Search NASA⌕ Search

SEARCH · Search NASA

Results for “transmission operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Type 5 Wind Turbine Technology: How Synchronised, Synchronous Generation Avoids Uncertainties About Inverter Interoperability under IEEE 2800:2022

Degradation of system strength because of inverter-based resources (IBRs) is a major concern facing the zero-carbon transition. A new standard released this year, IEEE Standard 2800, attempts to codify the relationship between IBRs and the Transmission System Operator (TSO). It is apparent from IEEE 2800:2022 that there remain fundamental problems with quantifying whether source impedance (the measure of "system strength" with which the standard is concerned) will present a problem for allowing an IBR to connect. This is "because of complex interdependencies between IBR and power system characteristics". So developers are increasingly required to adopt mitigation options such as adding synchronous condensers or curtailing IBRs. A proven Type 5 (synchronous) wind turbine exists and has been running at 0.5 MW scale in a 46 MW wind farm in New Zealand since 2006 and eight turbines in Scotland since 2013. The US National Renewable Energy Laboratory (NREL) is conducting a study of the impacts on grid reliability, stability, and resilience of Type 5 wind turbines. The project has both simulation and testing tasks and will result in proposing a variable generation solution that will help system operators and utilities address all reliability and most resilience challenges in the evolving grid.

grid stability↗

Forecasting Dynamic Line Rating with Spatial Variation Considerations

Dynamic line rating (DLR) is a technology that allows the ampacity of an electrical conductor to be calculated using real-time or forecasted weather conditions. Historically, the ampacity of a conductor has been determined using a static line rating method which assumes conservative weather assumptions. Therefore, not only can DLR give a more accurate measurement of the true ampacity of a conductor, but it can also increase its ampacity during weather conditions with greater thermal mitigations. The two primary cooling factors in the ampacity calculations are wind speed and direction. In complex terrain, wind speed and direction can have large variations over short distances. Therefore, accurately identifying the limiting span of a transmission line requires high spatial resolution of the wind along its path. One solution is to install dense weather stations along their path, though this can become costly over long distances. Therefore, researchers have investigated the use of Computation Fluid Dynamic (CFD) simulations to accurately compute the wind field along the path of a transmission line and use these results to identify the limiting section of the conductor. This work presents a case study that evaluates the coupling of CFD simulations and forecasted weather simulations using the High-Resolution Rapid Refresh (HRRR) model points over a 2-year span within a region in south eastern Idaho. The primary goal of the work is the evaluation of the number of HRRR model points used, i.e., weather stations, along the path of the line and the accuracy of the resulting DLR ampacity. This was done using 4, 10, 17, 26, and 35 HRRR model points along two transmission line paths. The results indicate that as the number of model points are increased, the DLR ampacity of the lines decrease, yet converge as more points are added and demonstrate little change with additional HRRR points. It is expected that these results can help transmission line operators identify the number of weather stations that must be installed when coupled with CFD simulations and DLR ampacity to ensure accurate ratings and safe operations.

17 WIND ENERGY↗

Forecasting Dynamic Line Rating with Spatial Variation Considerations

Dynamic line rating (DLR) is a technology that allows the ampacity of an electrical conductor to be calculated using real-time or forecasted weather conditions. Historically, the ampacity of a conductor has been determined using a static line rating method which assumes conservative weather assumptions. Therefore, not only can DLR give a more accurate measurement of the true ampacity of a conductor, but it can also increase its ampacity during weather conditions with greater thermal mitigations. The two primary cooling factors in the ampacity calculations are wind speed and direction. In complex terrain, wind speed and direction can have large variations over short distances. Therefore, accurately identifying the limiting span of a transmission line requires high spatial resolution of the wind along its path. One solution is to install dense weather stations along their path, though this can become costly over long distances. Therefore, researchers have investigated the use of Computation Fluid Dynamic (CFD) simulations to accurately compute the wind field along the path of a transmission line and use these results to identify the limiting section of the conductor. This work presents a case study that evaluates the coupling of CFD simulations and forecasted weather simulations using the High-Resolution Rapid Refresh (HRRR) model points over a 2-year span within a region in south eastern Idaho. The primary goal of the work is the evaluation of the number of HRRR model points used, i.e., weather stations, along the path of the line and the accuracy of the resulting ampacity. This was done using 4, 10, 17, 26, and 35 HRRR model points along two transmission line paths. The results indicate that as the number of model points are increased, the DLR ampacity of the lines decrease, yet converge as more points are added and demonstrate little change with additional HRRR points. It is expected that these results can help transmission line operators identify the number of weather stations that must be installed when coupled with CFD simulations and DLR ampacity to ensure accurate ratings and safe operations.

