Search NASA⌕ Search

SEARCH · Search NASA

Results for “visit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Expanding the Operational Use of Total Lightning Ahead of GOES-R

NASA's Short‐term Prediction Research and Transition Center (SPoRT) has been transitioning real‐time total lightning observations from ground‐based lightning mapping arrays since 2003. This initial effort was with the local Weather Forecast Offices (WFO) that could use the North Alabama Lightning Mapping Array (NALMA). These early collaborations established a strong interest in the use of total lightning for WFO operations. In particular the focus started with warning decision support, but has since expanded to include impact‐based decision support and lightning safety. SPoRT has used its experience to establish connections with new lightning mapping arrays as they become available. The GOES‐R / JPSS Visiting Scientist Program has enabled SPoRT to conduct visits to new partners and expand the number of operational users with access to total lightning observations. In early 2014, SPoRT conducted the most recent visiting scientist trips to meet with forecast offices that will used the Colorado, Houston, and Langmuir Lab (New Mexico) lightning mapping arrays. In addition, SPoRT met with the corresponding Center Weather Service Units (CWSUs) to expand collaborations with the aviation community. These visits were an opportunity to learn about the forecast needs of each office visited as well as to provide on‐site training for the use of total lightning, setting the stage for a real‐time assessment during May‐July 2014. With five lightning mapping arrays covering multiple geographic locations, the 2014 assessment has demonstrated numerous uses of total lightning in varying situations. Several highlights include a much broader use of total lightning for impact‐based decision support ranging from airport weather warnings, supporting fire crews, and protecting large outdoor events. The inclusion of the CWSUs has broadened the operational scope of total lightning, demonstrating how these data can support air traffic management, particularly in the Terminal Radar Approach Control Facilities (TRACON) region around an airport. These collaborations continue to demonstrate, from the operational perspective, the utility of total lightning and the importance of continued training and preparation in advance of the Geostationary Lightning Mapper.

GLM↗

Expected performance of m-solution backtracking

This paper derives upper bounds on the expected number of search tree nodes visited during an m-solution backtracking search, a search which terminates after some preselected number m problem solutions are found. The search behavior is assumed to have a general probabilistic structure. The results are stated in terms of node expansion and contraction. A visited search tree node is said to be expanding if the mean number of its children visited by the search exceeds 1 and is contracting otherwise. It is shown that if every node expands, or if every node contracts, then the number of search tree nodes visited by a search has an upper bound which is linear in the depth of the tree, in the mean number of children a node has, and in the number of solutions sought. Also derived are bounds linear in the depth of the tree in some situations where an upper portion of the tree contracts (expands), while the lower portion expands (contracts). While previous analyses of 1-solution backtracking have concluded that the expected performance is always linear in the tree depth, the model allows superlinear expected performance.

Nicol, D. M.↗

The International Space Station As a Free Flyer Servicing Node

The International Space Station will provide a multitude of opportunities for an expanding customer base to make use of this international resource. One such opportunity is servicing of various visiting vehicles that are in a similar orbit to the station. Servicing may include change-out of payloads, replenishment of consumables, repair, and refurbishment operations. Previous studies have been conducted in which "paper" free flyers have been assessed against the station s ability to accommodate them. Over the last several months though, an already flown free flyer, EURECA, was assessed as a real-life visiting free flyer design reference mission. Issues such as capture/berthing, servicing, logistics support, and stowage were assessed for station design and operational approaches. This paper will highlight critical visiting vehicle design considerations, identify station issues, and provide recommendations for accommodation of a wide range of visiting vehicle requirements of the future.

