Search NASASearch

SEARCH · Search NASA

Results for “webb”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

First constraints on QCD axion dark matter using James Webb Space Telescope observations

I present the first constraints on QCD axion dark matter using measurements from the James Webb Space Telescope. By utilizing publicly available MIRI and NIRSpec blank-sky observations, originally collected for sky subtraction purposes, I derive strong limits on the axion-photon coupling constant $g_{a \gamma \gamma}$ in the mass range 0.1-4 eV. These constraints improve upon previous studies by more than two orders of magnitude for a range of masses. This analysis underscores the potential of blank-sky observations as a powerful tool for constraining dark matter models and demonstrates how astrophysical missions can be repurposed for particle physics research.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

Reliable Transport over SpaceWire for James Webb Space Telescope (JWST) Focal Plane Electronics (FPE) Network

NASA's James Webb Space Telescope (JWST) faces difficult technical and budgetary challenges to overcome before it is scheduled launch in 2010. The Integrated Science Instrument Module (ISIM), shares these challenges. The major challenge addressed in this paper is the data network used to collect, process, compresses and store Infrared data. A total of 114 Mbps of raw information must be collected from 19 sources and delivered to the two redundant data processing units across a twenty meter deployed thermally restricted interface. Further data must be transferred to the solid-state recorder and the spacecraft. The JWST detectors are kept at cryogenic temperatures to obtain the sensitivity necessary to measure faint energy sources. The Focal Plane Electronics (FPE) that sample the detector, generate packets from the samples, and transmit these packets to the processing electronics must dissipate little power in order to help keep the detectors at these cold temperatures. Separating the low powered front-end electronics from the higher-powered processing electronics, and using a simple high-speed protocol to transmit the detector data minimize the power dissipation near the detectors. Low Voltage Differential Signaling (LVDS) drivers were considered an obvious choice for physical layer because of their high speed and low power. The mechanical restriction on the number cables across the thermal interface force the Image packets to be concentrated upon two high-speed links. These links connect the many image packet sources, Focal Plane Electronics (FPE), located near the cryogenic detectors to the processing electronics on the spacecraft structure. From 12 to 10,000 seconds of raw data are processed to make up an image, various algorithms integrate the pixel data Loss of commands to configure the detectors as well as the loss of science data itself may cause inefficiency in the use of the telescope that are unacceptable given the high cost of the observatory. This combination of requirements necessitates a redundant, fault tolerant, high- speed, low mass, low power network with a low Bit error Rate(1E-9- 1E-12). The ISIM systems team performed many studies of the various network architectures that meeting these requirements. The architecture selected uses the Spacewire protocol, with the addition of a new transport and network layer added to implement end-to-end reliable transport. The network and reliable transport mechanism must be implemented in hardware because of the high average information rate and the restriction on the ability of the detectors to buffer data due to power and size restrictions. This network and transport mechanism was designed to be compatible with existing Spacewire links and routers so that existing equipment and designs may be leveraged upon. The transport layer specification is being coordinated with European Space Agency (ESA), Spacewire Working Group and the Consultative Committee for Space Data System (CCSDS) PlK Standard Onboard Interface (SOIF) panel, with the intent of developing a standard for reliable transport for Spacewire. Changes to the protocol presented are likely since negotiations are ongoing with these groups. A block of RTL VHDL that implements a multi-port Spacewire router with an external user interface will be developed and integrated with an existing Spacewire Link design. The external user interface will be the local interface that sources and sinks packets onto and off of the network (Figure 3). The external user interface implements the network and transport layer and handles acknowledgements and re-tries of packets for reliable transport over the network. Because the design is written in RTL, it may be ported to any technology but will initially be targeted to the new Actel Accelerator series (AX) part. Each link will run at 160 Mbps and the power will be about 0.165 Watt per link worst case in the Actel AX.

Rakow, Glenn

James Webb Space Telescope Station-keeping

The James Webb Space Telescope (JWST) is planned to be launched in 2011 to the Sun- Earth L2 libration point. The resultant delta-Vs (dV) from momentum unloads will perturb the orbit and necessitate frequent station-keeping maneuvers. The station-keeping dV budget is highly sensitive to the direction of the resultant dV vector. A simple spacecraft reorientation prior to each momentum unload will allow some control over the direction of the resultant dV vector. For each inertial momentum vector direction, an optimum spacecraft attitude is determined which gives a resultant dV vector that requires the least amount of station-keeping dV. Using this procedure, the station-keeping dV budget for JWST can be reduced by 60%.

Beckman, Mark

The James Webb Space Telescope

The James Webb Space Telescope (JWST) will extend the discoveries of the Hubble Space Telescope by deploying a large cooled infrared telescope at the Sun-Earth Lagrange point L2. With a 6 m aperture and three instruments covering the wavelength range from 0.6 to 28 pm, it will provide sensitivities orders of magnitude better than any other facilities. It is intended to observe the light from the first galaxies and the first supernovae, the assembly of galaxies, and the formation and evolution of stars and planetary systems. In this talk I will review the scientific objectives, the hardware concepts and technology, and the predicted system performance.