17 WIND ENERGY↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric transmission value and its drivers in United States power markets

Electric transmission infrastructure plays a vital role during extreme weather and supply disruptions and can enable low-cost electricity systems. This paper contributes to a more complete understanding of the value and cost-effectiveness of transmission, as well as barriers to its development. By studying wholesale energy market prices in the United States between 2012 and 2022, we find that additional transfer capacity between regions would have been especially valuable, with a median value of $116 million per GW per year. This capacity would often have provided balanced benefits to each region. The market value of transmission was highly influenced by a small fraction of time: 5% of hours typically captured at least 45% of the total value. These peak periods were primarily driven by unforeseen changes in conditions within one day of operations. Annualized transmission infrastructure cost estimates were lower than the average market value for most locations, including all links crossing regional seams, where the value-to-cost ratio was often greater than 4. This suggests that there are barriers to developing valuable grid infrastructure. These results complement forward-looking modeling studies and support efforts to improve modeling practices.

Energy economics↗

Quantum computing in power systems

Electric power systems provide the backbone of modern industrial societies. Enabling scalable grid analytics is the keystone to successfully operating large transmission and distribution systems. However, today's power systems are suffering from ever-increasing computational burdens in sustaining the expanding communities and deep integration of renewable energy resources, as well as managing huge volumes of data accordingly. These unprecedented challenges call for transformative analytics to support the resilient operations of power systems. Recently, the explosive growth of quantum computing techniques has ignited new hopes of revolutionizing power system computations. Quantum computing harnesses quantum mechanisms to solve traditionally intractable computational problems, which may lead to ultra-scalable and efficient power grid analytics. This paper reviews the newly emerging application of quantum computing techniques in power systems. We present a comprehensive overview of existing quantum-engineered power analytics from different operation perspectives, including static analysis, transient analysis, stochastic analysis, optimization, stability, and control. We thoroughly discuss the related quantum algorithms, their benefits and limitations, hardware implementations, and recommended practices. We also review the quantum networking techniques to ensure secure communication of power systems in the quantum era. Finally, we discuss challenges and future research directions. This paper will hopefully stimulate increasing attention to the development of quantum-engineered smart grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wildfire Risk Evaluation Framework for Grid Operations and Planning

The United States (US) environmental protection agency's (EPA's) climate change indicators for wildfires show a long-term trend of increased annual wildfire activity, larger wildfire size, and more variable dynamics in wildfire behavior. This has caused more frequent preemptive public safety power shutoff (PSPS) events in the regions with recognized high wildfire risk. These preemptive power shutoffs attempt to prevent the ignition of a wildfire but it nonetheless renders the transmission line non-operational, which often sheds load of downstream communities. As wildfires and PSPS events become more frequent, it is crucial to find the communities most at risk of load shedding. To that end, this paper proposes the wildfire risk evaluation of the system (WiRES) framework, which is a performance-based framework that translates extreme weather-related and PSPS event probabilities into a cumulative probability of a non-operational transmission line. This study also provides a geospatial visualization tool that breaks down the entire western electrical coordinating council (WECC) region into 50 km grid cells which can be used to 1) filter out transmission lines with higher than a threshold outage probability, and 2) graphically discover the affected regions and their biophysical and socioeconomic metrics. %such as the social vulnerability index, population density, gross domestic product, etc. Lastly, an impact assessment study is conducted which connects the results of the proposed framework to python and powerworld-based contingency analysis to highlight the applicability of the framework.

