Search NASA⌕ Search

SEARCH · Search NASA

Results for “Configuration planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Pulsed-coil magnet systems for applying uniform 10–30 T fields to centimeter-scale targets on Sandia's Z facility

Sandia has successfully integrated the capability to apply uniform, high magnetic fields (10–30 T) to high energy density experiments on the Z facility. This system uses an 8-mF, 15-kV capacitor bank to drive large-bore (5 cm diameter), high-inductance (1–3 mH) multi-turn, multi-layer electromagnets that slowly magnetize the conductive targets used on Z over several milliseconds (time to peak field of 2–7 ms). This system was commissioned in February 2013 and has been used successfully to magnetize more than 30 experiments up to 10 T that have produced exciting and surprising physics results. These experiments used split-magnet topologies to maintain diagnostic lines of sight to the target. We describe the design, integration, and operation of the pulsed coil system into the challenging and harsh environment of the Z Machine. We also describe our plans and designs for achieving fields up to 20 T with a reduced-gap split-magnet configuration, and up to 30 T with a solid magnet configuration in pursuit of the Magnetized Liner Inertial Fusion concept.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Supersonic aerodynamic characteristics of canard, tailless, and aft-tail configurations for 2 wing planforms

Aerodynamic characteristics of canard, tailless, and aft tail configurations were compared in tests on a general research model (generic fuselage without canopy, inlets, or vertical tails) at Mach 1.60 and 2.00 in the Langley Unitary Plan Wind Tunnel. Two uncambered wing planforms (trapezoidal with 44 deg leading edge sweep and delta with 60 deg leading edge sweep) were tested for each configuration. The relative merits of the configurations were also determined theoretically, to evaluate the capabilities of a linear theory code for such analyses. The canard and aft tail configurations have similar measured values for lift curve slope, maximum lift drag ratio, and zero lift drag. The stability decrease as Mach number increases is greatest for the tailless configuration and least for the canard configuration. Because of very limited accuracy in predicting the aerodynamic parameter increments between configurations, the linear theory code is not adequate for determining the relative merits of canard, tailless, and aft tail configurations.

Covell, P. F.↗

NASA's Space Launch System: Enabling Exploration and Discovery

As NASA's new Space Launch System (SLS) launch vehicle continues to mature toward its first flight and beyond, so too do the agency's plans for utilization of the rocket. Substantial progress has been made toward the production of the vehicle for the first flight of SLS - an initial "Block 1" configuration capable of delivering more than 70 metric tons (t) to Low Earth Orbit (LEO). That vehicle will be used for an uncrewed integrated test flight, propelling NASA's Orion spacecraft into lunar orbit before it returns safely to Earth. Flight hardware for that launch is being manufactured at facilities around the United States, and, in the case of Orion's service module, beyond. At the same time, production has already begun on the vehicle for the second SLS flight, a more powerful Block 1B configuration capable of delivering more than 105 t to LEO. This configuration will be used for crewed launches of Orion, sending astronauts farther into space than anyone has previously ventured. The 1B configuration will introduce an Exploration Upper Stage, capable of both ascent and in-space propulsion, as well as a Universal Stage Adapter - a payload bay allowing the flight of exploration hardware with Orion - and unprecedentedly large payload fairings that will enable currently impossible spacecraft and mission profiles on uncrewed launches. The Block 1B vehicle will also expand on the initial configuration's ability to deploy CubeSat secondary payloads, creating new opportunities for low-cost access to deep space. Development work is also underway on future upgrades to SLS, which will culminate in about a decade in the Block 2 configuration, capable of delivering 130 t to LEO via the addition of advanced boosters. As the first SLS draws closer to launch, NASA continues to refine plans for the human deep-space exploration it will enable. Planning currently focuses on use of the vehicle to assemble a Deep Space Gateway, which would comprise a habitat in the lunar vicinity allowing astronauts to gain experience living and working in deep space, a testbed for new systems and capabilities needed for exploration beyond, and a departure point for NASA and partners to send missions to other destinations. Assembly of the Gateway would be followed by a Deep Space Transport, which would be a vehicle capable of carrying astronauts farther into our solar system and eventually to Mars. This paper will give an overview of SLS' current status and its capabilities, and discuss current utilization planning.