Antol, Jeffrey↗

Methodology for Developing a Probabilistic Risk Assessment Model of Spacecraft Rendezvous and Dockings

In 2007 NASA was preparing to send two new visiting vehicles carrying logistics and propellant to the International Space Station (ISS). These new vehicles were the European Space Agency s (ESA) Automated Transfer Vehicle (ATV), the Jules Verne, and the Japanese Aerospace and Explorations Agency s (JAXA) H-II Transfer Vehicle (HTV). The ISS Program wanted to quantify the increased risk to the ISS from these visiting vehicles. At the time, only the Shuttle, the Soyuz, and the Progress vehicles rendezvoused and docked to the ISS. The increased risk to the ISS was from an increase in vehicle traffic, thereby, increasing the potential catastrophic collision during the rendezvous and the docking or berthing of the spacecraft to the ISS. A universal method of evaluating the risk of rendezvous and docking or berthing was created by the ISS s Risk Team to accommodate the increasing number of rendezvous and docking or berthing operations due to the increasing number of different spacecraft, as well as the future arrival of commercial spacecraft. Before the first docking attempt of ESA's ATV and JAXA's HTV to the ISS, a probabilistic risk model was developed to quantitatively calculate the risk of collision of each spacecraft with the ISS. The 5 rendezvous and docking risk models (Soyuz, Progress, Shuttle, ATV, and HTV) have been used to build and refine the modeling methodology for rendezvous and docking of spacecrafts. This risk modeling methodology will be NASA s basis for evaluating the addition of future ISS visiting spacecrafts hazards, including SpaceX s Dragon, Orbital Science s Cygnus, and NASA s own Orion spacecraft. This paper will describe the methodology used for developing a visiting vehicle risk model.

Farnham, Steven J., II↗

Space Shuttle Program (SSP) Dual Docked Operations (DDO)

This document describes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), International Space Station (ISS) Program (ISSP), and Mission Operations Directorate for implementing Dual Docked Operations (DDO) during mated Orbiter/ISS missions. This work was performed over a number of years. Due to the ever increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during docked operations. This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles.

Sills, Joel W., Jr.↗

Space Shuttle Program Dual Docked Operations

- Dual Docked Operations (DDO) is the docking or undocking of a Russian Vehicle (RV) during Space Shuttle Orbiter/International Space Station (ISS) mated operations. - This paper and presentation summarizes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), ISS Program (ISSP), and Mission Operations Directorate for implementing DDO during mated Orbiter/ISS missions. [1] - Due to the ever-increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during mated Orbiter/ISS operations. - This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles. - Reviews were conducted to assess the viability and readiness of the SSP to protect for DDO on any given mission and it was found to be t echnically feasible

Launch vehicles↗

Space Shuttle Program Dual Docked Operations

- Dual Docked Operations (DDO) is the docking or undocking of a Russian Vehicle (RV) during Space Shuttle Orbiter/International Space Station (ISS) mated operations. - This paper and presentation summarizes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), ISS Program (ISSP), and Mission Operations Directorate for implementing DDO during mated Orbiter/ISS missions. [1] - Due to the ever-increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during mated Orbiter/ISS operations. - This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles. - Reviews were conducted to assess the viability and readiness of the SSP to protect for DDO on any given mission and it was found to be t echnically feasible

Launch vehicles↗

The Variable Detection of Atmospheric Escape around the Young, Hot Neptune AU Mic b

Photoevaporation is a potential explanation for several features within exoplanet demographics. Atmospheric escape observed in young Neptune-sized exoplanets can provide insight into and characterize which mechanisms drive this evolution and at what times they dominate. AU Mic b is one such exoplanet, slightly larger than Neptune (4.19 R ⊕ ). It closely orbits a 23 Myr pre-main-sequence M dwarf with an orbital period of 8.46 days. We obtained two visits of AU Mic b at Lyα with Hubble Space Telescope (HST)/Space Telescope Imaging Spectrograph. One flare within the first HST visit is characterized and removed from our search for a planetary transit. We present a nondetection in our first visit, followed by the detection of escaping neutral hydrogen ahead of the planet in our second visit. The outflow absorbed ∼30% of the star’s Lyα blue wing 2.5 hr before the planet’s white-light transit. We estimate that the highest-velocity escaping material has a column density of 10 13.96 cm −2 and is moving 61.26 km s −1 away from the host star. AU Mic b’s large high-energy irradiation could photoionize its escaping neutral hydrogen in 44 minutes, rendering it temporarily unobservable. Our time-variable Lyα transit ahead of AU Mic b could also be explained by an intermediate stellar wind strength from AU Mic that shapes the escaping material into a leading tail. Future Lyα observations of this system will confirm and characterize the unique variable nature of its Lyα transit, which, combined with modeling, will tune the importance of stellar wind and photoionization.

