Search NASA⌕ Search

SEARCH · Search NASA

Results for “succession planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Capabilities Development at the University of Texas at El Paso for Hydrogen Generation Research and Education

Gasification-based systems have recently received much attention due to their capability of converting wastes into useful fuels. The gasification of biomass, municipal solid waste (MSW), plastics, and other sustainable resources has shown promise in hydrogen production. When coupled to a CCU or CCS unit, these systems have the potential to achieve carbon neutrality or carbon-negative emissions. In addition, these systems have an edge over conventional incineration or landfill systems by reducing greenhouse gas emissions and recovering useful energy. However, the gasification of MSW and other wastes is still in its early stages. In particular, co-gasification of wastes with biomass has significant unknowns in optimizing the reaction kinetics, operability, design and performance improvements. Currently, Supercritical Water Gasifiers (SCWG) and Plasma Gasifiers are the major systems that are capable of producing high hydrogen amounts from Biomass and MSW, respectively. However, both systems have high capital and operating costs, adversely affecting efficiency and the hydrogen production cost. Additionally, due to lower temperatures, SCWGs are prone to tar formation and fouling in the heat exchangers. Hence, there is a need to look for alternative solutions for MSW and biomass gasifications, particularly in co-gasification. The current effort aims to develop a strategic plan to establish a sustainable gasification facility for hydrogen research at the University of Texas at El (UTEP). A major part of this effort involves an extensive literature survey to identify technological gaps and potential areas of interest. Several concepts were developed in accordance with the current demands from the literature survey. Based on the concepts, a center-wide capability assessment was conducted to measure the current capacity and feasibility of establishing hydrogen research. Afterward, a strategic research plan was developed, and a list of required resources was made for the expansion of hydrogen research at UTEP. In addition, successful partnerships with the local county and the city were developed to pursue hydrogen research. The strategic goal setting and planning of UTEP Aerospace Center resulted in securing $2.5 million in external support to expand the hydrogen research during the project performance period. In addition, during the project period, a course in Hydrogen Energy Systems was developed to expand the energy curriculum at the UTEP Aerospace and Mechanical Engineering Department. The course focused on hydrogen production, storage, supply and delivery and application. The cross-listed course was offered at both undergraduate and graduate levels during the Spring 2024 semester and had 27 enrolled students. Moreover, the students supported under this award were trained in gasification process modeling, CAD, CFD and FEA during the project period. The training enabled the students to move into new projects to support gasification design, integrated gasification combined cycle process plant analysis, gasifier structural and operational analysis, and digitally threading the systems.

08 HYDROGEN↗

Strategies for Successful Energy Project Financing [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers.This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation focuses on strategies for successful project financing. This workshop is on April 29, 2026.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Report: Next Generation Diamond Drumhead X-Ray Optics

Problem / Opportunity Statement: Future high-impact scientific applications at synchrotron and Free-Electron Laser (FEL) X-ray sources require the development of processing and mounting methods for ultra-thin diamond crystals to meet the most challenging needs of pioneering research at next generation light source facilities. These methods should be capable of manufacturing crystal plates as thin as 10 micrometers over an area of a few mm2, and with a surface cut in different crystal orientations, such as the diamond {100}, {111}, {110} and {113} planes. Project Purpose and Approach: In Phase I, Great Lakes Crystal Technologies (GLCT) partnered with Stonybrook University (SUNY) to created thin diamond drumhead crystals. The purpose of the Phase I project is to transfer the drumhead membrane window etching technology from SUNY to GLCT. Testing of a device using the beamline at Stanford Linear Accelerator Laboratory was initially planned, however, a delay on the part of a third party service provided required us to get beamline testing done at Argonne National Laboratory. Phase I Taskwork: Testing of a high purity diamond plate thinning and etching process was performed. By SUNY and GLCT. Plates were sent to a third party service provider for thinning to ~100 microns, however, delays required that GLCT develop an in-house thinning process to complete the taskwork. GLCT successfully developed this in-house capability even though it was initially planned to be part of the Phase II Taskwork. Multiple practice and deliverable plates were provided to SUNY to be etched into the target drumhead devices. GLCT practiced and refined an in-house plate thinning process and produced five plates with thicknesses in the 60 – 150 micron range. Processing of the plates has begun and will continue in a no-cost extension period necessitated by the third party service provider delay. GLCT also procured and installed a reactive ion etching/inductively coupled plasma system. In addition, one of the thinned plates was measured at the Applied Photon Source at APL for a pre-processing assessment of the crystalline strain. After processing the plate into a drumhead and annealing, a post-processing assessment of the strain will be performed. Phase I Results: The initial data from GLCT’s plate thinning process development, SUNY’s drumhead etching processing, and characterization at APS/ANL demonstrate our teams capabilities to achieve the project goals. Commercial Applications & Benefits: The proposed technology will benefit advanced x-ray science performed at BNL and the 70+ additional advanced beamlines around the world. There are also a number of medical and homeland security applications which could benefit from the technology.

