Search NASA⌕ Search

SEARCH · Search NASA

Results for “CALENDARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Analysis of Loss-of-Offsite-Power Events 1987-2018

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1987 through 2018. LOOP events during critical operation that do not result in a reactor trip are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. No significant trends in critical operation LOOP frequencies over the most recent 10-year period are identified. Adverse trends in LOOP durations are identified for switchyard-centered and grid-related LOOPs, as well as overall LOOPs during critical operation and overall LOOPs during shutdown operation. Both grid-related and weather-related LOOP events are found to show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1987–1996 time period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Corrective Action Management Unit Report of Post-Closure Care Activities (CY 2018)

The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 26, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised and updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for calendar year (CY) 2018 as required by the Permit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Salt Repository Concept for CSNF in 21-PWR Size Canisters

The most straightforward concept for disposal of large, heavy packages containing commercial spent nuclear fuel (CSNF) in a repository in bedded salt, would be to emplace them directly on the floor in emplacement tunnels. In-tunnel axially aligned horizontal emplacement would minimize excavated volume and avoid drilling of large-diameter emplacement boreholes. A similar concept was proposed in Germany for direct disposal of POLLUX ® canisters. The repository would be constructed at a depth of 500 to 1,000 m for isolation from the surface, and for sufficient overburden stress to ensure creep reconsolidation of repository openings. It could entail modular panels of emplacement tunnels arranged on headings oriented in cardinal directions from a central core, to accommodate the estimated 140,000 MTU total U.S. CSNF inventory. To do so, the overall area of the repository layout would be approximately 20 km 2 . Many layouts are possible, but the approach should be modular, excavation should be deferred for as long as possible to avoid maintenance, and the emplacement areas should share support facilities and shafts. Vertical shafts would be used in accordance with mining practice in sedimentary basins. Large diameter shafts would be needed for ventilation exhaust and waste transport, with smaller shafts for waste salt removal, men & materials, and ventilation intake. The spacing between disposal tunnels as estimated from thermal modeling, seeks to limit the maximum average areal thermal load in the panels to 11 W/m 2 to control long-term heat buildup in the host rock. Peak salt temperature would occur within a few years and would be dominated by each waste package locally, simplifying thermal management. There would be some flexibility to decrease the package spacing or increase the emplacement thermal power limit Backfilling emplaced waste packages immediately with mine-run crushed salt would provide shielding and expedite reconsolidation. This arrangement would isolate adjacent waste packages from one another by the intervening backfill, especially after it reconsolidates and its properties approach those of intact salt. After the repository is fully loaded and the performance confirmation program is complete, activities to permanently close the repository would be initiated. During closure operations all openings in the host salt would be backfilled, then shafts would be sealed, and boreholes plugged. Plans for the Waste Isolation Pilot Plant (WIPP) show how sealing and plugging could be done. A monitoring program could continue for 50 years or longer after repository closure. With an emplacement thermal power limit of 10 kW per waste package, nearly all the CSNF that is projected to be produced by the current fleet of reactors in the U.S. could be emplaced over a period of approximately 50 years starting in calendar 2048. No barriers to implementation in a reasonable timeframe have been identified from this generic analysis. Engineering challenges include: 1) shaft construction; 2) a very-large capacity shaft hoist; 3) overpack design; 4) a transport-emplacement-vehicle (TEV) for transporting waste packages once they are underground and emplacing them remotely; and 5) remotely operated equipment for emplacing backfill. The method of shaft construction would depend on site-specific conditions, and could involve freezing the subsurface. A shaft hoist with payload capacity of 175 MT seems technically and economically feasible based on development work in Germany, and it would be the largest hoist of its kind. The function of disposal overpacks would be to provide reliable containment during repository operations, which could be accomplished using a corrosion allowance material such as a low-carbon steel. Development effort would be needed to determine overpack thickness (e.g., 7 to 20 cm) that can resist corrosion and loading from salt creep, to rovide containment throughout the repository operational period. The transport-emplacement vehicle (TEV) would be similar to previous concepts, particularly one option proposed for a Yucca Mountain repository. It would move over a rough salt floor on independently driven and steered wheels, and carry heavy shielding in addition to a waste package. By analogy to the safety case for the WIPP in New Mexico, human intrusion is likely to be the dominant mode of radionuclide release from the repository. Treatment of human intrusion for a CSNF repository in salt could depend on promulgation of site-specific changes in the regulations. Radionuclide release and migration would be quite limited for undisturbed conditions. There may be opportunities for improved understanding of salt performance with waste heating, based on future in situ testing in an underground salt research laboratory. This report also discusses a developing area of salt rock mechanics that involves low-stress, low strain-rate creep that might cause large, heavy waste packages to slowly sink. Site-specific sampling, testing, and modeling would be used to determine if the mechanism is important enough to merit consideration in design, or inclusion in performance assessment. Part of engineering design and postclosure safety assessment for a CSNF repository in salt would be to implement a methodology to show that the probability of a criticality event in the repository, when waste packages eventually breach and are flooded, is less than the probability screening threshold for performance assessment. In the methodology, a criticality analysis would be performed for waste packages in the repository, incorporating measures that could be introduced as needed to limit reactivity, for example using fuel selection and loading rules, and crediting the absorption of thermal neutrons by natural chlorine in the environment. A similar analysis has been underway for CSNF stored in dual-purpose canisters. Ideally the strategy would be developed prior to actually loading SNF assemblies into canisters used in waste packages for disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Report - SRNL Aging and Lifetimes program tritium aging studies on structural alloys