Schorr, Andrew↗

The Economic Potential of Two Nuclear-Renewable Hybrid Energy Systems

Tightly coupled nuclear-renewable hybrid energy systems (N-R HESs) are an option that can generate zero-carbon, dispatchable electricity and provide zero-carbon energy for industrial processes at a lower cost than alternatives. N-R HESs are defined as systems that are managed by a single entity and link a nuclear reactor that generates heat, a thermal power cycle for heat to electricity conversion, at least one renewable energy source, and an industrial process that uses thermal and/or electrical energy. This report provides results of an analysis of two N-R HES scenarios. The first is a Texas-synthetic gasoline scenario that includes four subsystems: a nuclear reactor, thermal power cycle, wind power plant, and synthetic gasoline production technology. The second is an Arizona-desalination scenario with its four subsystems a nuclear reactor, thermal power cycle, solar photovoltaics, and a desalination plant. The analysis focuses on the economics of the N-R HESs and how they compare to other options, including configurations without all the subsystems in each N-R HES and alternatives where the energy is provided by natural gas.

14 SOLAR ENERGY↗

Top-Mounted Propulsion Test Plans (TMP17)

NASA recently completed a study of propulsion cycles and nozzle types applicable to a 70-passenger, M1.6 supersonic airliner, paying especial attention to the noise produced during landing and take-off. The results of the study were validated in a model-scale test at NASA Glenn last summer. The findings of that study and test, along with other studies, have resulted in a new strategy for achieving the Commercial Supersonic Technologys goals for noise and performance. Key to that strategy is moving the propulsion to the top-side of the vehicle and modifying the nozzle and inlet to maximally shield the propulsion noise while maintaining efficient operation. Installed exhaust configurations have been designed to minimize the exhaust noise using new acoustic design tools. A test planned for the fall of 2017 will validate both the new design tools and the low-noise concept using a new translating phased array. During the test, questions regarding modifications of convected waves in the jet near-field that are key to new understandings of aft jet noise will be addressed. Also, to better tie rig results to real-world measurements, a model-scale version of a nozzle that was flight tested by Glenn Research Center in 2001 will be tested.

Jet noise↗

NASA's Space Launch System: SmallSat Deployment to Deep Space

Leveraging the significant capability it offers for human exploration and flagship science missions, NASA's Space Launch System (SLS) also provides a unique opportunity for lower-cost deep-space science in the form of small-satellite secondary payloads. Current plans call for such opportunities to begin with the rocket's first flight; a launch of the vehicle's Block 1 configuration, capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO), which will send the Orion crew vehicle around the moon and return it to Earth. On that flight, SLS will also deploy 13 CubeSat-class payloads to deep-space destinations. These secondary payloads will include not only NASA research, but also spacecraft from industry and international partners and academia. The payloads also represent a variety of disciplines including, but not limited to, studies of the moon, Earth, sun, and asteroids. While the SLS Program is making significant progress toward that first launch, preparations are already under way for the second, which will see the booster evolve to its more-capable Block 1B configuration, able to deliver 105t to LEO. That configuration will have the capability to carry large payloads co-manifested with the Orion spacecraft, or to utilize an 8.4-meter (m) fairing to carry payloads several times larger than are currently possible. The Block 1B vehicle will be the workhorse of the Proving Ground phase of NASA's deep-space exploration plans, developing and testing the systems and capabilities necessary for human missions into deep space and ultimately to Mars. Ultimately, the vehicle will evolve to its full Block 2 configuration, with a LEO capability of 130 metric tons. Both the Block 1B and Block 2 versions of the vehicle will be able to carry larger secondary payloads than the Block 1 configuration, creating even more opportunities for affordable scientific exploration of deep space. This paper will outline the progress being made toward flying smallsats on the first flight of SLS, and discuss future opportunities for smallsats on subsequent flights.