Mather, John C.

The James Webb Telescope Instrument Suite Layout: Optical System Engineering Considerations for a Large, Deployable Space Telescope

The James Webb Space Telescope (JWST) is a space-based, infrared observatory designed to study the early stages of galaxy formation in the Universe. The telescope will be launched into an elliptical orbit about the second Lagrange point and passively cooled to 30-50 K to enable astronomical observations from 0.6 to 28 microns. A group from the NASA Goddard Space Flight Center and the Northrop Grumman Space Technology prime contractor team has developed an optical and mechanical layout for the science instruments within the JWST field of view that satisfies the telescope s high-level performance requirements. Four instruments required accommodation within the telescope's field of view: a Near-Infrared Camera (NIRCam) provided by the University of Arizona; a Near-Mared Spectrometer (NIRSpec) provided by the European Space Agency; a Mid-Infrared Instrument (MIRI) provided by the Jet Propulsion Laboratory and a European consortium; and a Fine Guidance Sensor (FGS) with a tunable filter module provided by the Canadian Space Agency. The size and position of each instrument's field of view allocation were developed through an iterative, concurrent engineering process involving the key observatory stakeholders. While some of the system design considerations were those typically encountered during the development of an infrared observatory, others were unique to the deployable and controllable nature of JWST. This paper describes the optical and mechanical issues considered during the field of view layout development, as well as the supporting modeling and analysis activities.

Bos, Brent

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Architecture and Technology

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is the first NASA segmented space telescope and is planned for launch in 201 1. The telescope architecture was recently finalized with the selection of the primary mirror material. This presentation reviews the telescope architecture and discusses the remaining key technological challenges of this element.

Feinberg, Lee D.

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Architecture and Technology

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is the first NASA segmented space telescope and is planned for launch in 2011. The telescope architecture was recently finalized with the selection of the primary mirror material. This presentation reviews the telescope architecture and discusses the remaining key technological challenges of this element.

Feinberg, Lee D.

James Webb Space Telescope Ka-Band Trade

In August 2003 James Webb Space Telescope (JWST) had its Initial Review Confirmation Assessment Briefing with NASA HQ management. This is a major milestone as the project was approved to proceed from Phase A to B, and NASA will commit funds for the project towards meeting its science goals from the Earth-Sun s Lagrange 2 (L2) environment. At this briefing, the Project was asked, "to take another look" into using, the JPL s Deep Space Network (DSN) as the provider of ground stations and evaluate other ground station options. The current operations concept assumes S-band and X-band communications with a daily &hour contact using the DSN with the goal of transmitting over 250 Gigabit (Gb) of data to the ground. The Project has initiated a trade study to look at this activity, and we would like to share the result of the trade in the conference. Early concept trades tends to focus on the "normal" operation mode of supporting telemetry (science and engineering), command and radio metrics. Entering the design phase, we find that we have the unique ranging requirement for our L2 orbit using alternating ground stations located in different hemispheres. The trade must also address emergency operations (which are covered when using the DSN). This paper describes the issues confronting this Project and how the DSN and the JWST Project are working together to find an optimized approach for meeting these issues. We believe this trade is of major interest for future Code S and other L2 missions in that JWST will set the standard.

Gal-Edd, Jonathan

The James Webb Space Telescope

The James Webb Space Telescope (JWST) will be a large (6m) cold (50K) telescope launched to the second Earth-Sun Lagrange point. It is the successor to the Hubble Space Telescope, and is a partnership of NASA, ESA and CSA. It's science goals are to detect and identify the first galaxies to form in the universe, to trace their assembly into the Hubble Sequence, and to study stellar and planetary system formation. JWST will have three instruments: The Near InfiaRed Camera (NIRCam) and the Near InfraRed multiobject Spectrometer (NIRSpec) will cover the wavelength range 0.6 to 5 microns, and the Mid InfraRed Instrument (MIRI) will do both imaging and spectroscopy from 5 to 28 microns.

Gardner, Jonathan P.

Finding our Origins with the Hubble and James Webb Space Telescopes

NASA s Origins program is a series of space telescopes designed to study the origins of galaxies, stars, planets and life in the universe. In this talk, I will concentrate on the origin and evolution of galaxies, beginning with the Big Bang and tracing what we have learned with the Hubble Space Telescope through to the present day. I will introduce several of the tools that astronomers use to measure distances, measure velocities, and look backwards in time. I will show that results from studies with Hubble have led to plans for its successor, the James Webb Space Telescope, which is designed to find the first galaxies that formed in the distant past. I will finish with a short discussion of other missions in the Origins theme, including the Terrestrial Planet Finder.

Gardner, Jonathan P.

The James Webb Space Telscope

The James Webb Space Telescope (JWST) will extend the discoveries of the Hubble Space Telescope by deploying a large cooled infrared telescope at the Sun-Earth Lagrange point L2. With a 6 m aperture and three instruments covering the wavelength range from 0.6 to 28 microns, it will provide sensitivities orders of magnitude better than any other facilities. It is intended to observe the light from the first galaxies and the first supernovae, the assembly of galaxies, and the formation and evolution of stars and planetary systems. In this talk I will review the scientific objectives, the hardware concepts and technology, and the predicted system performance.

