Search NASA⌕ Search

SEARCH · Search NASA

Results for “subcontracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

85 records · Page 5

Marshall Space Flight Center Small Business Opportunities

This viewgraph presentation reviews the small business opportunities that are available with the Marshall Space Flight Center. It includes information on all forms of opportunities available and information sources: subcontracting, websites, contacts and a separate section on Small Business Innovation Research (SBIR) & Small Business Technology Transfer (STTR) Programs

Garrison, Lynn↗

Development and Testing of the Orion CEV Parachute Assembly System (CPAS)

The Crew Exploration Vehicle (CEV) is an element of the Constellation Program that includes launch vehicles, spacecraft, and ground systems needed to embark on a robust space exploration program. As an anchoring capability of the Constellation Program, the CEV shall be human-rated and will carry human crews and cargo from Earth into space and back again. Coupled with transfer stages, landing vehicles, and surface exploration systems, the CEV will serve as an essential component of the architecture that supports human voyages to the Moon and beyond. In addition, the CEV will be modified, as required, to support International Space Station (ISS) mission requirements for crewed and pressurized cargo configurations. Headed by Johnson Space Center (JSC), NASA selected Jacobs Engineering as the support contractor to manage the overall CEV Parachute Assembly System (CPAS) program development. Airborne Systems was chosen to develop the parachute system components. General Dynamics Ordnance and Tactical Systems (GD-OTS) was subcontracted to Airborne Systems to provide the mortar systems. Thus the CPAS development team of JSC, Jacobs, Airborne Systems and GD-OTS was formed. The CPAS team has completed the first phase, or Generation I, of the design, fabrication, and test plan. This paper presents an overview of the CPAS program including system requirements and the development of the second phase, known as the Engineering Development Unit (EDU) architecture. We also present top level results of the tests completed to date. A significant number of ground and flight tests have been completed since the last CPAS presentation at the 2007 AIAA ADS Conference.

Lichodziejewski, David↗

Marshall Space Flight Center Engineering Directorate Overview: Launching the Future of Science and Exploration

The Marshall Small Business Association (MSBA) serves as a central point of contact to inform and educate small businesses interested in pursuing contracting and subcontracting opportunities at the Marshall Space Flight Center. The MSBA meets quarterly to provide industry with information about how to do business with Marshall and to share specific information about Marshall s mission, which allows private businesses to envision how they might contribute. For the February 19 meeting, the Engineering Directorate will give an overview of its unique capabilities and how it is organized to provide maximum support for the programs and projects resident at Marshall, for example, the Space Shuttle Propulsion Office, Ares Projects Office, and Science and Mission Systems Office. This briefing provides a top-level summary of the work conducted by Marshall s largest organization, while explaining how resources are deployed to perform the volume of work under Marshall s purview.

Miley, Steven C.↗

Automated Planning and Scheduling for Space Mission Operations

Research Trends: a) Finite-capacity scheduling under more complex constraints and increased problem dimensionality (subcontracting, overtime, lot splitting, inventory, etc.) b) Integrated planning and scheduling. c) Mixed-initiative frameworks. d) Management of uncertainty (proactive and reactive). e) Autonomous agent architectures and distributed production management. e) Integration of machine learning capabilities. f) Wider scope of applications: 1) analysis of supplier/buyer protocols & tradeoffs; 2) integration of strategic & tactical decision-making; and 3) enterprise integration.

scheduling↗

Workmanship Challenges for NASA Mission Hardware

This slide presentation reviews several challenges in workmanship for NASA mission hardware development. Several standards for NASA workmanship exist, that are required for all programs, projects, contracts and subcontracts. These Standards contain our best known methods for avoiding past assembly problems and defects. These best practices may not be available if suppliers are used who are not compliant with them. Compliance includes having certified operators and inspectors. Some examples of problems that have occured from the lack of requirements flow-down to contractors are reviewed. The presentation contains a detailed example of the challenge in regards to The Packaging "Design" Dilemma.

