A Rinsing Effluent Evaporator for Dismantling Operations - 13271

Between 1958 and 1997, the UP1 plant at Marcoule - located in the south of France - reprocessed and recycled nearly 20,000 MT of used fuel from special defense applications reactors, as well as fuel from the first generation of electricity generating reactors in France (natural uranium fuel, CO{sub 2}-cooled, graphite-moderated). Decommissioning and Dismantling of the UP1 plant and its associated units started in 1998. Since 2005, the UP1 facility has been operated by AREVA as the Marcoule Management and Operation contractor for French Atomic Energy Commission (CEA). An important part of this decommissioning program deals with the vitrification facility of Marcoule. This facility includes 20 tanks devoted to interim storage of highly active solutions, prior to vitrification. In 2006, a rinsing program was defined as part of the tank cleanup strategy. The main objective of the rinsing phases was to decrease activity in order to limit the volume of 'long-life active' waste produced during the decommissioning operations, so the tanks can be dismantled without the need of remote operations. To enable this rinsing program, and anticipating large volumes of generated effluent, the construction of an evaporation unit proved to be essential. The main objective of this unit was to concentrate the effluent produced during tank rinsing operations by a factor of approximately 10, prior to it being treated by vitrification. The evaporator design phase was launched in September 2006. The main challenge for the Project team was the installation of this new unit within a nuclear facility still in operation and in existing compartments not initially designed for this purpose. Cold operating tests were completed in 2008, and in May 2009, the final connections to the process were activated to start the hot test phase. During the first hot test operations performed on the first batches of clean-up effluent, the evaporator had a major operating problem. Extremely large quantities of foam were produced, affecting the evaporator operation, and creating the risk of a reduction in its capacity and throughput performance. A task force of AREVA process, operations, and safety experts from Marcoule and the La Hague reprocessing complex was assembled. New operating parameters were defined and tested to improve the process. Since then, the evaporator has performed very satisfactorily. The foam buildup phenomenon has been brought under complete control. All the different types of effluents produced during cleanup operations have been concentrated, and the results obtained in terms of quality and throughput, have ensured a consistent supply to the vitrification unit. The evaporator was operated until the end of April 2012, and enabled the production of 500 cubic meters of very high activity effluent, concentrating the fission products rinsed from the storage tanks. The evaporator will now be deactivated and decommissioned, with the first rinsing and cleanup operations scheduled to begin in 2014. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SRR's 'Next Step' in the Lean Journey -Taking Lean to the Workforce - 17247

The Savannah River Site, a U.S. Department of Energy (DOE) facility, contracted Savannah River Remediation (SRR) to manage its liquid waste project, which is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51, one million-gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for a decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 tanks have been closed to date. At SRR, the Lean business management system has been adopted to address site inefficiencies, aging infrastructure concerns and budget constraints. The Lean philosophy took root decades ago in the manufacturing sector and started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. The first step of the SRR Lean Journey was to formally identify areas of improvement and initiate Value Stream Analysis (VSAs) and Rapid Improvement Events (RIEs). SRR has achieved improvements in procedure implementation, work planning and control, project schedule compression, and engineering requirements. SRR is now phasing in the next phase of Lean through Managing for Daily Improvement (MDI), Visual Management and 5S (sort, set in order, shine, standardize, and sustain). MDI is a fundamental Lean principle in that we use our most valuable asset, our employees, to drive continuous improvement versus a smaller population through formal events. Part of MDI includes visual management where the workforce can go to a 'dashboard' to see and understand the company mission and status. 5S is a process where a work group improves performance in an area by addressing physical organization, efficiency, uniformity, standardization, and mechanisms to sustain improvements. 5S stands for: Sort, Set in Order, Shine, Standardize, and Sustain. This paper will focus on the 'Next Step' in SRR's Lean journey by address how SRR is implementing MDI and 5S to improve CONOPs, Project efficiencies, and worker engagement in day to day operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Iron Phosphate Glass-Containing Hanford Waste Simulant (Rev. 1)