This report documents work performed in calendar year 2020 at SRNL in support of the Aging and Lifetimes program. This work is part of an on-going collaboration between SRNL and SNL to understand tritium embrittlement of structural metals in Gas Transfer System reservoirs which informs lifetime assessments and lifetime predictions. In this effort, test coupons are precharged with tritium and allowed to age in a freezer to minimize tritium egress and allow for born-in helium levels to systematically increase. Coupons are then removed periodically and tested to develop an understanding of how mechanical properties degrade as helium levels increase. This report summarizes test results from coupons which are in various stages of aging as they were tritium precharged in previous years.

36 MATERIALS SCIENCE↗

Meteorological services annual data report for 2020

This document presents the meteorological data collected at Brookhaven National Laboratory (BNL) by Meteorological Services (Met Services) for the calendar year 2020. The purpose is to publicize the data sets available to emergency personnel, researchers and facility operations. Met services has been collecting data at BNL since 1949. Data from 1994 to the present is available in digital format. Data is presented in monthly plots of one-minute data. This allows the reader the ability to peruse the data for trends or anomalies that may be of interest to them. Full data sets are available to BNL personnel and to a limited degree outside researchers. The full data sets allow plotting the data on expanded time scales to obtain greater details (e.g., daily solar variability, inversions, etc.).

54 ENVIRONMENTAL SCIENCES↗

CY2020 Report for PECOS Activities

All experiments involving the Pecos target chamber in calendar year (CY) 2020 were dedicated to Pre-Heat studies in the context of Magnetized Liner Inertial Fusion (MagLIF). Activities at the target area included actual laser shots but also diagnostic and maintenance, and preparatory work for experiments with cryogenically cooled targets. The latter took up a large part of CY2020’s shot availability, and consequently there were fewer shots performed than in previous years. Since the Z-Beamlet and Z-Petawatt lasers support multiple campaigns, we can only anticipate laser and laser-operator time for one out of three shot windows in a day, and typically not on every day of the week. For that reason, many of our non-shot activities need to be traded against shots as well.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Universal Utility Data Exchange Workflow Design

This workflow design document describes the process of establishing a Universal Utility Data Exchange (UUDEX) Connection between two or more UUDEX Endpoints. The existing processes required to establish a data link using Inter Control Center Communications Protocol (ICCP) are very time consuming, from both the perspectives of effort and calendar time. The intent of UUDEX is to provide a more streamlined alternative. The UUDEX Workflow is also used to establish UUDEX Connections to exchange data other than that found in traditional ICCP data exchanges such as exchanges of power system model files, security events and mitigations, disturbance reports, and market data.

