Search NASA⌕ Search

SEARCH · Search NASA

Results for “systems architecture systems engineering technology development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

GSFC Information Systems Technology Developments Supporting the Vision for Space Exploration

The Vision for Space Exploration will guide NASA's future human and robotic space activities. The broad range of human and robotic missions now being planned will require the development of new system-level capabilities enabled by emerging new technologies. Goddard Space Flight Center is actively supporting the Vision for Space Exploration in a number of program management, engineering and technology areas. This paper provides a brief background on the Vision for Space Exploration and a general overview of potential key Goddard contributions. In particular, this paper focuses on describing relevant GSFC information systems capabilities in architecture development; interoperable command, control and communications; and other applied information systems technology/research activities that are applicable to support the Vision for Space Exploration goals. Current GSFC development efforts and task activities are presented together with future plans.

Hughes, Peter↗

NASA Space Nuclear Propulsion (SNP) MBSE Initiatives

NASA’s Space Nuclear Propulsion (SNP) program is developing several MagicDraw SysML models to support the development of high performance Nuclear Thermal Rocket Engines (NTRE). Currently, the Demonstration Rocket for Agile Cislunar Operations (DRACO) project is aiming to perform the first ever flight demonstration of an NTRE, and NASA is developing a DRACO Insight Project Model Based Systems Engineering (MBSE) model to capture, define, analyze, and report on the flight and ground test system architecture, functional behavior, requirements, risks, and lessons learned. Additional models are in work for engine component trade trees, fault detection sensor coverage analysis using a Goal Function Tree (GFT) plugin, stakeholder engagement, and technology maturation projects. The GFT plugin is the Galois, Inc. Failure Recovery Instruction Generation using Automata derived from Traditional Engineering models (FRIGATE) tool. A new capability for Jira to MagicDraw data sharing using the OpenPDM collaboration platform is under development with partner Victory Solutions, Inc. to enhance risk impact analysis.

Space Nuclear Propulsion (SNP)↗

HSI in NASA: From Research to Implementation

As NASA plans to send human explorers beyond low Earth orbit, onward to Mars and other destinations in the solar system, there will be new challenges to address in terms of HSI. These exploration missions will be quite different from the current and past missions such as Apollo, Shuttle, and International Space Station. The exploration crew will be more autonomous from ground mission control with delayed, and at times, no communication. They will have limited to no resupply for much longer mission durations. Systems to deliver and support extended human habitation at these destinations are extremely complex and unique, presenting new opportunities to employ HSI practices. In order to have an effective and affordable HSI implementation, both research and programmatic efforts are required. Currently, the HSI-related research at NASA is primarily in the area of space human factors and habitability. The purpose is to provide human health and performance countermeasures, knowledge, technologies, and tools to enable safe, reliable, and productive human space exploration beyond low Earth orbit, and update standards, requirements, and processes to verify and validate these requirements. In addition, HSI teams are actively engaged in technology development and demonstration efforts to influence the mission architecture and next-generation vehicle design. Finally, appropriate HSI references have been added to NASA' s systems engineering documentation, and an HSI Practitioner's Guide has been published to help design engineers consider HSI early and continuously in the acquisition process. These current and planned HSI-related activities at NASA will be discussed in this panel.

Whitmore, Mihriban↗

Systems Engineering for Space Exploration Medical Capabilities

Human exploration missions that reach destinations beyond low Earth orbit, such as Mars, will present significant new challenges to crew health management. For the medical system, lack of consumable resupply, evacuation opportunities, and real-time ground support are key drivers toward greater autonomy. Recognition of the limited mission and vehicle resources available to carry out exploration missions motivates the Exploration Medical Capability (ExMC) Element's approach to enabling the necessary autonomy. The Element's work must integrate with the overall exploration mission and vehicle design efforts to successfully provide exploration medical capabilities. ExMC is applying systems engineering principles and practices to accomplish its goals. This paper discusses the structured and integrative approach that is guiding the medical system technical development. Assumptions for the required levels of care on exploration missions, medical system goals, and a Concept of Operations are early products that capture and clarify stakeholder expectations. Model-Based Systems Engineering techniques are then applied to define medical system behavior and architecture. Interfaces to other flight and ground systems, and within the medical system are identified and defined. Initial requirements and traceability are established, which sets the stage for identification of future technology development needs. An early approach for verification and validation, taking advantage of terrestrial and near-Earth exploration system analogs, is also defined to further guide system planning and development.