Resolution of the nation's high-level tank waste legacy requires the design, construction, and operation of large and technically complex one-of-a-kind processing waste treatment and vitrification facilities. While the ultimate limits for waste loading and melter efficiency have yet to be defined or realized, significant reductions in glass volumes for disposal and mission life may be possible with advancements in melter technologies and/or glass formulations. This test report describes the experimental results from a small-scale test using the research-scale melter (RSM) at Pacific Northwest National Laboratory (PNNL) to demonstrate the viability of iron-phosphate-based glass with a selected waste composition that is high in sulfate (4.37 wt% SO 3 ). The primary objective of the test was to develop data to support a cost-benefit analysis related to the implementation of phosphate-based glasses for Hanford low-activity waste (LAW) and/or other high-level waste streams within the U.S. Department of Energy complex. The testing was performed by PNNL and supported by Idaho National Laboratory, Savannah River National Laboratory, Missouri University of Science and Technology, and Mo-Sci Corporation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Remediation Liquid Waste Operations Making the Workplace Safer - Lean and Human Performance Improvement Initiatives - 17244

The Savannah River Site, a U.S. Department of Energy facility, contracted Savannah River Remediation (SRR) to manage its liquid waste project, which is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51, one million gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for a decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 of the 51 tanks have been closed to date. Over the past three years, SRR implemented a Lean Business Management System to address site inefficiencies, aging infrastructure concerns and budget constraints. The Lean philosophy started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. Like safety, continuous improvement is a fundamental core business value that starts at the top. The Lean Business System, led by our executive management team, drives quality, production and waste elimination by focusing on People using a structured Process that allows the workforce to identify and fix problems in their workplace. Many inefficiencies and quality related issues start with the desire to make systems fail-safe without defining the core requirements for which that process or program was created. This leads to added complexity and latent or inherent human performance issues embedded within our processes. While Lean can't fix all problems, a combination of strong nuclear safety culture, robust conduct of operations, active human performance improvement process, and a business practice of continuously looking for improvements leads to excellence across our industry and creates a culture that is worthy of promoting. Without strong management, our systems fail because no one sponsors or encourages those attributes we covet. Leadership starts at the top with our customer defining what provides 'value' to them, and filters down through to the organization and ultimately the workforce in day to day conduct of operations. It is imperative that our customer drives these desirable ideals through recognition and contractual requirements to encourage and support those behavioral traits that are critical to our ongoing success.This paper focuses on how the Lean Business Management System supports those attributes that we value: a strong nuclear safety culture; disciplined conduct of operations; and a culture of robust human performance and continuous improvement. These attributes in our daily work environment propel a safer, more consistent, more efficient workplace. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robust and High-Waste Loaded Glass Formulations for Hanford Low-Activity Waste - 19050

The Hanford Low-Activity Waste (LAW) vitrification facility will receive LAW batches with abruptly changing compositions that span relatively broad ranges. In particular, the concentration ratios of sodium-to-sulfate, -chloride, -chromate, -phosphate, -potassium, and -aluminate create challenges in glass formulation. Glass compositions that simultaneously satisfy several processability, product quality, and composition constraints with sufficient confidence must be formulated for each LAW batch in near-realtime to enable desired throughput. A method for developing glass compositions while maximizing the waste loading and the process robustness was developed. This method compiled the glass composition-property data collected over nearly two decades, primarily by Pacific Northwest National Laboratory, The Catholic University of America, and Savannah River National Laboratory, in support of both the Hanford Tank Waste Treatment and Immobilization Plant project and the U.S. Department of Energy Office of River Protection Enhanced Waste Glass project. These data were used to develop models that link the melter feed composition to the resulting glass properties. Mathematical constructs were developed to optimize glass compositions for each waste batch in real-time that will simultaneously satisfy processability, product quality, and composition constraints with sufficient statistical confidence. Property prediction and various process uncertainties were reflected in the formulation. The formulation approach directly lends itself to adjustment of glass formulation to achieve program goals. This presentation will summarize the formulation approach and supporting data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improved Alumina Loading in High-Level Waste Glasses