Plante, Jeannette↗

Analysis of Dependencies and Impacts of Metroplex Operations

This report documents research performed by Purdue University under subcontract to the George Mason University (GMU) for the Metroplex Operations effort sponsored by NASA's Airportal Project. Purdue University conducted two tasks in support of the larger efforts led by GMU: a) a literature review on metroplex operations followed by identification and analysis of metroplex dependencies, and b) the analysis of impacts of metroplex operations on the larger U.S. domestic airline service network. The tasks are linked in that the ultimate goal is an understanding of the role of dependencies among airports in a metroplex in causing delays both locally and network-wide. The Purdue team has formulated a system-of-systems framework to analyze metroplex dependencies (including simple metrics to quantify them) and develop compact models to predict delays based on network structure. These metrics and models were developed to provide insights for planners to formulate tailored policies and operational strategies that streamline metroplex operations and mitigate delays and congestion.

DeLaurentis, Daniel A.↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Source record↗

Design Concepts for Cooled Ceramic Composite Turbine Vane

The objective of this work was to develop design concepts for a cooled ceramic vane to be used in the first stage of the High Pressure Turbine(HPT). To insure that the design concepts were relevant to the gas turbine industry needs, Honeywell International Inc. was subcontracted to provide technical guidance for this work. The work performed under this contract can be divided into three broad categories. The first was an analysis of the cycle benefits arising from the higher temperature capability of Ceramic Matrix Composite(CMC) compared with conventional metallic vane materials. The second category was a series of structural analyses for variations in the internal configuration of first stage vane for the High Pressure Turbine(HPT) of a CF6 class commercial airline engine. The third category was analysis for a radial cooled turbine vanes for use in turboshaft engine applications. The size, shape and internal configuration of the turboshaft engine vanes were selected to investigate a cooling concept appropriate to small CMC vanes.

vanes↗

A Dose of Reality: Radiation Analysis for Realistic Human Spacecraft

INTRODUCTION As with most computational analyses, a tradeoff exists between problem complexity, resource availability and response accuracy when modeling radiation transport from the source to a detector. The largest amount of analyst time for setting up an analysis is often spent ensuring that any simplifications made have minimal impact on the results. The vehicle shield geometry of interest is typically simplified from the original CAD design in order to reduce computation time, but this simplification requires the analyst to "re-draw" the geometry with a limited set of volumes in order to accommodate a specific radiation transport software package. The resulting low-fidelity geometry model cannot be shared with or compared to other radiation transport software packages, and the process can be error prone with increased model complexity. The work presented here demonstrates the use of the DAGMC (Direct Accelerated Geometry for Monte Carlo) Toolkit from the University of Wisconsin, to model the impacts of several space radiation sources on a CAD drawing of the US Lab module. METHODS The DAGMC toolkit workflow begins with the export of an existing CAD geometry from the native CAD to the ACIS format. The ACIS format file is then cleaned using SpaceClaim to remove small holes and component overlaps. Metadata is then assigned to the cleaned geometry file using CUBIT/Trelis from csimsoft (Registered Trademark). The DAGMC plugin script removes duplicate shared surfaces, facets the geometry to a specified tolerance, and ensures that the faceted geometry is water tight. This step also writes the material and scoring information to a standard input file format that the analyst can alter as desired prior to running the radiation transport program. The scoring results can be transformed, via python script, into a 3D format that is viewable in a standard graphics program. RESULTS The CAD model of the US Lab module of the International Space Station, inclusive of all the racks and components, was simplified to remove holes and volume overlaps. Problematic features within the drawing were also removed or repaired to prevent runtime issues. The cleaned drawing was then run through the DAGMC workflow to prepare for analysis. Pilot tests modeling transport of 1GeV proton and 800MeV/A oxygen sources show that reasonable results are converged upon in an acceptable amount of overall computation time from drawing preparation to data analysis. The FLUKA radiation transport code will next be used to model both a GCR and a trapped radiation source. These results will then be compared with measurements that have been made by the radiation instrumentation deployed inside the US Lab module. DISCUSSION Early analyses have indicated that the DAGMC workflow is a promising toolkit for running vehicle geometries of interest to NASA through multiple radiation transport codes. In addition, recent work has shown that a realistic human phantom, provided via a subcontract with the University of Florida, can be placed inside any vehicle geometry for a combinatorial analysis. This added functionality gives the user the ability to score various parameters at the organ level, and the results can then be used as input for cancer risk models.

Barzilla, J. E.↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Planning Package↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Schumann, Deborah C.↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Christopher Lewis Sadler↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide EVM guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts, and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical, cost and schedule problems as well as the intended course and success of corrective actions.

Christopher Lewis Sadler↗