Search NASASearch

SEARCH · Search NASA

Results for “task work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

A Tool for the Automated Collection of Space Utilization Data: Three Dimensional Space Utilization Monitor

Space Human Factors and Habitability (SHFH) Element within the Human Research Program (HRP) and the Behavioral Health and Performance (BHP) Element are conducting research regarding Net Habitable Volume (NHV), the internal volume within a spacecraft or habitat that is available to crew for required activities, as well as layout and accommodations within the volume. NASA needs methods to unobtrusively collect NHV data without impacting crew time. Data required includes metrics such as location and orientation of crew, volume used to complete tasks, internal translation paths, flow of work, and task completion times. In less constrained environments methods exist yet many are obtrusive and require significant post-processing. Examplesused in terrestrial settings include infrared (IR) retro-reflective marker based motion capture, GPS sensor tracking, inertial tracking, and multi-camera methods Due to constraints of space operations many such methods are infeasible. Inertial tracking systems typically rely upon a gravity vector to normalize sensor readings,and traditional IR systems are large and require extensive calibration. However, multiple technologies have not been applied to space operations for these purposes. Two of these include: 3D Radio Frequency Identification Real-Time Localization Systems (3D RFID-RTLS) Depth imaging systems which allow for 3D motion capture and volumetric scanning (such as those using IR-depth cameras like the Microsoft Kinect or Light Detection and Ranging / Light-Radar systems, referred to as LIDAR)

Vos, Gordon A.

STS pilot user development program

Full exploitation of the STS capabilities will be not only dependent on the extensive use of the STS for known space applications and research, but also on new, innovative ideas of use originating with both current and new users. In recognition of this, NASA has been engaged in a User Development Program for the STS. The program began with four small studies. Each study addressed a separate sector of potential new users to identify techniques and methodologies for user development. The collective results established that a user development function was not only feasible, but necessary for NASA to realize the full potential of the STS. This final report begins with a description of the overall pilot program plan, which involved five specific tasks defined in the contract Statement of Work. Each task is then discussed separately; but two subjects, the development of principal investigators and space processing users, are discussed separately for improved continuity of thought. These discussions are followed by a summary of the primary results and conclusions of the Pilot User Development Program. Specific recommendations of the study are given.

Mcdowell, J. R.

NEPP Program Task 17-294 Government Working Group

This presentation will discuss in detail NASA Government Working Group government topics from NASA Electronic Parts Assurance Group (NEPAG) which require additional in-depth technical solutions.

Quality Assurance and Reliability - Government Wor

NASA Battery Working Group - 2007-2008: Battery Task Summary Report

This presentation provides a summary of the 2007-2008 NASA Battery Working Group efforts completed in support of the NASA Engineering Safety Center (NESC). The effort covered a series of pro-active tasks that address the following: Binding Procurements -- guidelines related to requirements for the battery system that should be considered at the time of contract award Wet Life of Ni-H2 Batteries -- issues/strategies for effective storage and impact of long-term storage on performance and life Generic Guidelines for Lithium-ion Safety, Handling and Qualification -- Standardized approaches developed and risk assessments (1) Lithium-ion Performance Assessment -- survey of manufacturers and capabilities to meet mission needs. Guidelines document generated (2) Conditions Required for using Pouch Cells in Aerospace Missions -- focus on corrosion, thermal excursions and long-term performance issues. Document defining requirements to maintain performance and life (3) High Voltage Risk Assessment -- focus on safety and abuse tolerance of battery module assemblies. Recommendations of features required for safe implementation (4) Procedure for Determination of Safe Charge Rates -- evaluation of various cell chemistries and recommendation of safe operating regimes for specific cell designs

Manzo, Michelle

NASA work unit system file maintenance manual

The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles on research efforts and statistics on fund distribution. The file maintenance operator can add, delete and change records at a remote terminal or can submit punched cards to the computer room for batch update. The system is designed for file maintenance by a person with little or no knowledge of data processing techniques.