Recent tank retrieval, blending, and treatment strategies at both the Savannah River Site (SRS) and Hanford have identified increased amounts of high-Al{sub 2}O{sub 3} waste streams that are scheduled to be processed through their respective high-level waste (HLW) vitrification facilities. It is well known that the addition of small amounts of Al{sub 2}O{sub 3} to borosilicate glasses generally enhances the durability of the waste glasses. However, at higher Al{sub 2}O{sub 3} concentrations nepheline (NaAlSiO{sub 4}) formation can result in a severe deterioration of the chemical durability of the slowly cooled glass near the center of the canister. Additionally, higher concentrations of Al{sub 2}O{sub 3} generally increase the liquidus temperature of the melt and decrease the processing rate. Pacific Northwest National Laboratory (PNNL), Savannah River National Laboratory (SRNL), and Khlopin Radium Institute (KRI) are jointly performing laboratory and scaled-melter tests, through US Department of Energy, EM-21 Office of Waste Processing program, to develop glass formulations with increased Al{sub 2}O{sub 3} concentrations. These glasses are formulated for specific DOE waste compositions at Hanford and Savannah River Site. The objectives are to avoid nepheline formation while maintaining or meeting waste loading and/or waste throughput expectations as well as satisfying critical process and product performance related constraints such as viscosity, liquidus temperature, and glass durability. This paper summarizes the results of recent tests of simulated Hanford HLW glasses containing up to 26 wt% Al{sub 2}O{sub 3} in glass. In summary: Glasses with Al{sub 2}O{sub 3} loading ranging from 25 to 27 wt% were formulated and tested at a crucible scale. Successful glass formulations with up to 26 wt% Al{sub 2}O{sub 3} that do not precipitate nepheline during CCC treatment and had spinel crystals 1 vol% or less after 24 hr heat treatment at 950 deg. C were obtained. The selected glass, HAL-17 with 26 wt% Al{sub 2}O{sub 3}, had viscosity and electrical conductivity within the boundaries for adequate processing in the Joule heated melters operated at 1150 deg. C. This HAL-17 glass was successfully processed using small-scale (SMK) and larger scale (EP-5) melters. There was no indication of spinel settling during processing. The product glass samples from these melter tests contained 1 to 4 vol% spinel crystals that are likely formed during cooling. The PCT tests on the product glasses are underway. The present study demonstrated that it is possible to formulate the glasses with up to 26 wt% Al{sub 2}O{sub 3} that satisfy the property requirements and is processable with Joule-heated melters operated at 1150 deg. C. The 'nepheline discriminator' for HAL-17 glass is 0.45, which supports that claim that the current rule ('nepheline discriminator' < 0.62) is too restrictive. Considering that the cost of HLW treatment is highly dependent on loading of waste in glass, this result provides a potential for significant cost saving for Hanford. The maximum Al{sub 2}O{sub 3} loading that can be achieved will also depend on concentrations of other components in wastes. For example, the loading of waste used in this study was also limited by the spinel crystallization after 950 deg. C 24 hr heat treatment, which suggests that the concentrations of spinel-forming components such as Fe{sub 2}O{sub 3}, Cr{sub 2}O{sub 3}, NiO, ZnO, and MnO would be critical in addition to Al{sub 2}O{sub 3} for the maximum Al{sub 2}O{sub 3} loading achievable. The observed glass production rate per unit melter surface area of 0.75 MT/(d.m{sup 2}) for SMK test is comparable to the design capacity of WTP HLW melters at 0.8 MT/(d.m{sup 2}). However, the test with EP-5 melter achieved 0.38 MT/(d.m{sup 2}), which is roughly a half of the WTP design capacity. This result may imply that the glass with 26 wt% Al{sub 2}O{sub 3} may not achieve the WTP design production rate. However, this hypothesis is not conclusive because of unknown effects of melter size and operational differences. Further testing is needed to quantify the effect of high Al{sub 2}O{sub 3} loading on glass production rate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 16281