Exoplanets↗

Learned navigation in unknown terrains: A retraction method

The problem of learned navigation of a circular robot R, of radius delta (is greater than or equal to 0), through a terrain whose model is not a-priori known is considered. Two-dimensional finite-sized terrains populated by an unknown (but, finite) number of simple polygonal obstacles are also considered. The number and locations of the vertices of each obstacle are unknown to R. R is equipped with a sensor system that detects all vertices and edges that are visible from its present location. In this context two problems are covered. In the visit problem, the robot is required to visit a sequence of destination points, and in the terrain model acquisition problem, the robot is required to acquire the complete model of the terrain. An algorithmic framework is presented for solving these two problems using a retraction of the freespace onto the Voronoi diagram of the terrain. Algorithms are then presented to solve the visit problem and the terrain model acquisition problem.

Rao, Nageswara S. V.↗

Knowledge-based systems in Japan

This report summarizes a study of the state-of-the-art in knowledge-based systems technology in Japan, organized by the Japanese Technology Evaluation Center (JTEC) under the sponsorship of the National Science Foundation and the Advanced Research Projects Agency. The panel visited 19 Japanese sites in March 1992. Based on these site visits plus other interactions with Japanese organizations, both before and after the site visits, the panel prepared a draft final report. JTEC sent the draft to the host organizations for their review. The final report was published in May 1993.

Feigenbaum, Edward↗

Solid Earth and Natural Hazards (SENH) Research and Applications Program and Internation

This is a final report for grant NAG5-8627 entitled 'Joint UNAVCO and JPL proposal to NASA for support of the Solid Earth and Natural Hazards Research and Applications Program and Internation'. This report consists of the following sections: (1) new installations (with site visits); (2) upgrades (with site visits; (3) upcoming upgrades (with site visits); and (4) data management and archive efforts during the performance period.

Source record↗

Relaxing USOS Solar Array Constraints for Russian Vehicle Undocking

With the retirement of Space Shuttle cargo delivery capability and the ten year life extension of the International Space Station (ISS) more emphasis is being put on preservation of the service life of ISS critical components. Current restrictions on the United States Orbital Segment (USOS) Solar Array (SA) positioning during Russian Vehicle (RV) departure from ISS nadir and zenith ports cause SA to be positioned in the plume field of Service Module thrusters and lead to degradation of SAs as well as potential damage to Sun tracking Beta Gimbal Assemblies (BGA). These restrictions are imposed because of the single fault tolerant RV Motion Control System (MCS), which does not meet ISS Safety requirements for catastrophic hazards and dictates 16 degree Solar Array Rotary Joint position, which ensures that ISS and RV relative motion post separation, does lead to collision. The purpose of this paper is to describe a methodology and the analysis that was performed to determine relative motion trajectories of the ISS and separating RV for nominal and contingency cases. Analysis was performed in three phases that included ISS free drift prior to Visiting Vehicle separation, ISS and Visiting Vehicle relative motion analysis and clearance analysis. First, the ISS free drift analysis determined the worst case attitude and attitude rate excursions prior to RV separation based on a series of different configurations and mass properties. Next, the relative motion analysis calculated the separation trajectories while varying the initial conditions, such as docking mechanism performance, Visiting Vehicle MCS failure, departure port location, ISS attitude and attitude rates at the time of separation, etc. The analysis employed both orbital mechanics and rigid body rotation calculations while accounting for various atmospheric conditions and gravity gradient effects. The resulting relative motion trajectories were then used to determine the worst case separation envelopes during the clearance analysis. Analytical models were developed individually for each stage and the results were used to build initial conditions for the following stages. In addition to the analysis approach, this paper also discusses the analysis results, showing worst case relative motion envelopes, the recommendations for ISS appendage positioning and the suggested approach for future analyses.