97 MATHEMATICS AND COMPUTING↗

DOE Express Quantum Computing Application Teams (QCAT FY20 Report)

The QCOR project consists of 4 main research tasks: 1) scientific applications and algorithm development for machine learning (ML) and quantum theories of condensed matter systems and lattice gauge theories; 2) high-level quantum-classical (HLQC) language and domain specific language (DSL) development; 3) compiler and interfaces development for the HLQC language; and 4) hardware-level control, optimization, and algorithms libraries. In the succeeding sections we report on progress towards our research tasks during the 2020 calendar year.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2020)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment. 2) CAU 91, Area 3 U-3fi Injection Well. 3) CAU 92, Area 6 Decon Pond Facility. 4)CAU 110, Area 3 WMD U-3ax/bl Crater. 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits. 6) CAU 112, Area 23 Hazardous Waste Trenches. The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.

54 ENVIRONMENTAL SCIENCES↗

Review of Pantex Radiation Safety Department 2020 Backup Dosimetry Processing Methodology

In the first quarter (Q1) of Calendar Year 2020, the Pantex Radiation Safety Department (Pantex) experienced various issues and failures with their dosimeter processing equipment. Efforts to repair the equipment resulted in limited functionality without the ability to process dosimeters assigned to personnel for monitoring dose. As a result of the impairments to the dosimeter processing equipment, Pantex called upon Nevada National Security Site (NNSS) for support, as their designated backup processor. In January of 2021, LLNL Subject Matter Experts in External Dosimetry started an NNSA-requested review of Pantex’s personnel doses in Q1 2020. Its focus was the technical validity of the means and methods used by Pantex and its conclusions and provide a level of confidence to National Nuclear Security Administration (NNSA) that the resulting personnel doses were reasonable, conservative, and defensible.

61 RADIATION PROTECTION AND DOSIMETRY↗

Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan (CY 2021)

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2021 at the U.S. Department of Energy Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring is performed by the GWPP. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12. Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. The following sections of this report provide details regarding the CY 2021 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2021) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F. Modifications to the CY 2021 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan.

54 ENVIRONMENTAL SCIENCES↗

Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This report contains the groundwater and surface water monitoring data obtained during calendar year (CY) 2019 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system, shown as Plant North. The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Background information in Section 2 of this report outlines the hydrogeologic framework for groundwater and surface water quality monitoring at Y-12 and includes an overview of the groundwater contamination in each hydrogeologic regime. Section 3 provides details regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP, including sampling locations and frequency, sample collection and handling, field measurements and laboratory analytes, quality assurance (QA)/quality control (QC) sampling, data management, and data quality assessment (DQA). However, the equivalent QA/QC or DQA information for the groundwater and surface water data associated with the monitoring programs implemented by UCOR are not included in this report and instead are deferred to referenced programmatic plans and reports issued by OREM and UCOR. Section 4 of this report presents a summary evaluation of the CY 2019 monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring. The evaluation is based primarily on the analytical results for the following principal groundwater contaminants at Y-12: nitrate, uranium, gross alpha activity, gross beta activity, and volatile organic compounds (VOCs). Section 5 summarizes the most significant findings with respect to the principal contaminants along with recommendations for any proposed changes to the ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP. Technical reports and plans cited in the narrative sections of the report are listed in Section 6. Narrative sections of this report reference several appendices. Figures (maps and diagrams) and data tables (excluding data summary tables incorporated in the narrative sections) are in Appendix A and Appendix B, respectively. Appendix C contains construction details for each well sampled during CY 2019 by either the Y-12 GWPP or UCOR, along with schematic diagrams for wells equipped with Westbay™ multiport sampling equipment or Barcad® pump systems. Appendix D supports the background summary discussion in Section 2 and provides more detailed information about the hydrogeologic framework for groundwater and surface water monitoring at Y-12, including the primary sources of groundwater contamination in each hydrogeologic regime. Results for all field measurements and laboratory analyses obtained by the Y-12 GWPP and UCOR are presented in Appendix E, which also includes the sample numbers for the QA/QC samples associated with groundwater and surface water monitoring performed by the Y-12 GWPP.

