UDQE for the ORNL Building 2026 Hot Cell Process Waste
Report prepared for NDEP
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Report prepared for NDEP
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Report prepared for NDEP
Explore the source record for details and available documents.
Savannah River Mission Completion is the Liquid Waste (LW) contractor at the Savannah River Site (SRS). The LW mission is tasked with treating and disposing of legacy nuclear waste. There are multiple facilities involved in this work, including the Concentration, Storage, and Transfer Facilities (CSTF), the Defense Waste Processing Facility (DWPF), the Salt Waste Processing Facility (SWPF), and the Saltstone Production Facility (SPF). The CSTF includes 43 underground waste tanks used to store and support processing of radioactive liquid waste. Waste removal activities, such as salt dissolution campaigns and sludge agitation, are conducted within the CSTF waste tanks to convert the waste into a form that allows for downstream processing at other LW facilities. While performing these waste removal campaigns, camera inspections are performed to assess the quantity and distribution of the remaining waste within the waste tank (i.e. saltcake or sludge). Understanding the quantity and distribution of the salt/sludge within the waste tanks allows for improved waste removal strategies (e.g. mixing pump operation) and refined safety controls. Typically, several camera inspections are performed during a waste removal transfer to verify the elevation of the visible salt/sludge mounds against the known elevation of the liquid surface. The camera inspection footage must then be interpreted by a trained engineer who will develop a 2-D map that depicts the waste distribution at various elevations within the waste tank. This tank mapping is then used in conjunction with conservative assumptions to evaluate the volume of saltcake or sludge that is present within the waste tank.
Radioactive wastes from nuclear fuel processing are stored in large underground storage tanks at the Hanford Nuclear Reservation. Treatment and remediation require that waste feed from the storage tanks be delivered to the Hanford Tank Waste Treatment and Immobilization Plant continually for the duration of the treatment mission. Furthermore, the complex physical and chemical processes required for this mission, the significant scale, and the hazardous nature of the waste necessitate the use of simulants in process testing. A new class of simulants, “performance-based simulants,” has been developed to match the process performance of the simulant to actual waste performance data.
The Savannah River National Laboratory analyzed samples from Savannah River Site Waste Tank 41H and 21H to support qualification of Salt Waste Processing Facility Waste Batches 3 and 4 (the FY21 Salt Batch Qualification samples) for processing. Neither of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. These results were initially provided to Savannah River Remediation (Liquid Waste Operations Sub-contractor) as External Sample Results LIMS Reports. The analytical results (both expedited and routine) are now summarized and discussed in this technical report.
The Defense Waste Processing Facility (DWPF) processes and vitrifies radioactive waste that it receives from the Concentration, Storage, and Transfer Facility (CSTF) and Salt Waste Processing Facility (SWPF). As a result of the evaporation of water during both the melter feed preparation and the melter feed vitrification steps in DWPF, a recycle waste stream is generated, neutralized, and sent back to the CSTF. The recycle waste is a dilute water stream originating from the collection of condensate liquids containing some minor sludge and frit solids and other waste components primarily resulting from entrainment into the condensate during foam-over events. The recycle stream volume is significant and is expected to approach 3 million gallons per year once the SWPF reaches full operation. Diverting the bulk of the recycle waste stream from the CSTF is essential for the eventual closure of the waste tanks, and hence the completion of the SRS liquid waste mission.
The Savannah River Site (SRS) and Hanford produced large quantities of plutonium and other radioisotopes. The separations processes recovered plutonium and produced large quantities of High- Level Waste (HLW) that accumulated at each site in large, underground storage tanks. SRS has been retrieving the stored HLW, pretreating the waste for immobilization, and immobilizing the waste in glass or grout waste forms since the mid-1990s. Treatment of the waste at Hanford is expected to start in the early 2020s. Mercury is present in both the SRS and Hanford tank waste. SRS has recently completed an evaluation of mercury speciation throughout the tank waste treatment and immobilization flowsheet. This study was reviewed to determine what information from the study can be applied to the Hanford tank waste treatment program.
