Search NASA⌕ Search

SEARCH · Search NASA

Results for “variable resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Characteristics and Variability of the Nearshore Wave Resource on the U.S. West Coast

Characterizing the nearshore wave resource at a regional scale poses a great challenge because high-quality wave data are required. This paper presents a detailed analysis of nearshore wave climate and resource characterization on the U.S. West Coast based on a 32-year, regional wave hindcast. Resource characterization closely followed the International Electrotechnical Commission standards. The wave hindcast data were generated from an unstructured-grid SWAN model with approximately 300 m grid resolution in the nearshore region. Statistics of six IEC wave resource parameters at the 50 m water depth were calculated for four sub-regions along the coast, including Washington, Oregon, and Northern and Southern California. Results indicate that the Washington and Oregon coast has a similar nearshore wave resource. The wave resource in Southern California is significantly less than that of the Washington and Oregon coast. Alongshore and cross-shore variabilities of wave power were assessed. Temporal variability, at seasonal, inter-annual, and decadal scales were analyzed. Overall, strong seasonal variation is observed; high wave energy occurs in the winter months and calm seas in the summer. Finally, extreme environmental conditions, i.e., the 100-year extreme environmental contours, for different locations along the West Coast were investigated.

wave resource characterization, nearshore, west co↗

Redefining Resource Adequacy for Modern Power Systems: A Report of the Redefining Resource Adequacy Task Force

Today's rapidly increasing levels of wind, solar, storage, and load flexibility require the industry to rethink reliability planning and resource adequacy methods for modern power systems. Periods with a risk of shortfall often no longer coincide with peak demand - reliability risks are less about peak load and more about the daily setting of the sun, extended cloud cover, wind speeds, cold snaps, and heat waves. In addition, demand is increasingly flexible. Key resources are time-sensitive, as batteries need time to recharge and electricity customers can only be asked to provide demand response for just so long. And reliability failures are often correlated - with one another and with the weather. Two driving factors require the industry to reconsider its analytical approach for resource adequacy: (1) Chronological grid operations: The increasing importance of variable renewable resources (such as wind and solar) and of energy-limited resources (storage and demand response) make it essential to understand the full year of chronological operation of the grid. Specific attention must be paid to hourly, seasonal, and inter-annual resource variability. The sequence of the variability is key, as energy-limited resources such as batteries or demand response require either a preceding period or subsequent period of high production to be useful for grid reliability. (2) Correlated events: Historically, resource adequacy analysis focused on shortfalls caused by random, discrete mechanical failures of large generating units. In contrast, shortfalls today are often caused by multiple, correlated events caused by common weather patterns. Resource adequacy analysis must increasingly shift its focus to these correlated events. The redesign of resource adequacy methods will benefit from a set of guiding principles to better allow for sharing of insights and best practices, interregional resource coordination, and a smoother regulatory process for resource procurement. The objective of this report is to move this redesign forward. It provides an overview of key drivers changing the way resource adequacy needs to be evaluated, identifies shortcomings of conventional approaches, and outlines first principles for practitioners to consider as they adapt their approaches. The central message is: what got us here won't get us there.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Storage for Variable Renewable Energy Resource Integration - A Regional Assessment for the Northwest Power Pool (NWPP)

This paper addresses the following key questions in the discussion on the integration of renewable energy resources in the Pacific Northwest power grid: a) what will be the future balancing requirement to accommodate a simulated expansion of wind energy resources from 3.3 GW in 2008 to 14.4 GW in 2019 in the Northwest Power Pool (NWPP), and b) what are the most cost effective technological solutions for meeting the balancing requirements in the Northwest Power Pool (NWPP). A life-cycle analysis was performed to assess the least-cost technology option for meeting the new balancing requirement. The technologies considered in this study include conventional turbines (CT), sodium sulfur (NaS) batteries, lithium ion (Li-ion) batteries, pumped hydro energy storage (PH), and demand response (DR). Hybrid concepts that combine 2 or more of the technologies above are also evaluated. This analysis was performed with collaboration by the Bonneville Power Administration and funded by the Energy Storage Systems Program of the U.S. Department of Energy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Model Predictive Control to Improve Grid Resilience