Menkin, Evgeny↗

Geo-Statistical Approach to Estimating Asteroid Exploration Parameters

NASA's vision for space exploration calls for a human visit to a near earth asteroid (NEA). Potential human operations at an asteroid include exploring a number of sites and analyzing and collecting multiple surface samples at each site. In this paper two approaches to formulation and scheduling of human exploration activities are compared given uncertain information regarding the asteroid prior to visit. In the first approach a probability model was applied to determine best estimates of mission duration and exploration activities consistent with exploration goals and existing prior data about the expected aggregate terrain information. These estimates were compared to a second approach or baseline plan where activities were constrained to fit within an assumed mission duration. The results compare the number of sites visited, number of samples analyzed per site, and the probability of achieving mission goals related to surface characterization for both cases.

probability↗

Voyager's Grand Tour

In the early days of the Space Age, scientists realized that given the right planetary alignments it might be possible to use the gravity of one planet to change the trajectory of a spacecraft and send it on to another planet without expending any fuel. This slingshot or gravity assist trajectory principle was first tested by Mariner 10, which used the gravity of Venus to slingshot its way to Mercury in 1974. A very rare planetary alignment would occur in the late 1970's allowing a spacecraft to visit all the outer planets (Jupiter, Saturn, Uranus, Neptune and Pluto) using gravity assists at each planet to send it on to the next. This unique alignment would not occur again for another 175 years! The initial ambitious plan, called the Grand Tour, was to send two pairs of spacecraft, one pair to visit Jupiter, Saturn and Pluto, the other to fly by Jupiter, Uranus and Neptune. However, the original plan was scaled back in the budget conscious early 1970's to just two less capable spacecraft visiting only Jupiter and Saturn, and Titan, Saturn's largest moon Taking advantage of this alignment would be two Voyager spacecraft, both beginning their long journeys in 1977. Voyager 2 launched first, on August 20, followed by Voyager 1 on September 5. Both spacecraft would first fly by Jupiter and use that planet's massive gravity to bend their trajectories to then fly by Saturn. Voyager 1 would also be targeted to fly by Saturn's moon Titan, which was known to have a dense atmosphere, a trajectory that would preclude any future planetary flybys. But the option was kept open, if Voyager 1's Titan flyby was successful, to retarget Voyager 2 to send it on to Uranus and maybe even Neptune - assuming it would survive that long! Just 13 days after its launch, Voyager 1 scored the first of its many firsts: at a distance of 7.25 million miles, it turned its camera back toward Earth and snapped the first ever photograph of the Earth-Moon system in a single frame, giving a sneak preview of the discoveries that lay ahead.

Uri, Joihn J.↗

Persistent Assets in Zero-G and on Planetary Surfaces: Enabled by Modular Technology and Robotic Operations

Space operations are on the cusp of a revolutionary new operational paradigm that leverages modular systems and recurring robotic visits to “Persistent Assets” enabling asset maintenance, repair, and enhancement. A “Persistent Asset” is defined here as any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. This term is an extension of the term “Persistent Platform” used by Ms. Pam Melroy at the Defense Advanced Research Projects Agency to describe the vision of the Agency for a geosynchronous Earth orbiting platform. In this paper, the term “Persistent Asset” is introduced to encompass not only zero-g systems; such as telecommunication platforms, Earth observing science platform, Department of Defense platforms, and scientific telescope systems, but also planetary surface systems that support missions such as human outposts, science stations, and in-situ resource utilization systems. In contrast to the current state of the art, where space systems are typically launched as a single unit and operated without any further physical intervention after launch; future systems will be maintained, enhanced and reconfigured in-situ as new technology becomes available or mission needs change. Visits to the persistent asset can be regularly scheduled or dictated by funding constraints enabling a pay-as-you-go approach, which is largely independent of time-constraints and able to exploit launches of opportunity. In this paper, historical in-space assembly activities which relied heavily on astronaut extra-vehicular activity will be reviewed as well as early robotic assembly activities. These approaches will be contrasted with emerging modular approaches supporting realization of a new Persistent Asset operational paradigm. The paper will define attributes of the Persistent Asset paradigm and illustrate advantages by applying the paradigm to two relevant applications: 1) a large space telescope backing structure and 2) the backbone structure for a solar electric transport vehicle. Finally, recently developed unique Persistent Asset elements (modules, and interface approaches) will be described.