Robinson, Kimberly F.↗

NASA's Space Launch System: SmallSat Deployment to Deep Space

Leveraging the significant capability it offers for human exploration and flagship science missions, NASA's Space Launch System (SLS) also provides a unique opportunity for lower-cost deep-space science in the form of small-satellite secondary payloads. Current plans call for such opportunities to begin with the rocket's first flight; a launch of the vehicle's Block 1 configuration, capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO), which will send the Orion crew vehicle around the moon and return it to Earth. On that flight, SLS will also deploy 13 CubeSat-class payloads to deep-space destinations. These secondary payloads will include not only NASA research, but also spacecraft from industry and international partners and academia. The payloads also represent a variety of disciplines including, but not limited to, studies of the moon, Earth, sun, and asteroids. While the SLS Program is making significant progress toward that first launch, preparations are already under way for the second, which will see the booster evolve to its more-capable Block 1B configuration, able to deliver 105t to LEO. That configuration will have the capability to carry large payloads co-manifested with the Orion spacecraft, or to utilize an 8.4-meter (m) fairing to carry payloads several times larger than are currently possible. The Block 1B vehicle will be the workhorse of the Proving Ground phase of NASA's deep-space exploration plans, developing and testing the systems and capabilities necessary for human missions into deep space and ultimately to Mars. Ultimately, the vehicle will evolve to its full Block 2 configuration, with a LEO capability of 130 metric tons. Both the Block 1B and Block 2 versions of the vehicle will be able to carry larger secondary payloads than the Block 1 configuration, creating even more opportunities for affordable scientific exploration of deep space. This paper will outline the progress being made toward flying smallsats on the first flight of SLS, and discuss future opportunities for smallsats on subsequent flights.

Robinson, Kimberly F.↗

Modeling in the State Flow Environment to Support Launch Vehicle Verification Testing for Mission and Fault Management Algorithms in the NASA Space Launch System

Analysis methods and testing processes are essential activities in the engineering development and verification of the National Aeronautics and Space Administration's (NASA) new Space Launch System (SLS). Central to mission success is reliable verification of the Mission and Fault Management (M&FM) algorithms for the SLS launch vehicle (LV) flight software. This is particularly difficult because M&FM algorithms integrate and operate LV subsystems, which consist of diverse forms of hardware and software themselves, with equally diverse integration from the engineering disciplines of LV subsystems. M&FM operation of SLS requires a changing mix of LV automation. During pre-launch the LV is primarily operated by the Kennedy Space Center (KSC) Ground Systems Development and Operations (GSDO) organization with some LV automation of time-critical functions, and much more autonomous LV operations during ascent that have crucial interactions with the Orion crew capsule, its astronauts, and with mission controllers at the Johnson Space Center. M&FM algorithms must perform all nominal mission commanding via the flight computer to control LV states from pre-launch through disposal and also address failure conditions by initiating autonomous or commanded aborts (crew capsule escape from the failing LV), redundancy management of failing subsystems and components, and safing actions to reduce or prevent threats to ground systems and crew. To address the criticality of the verification testing of these algorithms, the NASA M&FM team has utilized the State Flow environment6 (SFE) with its existing Vehicle Management End-to-End Testbed (VMET) platform which also hosts vendor-supplied physics-based LV subsystem models. The human-derived M&FM algorithms are designed and vetted in Integrated Development Teams composed of design and development disciplines such as Systems Engineering, Flight Software (FSW), Safety and Mission Assurance (S&MA) and major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GN&C), Thrust Vector Control (TVC), liquid engines, and the astronaut crew office. Since the algorithms are realized using model-based engineering (MBE) methods from a hybrid of the Unified Modeling Language (UML) and Systems Modeling Language (SysML), SFE methods are a natural fit to provide an in depth analysis of the interactive behavior of these algorithms with the SLS LV subsystem models. For this, the M&FM algorithms and the SLS LV subsystem models are modeled using constructs provided by Matlab which also enables modeling of the accompanying interfaces providing greater flexibility for integrated testing and analysis, which helps forecast expected behavior in forward VMET integrated testing activities. In VMET, the M&FM algorithms are prototyped and implemented using the same C++ programming language and similar state machine architectural concepts used by the FSW group. Due to the interactive complexity of the algorithms, VMET testing thus far has verified all the individual M&FM subsystem algorithms with select subsystem vendor models but is steadily progressing to assessing the interactive behavior of these algorithms with LV subsystems, as represented by subsystem models. The novel SFE applications has proven to be useful for quick look analysis into early integrated system behavior and assessment of the M&FM algorithms with the modeled LV subsystems. This early MBE analysis generates vital insight into the integrated system behaviors, algorithm sensitivities, design issues, and has aided in the debugging of the M&FM algorithms well before full testing can begin in more expensive, higher fidelity but more arduous environments such as VMET, FSW testing, and the Systems Integration Lab7 (SIL). SFE has exhibited both expected and unexpected behaviors in nominal and off nominal test cases prior to full VMET testing. In many findings, these behavioral characteristics were used to correct the M&FM algorithms, enable better test coverage, and develop more effective test cases for each of the LV subsystems. This has improved the fidelity of testing and planning for the next generation of M&FM algorithms as the SLS program evolves from non-crewed to crewed flight, impacting subsystem configurations and the M&FM algorithms that control them. SFE analysis has improved robustness and reliability of the M&FM algorithms by revealing implementation errors and documentation inconsistencies. It is also improving planning efficiency for future VMET testing of the M&FM algorithms hosted in the LV flight computers, further reducing risk for the SLS launch infrastructure, the SLS LV, and most importantly the crew.

