Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design, Technology and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

UltraSciencenet: High- Performance Network Research Test-Bed

The high-performance networking requirements for next generation large-scale applications belong to two broad classes: (a) high bandwidths, typically multiples of 10Gbps, to support bulk data transfers, and (b) stable bandwidths, typically at much lower bandwidths, to support computational steering, remote visualization, and remote control of instrumentation. Current Internet technologies, however, are severely limited in meeting these demands because such bulk bandwidths are available only in the backbone, and stable control channels are hard to realize over shared connections. The UltraScience Net (USN) facilitates the development of such technologies by providing dynamic, cross-country dedicated 10Gbps channels for large data transfers, and 150 Mbps channels for interactive and control operations. Contributions of the USN project are two-fold: (a) Infrastructure Technologies for Network Experimental Facility: USN developed and/or demonstrated a number of infrastructure technologies needed for a national-scale network experimental facility. Compared to Internet, USN's data-plane is different in that it can be partitioned into isolated layer-1 or layer-2 connections, and its control-plane is different in the ability of users and applications to setup and tear down channels as needed. Its design required several new components including a Virtual Private Network infrastructure, a bandwidth and channel scheduler, and a dynamic signaling daemon. The control-plane employs a centralized scheduler to compute the channel allocations and a signaling daemon to generate configuration signals to switches. In a nutshell, USN demonstrated the ability to build and operate a stable national-scale switched network. (b) Structured Network Research Experiments: A number of network research experiments have been conducted on USN that cannot be easily supported over existing network facilities, including test-beds and production networks. It settled an open matter by demonstrating that the performance of switched connections and Multiple Protocol Label Switching tunnels over routed networks are comparable. Furthermore, such connections can be easily peered, and the performance of the resultant hybrid connections is still comparable to the constituent pure connections. USN experiments demonstrated that Infiniband transport can be effectively extended to wide-area connections of thousands of miles, which opens up new opportunities for efficient bulk data transport. USN provided dedicated connections to Cray X1 supercomputer and helped diagnose TCP performance problems which might have been otherwise incorrectly attributed to traffic on shared connections. USN contributed to the development of transport methods for dedicated connections to other traffic. Recently, experiments were conducted to assess the performance of application acceleration devices that employ flow optimization and data compression methods to improve TCP performance.

99 GENERAL AND MISCELLANEOUS↗

Design of a high-power compact SRF linac for industrial applications of e-beam irradiation

Fermilab has developed a novel concept for an industrial electron linac using Nb3Sn coating technology and conduction cooling. These conduction-cooled linacs can generate electron beam energies up to 10 MeV in continuous-wave operation and reach higher power (>=1 MW) by combing several modules. Compact and light enough to mount on mobile platforms, our machine is anticipated to enable new in-situ environmental remediation applications such as waste-water treatment for urban areas, X-ray medical device sterilization, and innovative pavement applications. We highlight a few aspects of a 1 MW design of such a machine in this paper. A detailed plan is in Dhuley et al. (2022) Phys. Rev. Accel. Beams 25, 041601.

43 PARTICLE ACCELERATORS↗

Multipurpose modular experimental station for the DiProI beamline of Fermi-Elettra free electron laser

We present a compact modular apparatus with a flexible design that will be operated at the DiProI beamline of the Fermi-Elettra free electron laser (FEL) for performing static and time-resolved coherent diffraction imaging experiments, taking advantage of the full coherence and variable polarization of the short seeded FEL pulses. The apparatus has been assembled and the potential of the experimental setup is demonstrated by commissioning tests with coherent synchrotron radiation. This multipurpose experimental station will be open to general users after installation at the Fermi-Elettra free electron laser in 2011.

43 PARTICLE ACCELERATORS↗

Automated high pressure cell for pressure jump x-ray diffraction

A high pressure cell for small and wide-angle x-ray diffraction measurements of soft condensed matter samples has been developed, incorporating a fully automated pressure generating network. The system allows both static and pressure jump measurements in the range of 0.1-500 MPa. Pressure jumps can be performed as quickly as 5 ms, both with increasing and decreasing pressures. Pressure is generated by a motorized high pressure pump, and the system is controlled remotely via a graphical user interface to allow operation by a broad user base, many of whom may have little previous experience of high pressure technology. Samples are loaded through a dedicated port allowing the x-ray windows to remain in place throughout an experiment; this facilitates accurate subtraction of background scattering. The system has been designed specifically for use at beamline I22 at the Diamond Light Source, United Kingdom, and has been fully integrated with the I22 beamline control systems.

