Search NASA⌕ Search

SEARCH · Search NASA

Results for “transfer line”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Integration and commissioning plan of Full Flow Purifier at Muon Campus

The Full Flow Purifier for Fermilab’s Muon Campus uses a charcoal bed surrounded by a liquid nitrogen jacket to purify up to 240 g/s of helium gas. Fabrication by Ability Engineering Technology Inc. has been completed and the purifier delivered to Fermilab. It is the largest purifier to be used at Fermilab based on both capacity and size. A previous paper discussed the design of purifier for various operational conditions and horizontal shipping. The purifier is designed to withstand 5g force in vertical and 2g force in lateral and longitudinal directions. Transportation experience from vendor to Fermilab and within site is discussed. Integration of the purifier involved design and fabrication of a liquid nitrogen transfer line, regeneration system, and helium piping to connect it to Muon Campus cryogenic system. It also involved establishing electrical, instrumentation and controls connections to the system. Integration of the purifier is discussed in detail. The purifier is to be commissioned using up to 4 MYCOM helium compressors to supply helium and liquid nitrogen supplied by a 15,000 -gallon tank. Actual effectiveness of the 3-stream heat exchanger is to be estimated based on measured temperatures and flow rate. Impurity levels shall be monitored at inlet and outlet of the purifier. Theoretical adsorption capacity of the purifier is calculated based on the measured temperatures and flowrates and is compared to actual adsorption capacity over time.

Subedi, Jeewan [Fermilab]↗

Development of High Temperature (>700°C) Molten Salt Pump Technology for Generation 3 Solar Power Tower Systems

Bearings are required for long-shafted pumps historically used in concentrating solar thermal power applications. For molten chloride salts, bearings for such service conditions are not commercially available, nor has a design been demonstrated to work. Therefore, a project was sponsored by the Department of Energy’s Solar Energy Technologies Office for the development and demonstration of a submerged bearing for use in chloride salt pumps. This project’s tasks covered the tribological testing of candidate materials and the design, fabrication, testing, and post-test analysis of full-scale salt-compatible bearings. This work expands upon previous work. The effects of potential particulate in the salt were investigated through tribological bench testing. Through 11 tests, the MgO particulate size and concentration in a molten chloride salt were varied, and the effects on friction, wear rate, and wear characteristics were recorded. Novel journal bearings for chloride salt service were designed and fabricated based on these results. The bearings were of a relevant scale (i.e., for a 1.5 in. pump shaft) to demonstrate the technology with respect to further scale-up. The bearings were made of Haynes 244 and Yttria Partially Stabilized Zirconia. A custom bearing test rig, salt tanks, and associated infrastructure (e.g., heaters, tanks, transfer lines, gas flow control) were designed, procured, and installed. A few issues were encountered in the system fabrication process, resulting in delay of the project schedule. The system was successfully fabricated and assembled. Heating, cover gas, and pump motor systems were integrated into the control logic. This progress of the bearing test system represents a significant step forward towards demonstrating this promising technology. Nevertheless, the project ended before testing of the full-scale bearings could be performed.

14 SOLAR ENERGY↗

Improvements to Stripping Foils in BTA

To achieve the desired charge state in the Alternating Gradient Synchrotron (AGS), there is a stripping foil in the Booster to AGS (BtA) transfer line. For light ions, such as p, d, and h, they are already fully stripped in the Booster, or ions such as O have few electrons to be stripped off, and a thin foil of aluminum is used. For medium weight ions, such as Zr and Ru, they use what foils are available which have been optimized for heavy and light ions at 100 MeV/u. This worked well in the Zr case which achieved a measured stripping efficiency of 87%, contrary to the Ru case which achieved a measured stripping efficiency of 63%. For the EIC early science, Ag is currently intended to be the first ion. Using our existing foils, this would, at best, yield a helium-like charge state with a theoretical stripping efficiency of 50%. To improve on this, two foils of Ti or Nb have been selected to provide optimal stripping efficiency of Ag, and other energetic medium ions, which can reach 90% efficiency to fully strip the Ag ions. For heavy ions, the Al+C or Al+Ni stripping foils (sandwich foils) are used to produce helium-like charge states. For high intensity operation of Au, the Al foil nears its melting point and, in some cases, has been severely damaged. To maximize foil lifetime, there is a maximum intensity per unit time in BTA dependent on the Booster and AGS timing configurations. To mitigate the risk of melting the Al, replacement foils that use Ti, Nb, or anodized Al have been evaluated for their improved thermal qualities. At the selected thicknesses, each foil has equivalent charge distributions before entering the C foil, and should provide the same stripping efficiency through the entire sandwich.