Mindock, Jennifer↗

Combined Heat and Power Systems Technology Development and Demonstration 370 kW High Efficiency Microturbine

The C370 Program was awarded in October 2010 with the ambitious goal of designing and testing the most electrically efficient recuperated microturbine engine at a rated power of less than 500 kW. The aggressive targets for electrical efficiency, emission regulatory compliance, and the estimated price point make the system state-of-the-art for microturbine engine systems. These goals will be met by designing a two stage microturbine engine identified as the low pressure spool and high pressure spool that are based on derivative hardware of Capstone’s current commercially available engines. The development and testing of the engine occurred in two phases. Phase I focused on developing a higher power and more efficient engine, that would become the low pressure spool which is based on Capstone’s C200 (200kW) engine architecture. Phase II integrated the low pressure spool created in Phase I with the high pressure spool, which is based on Capstone’s C65 (65 kW) commercially available engine. Integration of the engines, based on preliminary research, would allow the dual spool engine to provide electrical power in excess of 370 kW, with electrical efficiency approaching 42%. If both of these targets were met coupled with the overall CHP target of 85% total combined heating and electrical efficiency California Air Resources Board (CARB) level emissions, and a price target of $600 per kW, the system would represent a step change in the currently available commercial generation technology. Phase I of the C370 program required the development of the C370 low pressure spool. The goal was to increase the C200 engine power by a minimum of 25% — 250 kW — and efficiency from 32% to 37%. These increases in the C200 engine output were imperative to meet the power requirements of the engine when both spools were integrated. An additional benefit of designing and testing the C370 low pressure spool was the possibility of developing a stand-alone product for possible commercialization. The low pressure spool design activity focused on an aeropath derivative of the current C200 engine. The aeropath derivative included changes to the compressor section —compressor and inducer — and to the turbine nozzle. The increased power also necessitated a larger, more powerful generator and generator controller to support the increased power requirements. These two major design changes were completed by utilizing both advanced 3D modeling and computational fluid dynamics modelling. After design, modeling, and analysis, the decision was made to acquire and integrate the components for testing. The second task of Phase I was to integrate and test the components of the low pressure spool to validate power and efficiency. Acquisition of the components for the low pressure spool was completed utilizing Capstone’s current supplier base. Utilization of Capstone’s supply base for integration of the test article would allow — if the decision was made —expedited commercialization of the product. After integration of the engine components, the engine was tested and evaluated for performance and emissions. Test data analysis confirmed that the engine met all power and efficiency requirements and did so while maintaining CARB level emissions. The emissions were met without the use of any post processing or catalyst. After testing was completed, the DOE authorized — via a milestone review — proceeding to Phase II: the development of the integrated C370 engine. The C370 high pressure spool design activity required significant changes to the C65 engine architecture. The engine required a high power density generator, completely redesigned compressor stage, turbine section, recuperator, controls architecture, and intercooler stage asThe two most critical design challenges were the turbine section (the nozzle and turbine) and the controls architecture. The design and analysis of all of the components was completed and integrated into a system model. The system model — after numerous iterations — indicated that, once integrated, the engine will meet or exceed all system requirements. Unfortunately, the turbine section’s life requirements remain a technical challenge and will require continued refinement of the bi-metallic turbine wheel design and manufacturing approach to meet the life requirement at theses high temperatures. The current controls architecture requires substantial effort to develop a system capable of handling the high-speed, near real-time controls requirement, but it was determined not to be a technical roadblock for the project. The C370 Program has been a significant effort with state-of-the-art technical targets. The targets have pushed Capstone’s designers to the limits of current technology. The program has been fortunate to see many successes: the successful testing of the low pressure spool (C250), the development of new material processes, and the implementation of new design practices. The technology and practices learned during the program will be utilized in Capstone’s current product lines and future products. The C370 Program has been a resounding success on many fronts for the DOE and for Capstone.

none↗

Advanced software integration: The case for ITV facilities

The array of technologies and methodologies involved in the development and integration of avionics software has moved almost as rapidly as computer technology itself. Future avionics systems involve major advances and risks in the following areas: (1) Complexity; (2) Connectivity; (3) Security; (4) Duration; and (5) Software engineering. From an architectural standpoint, the systems will be much more distributed, involve session-based user interfaces, and have the layered architectures typified in the layers of abstraction concepts popular in networking. Typified in the NASA Space Station Freedom will be the highly distributed nature of software development itself. Systems composed of independent components developed in parallel must be bound by rigid standards and interfaces, the clean requirements and specifications. Avionics software provides a challenge in that it can not be flight tested until the first time it literally flies. It is the binding of requirements for such an integration environment into the advances and risks of future avionics systems that form the basis of the presented concept and the basic Integration, Test, and Verification concept within the development and integration life cycle of Space Station Mission and Avionics systems.