Quayle, Paul↗

Energy Project Siting, Permitting, and Community Impacts [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers.This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation focuses on strategies for successful project financing. This workshop is on April 29, 2026.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Analysis and Planning Framework for Nuclear Plant Transformation

Commercial nuclear power in the United States has been an unqualified success by any measure, providing low cost, carbon-free, and safe baseload electricity for decades. The industry today is at the peak of its historical performance in terms of generation output, reliable operations, and demonstrated nuclear safety. However, it is no longer among the lowest-cost electric generation sources with the emergence of subsidized renewables and shale gas generation. The business model that has served the operating nuclear fleet so well over its life is now a drag on cost performance due to its reliance on a large highly skilled labor force. In contrast, digital technology and innovation are enabling dramatic efficiencies in energy production, resulting in fierce competition for a commodity such as electricity. The nuclear power industry has responded to this challenge with many initiatives to improve efficiency and modernize plant equipment, especially where reliability and obsolescence issues are pressing. However, it would be a missed opportunity to merely modernize the plant components and the work processes of an outdated business model that was formulated to manage the technology of the 1960s. Rather, the greater opportunity is to transform that business model to one that fully exploits the capabilities of modern digital technology, resulting in substantially lower production costs and sustainable market viability. One successful example of such transformation is the concept of Integrated Operations, which was introduced into the North Sea oil and gas industry a couple of decades ago when the profitability of operating these fields was severely threatened by low world petroleum prices and the high overhead of operating the offshore oil and gas platforms. This effort resulted in significant changes to how these oil fields were operated and allowed the industry to continue profitable operation of these platforms. This example has some remarkable parallels to the U.S. commercial nuclear industry as described in the next section. This report provides an analysis and planning framework for such a nuclear plant operating model transformation based on the transferable learnings from the North Sea transformation. This framework is termed Integrated Operations for Nuclear or ION. This report describes the key principles and methods of Integrated Operations and how they are being applied in a collaboration between the DOE Light Water Reactor Sustainability Program and Xcel Energy in an initiative to transform its operating model for performance improvement and long-term sustainability. It describes a method to bring the operating costs of a nuclear fleet in line with market-based pricing, transforming work functions to reduce cost with technology innovations. This initiative will continue over the next several years in the detailed development of transformative concepts for nuclear plants, which will be published as follow-up to this initial report on Integrated Operations for Nuclear.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SCO#1197 Addendum #4 OSR Characterization Database (Test Report)

A test plan was developed and approved in June of 2022. Testing was successfully performed to verify the functions of Version 2.0 of the OSR Characterization database. Checks verified that data remains consistent to tests previously performed using Microsoft Access® 2003, 2010 and 2016.

97 MATHEMATICS AND COMPUTING↗

Toward Solar Photovoltaic Storm Resilience: Learning from Hurricane Loss and Rebuilding Better

The General Service Administration (GSA) suffered extensive damage to its solar arrays located throughout the Caribbean from Hurricanes Irma and Maria in 2017. While the damage that occurred was unfortunate, there are excellent lessons learned that can be gained and utilized on new systems. A site on St. Croix provides a particularly high-value opportunity for lessons learned due to the innovative rebuilding process utilized by GSA managers and the in-depth analysis performed by the project engineers. This case study focuses on the rebuild of a 469-kW ground array located at the Almeric L. Christian Federal Building in Christiansted, St. Croix in the U.S. Virgin Islands. This array was destroyed by Hurricane Maria. The entire process of planning and subsequent rebuilding that the GSA managers undertook was highly successful. Notably, GSA managers conducting the rebuild effort obtained an independent assessment of failure modes from U.S. Department of Energy (DOE) national labs and then retained a consulting engineering firm to develop design and construction guidance for the rebuild effort. This design and construction guidance was then provided to the engineering, procurement, and constructing firm to implement while rebuilding the site.