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. The WTP includes several facilities that will contribute to waste processing: (1) the Pretreatment (PT) Facility, which is designed to receive waste retrieved from the Hanford tank farms and separate it into low-activity and high-level waste streams; (2) the Low-Activity Waste (LAW) Facility, which will vitrify the low-activity waste stream; (3) the High-Level Waste (HLW) Facility, which will vitrify the high-level waste stream; (4) the Analytical Laboratory (Lab), which will support both vitrification facilities' operations; and (5) the Balance of Facilities (BOF), which will provide industrial support capabilities and infrastructure, like electricity and steam, needed for WTP operations. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE has established an approach that would facilitate immobilization of tank waste to begin as early as practicable without waiting for completion of work to resolve the technical issues associated with the PT and HLW Facilities. This approach enables LAW treatment to begin before the PT and HLW facilities are completed by transferring low activity waste directly from the Hanford tank farms to the LAW Facility - referred to as Direct Feed LAW (DFLAW). ORP has placed the highest priority on completing the Low Activity Waste Facility, Balance of Facilities, and Analytical Laboratory (collectively known as LBL) in support of the planned phased start to the Hanford Tank waste treatment mission. DOE has requested, and the WTP contractor has delivered contract modifications proposals for: (1) design of a permanent capability to accommodate DFLAW in WTP; (2) procurement and construction of modifications to enable DFLAW operations in WTP, and (3) completion of LBL work scope in the current contract through hot commissioning in a manner to accommodate a phased start toward completing the WTP mission. DOE is reviewing and approving contract modifications in a sequence and schedule that allows for an orderly completion of the LBL Facilities and to begin treating low-activity tank waste as soon as practicable. In August 2014, ORP authorized the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. Authorization for HLW equipment procurements and construction is forthcoming, based on conditions that must be satisfied for a full release of these activities, including completion of an update to the Preliminary Documented Safety Analysis. DOE has also established a comprehensive plan for resuming production activities for the PT Facility that is similar to the process established and implemented for the HLW Facility. Resolution of the technical issues and establishment of a revised safety basis are key prerequisites to resuming engineering, procurements, and construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing a Direct-Feed Low-Activity Waste Capability in the Hanford Waste Treatment Plant - 18332

The original design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE) has developed a sequenced approach to completing the WTP Project, beginning with feeding some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. Sending low-activity waste from the tank farms to the LAW Facility is referred to as direct-feed LAW (DFLAW). Under this plan, low-activity waste will be pretreated in the Hanford tank farms for cesium and solids separation to meet LAW Facility waste acceptance criteria and produce an acceptable low-activity waste product. The waste feed will then be transferred to the LAW Facility where it will be immobilized in glass, poured into stainless steel containers, and then transported by truck to the Integrated Disposal Facility, a mixed low-level waste disposal site located in the Hanford 200 East Area. The DFLAW operation will deliver about 1 million gallons of double-shell tank waste for treatment each year of operation, and nominally produce 21 metric tons of immobilized low-activity waste glass per day. The resultant freed space in the double-shell tanks will support safe tank farm operations and staging of additional waste for treatment. In December 2016 DOE executed a contract modification and approved a change to the project's performance baseline to complete the LAW Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. The contract modification and revised performance baseline support completion and hot commissioning of WTP facilities needed for DFLAW operations is as early as January 2022. DOE has made significant progress on design, equipment procurements, and civil construction of modifications required to implement the DFLAW capability in the WTP, including progress on civil construction of a new effluent management facility, which will process secondary liquid waste resulting from LAW Facility vitrification operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Process Control Approach to Implement High Waste Loading Glass Formulations for Hanford Low Activity Waste Vitrification - 18435

Acceptable glass formulations for vitrification of Hanford low activity waste (LAW) at The Hanford Tank Waste Treatment and Immobilization Plant (WTP) must meet a variety of product quality, processability, and waste loading requirements. The glass formulation development work underpinning the WTP baseline LAW glasses was captured in a vitrification process control approach developed by the Vitreous State Laboratory (VSL) and Atkins Energy Federal EPC, Inc. that permits the calculation of the glass formulation required for each particular batch of LAW delivered to the LAW vitrification facility. Since that time, we have developed a wide range of glass formulations that achieve considerably higher waste loadings and which therefore are more economically attractive in terms of reduced amounts of glass produced and decreased time for treatment. That work was done in support of the Department of Energy's Office of River Protection program that is examining options to optimize the LAW facility and LAW glass waste form. Implementation of these high waste loading formulations at the WTP requires the development of a new LAW vitrification process control algorithm, which is the subject of this paper. Waste loadings in LAW glasses are typically limited by either the alkali loading for LAW with low sulfate content or the SO{sub 3} loading for LAW with high sulfate content. In the former case, waste loadings are limited by refractory corrosion and glass corrosion on the vapor hydration test (VHT) and product consistency test (PCT), all of which tend to increase with higher alkali concentrations. In the latter case, waste loadings are limited by the formation of a molten sulfate phase in the melter, which has deleterious effects. The LAW vitrification process control strategy must mitigate these effects while optimizing waste loadings. Given the composition of any LAW stream, the new LAW vitrification process control algorithm permits the calculation of a suitable high waste loading glass composition and the required glass forming additives such that all processing, waste loading, and product quality requirements are met. This algorithm was developed from data for a large number of glasses that were formulated, and characterized with respect to a variety of properties affecting processability and product quality; many of these formulations were also subjected to melter testing to verify acceptable processing characteristics, processing rates, and the absence of secondary sulfate phase formation. This paper describes the development of the present algorithm, comparisons to the present lower waste loading baseline WTP process control approach, and plans for further development and testing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of dilution-induced precipitates on the filtration of Hanford liquid tank wastes

