Search NASA⌕ Search

SEARCH · Search NASA

Results for “tradeoffs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Tracking and Data Relay Satellite System configuration and tradeoff study. Volume 2: Delta 2914 launched TDRSS, Configuration 2. Part 2: Final Report, 22 August 1972 - 1 April 1973

Configuration data and design information for a Delta 2914 launched configuration with greatly enhanced telecommunication service over the Part I Delta 2914 configuration is contained. The overall system definition, operations and control, and telecommunication service system, including link budgets are discussed. A brief description of the user transceiver and ground station is presented. A final section includes a summary description of the TDR spacecraft and all the subsystems. The data presented are largely in tabular form.

Source record↗

Tracking and Data Relay Satellite System configuration and tradeoff study. Volume 3: Atlas Centaur launched TDRSS. Part 2: Final Report, 22 August 1972 - 1 April 1973

Configuration data and design information for the Atlas Centaur launched configuration are presented. Overall system definition, operations and control, and telecommunication service system, including link budgets, are discussed. A brief description of the user telecommunications equipment and ground station is presented. A summary description of the TDR spacecraft and all the subsystems is included. The data presented are largely in tabular form. A brief treatment of an optional configuration with enhanced telecommunications service is described.

Source record↗

Tracking and Data Relay Satellite System configuration and tradeoff study. Volume 4: Space shuttle launched TDRSS. Part 2: Final Report, 22 August 1972 - 1 April 1973

Configuration data and design information for the space shuttle launched configuration is presented. The overall system definition, operations and control, and telecommunication service system including link budgets are discussed. A brief description of the user transceiver and ground station is presented. A final section includes a summary description of the TDR spacecraft and all the subsystems. The data presented are largely in tabular form.

Source record↗

The use of a simulator in a synthetic aperture radar data processing tradeoff study.

A computer simulation of a synthetic aperture radar system is described. The objective in developing the simulator was to make it possible to assess the imaging performance of various configurations against a variety of target types. The simulation involves targets, the radar system itself, and the processor; several analysis and output options are provided. Targets may be internally generated or come from external sources, or externally produced (e.g., real) radar signals can be used. A number of parameters of the radar system can be varied. The characteristics of the processor can be adjusted to a considerable extent. Statistical analyses may be performed. Several output options are available, including imagery.

Lybanon, M.↗

Tracking and data relay satellite system configuration and tradeoff study. Volume 1: TDRS system summary, part 1

A Tracking and Data Relay Satellite System (TDRSS) concept for service of low and medium data rate user spacecraft has been defined. The TDRS system uses two geosynchronous dual spin satellites compatible with Delta 2914 to provide command, tracking, and telemetry service between multiple low earth orbiting users and a centrally located ground station. The low data rate user service capability via each TDRS is as follows: (1) forward link at UHF: voice to one user, commands to 20 users (sequential), range and range rate service, and (2) return link at VHF: voice from one user, data from 20 users (simultaneous), range and range rate return signals. The medium data rate user service via each TDRS is as follows: (1) forward link at S band: voice or command and tracking signals to one user, and (2) return link at S band: voice, data and tracking signals from one user "order wire" for high priority service requests (implemented with an earth coverage antenna).

Source record↗

Tracking and data relay satellite system configuration and tradeoff study. Volume 3: TDRSS configuration and data summary, part 1

A reference handbook of configuration data and design information is presented. It treats the overall system definition, operations and control, and telecommunication service system including link budgets. A brief description of the user transceiver and ground station is presented. A final section includes a summary description of the TDR spacecraft and all the subsystems. The data presented are largely in tabular form for easy reference.