Wildfire, Resilience, Extreme Events, Grid Reslien↗

Transmission line design for the lunar environment

How the mass, operating temperature, and efficiency of a transmission line operating on the moon are affected by its operating parameters, the lunar environment, and the choice of materials is examined. The key transmission line parameters which have an effect on mass, operating temperature, and efficiency are voltage, power loss, and waveform. The choice of waveform for transmission will be influenced by the waveform of the source and load, and therefore an analysis of both DC and AC transmission is necessary for a complete understanding of lunar power transmission. The data presented are for the DC case only; however, the discussion of the environmental effects and of material selection is pertinent to both AC and DC transmission. The operating voltage is shown to be a key parameter in transmission line design. The role efficiency plays in transmission line design is also examined. The analyses include above- and below-the-surface operation for both a vacuum-insulated, two-wire, transmission line, and a solid-dielectric-insulated, coaxial, transmission line.

Gaustad, Krista L.↗

DSO+T: Valuation Methodology and Economic Metrics (DSO+T Study: Volume 4)

This report summarizes a rigorous valuation analysis methodology used by the Distribution System Operator with Transactive (DSO+T) study to estimate the financial benefits and costs of adopting Transactive Energy coordination of distributed energy resources for key stakeholders (for example distribution system operators and customers). This was achieved by modeling the value exchanges between stakeholders and determining the annualized costs and revenues experienced by stakeholders, enabling the evaluation of overall impact on stakeholder’s annualized cash flow. Extensive work was conducted developing methods to estimate the operating costs of distribution system operators at a level of granularity that would allow the financial impact of implementing a transactive energy approach to be estimated. This work included developing parametric models for labor and software costs, distribution system capital and maintenance costs, growth rates, and factors to determine annualized costs of capital investments. Simulation results were used to calculate wholesale energy costs and revenues from retail sales. Valuation analysis methods were also developed for other stakeholders including customers, the transmission system operator, independent system operator, and generators. The resulting capability allows a complete mapping of the flow of financial value between stakeholders that can be directly integrated with the results of demand flexibility simulations. Example results are provided for a business-as-usual case and compared to a transactive energy case as well as to actual cost data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Enhanced Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation: Dynamic Market Participation Restriction Estimation

In the previous study and report, we developed a computational framework to explore the technical and economic viability of the dual use of pumped storage hydropower (PSH) for both transmission assets and market participation. The rationale for the dual-use application is to improve the resource utilization rate and reduce the cost recovery burden. A PSH-based transmission solution generally has a large capacity, which corresponds to a higher investment cost compared to a traditional line solution. Market participation may allow the PSH asset to offset part of its high investment cost. A critical question is whether it is economically and technically viable to allow dual use of a PSH-based transmission project without jeopardizing transmission system reliability. And a more specific follow-up question is how to improve market participation performance while maintaining transmission reliability. In this study, we extend the computational framework by updating the method to determine transmission service obligation requirements dynamically based on the possibility of the need for transmission service in operation. Specifically, we correlate the need for transmission service with the probability of thermal overloading on a monitored transmission line, which is essentially based on the probability distribution of power flow and its probability of exceeding the line rating based on system dispatch and operational uncertainties. In addition, the need depends on the level of risk that a system operator is willing to take. The higher the risk tolerance, the lower the requirement that the system operator would apply to the PSH project as a transmission asset. The requirements are updated every day before the PSH project determines its market participation strategy. With the updated transmission service requirements, it is expected that a PSH project can serve as a transmission asset when the transmission system is at risk and really needs it, while it can participate in a market with sufficient information and certain restrictions. In this way, the transmission service quality and market participation performance can both be improved.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mitigating the Impacts of Uncertain Geomagnetic Disturbances on Electric Grids: A Distributionally Robust Optimization Approach

Severe geomagnetic disturbances (GMDs) increase the magnitude of the electric field on the Earth’s surface (E-field) and drive geomagnetically-induced currents (GICs) along the transmission lines in electric grids. These additional currents can pose severe risks, such as current distortions, transformer saturation and increased reactive power losses, each of which can lead to system unreliability. Today several mitigation actions (e.g., changing grid topology) exist that can reduce the harmful GIC effects on the grids. Making such decisions can be challenging, however, because the magnitude and direction of the E-field are uncertain and non-stationary. In this paper, we model uncertain E-fields using the distributionally robust optimization (DRO) approach that determines optimal transmission grid operations such that the worst-case expectation of the system cost is minimized. We also capture the effect of GICs on the nonlinear AC power flow equations. For solution approaches, we develop an accelerated column-and-constraint generation (CCG) algorithm by exploiting a special structure of the support set of uncertain parameters representing the E-field. Extensive numerical experiments based on “epri-21” and “uiuc-150” systems, designed for GMD studies, demonstrate (i) the computational performance of the accelerated CCG algorithm, (ii) the superior performance of distributionally robust grid operations that satisfy nonlinear, nonconvex AC power flow equations and GIC constraints, in comparison with standard stochastic programming-based methods during the out-of-sample testing.