To facilitate its vitrification, a portion of the radioactive wastes currently stored at the Hanford Site will be staged and treated using tank-side operations to render their chemistry compliant with the requirements of Hanford’s low-activity waste vitrification facility. Initial sampling of staged feeds indicates that process-water dilution, used to reduce waste feed sodium content to levels acceptable for vitrification (5–6 M Na), may cause precipitation of fine, difficult to settle solids that could affect downstream tank-side filtration and ion-exchange. However, dilution-induced precipitation has not been demonstrated under controlled, rigorous laboratory conditions. This paper presents a set of qualitative and quantitative assessments of dilution-induced precipitation using a nonradioactive, Hanford Tank AP-105 simulated waste. Further, these studies found that dilution of AP-farm waste simulants induced precipitation of up to 150 ppm solids, regardless of whether dilution was done with process water (which contains, among other analytes, naturally occurring Ca and Mg) or deionized water. Naturally occurring process-water analytes appeared to accelerate the rate (and possibly extent) of precipitation. Filtration of diluted waste simulants also found that the precipitated solids challenged prototypic tank-side filter operations; however, the impact to filtration performance was readily managed through waste staging settle/decant operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Fiber Laser Cutting System for Dismantling Glass Melter - 13071

Since 2008, the equipment for dismantling the used glass melter has been developed in High-level Liquid Waste (HLW) Vitrification Facility in the Japanese Rokkasho Reprocessing Plant (RRP). Due to the high radioactivity of the glass melter, the equipment requires a fully-remote operation in the vitrification cell. The remote fiber laser cutting system was adopted as one of the major pieces of equipment. An output power of fiber laser is typically higher than other types of laser and so can provide high-cutting performance. The fiber laser can cut thick stainless steel and Inconel, which are parts of the glass melter such as casings, electrodes and nozzles. As a result, it can make the whole of the dismantling work efficiently done for a shorter period. Various conditions of the cutting test have been evaluated in the process of developing the remote fiber cutting system. In addition, the expected remote operations of the power manipulator with the laser torch have been fully verified and optimized using 3D simulations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying lean management to aging infrastructure - 15416

Currently the Savannah River Site liquid waste system consists of 51 waste tanks, two operating evaporators, a salt processing pilot plant, the DWPF vitrification facility, the salt-stone Processing Facility and an Effluent Treatment Plant. Six of the waste tanks have been grouted and closed and the full scale Salt Waste Processing Facility (SWPF) is under construction. Some of the waste tanks and associated infrastructure were placed into operation as early as 1954 and DWPF went into operation in 1996. Due to this long history of operation, the SRS liquid waste system is being challenged by aging infrastructure issues and the stored radioactive liquid waste has been identified by regulators as the highest environmental risk in the state. Much of the DOE complex faces similar infrastructure issues. Remedies that can mitigate the impact of those issues are needed all across the complex. At SRS, Lean Management has been adopted as a business process to help address some of the impacts. Lean Management got its start decades ago in the manufacturing sector and has its roots in the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health care, and now the DOE complex. Lean Management has a 'secret sauce' that must be correct to avoid becoming the 'flavor of the month'. The easy part is the talking. The hard part is the doing. The payoff is in the doing. Obviously as facilities and equipment age, more and more funds are needed to maintain, refurbish, and replace them. Funding of course is tight for all our sites. Lean management generates work efficiency so a given set of resources can produce more. It must be noted that this isn't by working harder but rather by focusing scarce resources on the few activities that truly add value. A positive aspect for companies that have been on this journey is employees feel less stress and higher motivation. The work they do matters and they have fewer outside impediments to distract and sap their energy. SRR has used the Lean process to streamline both work planning and control and the supply chain to improve maintenance efficiency and reduce the Corrective Maintenance backlog. This paper explains how this was done, the challenges encountered, and how organizations can use this methodology for their own improvements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improved Alumina Loading in High-Level Waste Glasses