14 SOLAR ENERGY↗

Cold Spray Cobalt Magnetostrictive Electromagnetic Acoustic Transducers for High Temperature Structure Monitoring

The Department of Energy’s Advanced Sensors and Instrumentation program seeks to develop and qualify advanced sensors for the nuclear industry. Reliable high temperature and high radiation sensors for detection and characterization of structural flaws in pipes, vessels, and structurally critical components is a weakness for both conventional light water reactors with coolant T-hot approaching 350oC, and for advanced reactors with T-hot temperatures in excess of 500 to 800oC. Magnetostrictive Electromagnetic Acoustic Transducers using a cold spray cobalt coating have been proposed as a sensor design that can withstand these kinds of temperatures and radiation levels to serve as online sensors to detect flaws before cracks, pits, or erosion/corrosion flaws progress to through-wall failures. This report tests cold spray cobalt as part of a magnetostrictive EMAT for high temperature service. Cobalt is known to have strong magnetostrictive properties however the effect of cold spray application is not well studied. This program was surprised to discover that cold sprayed cobalt exhibited little or no magnetostrictive behavior until it was thermally annealed. Following annealing to 650oC however, cold spray cobalt did exhibit a magnetostrictive response. Work to date prior to this milestone report publication showed that magnetostrictive EMAT was successfully tested to 400oC with an alnico permanent magnet. The program plans to extend testing with an electromagnet to higher temperatures. This follow-on work will be reported under subsequent publications or as a revision to this report.

Glass, Samuel W.↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pathways and Insights from Community Solar: A Guide to Community Energy Storage Success

Community energy assets bring the benefits of renewables to all energy system stakeholders, not just those with sufficient capital, land ownership, and resources. As the price of energy storage continues to decline and energy equity and justice principles are incorporated into policies and planning activities, Community Energy Storage (CES) is poised to follow in the footsteps of Community Solar’s (CS) success. Though CES is in its early stages and faces many unique challenges, it is an invaluable tool on the pathway to decarbonization, with the potential to increase renewable access, energy affordability, resilience, energy independence, wealth creation, and community empowerment. This paper provides a brief review of the history of CS, comparing the market and regulatory advances of CS to the current state of CES. The lessons learned from the rise of CS are then adapted to support those working to increase CES adoption in pursuit of a more equitable and sustainable energy system for all.

community energy planning, community solar, commun↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Draft Prototype Microreactor Transportation Safety Program

Microreactors are compact reactors capable of producing less than 50 megawatts of electrical energy. Typically, these reactors are factory-fabricated and designed to be easily transportable by truck, rail, vessel, or air. Microreactor designs often assume that the unit can be transported containing either unirradiated or irradiated fuel. The interest in microreactors is driven by several factors, including the need to generate power on at remote locations, at military installations, at facilities such as data centers, and in areas recovering from natural disasters. The U.S. Department of Defense is actively pursuing the microreactor concept to meet the increasing energy demands of military operations that require portable and dense power sources. Commercial vendors are also exploring microreactor concepts. The report Microreactor Transportation Emergency Planning Challenges (Maheras et al. 2024) outlined the emergency planning challenges associated with the transportation of microreactors by road, rail, and by barge/ship. The successful commercial deployment and redeployment of microreactors will also require the development of microreactor transportation safety programs. The elements in these safety programs are not specific to microreactors; however, the transport of microreactors may pose unique challenges in these areas. This report builds on the report Microreactor Transportation Emergency Planning Challenges (Maheras et al. 2024) and develops the elements of a prototype microreactor transportation safety program that describes the elements that should be contained vendor-developed microreactor transportation safety programs, identifying the unique elements associated with microreactor transport. This will provide vendors and their transportation contractors a basis for their transportation planning and will accelerate the commercial deployment and redeployment of microreactors by identifying those issues unique to microreactor transport. The emphasis of this report is on highway transport of microreactors. This is based on a U.S. Nuclear Regulatory Commission transportation package approval strategy of crawl-walk-run, where transport by highway is evaluated first (Coles et al. 2021, 2024, Maheras et al. 2021), then other surface modes (rail and barge/ship), and finally air transport. Evaluation of maritime transport of microreactors was recently initiated (Rigato et al. 2024, Maheras et al. 2025). The report first discusses microreactors in general and microreactor transportation safety program planning assumptions. The report then provides a description of the transportation safety planning process and provides an extensive discussion of the elements of transportation safety programs. Specific elements examined included transportation roles and responsibilities, transportation planning, transportation mode and route selection, carrier selection, transportation packaging, advance notification of shipments, public information and communications, emergency response plans and procedures, inspections, security, safe parking, shipment tracking, weather and road conditions, medical preparedness, training and exercises, and program evaluation. The report then identifies the unique elements of a transportation safety program associated with microreactor transport. These unique elements were in the areas of: the unusual nature of microreactor designs, compensatory measures, increased radiation dose rates in the vicinity of microreactors, transportation package approval versus 10 CFR 50.59, and the use of a risk-informed transportation package approval process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Autonomous Tools for Attack Surface Reduction (Final Report)

