provide a comprehensive survey of how nutritional status and related systems are affected by 4-6 months of space flight. Analyzing the data will help us to define nutritional requirements for long-duration missions, and better understand human adaptation to microgravity. This expanded set of measurements will also aid in the identification of nutritional countermeasures to counteract, for example, the deleterious effects of microgravity on bone and muscle and the effects of space radiation.

Smith, Scott M.↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of June 2013, and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