The following article details a model predictive control (MPC) to improve grid resilience when faced with variable generation resources. This topic is of significant interest to utility power systems where distributed intermittent energy sources will increase significantly and be relied on for electric grid ancillary services. Previous work on MPCs has focused on narrowly targeted control applications such as improving electric vehicle (EV) charging infrastructure or reducing the cost of integrating Energy Storage Systems (ESSs) into the grid. In contrast, this article develops a comprehensive treatment of the construction of an MPC tailored to electric grids and then applies it integration of intermittent energy resources. To accomplish this, the following article includes a description of a reduced order model (ROM) of an electric power grid based on a circuit model, an optimization formulation that describes the MPC, a collocation method for solving linear time-dependent differential algebraic equations (DAEs) that result from the ROM, and an overall strategy for iteratively refining the behavior of the MPC. Next, the algorithm is validated using two separate numerical experiments. First, the algorithm is compared to an existing MPC code and the results are verified by a numerically precise simulation. It is shown that this algorithm produces a control comparable to existing algorithms and the behavior of the control carefully respects the bounds specified. Second, the MPC is applied to a small nine bus system that contains a mix of turbine-spinning-machine-based and intermittent generation in order to demonstrate the algorithm’s utility for resource planning and control of intermittent resources. This study demonstrates how the MPC can be tuned to change the behavior of the control, which can then assist with the integration of intermittent resources into the grid. The emphasis throughout the paper is to provide systematic treatment of the topic and produce a novel nonlinear control compatible design framework applicable to electric grids and the control of variable resources. This differs from the more targeted application-based focus in most presentations.

microgrid↗

RAVIS: Resource Forecast and Ramp Visualization for Situational Awareness of Variable Renewable Generation

The Resource Forecast and Ramp Visualization for Situational Awareness (RAVIS) is an innovative, open-source tool for visualizing variable renewable resource forecasts and alerts for significant up- and down-ramps in renewable generation and the consequent system net load. The modular dashboard of RAVIS contains configurable panes for viewing probabilistic time-series forecasts, ramp event alerts on the look-ahead timeline, and spatially resolved resource sites, and forecasts. For comprehensive situational awareness, the tool can add additional data layers from simulation and independent system operator (ISO) market clearing data---including electric line utilization, nodal price, and available generation flexibility---in response to continuously updated renewable forecasts. This paper introduces the RAVIS technology suite employed to provide optimum visualization and flexible design characteristics. The paper also illustrates some use cases of the tool using site-specific solar power forecast data obtained from the IBM Watt-Sun forecasting platform for the California ISO and Midcontinent ISO footprints. The source code for RAVIS is public (https://github.com/ravis-nrel/ravis), and the intended users are forecasters, utility planners, ISO operators, and researchers.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Integration of Storage in the DC Link of a Full Converter-Based Distributed Wind Turbine

Energy storage is known to support the dispatchability of variable renewable resources. In this paper, we model a battery energy storage system (BESS) integrated with the DC link of a Type IV full converter-based wind turbine and the necessary controls to achieve efficient dispatch. To support the validation of control methodologies, we build a detailed model of a Type IV research wind turbine at the National Renewable Energy Laboratory (NREL), the Controls Advanced Research Turbine (CART 3), and we integrated a lithium-ion BESS model in grid-following mode into the model. The simulation results illustrate the sizing and control of the DC link-integrated BESS for a given variable wind resource and varying dispatch strategies (i.e., under constant, uncertain, and ramping wind scenarios). The integrated storage can smooth variabilities in distributed wind output, hedge against uncertainties, provide the ramping capability, as well as support stability under voltage and frequency transients. All of these have been illustrated in MATLAB/Simulink.

DC-link voltage↗

Consequences of neglecting the interannual variability of the solar resource: A case study of photovoltaic power among the Hawaiian Islands

The interannual variability of the solar irradiance and meteorological conditions are often ignored in favor of single-year data sets for modeling power generation and evaluating the economic value of photovoltaic (PV) power systems. Yet interannual variability significantly impacts the generation from one year to another of renewable power systems such as wind and PV. Consequently, the interannual variability of power generation corresponds to the interannual variability of capital returns on investment. The penetration of PV systems within the Hawaiian Electric Companies' portfolio has rapidly accelerated in recent years and is expected to continue to increase given the state's energy objectives laid out by the Hawaii Clean Energy Initiative. We use the National Solar Radiation Database (1998-2015) to characterize the interannual variability of the solar irradiance and meteorological conditions across the State of Hawaii. These data sets are passed to the National Renewable Energy Laboratory's System Advisory Model (SAM) to calculate an 18-year PV power generation data set to characterize the variability of PV power generation. We calculate the interannual coefficient of variability (COV) for annual average global horizontal irradiance (GHI) on the order of 2% and COV for annual capacity factor on the order of 3% across the Hawaiian archipelago. Regarding the interannual variability of seasonal trends, we calculate the COV for monthly average GHI values on the order of 5% and COV for monthly capacity factor on the order of 10%. We model residential-scale and utility-scale PV systems and calculate the economic returns of each system via the payback period and the net present value. We demonstrate that studies based on single-year data sets for economic evaluations reach conclusions that deviate from the true values realized by accounting for interannual variability.