Source record

NASA work unit system users manual

The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles to indicate how much effort is being expended to what types of research, where the effort is being expended, and how funds are being distributed. The user obtains information by entering requests on the keyboard of a time-sharing terminal. Responses are received as video displays or typed messages at the terminal, or as lists printed in the computer room for subsequent delivery by messenger.

Source record

TurboTech Technical Evaluation Automated System

TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.

Tiffany, Dorothy J.

The Path to Crew Autonomy - Situational Awareness in Scheduling and Rescheduling Tasks for Novice Schedulers

To increase crew autonomy for long duration exploration-class missions (LDEM), certain mission support tasks need to be completed by crew. Currently, crew activities are scheduled over the course of several weeks by ground-based experts with years of experience-based training. These experts display extensive amounts of situational awareness (SA) throughout task execution by maintaining a mental model of additional factors during scheduling such as constraints (e.g. physical space/layout), abilities and skills of the crew, and crew preferences allowing them to anticipate and mitigate potential issues. Thus, situational awareness is a key component for crews to manage their own schedules. In this paper, we examined situational awareness in novice schedulers in both a scheduling and rescheduling task. Our findings indicate that there is no significant difference between scheduling and rescheduling tasks for the development of SA in novice schedulers. Additionally, our experiment shows that novice schedulers are less able to develop sufficient SA for constraints that are dependent on one or more activities. Thus, we propose that software aids may be useful to support novice schedulers and increase SA in scheduling/rescheduling tasks. This work is vital to ensure the successful transfer of mission support tasks to the crew for future LDEM.

situation awareness

Human-Automation Integration: Principle and Method for Design and Evaluation

Future space missions will increasingly depend on integration of complex engineered systems with their human operators. It is important to ensure that the systems that are designed and developed do a good job of supporting the needs of the work domain. Our research investigates methods for needs analysis. We included analysis of work products (plans for regulation of the space station) as well as work processes (tasks using current software), in a case study of Attitude Determination and Control Officers (ADCO) planning work. This allows comparing how well different designs match the structure of the work to be supported. Redesigned planning software that better matches the structure of work was developed and experimentally assessed. The new prototype enabled substantially faster and more accurate performance in plan revision tasks. This success suggests the approach to needs assessment and use in design and evaluation is promising, and merits investigatation in future research.

human-automation integration

Measurement of metabolic responses to an orbital-extravehicular work-simulation exercise

This paper describes a new system designed to simulate orbital EVA work and measure metabolic responses to these space-work exercises. The system incorporates an experimental protocol, a controlled-atmosphere chamber, an EVA-work exercise device, the instrumentation, and a data acquisition system. Engineering issues associated with the design of the proposed system are discussed. This EVA-work simulating system can be used with various types of upper-body work, including task boards, rope pulling, and arm ergometry. Design diagrams and diagrams of various types of work simulation are included.

Lantz, Renee

Setting priorities for space research: An experiment in methodology

In 1989, the Space Studies Board created the Task Group on Priorities in Space Research to determine whether scientists should take a role in recommending priorities for long-term space research initiatives and, if so, to analyze the priority-setting problem in this context and develop a method by which such priorities could be established. After answering the first question in the affirmative in a previous report, the task group set out to accomplish the second task. The basic assumption in developing a priority-setting process is that a reasoned and structured approach for ordering competing initiatives will yield better results than other ways of proceeding. The task group proceeded from the principle that the central criterion for evaluating a research initiative must be its scientific merit -- the value of the initiative to the proposing discipline and to science generally. The group developed a two-stage methodology for priority setting and constructed a procedure and format to support the methodology. The first of two instruments developed was a standard format for structuring proposals for space research initiatives. The second instrument was a formal, semiquantitative appraisal procedure for evaluating competing proposals. This report makes available complete templates for the methodology, including the advocacy statement and evaluation forms, as well as an 11-step schema for a priority-setting process. From the beginning of its work, the task group was mindful that the issue of priority setting increasingly pervades all of federally supported science and that its work would have implications extending beyond space research. Thus, although the present report makes no recommendations for action by NASA or other government agencies, it provides the results of the task group's work for the use of others who may study priority-setting procedures or take up the challenge of implementing them in the future.