42 ENGINEERING↗

In-Situ XRD/XRF to Support Life Detection on Mars

X-ray diffraction / X-ray fluorescence (XRD/XRF) analysis provides the most comprehensive mineralogical / compositional characterization of rocks and soils of any flight-capable technique. XRD data provide quantitative mineralogy (including abundance of X-ray amorphous materials) and crystal chemistry (structure, elemental composition and valence state), and XRF data provide complimentary major, minor, and some trace element abundances. Both types of data are important in evaluating habitability (environment of formation) and biosignature preservation/degradation (post-depositional diagenetic change). Whether or not a relict biosignature is detected, the mineral assemblage and its geochemistry can be used to determine the habitability of an ancient environment (e.g., salinity, pH, temperature), and to identify potential sources of energy for life (e.g., elements in different redox states). In this respect, a null result (a habitable environment lacking evidence of life) can play an important role in constraining the parameters of the search. Conversely, diagenetic alteration (taphonomic change) resulting from post-depositional variations in temperature, pressure or fluid chemistry can preserve evidence of biogenicity, erase such evidence completely or indeed can provide for post-depositional habitable conditions in the subsurface. XRD / XRF data are critical to these determinations. The CheMin instrument on the Mars Science Laboratory (MSL) Curiosity rover is the first XRD instrument flown in space. CheMin operates in transmission geometry with a Co X-ray source to minimize fluorescence from iron. Diffracted photons are collected with an energy-sensitive charge-coupled device (CCD). The position of the diffracted photons provides structural information for minerals, whereas the energy of sample-generated X-ray fluorescence photons provides elemental information, though these XRF data are qualitative. Mineralogical data from the CheMin XRD identified the three circumstances above: habitable depositional environments (e.g., Yellowknife Bay), habitable subsurface/diagenetic environments (e.g., throughout the Murray formation), and diagenetic conditions that may destroy evidence of habitability (e.g., oxidative and acidic environments at Vera Rubin ridge). Technological advances in X-ray technology and lessons learned from the operation of CheMin on Mars have resulted in a next-generation XRD/XRF, called CheMinX. Replacement of CheMin’s CCD with an array of hybrid pixel detectors and improvements in focusing optics dramatically decrease analysis time (15 minutes vs. 22 hours for MSL-CheMin) and result in a better angular resolution (0.18 vs. 0.30 °2θ for MSL-CheMin). This increased resolution improves mineral detection, including discrimination between types of pyroxenes, which is not possible with MSL-CheMin data. The hybrid pixel detectors do not require cooling like the MSL-CheMin CCD, therefore reducing the power needed to operate CheMinX. CheMinX has a silicon-drift detector (SDD) to measure fluoresced photons, enabling the quantification of major, minor, and some trace elements via XRF. XRD/XRF data are collected simultaneously in CheMinX, obviating the need for multiple compositional instruments. The CheMinX design also improves upon MSL-CheMin’s sample handling. Instead of sample cells on wheel, which are often not reusable and add complexity in commanding the instrument, CheMinX has single-use cells in a cartridge/dispenser configuration. Because of these improvements, CheMinX is an ideal instrument for Discovery-class life-detection missions, including Mars Life Explorer that was recommended for development in the Planetary Science and Astrobiology Decadal Survey 2023-2032.