14 SOLAR ENERGY↗

RAVIS: Resource Forecast and Ramp Visualization for Situational Awareness of Variable Renewable Generation: Preprint

The Resource Forecast and Ramp Visualization for Situational Awareness (RAVIS) is an innovative, open-source tool for visualizing variable renewable resource forecasts and alerts for significant up- and down-ramps in renewable generation and the consequent system net load. The modular dashboard of RAVIS contains configurable panes for viewing probabilistic time-series forecasts, ramp event alerts on the look-ahead timeline, and spatially resolved resource sites, and forecasts. For comprehensive situational awareness, the tool can add additional data layers from simulation and independent system operator (ISO) market clearing data—including electric line utilization, nodal price, and available generation flexibility—in response to continuously updated renewable forecasts. This paper introduces the RAVIS technology suite employed to provide optimum visualization and flexible design characteristics. The paper also illustrates some use cases of the tool using site-specific solar power forecast data obtained from the IBM Watt-Sun forecasting platform for the California ISO and Midcontinent ISO footprints. The source code for RAVIS is public (https://github.com/ravis-nrel/ravis), and the intended users are forecasters, utility planners, ISO operators, and researchers.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Wind resource quality affected by high levels of renewables

For solar photovoltaic (PV) and wind resources, the capacity factor is an important parameter describing the quality of the resource. As the share of variable renewable resources (such as PV and wind) on the electric system is increasing, so does curtailment (and the fraction of time when it cannot be avoided). At high levels of renewable generation, curtailments effectively change the practical measure of resource quality from capacity factor to the incremental capacity factor. The latter accounts only for generation during hours of no curtailment and is directly connected with the marginal capital cost of renewable generators for a given level of renewable generation during the year. The Western U.S. wind generation is analyzed hourly for a system with 75% of annual generation from wind, and it is found that the value for the system of resources with equal capacity factors can vary by a factor of 2, which highlights the importance of using the incremental capacity factor instead. Finally, the effect is expected to be more pronounced in smaller geographic areas (or when transmission limitations imposed) and less pronounced at lower levels of renewable energy in the system with less curtailment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wave Resource Spatial and Temporal Variability Dependence on WEC Size

As the wave energy sector grows and looks to the Blue Economy for commercialization opportunities, there is a distinct and pressing need to clearly understand and quantify the coupled impacts of wave energy converter (WEC) size and wave resource characteristics on the annual energy production, spatial variability and temporal variability. Utilizing generic frequency domain representations of the Oscilla Power Triton WEC and spectral wave conditions at PacWave (Oregon), Los Angeles (California) and WETS (Hawaii), a series of interesting results emerge. Firstly, the 'optimal' WEC size, from an energy standpoint, is fundamentally dependent on the frequency distribution of the incoming wave variance density spectrum. Secondly, and from a seasonality perspective, the seasonal WEC energy generation doesn't necessarily follow the seasonal distribution of gross wave power. Finally, from an hourly power variability perspective, a reduction in WEC size generally decreases variability. However, for each of the locations investigated, there appears to be a WEC size threshold; a threshold where further reducing WEC size results in increased power variability.

blue economy↗

Wave resource spatial and temporal variability dependence on WEC size

As the wave energy sector grows and looks to the Blue Economy for commercialization opportunities, there is a distinct and pressing need to clearly understand and quantify the coupled impacts of wave energy converter (WEC) size and wave resource characteristics on the annual energy production, spatial variability and temporal variability. Utilizing generic frequency domain representations of the Oscilla Power Triton WEC and spectral wave conditions at PacWave (Oregon), Los Angeles (California) and WETS (Hawaii), a series of interesting results emerge. Firstly, the ‘optimal’ WEC size, from an energy standpoint, is fundamentally dependent on the frequency distribution of the incoming wave variance density spectrum. Secondly, and from a seasonality perspective, the seasonal WEC energy generation doesn’t necessarily follow the seasonal distribution of gross wave power. Finally, from an hourly power variability perspective, a reduction in WEC size generally decreases variability. However, for each of the locations investigated, there appears to be a WEC size threshold; a threshold where further reducing WEC size results in increased power variability.