Foaming occurs during treatment of high level waste (HLW) at Savannah River Site's Defense Waste Processing Facility (DWPF) in the Chemical Process Cell (CPC) due to high gas generation from process steam and chemical offgas products [1]. The presence of amphiphilic particles in the waste slurry stabilizes the foam [2], [3]. Efficient processing of HLW requires foam control, as foam-overs lead to lower productivity and potential radioactive contamination of condensate streams. DWPF currently employs Siovation Antifoam 747, a surfactant produced by Momentive Performance Materials, as an antifoaming agent during waste treatment. Despite its ability to control foam generation, processing issues have arisen from its use [4]. During DWPF chemical processing, a chemical antifoam agent must be effective at temperatures up to 103 deg. C between pH 3-13. Antifoam 747 is effective at pH 7 but degrades as pH deviates [5]. Antifoam 747 is 90% by weight Momentive{sup TM} L77 and 10% by weight Momentive{sup TM} Y-17580. These ingredients are trisiloxane products, which are especially vulnerable to attack in acidic and caustic environments. Since Antifoam 747 readily degrades, periodic addition is required. Several processing concerns related to Antifoam 747 have affected DWPF operation. Its overuse warranted concern of potential flammable melter offgas under upset conditions due to the generation of carbon dioxide and hydrogen. As a result, a Potential Inadequacy in the Safety Analysis (PISA) was declared [6]. Antifoam contribution has been included in the melter offgas flammability strategy and the quantity of antifoam is monitored to ensure limits are not exceeded. Testing at Savannah River National Laboratory (SRNL) determined that propanal, tri-methylsilanol, and hexamethyldisiloxane are generated as Antifoam 747 degrades, leading to a second PISA [7]. The formation of these byproducts poses additional flammability risks. Furthermore, the methyl and ethyl groups of these compounds may be responsible for the formation of the methyl and ethyl mercury discovered in DWPF [8], [9]. The formation of organomercury has specifically been called out by DOE as a need for increased research. The effectiveness of non-chemical methods for foam control and the efficiency of alternative antifoam agents were evaluated as part of an effort to improve HLW treatment operations at DWPF and to reduce, or eliminate, the flammability hazards associated with Antifoam 747 currently in use. Foaming of high-level waste (HLW) slurries is an issue at the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) which is currently mitigated with a chemical antifoam agent. The effectiveness of non-chemical methods for foam control and the efficiency of alternative antifoams were examined to improve HLW treatment at DWPF and to eliminate the flammability hazards associated with Siovation Antifoam 747 currently in use. Non-chemical foam control methods were deemed unviable for chemical processing at DWPF, as the spray/mist technique requires too much water and space limitations make installation and implementation of headspace agitators unfeasible. The use of ultrasonic energy thickened and further stabilized the foam. Two suitable alternative defoaming agents, Momentive{sup TM} Y- 17112 and Evonik Surfynol{sup R} MD-20, were identified. Both defoamers control foam over a pH range of 4- 13 at boiling, with no flammable degradation products, and only minimal quantities (100-200 mg/kg) are required under glycolic acid conditions. In order to validate the effectiveness of these defoaming agents, SRNL recommends irradiation testing and laboratory scale SRAT/SME experiments with actual radioactive waste. (authors)
The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)
The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.
In order to comply with the Defense Waste Processing Facility (DWPF) Waste Form Compliance Plan for Sluldge Batch 7b, Savannah River National Laboratory (SRNL) personnel characterized the Defense Waste Processing Facility (DWPF) pour stream (PS) glass sample collected while filling canister S04023. This report summarizes the results of the compositional analysis for reportable oxides and radionuclides and the normalized Product Consistency Test (PCT) results. The PCT responses indicate that the DWPF produced glass that is significantly more durable than the Environmental Assessment glass.
In order to comply with the Defense Waste Processing Facility (DWPF) Waste Form Compliance Plan for Sludge Batch 7b, Savannah River National Laboratory (SRNL) personnel characterized the Defense Waste Processing Facility (DWPF) pour stream (PS) glass sample collected while filling canister S04023. This report summarizes the results of the compositional analysis for reportable oxides and radionuclides and the normalized Product Consistency Test (PCT) results. The PCT responses indicate that the DWPF produced glass that is significantly more durable than the Environmental Assessment glass. Results and further details are documented in SRNL-STI-2013-00462, Revision 1 “Analysis of the DWPF Sludge Batch 7b (Macrobatch 9) Pour Stream Glass Sample.”
Abstract Legacy radioactive waste from nuclear weapons material processing is the biggest environmental challenge in the state of South Carolina, and one of the biggest in the United States. Although substantial progress has been made in processing and vitrifying high‐level radioactive waste at the Savannah River site, approximately 35 million gallons remains to be treated and dispositioned. In this article, we show the development of a new defoamer for use in the processing of high‐level radioactive waste. The application of the new defoamer is not only more effective at controlling foam but will shorten the batch processing time leading to safer and more efficient processing. This has the potential to help shorten the overall site mission lifetime, saving the federal government hundreds of millions of dollars. The novel aspect of the new defoamer is its effectiveness and stability in the harsh conditions needed for processing high‐level radioactive waste: high temperatures, pH 4–13, strong oxidizing and reducing agents, and numerous metal catalysts. The defoamer will replace an existing antifoam agent that decomposes to form multiple flammable gases. Because the existing antifoam agent decomposes quickly, processing changes increased processing time. Statement of novelty We demonstrate that a new defoamer has been developed for use in processing high‐level radioactive waste. This novel defoamer is effective and stable in the harsh processing conditions with no detectable flammable by‐products. Because the existing antifoam agent decomposes quickly, processing changes, including lowering acid addition rates and evaporation rates, increased processing time. The new defoamer is not only more effective at controlling foam but will shorten the batch processing time and lead to safer and more efficient processing by eliminating the production of flammable gases. Statement of industrial relevance Foaming is of great concern in many industrial processes involving three‐phase gas/liquid/fine‐solids systems, like in water evaporation, mineral floatation, air sparging in situ remediation techniques, and in those found in the paper industry.