Doggett, William R.↗

Persistent Assets in Zero-G and on Planetary Surfaces: Enabled by Modular Technology and Robotic Operations

Space operations are on the cusp of a revolutionary new operational paradigm that leverages modular systems and recurring robotic visits to “Persistent Assets” enabling asset maintenance, repair, and enhancement. A “Persistent Asset” is defined here as any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. This term is an extension of the term “Persistent Platform” used by Ms. Pam Melroy at the Defense Advanced Research Projects Agency to describe the vision of the Agency for a geosynchronous Earth orbiting platform. In this paper, the term “Persistent Asset” is introduced to encompass not only zero-g systems; such as telecommunication platforms, Earth observing science platform, Department of Defense platforms, and scientific telescope systems, but also planetary surface systems that support missions such as human outposts, science stations, and in-situ resource utilization systems. In contrast to the current state of the art, where space systems are typically launched as a single unit and operated without any further physical intervention after launch; future systems will be maintained, enhanced and reconfigured in-situ as new technology becomes available or mission needs change. Visits to the persistent asset can be regularly scheduled or dictated by funding constraints enabling a pay-as-you-go approach, which is largely independent of time-constraints and able to exploit launches of opportunity. In this paper, historical in-space assembly activities which relied heavily on astronaut extra-vehicular activity will be reviewed as well as early robotic assembly activities. These approaches will be contrasted with emerging modular approaches supporting realization of a new Persistent Asset operational paradigm. The paper will define attributes of the Persistent Asset paradigm and illustrate advantages by applying the paradigm to two relevant applications: 1) a large space telescope backing structure and 2) the backbone structure for a solar electric transport vehicle. Finally, recently developed unique Persistent Asset elements (modules, and interface approaches) will be described.

William R Doggett↗

Near-term Persistent Platform Orbital Testbed: Three Candidate Architecture Options

On-orbit Servicing, Assembly, and Manufacturing (OSAM) will revolutionize the space industry by transforming the concept of operations of space systems and enabling new, radically different system implementations. These new implementations will benefit from a novel persistent asset design paradigm which focuses on evolvable designs that are tailored to the operational environment, not the launch environment. In addition, the ability to launch sub-systems independently enable future persistent assets to economically expand in capability and size, achieving cost effective and productive operations lasting for decades like terrestrial observatories. With few exceptions (International Space Station, Hubble Space Telescope, Mission Extension Vehicle customers), current space systems are not visited once they are operational. Leveraging emerging low cost commercial launch provides the ability to repeatedly and routinely revisit space systems. Thus, revolutionary new approaches for space system design are possible, creating completely new opportunities for small businesses and accelerating the growth of already established space industries. To usher in the revolutionary new operational paradigm, two things are needed. First, to build confidence in the technology and new paradigm, there must be a leading example, a bellwether persistent asset, that demonstrates the reliability and maturity of the new persistent asset paradigm (where repeated visits are common). Second, in order to rapidly advance and validate OSAM capabilities, an efficient means is required to conduct tests in the space environment. A persistent platform testbed satisfies both these needs. The space environment exhibits a plethora of characteristics that are difficult and costly to accurately simulate for a full system in a terrestrial laboratory, such as near zero gravity, a wide range of ionizing radiation types, atomic oxygen, and micro-meteoroids and space debris traveling at high velocity. In addition, since persistent assets range in mass from a few grams to several metric tons, it is difficult to accurately simulate interactions between these systems and visiting vehicles (that also exhibit a wide range of varying masses and capabilities). These interactions include the transmission of forces and/or exchanging mass (in the form of instruments, fuel, robotic assets, etc.). Thus, a rapid, versatile and cost efficient in-space testing capability that includes a persistent test platform and a surrounding in-space test zone is needed to mature technologies through experimentation. The testbed can provide common services, such as: power, thermal control, vibration isolation, data transmission between experiments and terrestrial experimenters, station-keeping, pointing, and robotic agents that can be leveraged by customer experiments. The onboard robotic agents can be used to provide payload handling services, such as: assembly, change out or upgrade, relocation, connecting/disconnecting utilities, inspection, repair or servicing, etc. Since the persistent platform cost will be amortized over many hosted payloads, its services can eventually be offered at a price much lower than if one were to design a unique and dedicated spacecraft and mission for those few experiments. The key to achieving an effective testbed is providing efficient cost effective access and infrastructure to a variety of commercial, academic and government customers coupled with extensibility, in the capability of an individual persistent platform test bed or replication of the test bed in a different operational regime. Three potential options for implementing a test bed were developed and evaluated in this study.