Trevino, Luis↗

Climate-Water Adaptation for Future US Electricity Infrastructure

Future climate-water conditions are anticipated to increase electricity demand, reduce transmission capacity, and limit power production. Yet, typical electricity capacity expansion planning does not consider climate-water constraints. We project four alternative U.S. power system configurations using an iterative modeling and data exchange platform that integrates climate-driven hydrological, thermal power plant, and capacity expansion models. Through a comparison with traditional modeling approaches, we show that this novel approach provides greater confidence in electricity capacity projections by incorporating feasibility checks that adjust infrastructure development to reach grid reliability thresholds under climate-water constraints. Initial projections without climate-water impacts on electricity generation show future power systems become less vulnerable, independent of climate-water adaptation, as economic drivers increase renewable and natural gas-based capacity, while water-intensive coal and nuclear plants retire. However, power systems may face reliability challenges without climate-water adaptation, revealing the significance of incorporating climate-water impacts into power system planning. Climate-adjusted (Iterative approach) projections require a 5.3-12.0% increase in national-level capacity, relative to Initial projections, leading to an additional $125-143 billion (5.0-7.0%) in infrastructure costs. Variable renewable and natural gas technologies account for nearly all the additional capacity and, together with regional trade-offs in electricity generation, enhance grid performance to reach reliability thresholds. These adaptation transitions also lower water use and emissions, contributing to climate change mitigation, and highlight the trade-offs and impacts of both near and long-term electricity generation planning decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA's Space Launch System: Enabling Exploration and Discovery

As NASA's new Space Launch System (SLS) launch vehicle continues to mature toward its first flight and beyond, so too do the agency's plans for utilization of the rocket. Substantial progress has been made toward the production of the vehicle for the first flight of SLS - an initial "Block 1" configuration capable of delivering more than 70 metric tons (t) to Low Earth Orbit (LEO). That vehicle will be used for an uncrewed integrated test flight, propelling NASA's Orion spacecraft into lunar orbit before it returns safely to Earth. Flight hardware for that launch is being manufactured at facilities around the United States, and, in the case of Orion's service module, beyond. At the same time, production has already begun on the vehicle for the second SLS flight, a more powerful Block 1B configuration capable of delivering more than 105 metric tons to LEO. This configuration will be used for crewed launches of Orion, sending astronauts farther into space than anyone has previously ventured. The 1B configuration will introduce an Exploration Upper Stage, capable of both ascent and in-space propulsion, as well as a Universal Stage Adapter - a payload bay allowing the flight of exploration hardware with Orion - and unprecedentedly large payload fairings that will enable currently impossible spacecraft and mission profiles on uncrewed launches. The Block 1B vehicle will also expand on the initial configuration's ability to deploy CubeSat secondary payloads, creating new opportunities for low-cost access to deep space. Development work is also underway on future upgrades to SLS, which will culminate in about a decade in the Block 2 configuration, capable of delivering 130 metric tons to LEO via the addition of advanced boosters. As the first SLS draws closer to launch, NASA continues to refine plans for the human deep-space exploration it will enable. Planning currently focuses on use of the vehicle to assemble a Deep Space Gateway, which would comprise a habitat in the lunar vicinity allowing astronauts to gain experience living and working in deep space, a testbed for new systems and capabilities needed for exploration beyond, and a departure point for NASA and partners to send missions to other destinations. Assembly of the Gateway would be followed by a Deep Space Transport, which would be a vehicle capable of carrying astronauts farther into our solar system and eventually to Mars. This paper will give an overview of SLS' current status and its capabilities, and discuss current utilization planning.