16 TIDAL AND WAVE POWER↗

A Novel Framework for Optimizing Ramping Capability of Hybrid Energy Storage Systems

Hybrid Energy Storage System has been widely applied in aerospace, electric vehicle, and microgrid applications. The advantages are that they include complimentary technologies with both high power and energy capabilities. HESS have the potential to be useful to the bulk power systems, for example to increase the value of energy produced by variable generation resource through enabling participation in ancillary service markets. Actualizing the benefits of HESSs requires optimizing the combined ramping capability of aggregated HESS resources. To provide quality ancillary service, source of HESSs locating at multiple sites of variable generation resource must be optimally sized and cohesively controlled. Optimizing aggregated resources can be formulated as an optimization problem. Successfully solving this problem not only requires using effective solution methods but also depends on accurately and rapidly setting the necessary parameters in the problem formula. This article proposes a novel framework with double-layer structure to solve the optimization problem of aggregating ramping capability. Program developed on the upper layer focuses on solving the optimization of aggregating ramping capability among multiple HESSs and is compatible with most existing optimization algorithms. Program on lower layer of the framework targets at optimizing the local control of a single HESS based on a thorough analytics of HESS operation strategy presented in this article. Result of local optimization is also provided to upper layer program for updating the parameters in formula of optimization problem. Real time hardware-in-the-loop test is conducted to verify the performance of the optimization framework developed. The work presented is expected to provide guidance for implementing this framework in practical operation.

Luo, Yushen↗

Marginal Cost Pricing in a World without Perfect Competition: Implications for Electricity Markets with High Shares of Low Marginal Cost Resources

A common approach to regulating electricity is through auction-based competitive wholesale markets. The goal of this approach is to provide a reliable supply of power at the lowest reasonable cost to the consumer. This necessitates market structures and operating rules that ensure revenue sufficiency for all generators needed for resource adequacy purposes. Wholesale electricity markets employ marginal-cost pricing to provide cost-effective dispatch such that resources are compensated for their operational costs. However, marginal-cost pricing alone cannot guarantee cost recovery outside of perfect competition, and electricity markets have at least six attributes that preclude them from functioning as perfectly competitive markets. These attributes include market power, externalities, public good attributes, lack of storage, wholesale price caps, and ineffective demand curve. Until (and unless) these failures are ameliorated, some form of corrective action(s) will be necessary to improve market efficiency so that prices can correctly reflect the needed level of system reliability. Many of these options necessarily involve some form of administrative or out-of-market actions, such as scarcity pricing, capacity payments, bilateral or other out-of-market contracts, or some hybrid combination. A key focus with these options is to create a connection between the electricity market and long-term reliability/loss-of-load expectation targets, which are inherently disconnected in the native markets because of the aforementioned market failures. The addition of variable generation resources can exacerbate revenue sufficiency and resource adequacy concerns caused by these underlying market failures. Because variable generation resources have near-zero marginal costs, they effectively suppress energy prices and reduce the capacity factors of conventional generators through the merit-order effect in the simplest case of a convex market; non-convexities can also suppress prices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

How Wrong Can the Operational AEP Uncertainty Estimate Be When We Ignore the Correlations Between the Uncertainty Components?

Calculations of wind farm annual energy production (AEP) on operational data are essential for a variety of financial transactions during the life of wind plants. The AEP estimate is associated with an uncertainty value, which is calculated by combining contributions connected to on-site measurements, long-term reference measurements, losses, regression, windiness adjustment, and wind resource interannual variability. Although very limited documentation on the topic exists, the conventional approach currently used by the wind energy community to assess the uncertainty connected to the operational AEP estimate assume that the different uncertainty components are uncorrelated and therefore calculates the overall uncertainty with a sum of squares approach. In this analysis, we contrast the traditional technique to estimate the overall AEP uncertainty by ignoring the correlation between its different components with a novel Monte Carlo based approach, which can instead take into account the correlation between different uncertainty categories. We consider monthly operational data from 472 wind farms from the Energy Information Administration (EIA) 923 database to assess the difference between the two approaches. Long-term wind speed data needed for the AEP assessment are taken from three reanalysis products: the Modern-Era Retrospective analysis for Research and Applications v2 (MERRA-2), the European Reanalysis Interim (ERA-interim), and the National Centers for Environmental Prediction v2 (NCEP-2). The results of the Monte Carlo approach show that three pairs of AEP uncertainty components do show a statistically significant correlation: the uncertainty connected with wind resource inter-annual variability is positively correlated with the one related to the windiness correction and negatively correlated with the one due to the regression, and the wind measurement uncertainty is positively correlated with the regression uncertainty. All these correlations, which are found between uncertainty components which are not only part of an operational analysis, but also of a wind resource assessment, are currently ignored in the conventional techniques used as industry standard. We further investigate the causes of these correlations, in terms of common dependencies of different uncertainty components on wind resource variability, number of data points, and quality of the regression between wind speed and energy production data. Next, we quantify the error in the current industry standard technique, in terms of the percentage difference in total uncertainty calculated with the two considered approaches, for all the analyzed wind farms. We find a mean absolute percentage difference of about 6%, with the largest differences being greater than 20%. The data clearly confirm that ignoring the actual correlation between the uncertainty components can lead to large errors in the assessment of the operational AEP uncertainty, and the proposed Monte Carlo approach should be preferred.

Monte Carlo↗