43 PARTICLE ACCELERATORS↗

The third generation superconducting 28 GHz electron cyclotron resonance ion source VENUS (invited)

VENUS is a third generation electron cyclotron resonance (ECR) ion source, which incorporates a high field superconducting NbTi magnet structure, a 28 GHz gryotron microwave source and a state of the art closed cycle cryosystem. During the decade from initial concept to regular operation, it has demonstrated both the feasibility and the performance levels of this new generation of ECR ion sources and required innovation on magnet construction, plasma chamber design, and beam transport. In this paper, the development, performance, and major innovations are described as well as a look to the potential to construct a fourth generation ECR ion source.

43 PARTICLE ACCELERATORS↗

The second generation Singapore high resolution proton beam writing facility

A new proton beam focusing facility, designed for proton beam writing (PBW) applications has been tested. PBW allows for proximity free structuring of high aspect ratio, high-density 3D nanostructures. The new facility is designed around OM52 compact quadrupole lenses capable of operating in a variety of high demagnification configurations. Performance tests show that proton beams can be focused down to 19.0 x 29.9 nm{sup 2} and single line scans show a beam width of 12.6 nm. The ultimate goal of sub 10 nm structuring with MeV protons will be discussed.

43 PARTICLE ACCELERATORS↗

A Broadband Mechanically Tuned Superconducting Cavity Design Suitable for the Fermilab Main Injector

Radio Frequency superconductivity has been a mainstay of accelerator science for decades. However, its benefits have yet to be applied to proton synchrotrons with demanding tuning requirements. For example, the Main Injector (MI), Fermilab's high-energy proton synchrotron, currently utilizes 20+ ferrite-loaded cavities for a targeted 1.2 s acceleration cycle. Harnessing the extremely high gradients associated with superconductivity, the required number of cavities could be reduced by an order of magnitude, dramatically lowering operational power requirements even with cryogenic considerations. Additionally, the current plans for the Fermilab accelerator complex evolution initiative involve almost doubling the number of cavities in MI if the same designs are to be used, further highlighting the potential benefits of superconductivity. These advantages are attractive, but to date, no tunable superconducting cavity suitable for MI has been proposed due to the incompatibility of conventional broadband tuning methods with superconductivity. Here, we present a tunable superconducting cavity concept capable of record-breaking performance. Tuning will be accomplished by using high-speed linear actuators to vary the insertion depth of metallic plungers into the cavity volume. This tuning concept is theoretically viable with currently available technology and will be fully compatible with a superconducting cavity.

43 PARTICLE ACCELERATORS↗

Massachusetts Large Blade Test Facility Final Report

Project Objective: The Massachusetts Clean Energy Center (CEC) will design, construct, and ultimately have responsibility for the operation of the Large Wind Turbine Blade Test Facility, which is an advanced blade testing facility capable of testing wind turbine blades up to at least 90 meters in length on three test stands. Background: Wind turbine blade testing is required to meet international design standards, and is a critical factor in maintaining high levels of reliability and mitigating the technical and financial risk of deploying massproduced wind turbine models. Testing is also needed to identify specific blade design issues that may contribute to reduced wind turbine reliability and performance. Testing is also required to optimize aerodynamics, structural performance, encourage new technologies and materials development making wind even more competitive. The objective of this project is to accelerate the design and construction of a large wind blade testing facility capable of testing blades with minimum queue times at a reasonable cost. This testing facility will encourage and provide the opportunity for the U.S wind industry to conduct more rigorous testing of blades to improve wind turbine reliability.

17 WIND ENERGY↗

A Mechanically Tuned Superconducting Main Injector Cavity

Radio Frequency (RF) superconductivity has been a mainstay of accelerator science for decades. However, its benefits have yet to be applied to proton synchrotrons with demanding tuning requirements. For example, the Main Injector (MI), Fermilab's high-energy proton synchrotron, currently utilizes 20+ ferrite-loaded cavities for a targeted 1.2 s acceleration cycle. Harnessing the extremely high gradients associated with superconductivity, the required number of cavities could be reduced by an order of magnitude, dramatically lowering operational power requirements even with cryogenic considerations. Additionally, the current plans for the Fermilab Accelerator Complex Evolution (ACE) initiative involve almost doubling the number of cavities in MI if the same designs are to be used, further highlighting the potential benefits of superconductivity. These advantages are attractive, but to date, no tunable superconducting cavity suitable for MI has been proposed due to the incompatibility of conventional broadband tuning methods with superconductivity. Here, we present a tunable superconducting cavity concept capable of record-breaking performance. Tuning will be accomplished by using high-speed linear actuators to vary the insertion depth of metallic plungers into the cavity volume. This tuning concept is theoretically viable with currently available technology and will be fully compatible with a superconducting cavity.