Persistent Platform↗

Near-term Persistent Platform Orbital Testbed: Three Candidate Architecture Options

On-orbit Servicing, Assembly, and Manufacturing (OSAM) will revolutionize the space industry by transforming the concept of operations of space systems and enabling new, radically different system implementations. These new implementations will benefit from a novel persistent asset design paradigm which focuses on evolvable designs that are tailored to the operational environment, not the launch environment. In addition, the ability to launch sub-systems independently enable future persistent assets to economically expand in capability and size, achieving cost effective and productive operations lasting for decades like terrestrial observatories. With few exceptions (International Space Station, Hubble Space Telescope, Mission Extension Vehicle customers), current space systems are not visited once they are operational. Leveraging emerging low cost commercial launch provides the ability to repeatedly and routinely revisit space systems. Thus, revolutionary new approaches for space system design are possible, creating completely new opportunities for small businesses and accelerating the growth of already established space industries. To usher in the revolutionary new operational paradigm, two things are needed. First, to build confidence in the technology and new paradigm, there must be a leading example, a bellwether persistent asset, that demonstrates the reliability and maturity of the new persistent asset paradigm (where repeated visits are common). Second, in order to rapidly advance and validate OSAM capabilities, an efficient means is required to conduct tests in the space environment. A persistent platform testbed satisfies both these needs. The space environment exhibits a plethora of characteristics that are difficult and costly to accurately simulate for a full system in a terrestrial laboratory, such as near zero gravity, a wide range of ionizing radiation types, atomic oxygen, and micro-meteoroids and space debris traveling at high velocity. In addition, since persistent assets range in mass from a few grams to several metric tons, it is difficult to accurately simulate interactions between these systems and visiting vehicles (that also exhibit a wide range of varying masses and capabilities). These interactions include the transmission of forces and/or exchanging mass (in the form of instruments, fuel, robotic assets, etc.). Thus, a rapid, versatile and cost efficient in-space testing capability that includes a persistent test platform and a surrounding in-space test zone is needed to mature technologies through experimentation. The testbed can provide common services, such as: power, thermal control, vibration isolation, data transmission between experiments and terrestrial experimenters, station-keeping, pointing, and robotic agents that can be leveraged by customer experiments. The onboard robotic agents can be used to provide payload handling services, such as: assembly, change out or upgrade, relocation, connecting/disconnecting utilities, inspection, repair or servicing, etc. Since the persistent platform cost will be amortized over many hosted payloads, its services can eventually be offered at a price much lower than if one were to design a unique and dedicated spacecraft and mission for those few experiments. The key to achieving an effective testbed is providing efficient cost effective access and infrastructure to a variety of commercial, academic and government customers coupled with extensibility, in the capability of an individual persistent platform test bed or replication of the test bed in a different operational regime. Three potential options for implementing a test bed were developed and evaluated in this study.

Persistent Platform↗