E B Rampe↗

Grid Integration of Offshore Wind Power: Standards, Control, Power Quality and Transmission

Offshore wind is expected to be a major player in the global efforts toward decarbonization, leading to exceptional changes in modern power systems. Understanding the impacts and capabilities of the relatively new and uniquely positioned assets in grids with high integration levels of inverter-based resources, however, is lacking, raising concerns about grid reliability, stability, power quality, and resilience, with the absence of updated grid codes to guide the massive deployment of offshore wind. To help fill the gap, this paper presents an overview of the state-of-the-art technologies of offshore wind power grid integration. First, the paper investigates the most current grid requirements for wind power plant integration, based on a harmonized European Network of Transmission System Operators (ENTSO-E) framework and notable international standards, and it illuminates future directions. The paper discusses the wind turbine and wind power plant control strategies, and new control approaches, such as grid-forming control, are presented in detail. The paper reviews recent research on the ancillary services that offshore wind power plants can potentially provide, which, when harmonized, will not only comply with regulations but also improve the value of the asset. The paper explores topics of wind power plant harmonics, reviewing the latest standards in detail and outlining mitigation methods. The paper also presents stability analysis methods for wind power plants, with discussions centered on validity and computational efficiency. Finally, the paper discusses wind power plant transmission solutions, with a focus on high-voltage direct-current topologies and controls.

17 WIND ENERGY↗

A study of electric power transmission lines for use on the lunar surface

Analytical models have been developed to study the operating characteristics of electrical transmission lines for use on the lunar surface. Important design considerations for a transmission line operating on the lunar surface are mass, temperature, and efficiency. Transmission line parameters which impact these considerations include voltage, power loss, and waveform. The electrical and thermal models developed are used to calculate transmission line mass, size, and temperature as a function of voltage, geometry, waveform, location, and efficiency. The analyses include ac and dc for above and below ground operation. Geometries studied include a vacuum-insulated, two-wire transmission line and a solid-dielectric insulated, coaxial transmission line. A brief discussion of design considerations and the models developed is followed by results for parameter studies for both dc and ac transmission lines.

Gordon, Lloyd B.↗

Optimal Planning and Operation of Multi-Frequency HVac Transmission Systems

Low-frequency high-voltage alternating-current (LF-HVac) transmission scheme has been recently proposed as an alternative solution to conventional 50/60-Hz HVac and high-voltage direct-current (HVdc) schemes for bulk power transfer. This paper proposes an optimal planning and operation for loss minimization in a multi-frequency HVac transmission system. In such a system, conventional HVac and LF-HVac grids are interconnected using back-to-back (BTB) converters. The dependence of system MW losses on converter dispatch as well as the operating voltage and frequency in the LF-HVac is discussed and compared with that of HVdc transmission. Based on the results of the loss analysis, multi-objective optimization formulations for both planning and operation stages are proposed. The planning phase decides a suitable voltage level for the LF-HVac grid, while the operation phase determines the optimal operating frequency and power dispatch of BTB converters, generators, and shunt capacitors. A solution approach that effectively handles the variations of transmission line parameters with the rated voltage and operating frequency in the LF-HVac grid is proposed. The proposed solutions of the planning and operation stages are evaluated using a multi-frequency HVac system. The results show a significant loss reduction and improved voltage regulation during a 24-hour simulation.

Nguyen, Quan H.↗

Smart connected worker edge platform for smart manufacturing: Part 2—Implementation and on‐site deployment case study

Abstract In this paper, we describe specific deployments of the Smart Connected Worker (SCW) Edge Platform for Smart Manufacturing through implementation of four instructive real‐world use cases that illustrate the role of people in a Smart Manufacturing paradigm through which affordable, scalable, accessible, and portable (ASAP) information technology (IT) acquires and contextualizes data into information for transmission to operation technologies (OT). For case one, the platform captures the relationships between energy consumption and human workflows for improved energy productivity while workers interact with machines during semiconductor manufacturing. The platform utilizes human cognition to identify anomalous machine behavior for root cause analysis of system faults via neural network (NN) that recognize alarm postures of workers with cameras. For case two, a smart assembly line is demonstrated for state monitoring and fault detection. Machine learning (ML) models are used to recognize system states and identify fault scenarios with human intervention. For case three, the platform monitors human–machine interactions to classify manufacturing machine states for proper operations and energy productivity. Internal energy states of individual or collections of manufacturing equipment are determined via NN based algorithms that disaggregate signals associated with smart metering typically deployed at manufacturing facilities. These methods predict the real time energy profile of each machine from the total energy profile of a manufacturing site. For case four, a software defined sensor system built with scientific workflow engines is demonstrated for contextualizing data from laser surface refraction for characterization, and diagnostics in the processing of additively manufactured titanium alloy.

Donovan, Richard P.↗