43 PARTICLE ACCELERATORS↗

Measurement of the Dispersion in the CeC Beamlines

The coherent electron cooling requires to match the relativistic factors of the hadron and electron beam within 10 -4 accuracy. Initial matching is based on the energy measurement of the electron beam using solenoid with accuracy about 10 -3 (the hadron relativistic factor can be found from the revolution frequency). Further matching is done with observation of the recombination rate with fine tuning based on the cooling rate. The last two steps require change of the electron energy which is achieved by change of the linac voltage. The interaction of the hadron and electron beams is affected by the transverse overlap of two beams. To minimize the effect, we need zero dispersion in the common section. The merge of the beams a dogleg transfer line is used containing two dipoles and three quadrupoles. The zeroing of dispersion is performed by settings of the quadrupoles. We have developed two ways to measure the dispersion. In the first mostly commonly used we change both dipoles by the same value creating the mismatch between the electron energy and bending magnet. In the compensated dogleg the position in the second dipole should not change, and the trajectory angle will change by the same amount as deflecting angle but in opposite direction. Therefore, the trajectory in the common section will not change. The value of the dispersion can be calculated from the beam displacement divided by the relative chang of the dipoles’ current. The second method is based on the change of the electron beam energy using linac. This method requires electron orbit alignment with linac axis to avoid beam steering. The results are shown in Fig.1 and Fig. 2. The first figure shows the dispersion prior the correction, and the second figure after the correction.

43 PARTICLE ACCELERATORS↗

Design of the DUNE APATF cryogenic system

Fermi National Accelerator Laboratory (FNAL) is developing the international Long- Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE) to advance neutrino science. The flagship of the DUNE project consists of a large particle detector constructed one-mile (1.6 km) beneath the surface at the Sanford Underground Research Facility (SURF) in Lead, SD. The SURF detector is the largest of its type ever built and is comprised of four cryostats totaling 70,000 tons of liquid argon (LAr) to record neutrino interactions with unprecedented precision. Each cryostat houses a detector, the first includes 150 Anode Panel Assemblies (APA) submersed within 17,500 tons of LAr. Before installing 150 APA within the SURF detector they will be cryogenically cooled to nominally 90 K at the APA Test Facility (APATF) utilizing nitrogen flows. The APATF cryogenic system is entirely located one-mile underground at the SURF facility and includes nominally 13 kW of refrigeration at 80 K, cryogenic transfer lines, APA test cryostats, a cryogenic control system, and various control and pressure safety elements to ensure performance and safety requirements are achieved. The APATF preliminary design is in progress and major considerations include an efficient, costeffective mechanism to deliver the required refrigeration to the APATF underground, support of rigid testing intervals to support the DUNE operating schedule, temperature stability of the APA and electronics within cryostats, efficient cryogenic system operation to minimize heat leak and/or liquid nitrogen consumption, thermo-mechanical stability and flexibility of components, and pressure safety of the APATF cryogenic system. Installation and integration of the APATF cryogenic system within the footprint and to adjacent sub-systems is also discussed.

43 PARTICLE ACCELERATORS↗

FNAL PIP-II Accumulator Ring

The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limitations. There are many accelerator engineering challenges that are already known and many that will be discovered. This proposal calls for an intermediate step that will both facilitate the operation of Booster in the PIP-II era and gain operational experience associated with high power injection rings. This step includes the design, construction and installation of a 0.8 GeV accumulator ring (upgradeable to 1+ GeV) to be located in the PIP-II Booster Transfer Line (BTL). The PIP-II accumulator ring (PAR) may be primarily designed around permanent magnets or use standard iron core magnet technology with an aperture selected to accommodate the desired high intensity protons at 0.8 GeV.

43 PARTICLE ACCELERATORS↗

Pressure safety approach for PIP-II cryogenic distribution system and cryomodules

The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vessel relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.