43 PARTICLE ACCELERATORS↗

Highly Efficient Regeneration Module for Carbon Capture Systems in NGCC Applications

The objective of this project is to design, fabricate, and test a highly efficient regeneration module capable of providing an ultra-lean absorption solution that is required for capturing CO 2 from dilute sources at 95% or better efficiency. By integrating this advanced regenerator module with SRI International’s Mixed Salt Process (MSP) absorption modules, SRI expects to demonstrate significant progress toward a reduction in cost of capture versus the DOE reference natural gas combined cycle (NGCC) plant with carbon capture. SRI designed, built, and tested an advanced stripper to enhance the performance of SRI’s MSP for CO 2 capture – a transformational ammonia-based solvent technology – for natural gas (NG) power sources. The testing of the advanced stripper for MSP was conducted at an SRI site using a simulated flue gas stream equivalent to about 10 kWe. The research work included modeling of the advanced stripper and integrating it with the MSP absorbers; studying the strategies for producing very highly alkaline lean solvent with minimized emissions; operating the stripper with advanced heat integration to improve process efficiencies; and collecting critically important data for a detailed techno-economic analysis (TEA). The project tasks were designed to address concerns relating to scale-up and integration of the technology to NG power plants—more specifically, to maximize the carbon capture efficiency achievable with MSP and identify pathways to achieve higher capture efficiencies and ultimately zero net carbon emissions. SRI teamed up with a process modeling company (OLI Systems), a process and chemical engineering company (Trimeric Corporation), and a cost-sharing commercial partner (Baker-Hughes – a leading multinational company that designs, manufactures, and services transformative energy technologies) to execute the project. The research findings will accelerate the MSP development and pave the way for the technology to reach the DOE’s goal, and ultimately commercialization of the MSP technology for low-cost CO 2 capture from NGCC flue gas and other dilute CO 2 sources.

03 NATURAL GAS↗

Results of a Soil Flushing Treatability Test for Hanford Site Hexavalent Chromium Removal - 20446

U.S. Department of Energy contractor CH2M Hill Plateau Remediation Company has made significant progress remediating hexavalent chromium in groundwater near the Columbia River through the operation of pump and treat facilities and source removal activities. To mitigate risks associated with hexavalent chromium contamination, which was identified in a CERCLA interim action record of decision as the primary groundwater contaminant of concern for the 100-KR-4 Operable Unit from discharging to the Columbia River, three ion-exchange pump and treat systems were installed between 1997 and 2009. Between 2010 and 2016, operation of the K West pump and treat system, located near the former 105K West plutonium production reactor, reduced concentrations below the groundwater remediation target for hexavalent chromium. In 2016, a rebound study was performed to evaluate the effectiveness of the pump and treat remedy and assess the potential for any residual hexavalent chromium sources continuing to contribute to groundwater contamination. As a result of the rebound study, a source of continued groundwater contamination was identified. To address this condition, a soil flushing treatability test was written and approved by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The test included saturating about a 1-acre area of soil with treated water with the goal of forcing the residual hexavalent chromium to groundwater where existing extraction wells could remove it for treatment, accelerating the cleanup process. In spring and summer 2019, CH2M Hill Plateau Remediation Company installed and began operating a shallow underground leach system to support the treatability test. Preliminary sampling data show the test was effective in removing the residual contamination. Following further evaluation and analysis from the initial test, the process will be considered for implementation elsewhere on the Hanford Site, particularly at locations where there is a known or suspected continuing contamination source in the soil column. The paper will cover the goals of the study, as well as more details about the following: - Overview of pump and treat exit strategy (using U.S. Environmental Protection Agency guidance); - The design and installation of the soil flushing technology in the 100-K Area; - The testing process and results of sampling data; - Post-study evaluation and potential for implementation in other locations at the Hanford Site. Innovative solutions for cleanup, such as the soil flushing technology, have resulted in substantial progress in the removal of groundwater contaminants at the Hanford Site, potentially shortening the time frame required to meet cleanup goals and resulting in significant cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Integrity Monitoring, Prediction and Assessment, Corrosion Control, and Repair of the Hanford Storage Tanks

DOE has launched a multi-year research program with the focus of preserving and increasing available volume for waste storage at Hanford. The long-term availability and operability of the Hanford Double Shell Tanks (DST) is critical to the completion of the Hanford mission. Maintaining the integrity of the tank will involve having a technology for repair or refurbishment of a DST should the tank function be compromised by degradation, monitoring the tank for indications of accelerated degradation, developing a means for mitigating accelerated degradation, and evaluating options for increasing the storage capacity in the tank farm without constructing new tanks. The project work was started in the middle of 2024; significant progress has been made in the following four areas: (i) tank refurbishment using a high performance grout and an epoxy sealant layer system, (ii) developing a chemically and radiologically stable reference electrode, (iii) designing and implementing a cathodic protection system to mitigate underside corrosion of DST secondary shells, and (iv) exploring evaporation to increase waste storage capacity.