The electric power grid is a complex critical infrastructure that forms the lifeline of modern society, and its secure and reliable operation is of paramount importance to national security and economic wellbeing. However, recent findings documented in authoritative sources indicate the threat of cyber-based attacks growing in numbers and sophistication. However, securing the grid against stealthy cyberattacks is a challenging task due to legacy nature of the infrastructure coupled with dynamic nature of threat landscape and ever-growing sophistication of the adversaries. Additionally, the grid’s attack surface continues to grow with the increased dependence on digital communications and control that now extends to each consumer through smart meters and distributed energy resources. Unfortunately, this expansive surface increases the grid’s vulnerability and further exposes critical control systems in both substations and control centers. To respond to this emerging need, we had successfully assembled an interdisciplinary team with academic- industry partnership to successfully conduct research, development, evaluation, demonstration, and commercialization of attack surface reduction tools, whose goal was to significantly reduce the cyber attack surface in the North American power grid. Our proposed project was a synergistic collaborative effort leveraging the synergistic expertise of the team members across power systems, cyber security and CPS security, testbeds, field deployments and demonstration, and successful commercialization. The following are the specific tasks that have been successfully completed two phases (2016-2020). Phase I: Task 1: Developed and implemented a robust Project Management and Data Management Plan, coupled with a well thought out Risk Mitigation Plan. Task 2.1: Developed a comprehensive framework that continually assesses and autonomously reduces the attack surface for the power grid control environment spanning across substations, control center and the SCADA network to significantly reduce the risks of cyber attacks. Task 2.2: Developed attack surface analysis techniques, metrics, and tools that assess the attack surface at multiple levels including the control center, substations, and the SCADA network. Task 2.3: Developed attack surface reduction techniques and tools that dynamically reduce attack surface and hence increase attacker’s cost without interfering in the critical functions of the system. Task 2.4: Prototyped, implemented, and quantitatively evaluated/validated the techniques and tools on a realistic industrial CPS security testbed environment by leveraging the unique resources of the team. Task 3: Developed Commercialization plan to transition the developed tools into power system industry stakeholders for a broader adoption by leveraging the expertise of our industrial members. Phase II: Task 4: Successfully completed field demonstration, verification, and evaluation of the effectiveness of the attack surface analysis and reduction techniques on a realistic utility testbed environment. This also involved the development of realistic scenarios, sound metrics, data sets, evaluation criteria, and documentation. Technology integration & Field demonstration: The project had significantly advanced the state-of-the-art research and practice in improving the cybersecurity of our nation’s power grid infrastructure against cyber threats. In particular, the proposed, designed, and deployed attack surface analysis and reduction algorithms and tools have contributed to significantly reducing the exposure and risk of the devices, substations, and the integrated SCADA/EMS/ DMS grid environment to cyber threat. Strong demonstration and evaluation techniques have verified the feasibility of the developed techniques on realistic cyber-physical testbeds and utility partner's real grid environment, and collaborative research and evaluation of attack surface reduction techniques (for wide-are monitoring and control) within a vendor (GE) EMS platform. The Attack Host Analyzer (AHA) tool that was developed through this project was made available through GitHub.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