Recent tank retrieval and blending strategies at both the Savannah River Site (SRS) and Hanford have identified increased amounts of high-Al2O3 waste streams that are scheduled to be processed through their respective high-level waste (HLW) vitrification facilities. It is well known that the addition of small amounts of Al2O3 to borosilicate glasses generally enhances the durability of the waste glasses. However, at higher Al2O3 concentrations nepheline (NaAlSiO4) formation can result in a severe deterioration of the chemical durability of the slowly cooled glass near the center of the canister. Additionally, higher concentrations of Al2O3 generally increase the liquidus temperature of the melt and decrease the processing rate and thus result in a decreased waste loading in glass. Because of these effects, the maximum concentrations of Al2O3 in glasses have been restricted to the range of 17 wt% or lower. Pacific Northwest National Laboratory (PNNL), Savannah River National Laboratory (SRNL), and Khlopin Radium Institute (KRI) are jointly performing laboratory and scaled melter tests, through US Department of Energy, EM-21 Office of Waste Processing program, to develop glass formulations with increased Al2O3 concentrations. These glasses are formulated for specific DOE waste compositions at Hanford and SRS. The objectives are to avoid nepheline formation while maintaining or meeting waste loading and/or waste throughput expectations as well as satisfying critical process and product performance related constraints. This paper reports the results of recent tests of simulated Hanford HLW glasses containing up to 26 wt% Al2O3 in glass.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SUMMARY OF 2010 DOE EM INTERNATIONAL PROGRAM STUDIES OF WASTE GLASS MELT RATE ENHANCEMENT

A collaborative study has been established under the U.S. Department of Energy (DOE) Office of Environmental Management International Program between the Savannah River National Laboratory (SRNL) and the V. G. Khlopin Radium Institute (KRI) in St. Petersburg, Russia, to investigate potential improvements in melt rate via chemical additions to the glass frit. Researchers at KRI suggested a methodology for selecting frit additives based on empirical coefficients for optimization of glass melting available in the Russian literature. Using these coefficients, KRI identified B{sub 2}O{sub 3}, CuO, and MnO as frit additives that were likely to improve melt rate without having adverse effects on crystallization of the glass or its chemical durability. The results of the melt rate testing in the SMK melter showed that the slurry feed rate (used as a gauge of melt rate) could be significantly increased when MnO or CuO were added to Frit 550 with the SMR-2 sludge. The feed rates increased by about 27% when MnO was added to the frit and by about 26% when CuO was added to the frit, as compared to earlier results for Frit 550 alone. The impact of adding additional B{sub 2}O{sub 3} to the frit was minor when added with CuO. The additional B{sub 2}O{sub 3} showed a more significant, 39% improvement in melt rate when added with MnO. The additional B{sub 2}O{sub 3} also reduced the viscosity of the glasses during pouring. Samples of the glasses from the melt rate testing characterized at SRNL showed that there were no significant impacts on crystallization of the glasses. All of the glasses had very good chemical durability. Chemical composition measurements showed that the frit additives were present in concentrations below the targeted values in some of the glasses. Therefore, it is possible that higher concentrations of these additives may further improve melt rate, although the impacts of higher concentrations of these components on crystallization and durability would need to be determined. Overall, the results show an excellent potential for these additives to significantly improve waste throughput for DOE vitrification facilities. A complete report from KRI is included as an appendix to this document.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Glass Property Database and Data Qualification Plan

The U.S. Department of Energy vitrification facilities currently employ glass property-composition models to ensure processability of waste streams and acceptability of the final glass products. The efficiency (e.g., process flexibility, reduced down time, and reduced cost) of waste vitrification is directly tied to the size of the waste processing envelope. To increase the size of the processing envelope, a larger database was developed. The database will improve the prediction accuracy of glass properties, leading to higher waste loadings, higher waste throughput, broader process flexibility, and reduced mission life. Some of the data in this expanded database has insufficient quality assurance (QA) rigor for use in nuclear facility operation and glass qualification. A plan was developed to qualify high-value data under the appropriate QA rigor for use at the Hanford Waste Treatment and Immobilization Plant’s High-Level Waste (HLW) Facility. This qualification plan first compares the data coverage over the composition region of interest to Hanford HLW by property. Those studies that significantly improve the data coverage in the Hanford HLW glass composition region were prioritized for qualification activities. Qualification methods including QA equivalence, peer review, data corroboration, and confirmatory testing have been assigned to each high-priority study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced High-Level Waste Glass Research and Development Plan