Robinson, Kimberly F.↗

Accuracy of Acuros XB and AAA dose calculation for small fields with reference to RapidArc stereotactic treatments

Purpose: To assess the accuracy against measurements of two photon dose calculation algorithms (Acuros XB and the Anisotropic Analytical algorithm AAA) for small fields usable in stereotactic treatments with particular focus on RapidArc. Methods: Acuros XB and AAA were configured for stereotactic use. Baseline accuracy was assessed on small jaw-collimated open fields for different values for the spot sizes parameter in the beam data: 0.0, 0.5, 1, and 2 mm. Data were calculated with a grid of 1 x 1 mm{sup 2}. Investigated fields were: 3 x 3, 2 x 2, 1 x 1, and 0.8 x 0.8 cm{sup 2} with a 6 MV photon beam generated from a Clinac2100iX (Varian, Palo Alto, CA). Profiles, PDD, and output factors were measured in water with a PTW diamond detector (detector size: 4 mm{sup 2}, thickness 0.4 mm) and compared to calculations. Four RapidArc test plans were optimized, calculated and delivered with jaw settings J3 x 3, J2 x 2, and J1 x 1 cm{sup 2}, the last was optimized twice to generate high (H) and low (L) modulation patterns. Each plan consisted of one partial arc (gantry 110 deg. to 250 deg.), and collimator 45 deg. Dose to isocenter was measured in a PTW Octavius phantom and compared to calculations. 2D measurements were performed by means of portal dosimetry with the GLAaS method developed at authors' institute. Analysis was performed with gamma pass-fail test with 3% dose difference and 2 mm distance to agreement thresholds. Results: Open square fields: penumbrae from open field profiles were in good agreement with diamond measurements for 1 mm spot size setting for Acuros XB, and between 0.5 and 1 mm for AAA. Maximum MU difference between calculations and measurements was 1.7% for Acuros XB (0.2% for fields greater than 1 x 1 cm{sup 2}) with 0.5 or 1 mm spot size. Agreement for AAA was within 0.7% (2.8%) for 0.5 (1 mm) spot size. RapidArc plans: doses were evaluated in a 4 mm diameter structure at isocenter and computed values differed from measurements by 0.0, -0.2, 5.5, and -3.4% for Acuros XB calculations (1 mm spot size), and of -0.1, 0.3, 6.7, and -1.2% for AAA, respectively for J3 x 3, J2 x 2, J1 x 1H, J1 x 1L RapidArc plans. Gamma Agreement Index from 2D dose analysis was higher than 95% for J3 x 3 and J2 x 2 plans, being around 80% for J1 x 1 maps. Sensitivity with respect to the dosimetric leaf gap and transmission factor MLC parameters was evaluated in the four RapidArc plans, showing the need to properly set the dosimetric leaf gap for accurate calculations. Conclusions: Acuros XB and AAA showed acceptable characteristics for stereotactic small fields if adequate tuning of configuration parameters is performed. Dose calculated for RapidArc stereotactic plans showed an acceptable agreement against point and 2D measurements. Both algorithms can therefore be considered safely applicable to stereotactic treatments.