Garman, John R.↗

Systems Engineering for Space Exploration Medical Capabilities

Human exploration missions to beyond low Earth orbit destinations such as Mars will present significant new challenges to crew health management during a mission compared to current low Earth orbit operations. For the medical system, lack of consumable resupply, evacuation opportunities, and real-time ground support are key drivers toward greater autonomy. Recognition of the limited mission and vehicle resources available to carry out exploration missions motivates the Exploration Medical Capability (ExMC) Element's approach to enabling the necessary autonomy. The Element's work must integrate with the overall exploration mission and vehicle design efforts to successfully provide exploration medical capabilities. ExMC is applying systems engineering principles and practices to accomplish its integrative goals. This paper discusses the structured and integrative approach that is guiding the medical system technical development. Assumptions for the required levels of care on exploration missions, medical system guiding principles, and a Concept of Operations are early products that capture and clarify stakeholder expectations. Mobel-Based Systems Engineering techniques are then applied to define medical system behavior and architecture. Interfaces to other flight and ground systems, and within the medical system are identified and defined. Initial requirements and traceability are established, which sets the stage for identification of future technology development needs. An early approach for verification and validation, taking advantage of terrestrial and near-Earth exploration system analogs, is also defined to further guide system planning and development.

Mindock, Jennifer↗

SigmaCLIPSE = presentation management + NASA CLI PS + SQL

SigmaCLIPSE provides an expert systems and 'intelligent' data base development program for diverse systems integration environments that require support for automated reasoning and expert systems technology, presentation management, and access to 'intelligent' SQL data bases. The SigmaCLIPSE technology and and its integrated ability to access 4th generation application development and decision support tools through a portable SQL interface, comprises a sophisticated software development environment for solving knowledge engineering and expert systems development problems in information intensive commercial environments -- financial services, health care, and distributed process control -- where the expert system must be extendable -- a major architectural advantage of NASA CLIPS. SigmaCLIPSE is a research effort intended to test the viability of merging SQL data bases with expert systems technology.

Weiss, Bernard P., Jr.↗

Pluto Express Sciencecraft System Design

A number of mission system architectures have been studied for a Pluto flyby mission, with the goal of achieving the most cost effective means of meeting a well defined set of science and technology objectives. The results of this trade study have been coupled with a new development implementation approach to create a highly integrated concurrently engineered mission system called a

Pluto↗

L-Band System Engineering - Concepts of Use, Systems Performance Requirements, and Architecture

This document is being provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-band and L-band Communications Standard Development. Task 7 was motivated by the five year technology assessment performed for the Federal Aviation Administration (FAA) under the joint FAA-EUROCONTROL cooperative research Action Plan (AP-17), also known as the Future Communications Study (FCS). It was based on direction provided by the FAA project-level agreement (PLA FY09_G1M.02-02v1) for "New ATM Requirements-Future Communications." Task 7 was separated into two distinct subtasks, each aligned with specific work elements and deliverable items. Subtask 7-1 addressed C-band airport surface data communications standards development, systems engineering, test bed development, and tests/demonstrations to establish operational capability for what is now referred to as the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2, which is the subject of this report, focused on preliminary systems engineering and support of joint FAA/EUROCONTROL development and evaluation of a future L-band (960 to 1164 MHz) air/ground (A/G) communication system known as the L-band digital aeronautical communications system (L-DACS), which was defined during the FCS. The proposed L-DACS will be capable of providing ATM services in continental airspace in the 2020+ timeframe. Subtask 7-2 was performed in two phases. Phase I featured development of Concepts of Use, high level functional analyses, performance of initial L-band system safety and security risk assessments, and development of high level requirements and architectures. It also included the aforementioned support of joint L-DACS development and evaluation, including inputs to L-DACS design specifications. Phase II provided a refinement of the systems engineering activities performed during Phase I, along with continued joint FAA/EUROCONTROL L-DACS development and evaluation support.