Source record↗

Tracking and data relay satellite system configuration and tradeoff study. Volume 4: TDRS system operation and control and telecommunications service system, part 1

Major study areas treated in this volume are: 1) operations and control and 2) the telecommunication service system. The TDRS orbit selection, orbital deployment, ground station visibility, sequence of events from launch to final orbit position, and TDRS control center functions required for stationkeeping, repositioning, attitude control, and antenna pointing are briefly treated as part of the operations and control section. The last topic of this section concerns the operations required for efficiently providing the TDRSS user telecommunication services. The discussion treats functions of the GSFC control and data processing facility, ground station, and TDRS control center. The second major portion of this volume deals with the Telecommunication Service System (TSS) which consists of the ground station, TDRS communication equipment and the user transceiver. A summary of the requirements and objectives for the telecommunication services and a brief summary of the TSS capabilities is followed by communication system analysis, signal design, and equipment design. Finally, descriptions of the three TSS elements are presented.

Source record↗

Tracking and data relay satellite system configuration and tradeoff study. Volume 5: TDRS spacecraft design, part 1

A dual spin stabilized TDR spacecraft design is presented for low data rate (LDR) and medium data rate (MDR) user spacecraft telecommunication relay service. The relay satellite provides command and data return channels for unmanned users together with duplex voice and data communication channels for manned user spacecraft. TDRS/ground links are in the Ku band. Command links are provided at UHF for LDR users and S band for MDR users. Voice communication channels are provided at UHF/VHF for LDR users and at S band for MDR users. The spacecraft is designed for launch on the Delta 2914 with system deployment planned for 1978. This volume contains a description of the overall TDR spacecraft configuration, a detailed description of the spacecraft subsystems, a reliability analysis, and a product effectiveness plan.

Source record↗

Tracking and data relay satellite system configuration and tradeoff study. Volume 7: Telecommunications system summary, part 1

The baseline Tracking and Data Relay Satellite telecommunication system is described. The configurations of the user spacecraft terminal and the ground based terminal are illustrated. The system service and performance summary is developed to show the link support, modes of operation, and link performance to the low data rate and medium data rate user spacecraft. The link budget calculation is included to show a typical computation for each space-to-space and space-to-ground link with the assumptions used in each calculation.

Hill, T. E.↗

Engineering report. Part 2: NASA wheel and brake material tradeoff study for space shuttle type environmental requirements

The study included material selection and trade-off for the structural components of the wheel and brake optimizing weight vs cost and feasibility for the space shuttle type application. Analytical methods were used to determine section thickness for various materials, and a table was constructed showing weight vs. cost trade-off. The wheel and brake were further optimized by considering design philosophies that deviate from standard aircraft specifications, and designs that best utilize the materials being considered.

Bok, L. D.↗

Tracking and data relay satellite system configuration and tradeoff study. Volume 2: System engineering, part 1, final report

All elements of the TDRS system were studied with emphasis on the design of a 3-axis stabilized satellite, and a telecommunication system optimized for support of low and medium data rate user spacecraft constrained to be launched on a Delta 2914. The research is reported to upgrade the spacecraft design to provide telecommunications support low, medium and high data rate users, considering launches with the Atlas/Centaur and the space shuttle. For Vols. 4, 5, 7, and 8, see N74-10809 through N74-10812.

Source record↗

Task three: Report: STDN Antenna and preamplifier cost tradeoff study

The general goal of this task, STDN Antenna and Preamplifier G/T Study, was to determine cost-effective combinations of antennas and preamplifiers for several sets of conditions for frequency, antenna elevation angle, and rain. The output of the study includes design curves and tables which indicate the best choice of antenna size and preamplifier type to provide a given G/T performance. The report indicates how to evaluate the cost effectiveness of proposed improvements to a given station. Certain parametric variations are presented to emphasize the improvement available by reducing RF losses and improving the antenna feed.

Source record↗

Systems design study of the Pioneer Venus spacecraft. Volume 1. Technical analyses and tradeoffs, sections 1-4 (part 1 of 4)

The results are reported of the Pioneer Venus studies from 2 October 1972 through 30 June 1973. Many missions were considered, involving two launch vehicles (Thor/Delta and Atlas/Centaur), and different launch opportunities and spacecraft configurations to meet varying science requirements, all at minimum cost. The sequence of events is described and the specific studies conducted are summarized. The effects of science payload on mission and spacecraft design are discussed along with the mission analyses.

Source record↗