61 RADIATION PROTECTION AND DOSIMETRY↗

NASA's Space Launch System: Affordability for Sustainability

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is charged with delivering a new capability for human exploration beyond Earth orbit in an austere economic climate. But the SLS value is clear and codified in United States (U.S.) budget law. The SLS Program knows that affordability is the key to sustainability and will provide an overview of initiatives designed to fit within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat, yet evolve the 70-tonne (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through the competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface some 40 years ago. Astronauts train for long-duration voyages on platforms such as the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. In parallel with SLS concept studies, NASA is now refining its mission manifest, guided by U.S. space policy and the Global Exploration Roadmap, which reflects the mutual goals of a dozen member nations. This mission planning will converge with a flexible heavy-lift rocket that can carry international crews and the air, water, food, and equipment they need for extended trips to asteroids and Mars. In addition, the SLS capability will accommodate very large science instruments and other payloads, using a series of modular fairings and adapters to configure the rocket for the mission. The SLS affordability plan includes streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture where the question Why? is often asked and the answer "Because we've always done it that way" is rarely heard. The SLS Program will deliver affordable space transportation solutions for the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021. As this briefing will show, the SLS will offer a global infrastructure asset for robotic and human scouts of all nations.

May, Todd A.↗

SU-F-T-649: Dosimetric Evaluation of Non-Coplanar Arc Therapy Using a Novel Rotating Gamma Ray System

Purpose: Stereotactic intra and extra-cranial body radiation therapy has evolved with advances in treatment accuracy, effective radiation dose, and parameters necessary to maximize machine capabilities. Novel gamma systems with a ring type gantry were developed having the ability to perform oblique arcs. The aim of this study is to explore the dosimetric advantages of this new system. Methods: The rotating Gamma system is named CybeRay (Cyber Medical Corp., Xian, China). It has a treatment head of 16 cobalt-60 sources focused to the isocenter, which can rotate 360° on the ring gantry and swing 35° in the superior direction. Treatment plans were generated utilizing our in-house Monte Carlo treatment planning system. A cylindrical phantom was modeled with 2mm voxel size. Dose inside the cylindrical phantom was calculated for coplanar and non-coplanar arcs. Dosimetric differences between CybeRay cobalt beams and CyberKnife 6MV beams were compared in a lung phantom and for previously treated SBRT patients. Results: The full width at half maxima of cross profiles in the S-I direction for the coplanar setup matched the cone sizes, while for the non-coplanar setup, FWHM was larger by 2mm for a 10mm cone and about 5mm for larger cones. In the coronal and sagittal view, coplanar beams showed elliptical shaped isodose lines, while non-coplanar beams showed circular isodose lines. Thus proper selection of the oblique angle and cone size can aid optimal dose matching to the target volume. Comparing a single 5mm cone from CybeRay to that from CyberKnife showed similar penumbra in a lung phantom but CybeRay had significant lower doses beyond lung tissues. Comparable treatment plans were obtained with CybeRay as that from CyberKnife.ConclusionThe noncoplanar multiple source arrangement of CybeRay will be of great clinical benefits for stereotactic intra and extra-cranial radiation therapy.

60 APPLIED LIFE SCIENCES↗

A method for planning collision free trajectories for two cooperating robots

Robotic systems designed specifically for space applications often exhibit a high level of autonomy to reduce the costs associated with having humans in space. This paper presents a method for autonomously planning collision free paths for two cooperating robots in a static environment. The method performs selective mapping of configuration space while attempting to locate a safe path. The method is based around an algorithm aimed at transversing a space of arbitrary dimension which contains both safe and unsafe regions. While the procedure cannot guarantee finding a solution even if one may exist, it is intended to find a solution to many practical path planning problems within a reasonable amount of time. Results are presented for applying the procedure to two cooperating six degree of freedom manipulators (Puma 560s).

Weaver, Jonathan M.↗

HybridPlan: A Capacity Planning Technique for Projecting Storage Requirements in Hybrid Storage Systems

Economic forces, driven by the desire to introduce flash into the high-end storage market without changing existing software-base, have resulted in the emergence of solid-state drives (SSDs), flash packaged in HDD form factors and capable of working with device drivers and I/O buses designed for HDDs. Unlike the use of DRAM for caching or buffering, however, certain idiosyncrasies of NAND Flash-based solid-state drives (SSDs) make their integration into hard disk drive (HDD)-based storage systems nontrivial. Flash memory suffers from limits on its reliability, is an order of magnitude more expensive than the magnetic hard disk drives (HDDs), and can sometimes be as slow as the HDD (due to excessive garbage collection (GC) induced by high intensity of random writes). Given the complementary properties of HDDs and SSDs in terms of cost, performance, and lifetime, the current consensus among several storage experts is to view SSDs not as a replacement for HDD, but rather as a complementary device within the high-performance storage hierarchy. Thus, we design and evaluate such a hybrid storage system with HybridPlan that is an improved capacity planning technique to administrators with the overall goal of operating within cost-budgets. HybridPlan is able to find the most cost-effective hybrid storage configuration with different types of SSDs and HDDs