43 PARTICLE ACCELERATORS↗

The Ionization Profile Monitors in the Recycler Ring

The ionization profile monitors (IPMs) are used to measure the beam size in synchrotrons. Both the Fermilab Recycler and Main Injector (MI) machines have IPMs. However, they were not well understood enough to provide confidence in their measurements. Accurately measuring beam size through the IPMs was crucial to recognize the loss mechanisms for accelerators and to keep the beam loss to a minimum. Thus, performing measurements with different parameters using the IPMs led to a better analysis on how changes in conditions affect the beam size. The IPM measurements are compared with that of multi-wires in the upstream transfer line after applying corrections. The results were compared with other diagnostics and the change in the beam size for different parameters are presented in this paper.

43 PARTICLE ACCELERATORS↗

Inspection Tools for Hanford Tanks and Waste Transport Systems - 20444

Recent integrity issues in the double-shell tanks (DST) at Hanford have motivated the need for developing innovative tools that can provide information regarding the health of the tanks. These issues include the primary linear failure of AY-102 and recent concerns of thinning in the DST secondary liners. Other concerns include erosion or corrosion on transfer lines and processing pipes. In recent years, Florida International University (FIU) has supported DOE-EM by developing tools that can assist in understanding the health of tanks and waste transport system at Hanford. More specifically, FIU has developed a miniature rover that can be deployed through small risers and gain access to refractory slots in the Hanford DSTs. It traverses through the slots on the primary liner upside down via magnets to avoid debris in the slots. Recent modifications include a spring loaded magnetic arm that allows the unit to traverse over large weld seams but does not reduce the overall functionality of the system. The system has also incorporated a control capsule that will sit within the annulus of the tank and improves on issues related to signal and voltage loss over long tether lines. Lastly, the unit is also being augmented with a second module that will include a means to prep the tank surface and obtain a thickness measurement using a dual element ultrasonic sensor. FIU has also developed a 6-inch peristaltic pipe crawler that operates similar to the previous pipe crawlers developed at FIU. This crawler is a marsupial type crawler that will navigate through the 6-inch drain lines, and deploy a small rover at the entrance of the drain slots. This rover will also traverse upside down on the secondary liner and provide information regarding the health of the liner. An initial prototype for the crawler unit has been developed, assembled and tested. The system is pneumatic and consists of three modules - two grippers and one extender. The validation tests are conducted in a mockup of the drain lines and demonstrate the system's ability to navigate through long pipe lengths and elbows. In this paper, a general overview of each of the aforementioned systems is presented along with results from testing and demonstrations that shows the applicability of each system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the Corrosion Risks to a Double Shell Tank During the Selective Removal of a Cesium-rich Supernate Layer - 20227

The Direct Feed Low Activity Waste (DF-LAW) activity will provide the initial feed to the Waste Treatment and Immobilization Plant at the Hanford Tank Farm facility. Feed preparation for DF-LAW will be carried out in multiple double shell waste tanks (DST) utilizing the Tank Side Cesium Removal (TSCR) process. Tank AP-106 will be an integral part of the TSCR process and hence key to the DFLAW activity. Prior to being utilized for this purpose, the Cs-137 concentration levels in the AP-106 supernate must be reduced significantly. The AP-106 re-purposing process manages normal waste tank addition procedures such that waste acceptance criteria objectives for Cs-137 removal are achieved. As this process was being developed, several concerns regarding tank integrity during and after repurposing of Tank AP-106, and the associated tanks (i.e., AP-102, AN-101, and AP-108), were addressed. The potential corrosion degradation mechanisms identified based on process knowledge included: general and pitting corrosion, caustic stress corrosion cracking, concentration cell corrosion, and microbiologically induced corrosion (MIC). A systematic approach was undertaken to assess the risk of corrosion during the AP-106 re-purposing process. The assessment considered the initial and present condition of the tank, the service history of the tank, the environmental conditions created in each tank during each stage of the process, process timing, and corrosion testing and modeling that approximated tank conditions. Based on this information, recommendations were provided to minimize the exposure of the tank to corrosive conditions. These recommendations included time limits for each stage of the process, staging of corrosion inhibitor solutions should process delays occur, and waste sampling with potential chemistry adjustments at defined steps in the process. Additionally, recommendations for post-process supernate chemistry adjustments and tank inspections were put forth. The greatest risk for this process occurs during the manipulation of large quantities of Columbia River water (i.e., greater than 450,000 gallons) within AP-106, the associated tanks and the supporting infrastructure (i.e., transfer line piping). This risk becomes more pronounced if there is a process upset and the tank walls remain exposed to a corrosive condition longer than intended. As long as the river water is blended into the supernate in a timely fashion, and the waste is adjusted appropriately with corrosion inhibitors, corrosion may be minimized and the final condition of the supernate in AP-106 and the associated tanks is expected to be in compliance with corrosion chemistry requirements. Contingency plans will be made to minimize the impact of a process upset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Physics Design of Proton Improvement Plan-II At Fermilab