The BREKTRIA 500 – A Breakthrough in Technology and Power Density for an Advanced 500kW Utility-Scale String Inverter (Final Technical Report)

The primary goal of this development project, planned to be 36 months in duration, was to create a 500kW utility-scale string inverter, demonstrating an advanced hybrid architecture that would achieve unprecedented high power density, and bring the inverter to the stage of production readiness. Specific key objectives for the 500kW utility-scale string inverter were: Create a 500kW 3-phase 600Vac inverter that was similar in overall size to the existing 250kW string inverters in the market, thereby demonstrating dramatically increased power density; Achieve a cost of goods, including all manufacturing-related costs and overheads, at or below 2.5¢/Wac ($12,500); Demonstrate full-power operation at a 45-50C ambient temperature with no power de-rating; Accommodate a PV array DC input of up to 1MWdc, aka a DC/AC Ratio of 2.0; Demonstrate peak efficiency greater than 99% at any operating dc voltage, and a CEC weighted average efficiency greater than or equal to 98.5%. The motivation for this project was to leapfrog the competition by creating the world’s most powerful string inverter, utilizing an innovative topology and achieving a step change increase in power density. Achieving the goals of the project would have enabled Yaskawa Solectria Solar to demonstrate its technology leadership, manufacture the utility-scale string inverter in the company’s facilities in Illinois, and bring to the market a highly-differentiated and compelling product to help the company grow its share in the large and growing utility market segment. During the course of this project, BREK Electronics’ hybrid architecture inverter was taken from an early-stage 125kW prototype, to a more mature and successfully demonstrated power stage at twice the power. Two 250kW power stages were planned to build the 500kW inverter. Significant progress was made in the inverter controls, achieving a clean AC sinewave and closed-loop operation into the grid, and improved efficiency by control of the high-speed switching. Further, the updated 250kW power stage was on track to achieve full power operation at an ambient temperature of 50C. At the time of the project’s closure in September 2022, global semiconductor supply remained limited, with shortages creating dramatic swings in both availability and price. Given this situation, our ability to predict cost-of-goods two years out with any accuracy or confidence was limited. As a result, the probability of attaining the target cost of 2.5¢/Wac for the 500kW inverter remained uncertain at the closure of the project. This project successfully demonstrated the potential for the advanced hybrid architecture inverter that emerged from a decade of university research on Si IGBTs and SiC mosfets, leading to this unique inverter topology. The team has taken the first steps toward an evolutionary advancement in inverter technology that remains to be fully realized.

14 SOLAR ENERGY↗

FY 2022 Site Sustainability Plan

The United States Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) is a recognized leader in sustainability, as evidenced by its ongoing optimization of resources in campus operations, including water, energy, waste, and purchasing, as well as continued commitment to meeting federal mandates and goals. NREL's dedication to sustainability supports the laboratory's success by applying what is learned through research and development to campus facilities and infrastructure systems. The Site Sustainability Plan provides a road map for all site planning and development. NREL drives the adoption of these initiatives to a global audience by conducting business operations that demonstrate the incorporation of clean energy practices. NREL will continue to develop a sustainable and resilient campus while growing greater technological capabilities to advance the national renewable energy marketplace.

climate change↗

Fog and Froth-based Post Combustion CO 2 Capture in Fossil Fuel Power Plants

The University of Kentucky (UK) project titled “Fog+Froth-Based Post-Combustion CO 2 Capture in Fossil Fuel Power Plant”, DE-FE0031733, was conducted from 5/1/2019 to 12/31/2023 in two Budget Periods (BPs), with BP1 from 5/1/2019 to 1/31/2021 and with BP2 from 2/1/2021 to 12/31/2023. The overall goal is to reduce the CO 2 capture capital and operating cost by reducing the absorber size. Other participants included Industrial Climate Solutions, Inc. (ICSI), ALL4 and NexantECA. All project deliverables, milestones, and success criteria were met. Scaled-up demonstration of the compact absorber is planned and two specific aspects of the project demonstration, the solvent spray and the low absorber bottom packing temperature, have been incorporated into the overall UK CO 2 capture process which is on the road to large scale verification and commercialization.

01 COAL, LIGNITE, AND PEAT↗