Source record

Estimation of Preferred Work Envelope from Simulated Functional Tasks in a Spacesuit

Spacesuits allow humans to function in an incredibly harsh environment. However, they introduce some restrictions to human capabilities. In general, crewmembers in a spacesuit have a restricted maximal reach envelope, reduced field of view, and reduced tactility. When tasks and interfaces are being designed, they need to take into account the restrictions associated with working in an Extravehicular Activity (EVA) suit.

Benson, Elizabeth

Applied Meteorology Unit Quarterly Report. First Quarter FY-13

The AMU team worked on five tasks for their customers: (1) Ms. Crawford continued work on the objective lightning forecast task for airports in east-central Florida. (2) Ms. Shafer continued work on the task for Vandenberg Air Force Base to create an automated tool that will help forecasters relate pressure gradients to peak wind values. (3) Dr. Huddleston began work to develop a lightning timing forecast tool for the Kennedy Space Center/Cape Canaveral Air Force Station area. (3) Dr. Bauman began work on a severe weather forecast tool focused on east-central Florida. (4) Dr. Watson completed testing high-resolution model configurations for Wallops Flight Facility and the Eastern Range, and wrote the final report containing the AMU's recommendations for model configurations at both ranges.

Source record

MRCI Task 3: Facilitating Data Collection, Sharing, and Analysis Final Technical Summary Report

The Midwest Regional Carbon Initiative (MRCI) Task 3.0 was defined to facilitate development of carbon capture, utilization, and storage (CCUS) in the region by collection and sharing of existing and new technical data from CCUS projects and research. The task also included support for further analysis and assessment of tools by the project team and by researchers working on programs such as National Risk Assessment Partnership (NRAP), machine learning (ML) techniques, and assessment and improvement of CCUS site assessment, operations, and monitoring aspects. Work under Task 3.0 addressed key issues related to CCUS deployment and provided foundational research and datasets to help establish CCUS projects in the MRCI. Report Authors and Principal Technical Contributors: Joel Sminchak, Laura Keister, Mackenzie Scharenberg, Priya Ravi-Ganesh, Autumn Haagsma, Srikanta Mishra, Jared Hawkins, Jared Schuetter, Amy Lang, Jaelen Lewis, Derrick James, Jorge Barrios, Stuart Skopec, and Sanjay Mawalkar (Battelle). Chris Korose, Carl Carmen, Nate Grigsby, Nathan Webb (Illinois State Geological Survey). Principal Investigators: Dr Neeraj Gupta, Dr. Chris Korose.

MRCI,NRAP,data collection,data compilation,legacy

Space station Simulation Computer System (SCS) study for NASA/MSFC. Volume 4: Conceptual design report

The Simulation Computer System (SCS) is the computer hardware, software, and workstations that will support the Payload Training Complex (PTC) at Marshall Space Flight Center (MSFC). The PTC will train the space station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. In the first step of this task, a methodology was developed to ensure that all relevant design dimensions were addressed, and that all feasible designs could be considered. The development effort yielded the following method for generating and comparing designs in task 4: (1) Extract SCS system requirements (functions) from the system specification; (2) Develop design evaluation criteria; (3) Identify system architectural dimensions relevant to SCS system designs; (4) Develop conceptual designs based on the system requirements and architectural dimensions identified in step 1 and step 3 above; (5) Evaluate the designs with respect to the design evaluation criteria developed in step 2 above. The results of the method detailed in the above 5 steps are discussed. The results of the task 4 work provide the set of designs which two or three candidate designs are to be selected by MSFC as input to task 5-refine SCS conceptual designs. The designs selected for refinement will be developed to a lower level of detail, and further analyses will be done to begin to determine the size and speed of the components required to implement these designs.

Source record