This paper presents the final physics design of the Proton Improvement Plan-II (PIP-II) at Fermilab, focusing on the linear accelerator (Linac) and its beam transfer line. We address the challenges in longitudinal and transverse lattice design, specifically targeting collective effects, parametric resonances, and space charge nonlinearities that impact beam stability and emittance control. The strategies implemented effectively mitigate space charge complexities, resulting in significant improvements in beam quality -- evidenced by reduced emittance growth, lower beam halo, decreased loss, and better energy spread management. This comprehensive study is pivotal for the PIP-II project's success, providing valuable insights and approaches for future accelerator designs, especially in managing nonlinearities and enhancing beam dynamics.

43 PARTICLE ACCELERATORS↗

Emittance Measurements with Wire Scanners in the Fermilab Side-coupled Linac

The Fermilab Side-Coupled Linac accelerates H-beam from 116 MeV to 400 MeV through seven 805 MHz modules. Twelve wire scanners are present in the Side Coupled Linac and four are present in the transfer line between the Linac and the Booster synchrotron ring. These wire scanners act as important diagnostic instruments to directly collect information on the beam's transverse distribution. The manipulation of the conditions of wire scanner data collection enables further characterization of the beamline, such as calculating emittance and the Twiss parameters of the beam at select regions, which we present here.

43 PARTICLE ACCELERATORS↗

Assessment of Flow-Enhanced Sensors for Actinide Quantification in MSRs

This report serves as the deliverable for Milestone M2RS-22AN0401062 that is part of Work Package RS-22AN040106 (Flow Enhanced Sensors for MSRs – ANL). The goal of this milestone is to assess the capabilities of flow-enhanced electrochemical sensors (FEES) to quantify actinides in molten salt reactors. Flow enhanced electrochemical sensors are a type of electroanalytical sensor that has been developed at Argonne National Laboratory to be installed directly into MSR flow conduits in order to make measurements of the salt composition. These sensors represent a significant improvement in capabilities compared to earlier electroanalytical sensors that instead can only be operated in quiescent conditions. To support this work, Argonne constructed a molten salt flow system to serve as a testbed for the development of safeguards and process monitoring-relevant sensors in challenging molten salt flow conditions. Through extensive flow testing using UCl3-bearing salts, Argonne has been able to show that the FEES are able to make good measurements of salt composition. Concentration measurements with a mean absolute error of 0.09 wt% have been achieved for representative fuel salt mixtures across a range of UCl3 loadings. Repeatability was also good, with the relative standard deviation from repeated measurements being less than 1.0%. These sensors have also been shown to be able to measure the flow rate of the salt within the flow system’s transfer line. Although the accuracy of the sensors has been good, the sensors have thus far not been able to achieve performance good enough to satisfy the nuclear material accountancy requirements in 10 CFR 74. To do so, accuracy levels of 0.1% must be achieved; the FEES when operated in Argonne’s flow system have so far only been able to achieve relative errors of approximately 5.0%. Much of the error that has been observed at this stage is due to challenges in maintaining a stable salt composition in the molten salt flow system, and it is not believed that there are any inherent flaws in the sensor design. Nonetheless, the high degree of accuracy required by 10 CFR 74 represents a significant challenge, and further design evolution and integration of the sensors into multimodal sensing frameworks will likely be needed to push the measurement accuracy to the needed level.

Moore, Colin E.↗

Measurement of the LCLS-II dark current using the LDMX Trigger Scintillator Prototype

The Light Dark Matter eXperiment (LDMX) is a proposed fixed-target missing momentum search for sub-GeV thermal relic dark matter. LDMX aims to probe thermal dark matter targets with 1016 electrons on target. Such an approach requires a high-repetition rate, low-current beam, with an average of one electron on target per event. These requirements are well-suited to the DArk Sector Experiments at LCLS-II (DASEL) facility, which will take advantage of the unused RF buckets between LCLS-II bunches to produce a well-defined low-current beam with a 26.9 ns bunch spacing. This document describes the results of a measurement of dark current in the Sector 30 transfer line (S30XL) of the LCLS-II beam, using a prototype of the LDMX trigger scintillator (TS) subsystem.