Mather, John C.

James Webb Space Telescope: Supporting Multiple Ground System Transitions in One Year

Ideas, requirements, and concepts developed during the very early phases of the mission design often conflict with the reality of a situation once the prime contractors are awarded. This happened for the James Webb Space Telescope (JWST) as well. The high level requirement of a common real-time ground system for both the Integration and Test (I&T), as well as the Operation phase of the mission is meant to reduce the cost and time needed later in the mission development for re-certification of databases, command and control systems, scripts, display pages, etc. In the case of JWST, the early Phase A flight software development needed a real-time ground system and database prior to the spacecraft prime contractor being selected. To compound the situation, the very low level requirements for the real-time ground system were not well defined. These two situations caused the initial real-time ground system to be switched out for a system that was previously used by the Bight software development team. To meet the high-!evel requirement, a third ground system was selected based on the prime spacecraft contractor needs and JWST Project decisions. The JWST ground system team has responded to each of these changes successfully. The lessons learned from each transition have not only made each transition smoother, but have also resolved issues earlier in the mission development than what would normally occur.

Detter, Ryan

Cryogenic Characterization and Testing of Magnetically-Actuated Microshutter Arrays for the James Webb Space Telescope

Two-dimensional MEMS microshutter arrays (MSA) have been fabricated at the NASA Goddard Space Flight Center (GSFC) for the James Webb Space Telescope (JWST) to enable cryogenic (approximately 35 K) spectrographic astronomy measurements in the near-infrared region. Functioning as a focal plane object selection device, the MSA is a 2-D programmable aperture mask with fine resolution, high efficiency and high contrast. The MSA are close- packed silicon nitride shutters (cell size of 100 x 200 microns) patterned with a torsion flexure to allow opening to 90 degrees. A layer of magnetic material is deposited onto each shutter to permit magnetic actuation. Two electrodes are deposited, one onto each shutter and another onto the support structure side-wall, permitting electrostatic latching and 2-D addressing. New techniques were developed to test MSA under mission-similar conditions (8 K less than or equal to T less than 300K). The magnetic rotisserie has proven to be an excellent tool for rapid characterization of MSA. Tests conducted with the magnetic rotisserie method include accelerated cryogenic lifetesting of unpackaged 128 x 64 MSA and parallel measurement of the magneto-mechanical stiffness of shutters in pathfinder test samples containing multiple MSA designs. Lifetest results indicate a logarithmic failure rate out to approximately 10(exp 6) shutter actuations. These results have increased our understanding of failure mechanisms and provide a means to predict the overall reliability of MSA devices.

King, T. T.

Navigation Concepts for the James Webb Space Telescope

This paper evaluates the performance that can be achieved using candidate ground and onboard navigation approaches for operation of the James Webb Space Telescope, which will be in an orbit about the Sun-Earth L2 libration point. The ground navigation approach processes standard range and Doppler measurements from the Deep Space Network The onboard navigation approach processes celestial object measurements and/or ground-to- spacecraft Doppler measurements to autonomously estimate the spacecraft s position and velocity and Doppler reference frequency. Particular attention is given to assessing the absolute position and velocity accuracy that can be achieved in the presence of the frequent spacecraft reorientations and momentum unloads planned for this mission. The ground navigation approach provides stable navigation solutions using a tracking schedule of one 30-minute contact per day. The onboard navigation approach that uses only optical quality celestial object measurements provides stable autonomous navigation solutions. This study indicates that unmodeled changes in the solar radiation pressure cross-sectional area and modeled momentum unload velocity changes are the major error sources. These errors can be mitigated by modeling these changes, by estimating corrections to compensate for the changes, or by including acceleration measurements.

Long, Anne

James Webb Space Telescope (JWST) Primary Mirror Material Selection

The James Webb Space Telescope (JWST) conducted a phase down select process via the Advanced Mirror System Demonstrator (AMSD) project to assess the Technology Readiness Level of various candidate mirror materials. This process culminated in the selection of Beryllium as the JWST primary mirror material. This paper outlines the mirror evaluation process, defines the selection criteria and summarizes the candidate mirror's performances.

Stahl, H. Philip

Integrated Modeling Activities for the James Webb Space Telescope: Optical Jitter Analysis

This is a continuation of a series of papers on the integrated modeling activities for the James Webb Space Telescope(JWST). Starting with the linear optical model discussed in part one, and using the optical sensitivities developed in part two, we now assess the optical image motion and wavefront errors from the structural dynamics. This is often referred to as "jitter: analysis. The optical model is combined with the structural model and the control models to create a linear structural/optical/control model. The largest jitter is due to spacecraft reaction wheel assembly disturbances which are harmonic in nature and will excite spacecraft and telescope structural. The structural/optic response causes image quality degradation due to image motion (centroid error) as well as dynamic wavefront error. Jitter analysis results are used to predict imaging performance, improve the structural design, and evaluate the operational impact of the disturbance sources.

Hyde, T. Tupper