Henriksen, Stephen↗

A Technology Architecture for Accessing the Oceans of Icy Worlds

The icy moon oceans beckon with ingredients that potentially may harbour extant life. Beginning with the Galileo and Cassini missions, measurements have revealed the presence of global oceans under the icy crust of several moons of Jupiter and Saturn. Among those moons, Europa and Enceladus have their ocean in contact with the rocky core, providing an environment similar to the conditions existing on the terrestrial sea-floor where life has developed at hydrothermal vents Accessing these oceans presents considerable difficulty due to a number of issues including the depth and composition of the icy crust, the time needed to travel through the crust, the power needed to propel a probe, communication of scientific and engineering data though the ice and back to Earth, entry and mobility in the ocean and autonomous operations for the life of the mission. A detailed trade space study was conducted to develop a technology architecture defining a system that would access an icy moon’s ocean. To specifically bound the architecture, Jupiter’s moon Europa was chosen as the target body though the work can apply to other bodies. The current understanding of the scientific properties of the ice crust and ocean was used to guide the development. A strawman scientific payload was devised to further develop a baseline set of requirements. Beginning with a launch and trajectory that can bring a system to Europa’s orbit, a complete trade space was developed outlining the engineering systems needed to access the ocean. The architecture was divided into specific phases for i) deorbit, descent and landing, ii) surface operations, iii) ice descent and iv) ocean access. The technical maturity of each of sub-system for the phases was assessed for systems that could be developed to a maturity ready for a preliminary design in less than ten years. Integrated system parameters on power, communication capacity, and mass were developed to further define the overall system. To constrain the design, a total time in the ice, from the ice crust surface to accessing the ocean was limited to three years, and 15Km of ice was baselined with a temperature profile through the ice estimated from the scientific literature.

Sengupta, Anita↗

Marshall Space Flight Center Propulsion Systems Department (PSD) KM Initiative

NASA Marshall Space Flight Center s Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities with in the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center Of Excellence (AISCE), Intergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KM implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to support the planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have been performed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural/KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level systems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

A Collaborative Vision for Deep Space Human Exploration

Artemis will be the first cooperative campaign among nations for crewed planetary exploration. This paradigm shift reflects a collaborative vision for deep space human exploration that embraces the concept that, “If you want to go fast, go alone; If you want to go far, go together.” This paper elaborates on the way the National Aeronautics and Space Administration(NASA)is striving to make its Moon to Mars effort a collaborative endeavor for long-term human exploration of deep space and for the international space community. The agency is making great strides in unifying its workforce, mission directorates, technical authorities, and centers behind shared goals and processes. Enhanced communication and a reinvigoration of systems engineering ideals have been a hallmark of that effort, guided by the Moon to Mars Architecture, which defines what NASA aims to accomplish and how it will execute those goals. This interdisciplinary approach ensures the Artemis campaign supports NASA’s engineering, science, and technology development goals. As of September 2024, over 43 nations have signed the Artemis Accords, which establish a common set of principles for peaceful cooperation in civil space exploration. Building off these efforts, NASA has been engaging in separate and distinct discussions about partner contributions to Artemis. International partnerships for the Artemis campaign include long-standing partners as well as agencies with which NASA has only more recently begun collaborating. The Gateway Program is an early example of both –benefitting from partnerships with Canada, Japan, and Europe forged though decades of cooperation on the International Space Station, as well as a new partnership with the United Arab Emirates. The agency’s Moon to Mars Objectives and Architecture unify the NASA workforce with common goals and shared systems-engineering processes. The architecture offers pathways for broader participation from industry, academia, and international partners. The agency evolves this collaborative approach through its annual Architecture Concept Review cycle, seeking input from the NASA workforce, and through workshops, from industry, academia, and the international space community to refine NASA’s roadmap for exploration. Exploring together, NASA and its partners are setting humanity on the path to long-term presence at the Moon and our eventual journey to Mars

Objective↗

Lunar Natural Environment for use by the Constellation Program

The Lunar Environments used by the Constellation Program are embodied in two documents, the NEDD (Natural Environments Definition for Design) and the DSNE (Design Specification for Natural Environments). Recently, the lunar environments for the NEDD have been defined and incorporated in the document, as the result of contributions from experts in all areas of lunar environments. The purpose of the NEDD is to provide a uniform description of the natural environment to serve as a basic framework for both the crewed and robotic missions of the Exploration Systems Mission Directorate (ESMD). It is intended to support engineering and analysis, requirements development, and verification involved in the development of exploration concepts and architectures, flight hardware, and new technologies. (It does not support the operational phases of the Program since models and data with different properties are needed for those applications.) By presenting a single benchmark definition of natural environment parameters it provides an easily accessible and uniform baseline for competitive studies, independent analyses, and concept studies.