Shukla, Pavan [Savannah River National Laboratory ↗

A 140 mA cw deuteron electron cyclotron resonance source for the IFMIF-EVEDA project

In the framework of the IFMIF-EVEDA phase (International Fusion Materials Irradiation Facility--Engineering Validation and Engineering Design Activities), the CEA-Saclay is in charged of the design and realization of the 140 mA cw deuteron source. The IFMIF EVEDA demonstrator will be installed in Japan in the next six years and will have to accelerate the deuteron beam up to 9 MeV. CEA will build the source and the low energy beam line (LEBT) and will test the cw high intensity deuteron production at Saclay. The SILHI source is an electron cyclotron resonance (ECR) source, operating at 2.45 GHz. In 2001, it produced more than 130 mA of deuteron beam in pulsed mode to minimize neutron production. Such a result pushes to develop a new ECR source based on the SILHI design and equipped with a specific extraction system. Several options of the accelerator column will be implemented in order to improve the reliability and the efficiency of the source. The IFMIF source and LEBT design will be reported.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

22 GeV CEBAF with Novel Fixed Field Alternating Gradient Design

Extending the energy reach of CEBAF up to 22 GeV within the existing tunnel is being explored. Proposed energy upgrade can be achieved by increasing the number of recirculations, while using the existing CEBAF SRF cavity system. Presented scheme is based on an exciting new approach to acceleratie electrons efficiently with multiple passes in a single FFA beam line. Encouraged by recent success of the CBETA Test Accelerator, a proposal was formulated raise CEBAF energy by replacing the highest-energy arcs with Fixed Field Alternating Gradient (FFA) arcs. The new pair of arcs configured with FFA lattice would support simultaneous transport of additional 6 passes with energies spanning a factor of two, using the non-scaling FFA principle implemented with Halbach-derived permanent magnets - a novel magnet technology that significantly saves energy and lowers operating costs. One of the challenges of the multi-pass (11) linac optics is to provide uniform focusing in a vast range of energies, using fixed field lattice. Here, we propose a triplet lattice scaled up with increasing momentum along the linac. This would provide a stable periodic solution covering energy ratio of 1:33. The current CEBAF configured with a 123 MeV injector, makes optical matching in the first linac virtually impossible due to extremely high energy span ratio (1:175). Therefore, we envision replacement of the current injector with a 650 MeV 3-pass recirculating injector based on the existing LERF facility. Finally, the 22 GeV CEBAF would promise to deliver in 10-passes a beam with normalized emittance of 80 mm·mrad and with a relative energy spread of 1.5 × 10-3. Further recirculation beyond 22 GeV is limited by large, 974 MeV per electron, energy loss due to synchrotron radiation.

Bogacz, Slawomir↗

Status of The Indian SRS Indus-2

Raja Ramanna Centre for Advanced Technology (RRCAT, formerly called Centre for Advanced Technology) is a prime R and D laboratory of Indian Department of Atomic Energy devoted to developing technologies related to accelerators and lasers as well as their applications. RRCAT is home to 2 synchrotron radiation sources (SRS): Indus-1 (a 100 mA, 450 MeV storage ring) and Indus-2 (a 2.5 GeV booster cum storage ring designed for a current of up to 300 mA), sharing a common injector system, comprising of 20 MeV microtron and 450-700 MeV range booster synchrotron. Most of the accelerator hardware has been built indigenously. Normally beam is injected into Indus-2 (and accumulated) at 550 MeV, and ramped to 2 or 2.5 GeV depending on the user needs. At present we have permission from Atomic Energy Regulatory Board (Indian agency charged with radiation protection responsibility in the country) to operate Indus-2 at 2.5 GeV with up to 50 mA and in the next stage we will get authorization to go up to 100 mA. Currently 5 beam lines on Indus-1 and 3 on Indus-2 are operational and work is going on 4 more beam lines on Indus-2 and is progressing well. The 3 completed beam lines on Indus-2 are: high resolution XRD, position sensitive detector based multi channel EXAFS (Extended X-ray Absorption Fine Structure) and EDXRD (Energy Dispersive X-ray Diffraction). The paper gives an overview of how the SRS program at RRCAT has evolved over the years, where we stand today and also some of our future plans.