54 ENVIRONMENTAL SCIENCES↗

Notice of Submittal – 2020 Radionuclide Air Emissions Report for Los Alamos National Laboratory

Enclosed is the Calendar Year 2020 Radionuclide Air Emissions Report for the Los Alamos National Laboratory (LANL). The submittal is in compliance with 40 CFR 61 Subpart H. The highest effective dose equivalent to any member of the public from LANL operations in 2020 is 0.29 millirem. This maximally exposed individual location is a business at 132 DP Road, Los Alamos, NM. The annual dose is well below the EPA standard of 10 millirem per year as established in Subpart H.

54 ENVIRONMENTAL SCIENCES↗

Global normal spectral irradiance in Albuquerque: a one-year open dataset for PV research

This report describes the creation process and final content of a spectral irradiance dataset for Albuquerque NM. The spectral irradiance measurements were made using a dual-axis tracker; therefore, they represent global normal irradiance. The dataset combines spectroradiometer and weather measurements from a two-year period into a continuous calendar year. The data files are accompanied by extensive metadata as well as example calculations and graphs to demonstrate the potential uses of this database.

14 SOLAR ENERGY↗

Battery Performance, Thermal, and Life Modeling for Southern California Edison (Cooperative Research and Development Final Report)

The objective of this project is to develop battery performance models, thermal models and life models for SCE to use in simulation and analysis of grid services involving energy storage. NREL will fit the models to three separate chemistries using test data provided by SCE. The dataset for each chemistry will include electrical, thermal and aging response to different temperatures and cycling conditions, measured under a variety of cell-level and module-level experiments described in SCE test protocol documents. Once tuned to a test dataset, the battery system model software will provide predictions of battery energy and power loss, and thus cycle and calendar life, for any energy storage grid service power profile of interest to SCE. The automated battery life modeling and simulation tool can also be applied to any other grid battery systems as long as necessary input data is available to accelerate battery model development and battery lifetime analysis.

25 ENERGY STORAGE↗

Argonne National Laboratory Site Environmental Report (CY2020)

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2020. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with environmental management, sustainability efforts, environmental corrective actions, and habitat restoration. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and wastewater were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off site population groups was estimated. Results are interpreted with respect to the origin of the radioactive and chemical substances (i.e., natural, Argonne, and other) and are compared with applicable standards intended to protect human health and the environment. A U.S. Department of Energy (DOE) dose calculation methodology, based on International Commission on Radiological Protection (ICRP) recommendations and the U.S. Environmental Protection Agency’s (EPA) CAP 88 Version 4.1 computer code, was used in preparing this report.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

CY2020 Annual Closure Monitoring Report for Corrective Action Unit 98: Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada (January 2020–December 2020, Revision 1)

This report presents the results of monitoring conducted for water quality, water levels, and institutional controls in calendar year (CY) 2020 by the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity at Corrective Action Unit (CAU) 98, Frenchman Flat (FF), at the Nevada National Security Site (NNSS), Nevada (Figure 1-1). This report also presents analytical laboratory results (including results of quality assurance/quality control samples, such as field duplicates [FDs]); and verification of use restrictions (URs), institutional controls, and water use. Groundwater samples were collected; water levels were measured; and well site surveillance was conducted in support of the Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada (NNSA/NFO, 2016) and its ensuing Records of Technical Change (ROTCs).

54 ENVIRONMENTAL SCIENCES↗