Ferguson, Dale C.↗

NASA Aeronautics Research Mission Directorate System Security Engineering Approaches

System security engineering (SSE) is a set of formal engineering methods and is considered a subset of systems engineering. It is a relatively new development in systems engineering with the initial NIST (National Institute of Standards) standard published in November of 2016 with updates in 2018, and 2022. The guiding principles in our methodology are based in NIST Special Publication 800-160 Vol. 1 “Systems Security Engineering: Considerations For A Multidisciplinary Approach In The Engineering Of Trustworthy Secure Systems” and integrate methodologies from common IT (Information Technology) threat modeling approaches utilizing MBSE (Model-Based Systems Engineering). The presentation will discuss how our teams utilize SSE and MBSE (Model-Based Systems Engineering) to develop secure architectures for systems under development in our NASA aeronautics research environment. This includes the activities to develop Protection Needs (PN) that, in turn result in security requirements in the design context and policies for the future state operational context for system protection. The process of applying SSE to analyze project architectures and ConOps (Concept of Operations) is intended to ensure the transferred research is both secure and securable in a “real-world” setting.

Systems Security Engineering↗

Marshall Space Flight Center Propulsion Systems Department (PSD) Knowledge Management (KM) Initiative

NASA Marshall Space Flight Center's Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities within the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center of Excellence (AISCE), lntergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KNI implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to suppo~th e planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have beon pedormed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural1KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level svstems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, - evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

Technologies to Enable the Next Great Observatory

The Large Ultraviolet/Optical/Infrared Surveyor (LUVOIR) is one of four mission concepts being studied by NASA for the 2020 Decadal Survey in Astronomy and Astrophysics. Enabling a mission as ambitious as LUVOIR requires an array of technologies. Critically, a systems-level approach must be taken to developing these technologies, guided by architecture studies to place each technology in the appropriate system context. Three technology systems enable the LUVOIR science objectives: the system, the system, and the system. Each of the technology systems comprise the individual technology components that must be developed and demonstrated as a system. Supporting engineering manufacturing development efforts are also identified for early risk reduction. It is important to note that the high-contrast coronagraph instrument and ultra-stable segmented telescope technology systems are tightly coupled; the performance capabilities of one system drive the requirements of the other. Similarly, the ultraviolet instrumentation technology system is loosely coupled to the other two; while the relative performance affects each system, they do not necessarily drive one another. This coupling between systems requires continuous cross-validation between the technology development paths. It is therefore critical that the technology development plan be executed in parallel with a detailed Pre-Phase A Architecture Study to provide the necessary systems-level perspective and cross-validation.

Bolcar, Matthew R.↗

Off-Road Vehicles Research Workshop (Summary Report)

This report summarizes the off-road vehicles stakeholder workshop that was focused on research, technical challenges, and future direction related to off-road vehicles and held at Argonne National Laboratory in October 2018. The views expressed in this report are those of the workshop participants. Topics discussed and included in this report are engine efficiency and emissions; efficient fluid power; and system integration, control, and new technologies. The purposes of this workshop were to: 1) Discuss and exchange information on the current state of technology for off-road vehicles; 2) Work collectively to address the technical challenges; and 3) Help shape the future direction for off-road vehicles research and development (R&D). The report highlights some key points, takeaways, and technical challenges and ideas to inform DOE R&D programs for the off-road sector. The workshop objectives were to: • Identify the barriers to cost-effective, high-efficiency, off-road vehicles; • Identify pre-competitive research topics that could have the biggest impact in overcoming barriers; and • Identify metrics that should be applied to program progress and ambitious but realistic goals. Customer acceptance, reliability, and system durability are some of the market barriers to new technology that were discussed during the workshop. Participants agreed that a comprehensive strategy is required to explore ways to improve engine efficiency while lowering emissions (i.e., NO x , GHG, etc.) and at the same time, meet customer needs and expectations. A full system optimization was recommended for off-road vehicles. It was noted that off-road vehicles are very diverse with a wide range of engine size and vehicle applications. A need for R&D for transient operations and other operating conditions was identified, as off-road vehicles are currently optimized for steady state. Fuel type for these vehicles has an important role. Fuel cost and fuel delivery to the work-site are challenging for any new fuel. Increased vehicle electrification is one of the new technologies discussed during the workshop. Electric propulsion for off-road vehicles has limited applications in the near term, but hybridization seems more promising. Furthermore, electrification requires better batteries and, possibly, the use of higher-voltage systems. Developing more efficient component technologies, including pumps, motors, and valves, is important for more efficient fluid power systems. New work-circuit architectures that can decrease throttling losses and better integrate the work circuit and engine can offer significant efficiency gains. Autonomous vehicles for off-road sectors were also discussed. Autonomous vehicles for off-road space are very appealing for some markets due to shortage in skilled labor and its significant impact on productivity, vehicle weight, and therefore, energy use and emissions. Autonomous driving for mining and farming applications is more feasible because the routes are predefined, but for other applications, such as forestry and construction vehicles, autonomous driving would be very challenging.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