43 PARTICLE ACCELERATORS↗

1:50 Scale Testing of Three Floating Wind Turbines at MARIN and Numerical Model Validation Against Test Data

The primary goal of the basin model test program discussed herein is to properly scale and accurately capture physical data of the rigid body motions, accelerations and loads for different floating wind turbine platform technologies. The intended use for this data is for performing comparisons with predictions from various aero-hydro-servo-elastic floating wind turbine simulators for calibration and validation. Of particular interest is validating the floating offshore wind turbine simulation capabilities of NREL’s FAST open-source simulation tool. Once the validation process is complete, coupled simulators such as FAST can be used with a much greater degree of confidence in design processes for commercial development of floating offshore wind turbines. The test program subsequently described in this report was performed at MARIN (Maritime Research Institute Netherlands) in Wageningen, the Netherlands. The models considered consisted of the horizontal axis, NREL 5 MW Reference Wind Turbine (Jonkman et al., 2009) with a flexible tower affixed atop three distinct platforms: a tension leg platform (TLP), a spar-buoy modeled after the OC3 Hywind (Jonkman, 2010) and a semi-submersible. The three generic platform designs were intended to cover the spectrum of currently investigated concepts, each based on proven floating offshore structure technology. The models were tested under Froude scale wind and wave loads. The high-quality wind environments, unique to these tests, were realized in the offshore basin via a novel wind machine which exhibits negligible swirl and low turbulence intensity in the flow field. Recorded data from the floating wind turbine models included rotor torque and position, tower top and base forces and moments, mooring line tensions, six-axis platform motions and accelerations at key locations on the nacelle, tower, and platform. A large number of tests were performed ranging from simple free-decay tests to complex operating conditions with irregular sea states and dynamic winds.

17 WIND ENERGY↗

1 GeV CW nonscaling FFAG for ADS, and magnet parameters

Multi-MW proton driver capability remains a challenging, critical technology for many core HEP programs, particularly the neutrino ones such as the Muon Collider and Neutrino factory, and for high-profile energy applications such as Accelerator Driven Subcritical Reactors (ADS) and Accelerator Transmutation of Waste for nuclear power and waste management. Work is focused almost exclusively on an SRF linac, as, to date, no re-circulating accelerator can attain the 10-20 MW capability necessary for the nuclear applications. Recently, the concept of isochronous orbits has been explored and developed for nonscaling FFAGs using powerful new methodologies in FFAG accelerator design. Work is progressing on a stable, high-intensity, 1 GeV isochronous FFAG. Initial specifications of novel magnets with the nonlinear radial fields required to support isochronous operation are also reported here.

43 PARTICLE ACCELERATORS↗

A simulation environment for ITER PCS development

A simulation environment known as the Plasma Control System Simulation Platform (PCSSP), specifically designed to support development of the ITER Plasma Control System (PCS), is currently under construction by an international team encompassing a cross-section of expertise in simulation and exception handling for plasma control. The proposed design addresses the challenging requirements of supporting the PCS design. This work provides an overview of the PCSSP project and a discussion of some of the major features of its design. Plasma control for the ITER tokamak will be significantly more challenging than for existing fusion devices. An order of magnitude greater performance is needed for some types of control, which together with limited actuator authority, implies that optimized individual controllers and nonlinear saturation logic are required. At the same time, consequences of control failure are significantly more severe, which implies a conflicting requirement for robust control. It also implies a requirement for comprehensive and robust exception handling. Coordinated control of multiple competing objectives with significant interactions, together with many shared uses of actuators to control multiple variables, implies that highly integrated control logic and shared actuator management will be required. It remains a challenge for the integrated technologies to simultaneously address these multiple and often competing requirements to be demonstrated on existing fusion devices and adapted for ITER in time to support its operational schedule. We describe ways in which the PCSSP will help address these challenges to support design of both the ITER PCS itself and the algorithms that will be implemented therein. and at the same time greatly reduce the cost of that development. We summarize the current status of the PCSSP design task, including system requirements and preliminary design documents already delivered as well as features of the ongoing detailed architectural design. The methods being incorporated in the detailed design are based on prior experience with control simulation environments in fusion and on standard practices prevalent in development of control-intensive industrial product designs.

43 PARTICLE ACCELERATORS↗