The U.S. Department of Energy Office of River Protection (ORP) has implemented an integrated program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product quality requirements. The integrated ORP program is focused on providing a technical, science-based foundation from which key decisions can be made regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities. The fundamental data stemming from this program will support development of advanced glass formulations, key process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste (HLW) vitrification facilities with an appreciation toward reducing overall mission life. The purpose of this advanced HLW glass research and development plan is to identify the near-, mid-, and longer-term research and development activities required to develop and validate advanced HLW glasses and their associated models to support facility operations at WTP, including both direct feed and full pretreatment flowsheets. This plan also integrates technical support of facility operations and waste qualification activities to show the interdependence of these activities with the advanced waste glass (AWG) program to support the full WTP mission. Figure ES-1 shows these key ORP programmatic activities and their interfaces with both WTP facility operations and qualification needs. The plan is a living document that will be updated to reflect key advancements and mission strategy changes. The research outlined here is motivated by the potential for substantial economic benefits (e.g., significant increases in waste throughput and reductions in glass volumes) that will be realized when advancements in glass formulation continue and models supporting facility operations are implemented. Developing and applying advanced glass formulations will reduce the cost of Hanford tank waste management by reducing the schedule for tank waste treatment and reducing the amount of HLW glass for storage, transportation, and disposal. Additional benefits will be realized if advanced glasses are developed that demonstrate more tolerance for key components in the waste (such as Al 2 O 3 , Cr 2 O 3 , SO 3 and Na 2 O) above the currently defined WTP constraints. Tolerating these higher concentrations of key waste loading limiters may reduce the burden on (or even eliminate the need for) leaching to remove Cr and Al and washing to remove excess S and Na from the HLW fraction. Advanced glass formulations may also make direct vitrification of the HLW fraction without significant pretreatment more cost effective. Finally, the advanced glass formulation efforts seek not only to increase waste loading in glass, but also to increase glass production rate. When coupled with higher waste loading, ensuring that all of the advanced glass formulations are processable at or above the current contract processing rate leads to significant improvements in waste throughput (the amount of waste being processed per unit time),which could significantly reduce the overall WTP mission life. The integration of increased waste loading, reduced leaching/washing requirements, and improved melting rates provides a system-wide approach to improve the effectiveness of the WTP process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation Of The Integrated Solubility Model, A Graded Approach For Predicting Phase Distribution In Hanford Tank Waste

The mission of the DOE River Protection Project (RPP) is to store, retrieve, treat and dispose of Hanford&#x27;s tank waste. Waste is retrieved from the underground tanks and delivered to the Waste Treatment and Immobilization Plant (WTP). Waste is processed through a pretreatment facility where it is separated into low activity waste (LAW), which is primarily liquid, and high level waste (HLW), which is primarily solid. The LAW and HLW are sent to two different vitrification facilities and glass canisters are then disposed of onsite (for LAW) or shipped off-site (for HLW). The RPP mission is modeled by the Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulator and mass balance model that is used for mission analysis and strategic planning. The integrated solubility model (ISM) was developed to improve the chemistry basis in HTWOS and better predict the outcome of the RPP mission. The ISM uses a graded approach to focus on the components that have the greatest impact to the mission while building the infrastructure for continued future improvement and expansion. Components in the ISM are grouped depending upon their relative solubility and impact to the RPP mission. The solubility of each group of components is characterized by sub-models of varying levels of complexity, ranging from simplified correlations to a set of Pitzer equations used for the minimization of Gibbs Energy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Numerical modeling of Joule heated ceramic melter

Computational fluid dynamics and heat transfer models of waste glass melters are being developed to support the vitrification campaign at the Waste Treatment and Immobilization Plant (WTP) as part of the United States nuclear waste stewardship and environmental protection programs. The WTP mission aims to achieve the stable and durable processing of vitrified waste in the safest, most efficient, and economical manner possible. Hanford’s tank waste is far more complex and varied than the waste treated by other vitrification facilities and both startup and long-term operational challenges are likely to be even greater than prior experience has shown. There are thousands of different waste compositions, which makes processing the waste a complex and challenging task. Models of test melters, pilot-scale, and full-scale melters have been developed to provide understanding and insight into the various physical and chemical phenomena occurring during vitrification. So the results of these modeling activities will be used to support the WTP operations to process legacy nuclear waste into a stable form for disposal.