Berzin, Elizabeth [SLAC]↗

Integration and commissioning plan of Full Flow Purifier at Muon Campus

The Full Flow Purifier for Fermilab's Muon Campus uses a charcoal bed surrounded by a liquid nitrogen jacket to purify up to 240 g/s of helium gas. Fabrication by Ability Engineering Technology Inc. has been completed and the purifier delivered to Fermilab. It is the largest purifier to be used at Fermilab based on both capacity and size. A previous paper discussed the design of purifier for various operational conditions and horizontal shipping. The purifier is designed to withstand 5g force in vertical and 2g force in lateral and longitudinal directions. Transportation experience from vendor to Fermilab and within site is discussed. Integration of the purifier involved design and fabrication of a liquid nitrogen transfer line, regeneration system, and helium piping to connect it to Muon Campus cryogenic system. It also involved establishing electrical, instrumentation and controls connections to the system. Integration of the purifier is discussed in detail. The purifier is to be commissioned using up to 4 MYCOM helium compressors to supply helium and liquid nitrogen supplied by a 60,000-liter tank. Actual effectiveness of the 3-stream heat exchanger is to be estimated based on measured temperatures and flow rate. Impurity levels will be monitored at inlet and outlet of the purifier. Theoretical adsorption capacity of the purifier is calculated based on the measured temperatures and flowrates and is compared to actual adsorption capacity over time.

Subedi, J. [Fermilab] (ORCID:0009000185837576)↗

Bidirectional Multiphoton Communication between Remote Superconducting Nodes

Quantum communication test beds provide a useful resource for experimentally investigating a variety of communication protocols. Here we demonstrate a superconducting circuit test bed with bidirectional multiphoton state transfer capability using time -domain shaped wave packets. Further, the system we use to achieve this comprises two remote nodes, each including a tunable superconducting transmon qubit and a tunable microwave -frequency resonator, linked by a 2 m-long superconducting coplanar waveguide, which serves as a transmission line. We transfer both individual and superposition Fock states between the two remote nodes, and additionally show that this bidirectional state transfer can be done simultaneously, as well as being used to entangle elements in the two nodes.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Damping inter-area oscillation using reinforcement learning controlled TCSC

Appropriate damping control of the inter-area oscillation would ensure the grid stability and maintain the tie-line power transfer capability. In this paper, we proposed a novel reinforcement learning (RL) based power oscillation damping (POD) controller that uses Thyristor Controlled Series Compensators (TCSC) to damp inter-area oscillations. By leveraging the unbiased gradient direction estimation of the natural evolution strategy (NES), we successfully regulated the power flows on the tie-lines and damped inter-area oscillations through dynamically modulating the inserted reactance of the TCSC. The proposed RL-based POD controller has been tested on both two-area four-machine system and North American Minni-WECC system. Extensive studies have demonstrated the excellent performance of the proposed RL-based TCSC POD controller in damping inter-area oscillations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Influence of non-adiabatic effects on linear absorption spectra in the condensed phase: Methylene blue

Modeling linear absorption spectra of solvated chromophores is highly challenging as contributions are present both from coupling of the electronic states to nuclear vibrations and from solute–solvent interactions. In systems where excited states intersect in the Condon region, significant non-adiabatic contributions to absorption line shapes can also be observed. Here, we introduce a robust approach to model linear absorption spectra accounting for both environmental and non-adiabatic effects from first principles. This model parameterizes a linear vibronic coupling (LVC) Hamiltonian directly from energy gap fluctuations calculated along molecular dynamics (MD) trajectories of the chromophore in solution, accounting for both anharmonicity in the potential and direct solute–solvent interactions. The resulting system dynamics described by the LVC Hamiltonian are solved exactly using the thermalized time-evolving density operator with orthogonal polynomials algorithm (T-TEDOPA). The approach is applied to the linear absorption spectrum of methylene blue in water. We show that the strong shoulder in the experimental spectrum is caused by vibrationally driven population transfer between the bright S1 and the dark S2 states. The treatment of the solvent environment is one of many factors that strongly influence the population transfer and line shape; accurate modeling can only be achieved through the use of explicit quantum mechanical solvation. The efficiency of T-TEDOPA, combined with LVC Hamiltonian parameterizations from MD, leads to an attractive method for describing a large variety of systems in complex environments from first principles.

Dunnett, Angus J. (ORCID:0000000285797826)↗