Capacity Planning↗

Development Unit Configuration and Current Status of the MIP/MTERC Experiment

The Mars In-Situ Propellant Production (ISPP) Precursor (MIP) experiment package is planned for inclusion on the Mars 2001 Lander. This experiment package consists of five experiments whose purpose is to demonstrate the performance of various ISPP processes in-situ on Mars. The demonstrated ability to produce propellant for Mars Return Vehicles (MRV) is considered to be a necessary precursor to any future manned mission to Mars. The Mars Thermal Environment/Radiator Characterization (MTERC) experiment is part of the MIP package and is intended to determine the Mars night sky temperature as well as to characterize the performance degradation of radiators caused by environmental exposure on Mars over time. Radiators are needed as part of the ISPP process to remove heat from the Mars Atmosphere Acquisition and Compression (MAAC) CO2 sorption compressor. MTERC will provide the data needed to optimize the design of radiators for ISPP and other processes. A MTERC Development Unit (DU) has been fabricated and tested at JPL. The MTERC DU consists of 1) a radiator subassembly, 2) a motor/cover subassembly, 3) a differential temperature control circuit and motor control electronics circuit board, and 4) a command and data handling electronics circuit board. This paper will describe the operational theory and the configuration of the MTERC DU and will discuss the current status of the MTERC experiment development including some selected results of performance testing that has been completed prior to the ISRU III meeting.

Juanero, K. J.↗

Development Unit Configuration and Current Status of the MIP/MTERC Experiment

The Mars In-Situ Propellant Production (ISPP) Precursor (MIP) experiment package is planned for inclusion on the Mars 2001 Lander. This experiment package consists of five experiments whose purpose is to demonstrate the performance of various ISPP processes in-situ on Mars. The demonstrated ability to produce propellant for Mars Return Vehicles (MRV) is considered to be a necessary precursor to any future manned mission to Mars. The Mars Thermal Environment/Radiator Characterization (MTERC) experiment is part of the MIP package and is intended to determine the Mars night sky temperature as well as to characterize the performance degradation of radiators caused by environmental exposure on Mars over time. Radiators are needed as part of the ISPP process to remove heat from the Mars Atmosphere Acquisition and Compression (MAAC) C02 sorption compressor. MTERC will provide the data needed to optimize the design of radiators for ISPP and other processes. A MTERC Development Unit (DU) has been fabricated and tested at JPL. The MTERC DU consists of: (1) a radiator subassembly, (2) a motor/cover subassembly, (3) a differential temperature control circuit and motor control electronics circuit board, and (4) a command and data handling electronics circuit board. This paper will describe the operational theory and the configuration of the MTERC DU and will discuss the current status of the MTERC experiment development including some selected results of performance testing that has been completed prior to the ISRU III meeting.

Juanero, K. J.↗

High Resolution Siting Suitability of Various Power Plant Technologies

Energy sector planning models determine the aggregate need for new generation, but these models are typically at the state or regional scale and are not equipped to address the wide range of location- and technology-specific issues that are increasingly a factor in power plant siting. These animations demonstrate the aggregate siting suitability of various power plant technology configurations, considering technology-specific factors that can prohibit development. The data presented is from the GRIDCERF (Geospatial Raster Input Data for Capacity Expansion Regional Feasibility) data package. GRIDCERF is a harmonized, open-source geospatial product that can be used to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. The animations presented here demonstrate a curated selection of the full suite of technology configurations available. GRIDCERF provides the necessary inputs for models that simulate power plant siting for regional capacity expansion planning such as the Capacity Expansion Regional Feasibility (CERF) model.

Mongird, Kendall [Pacific Northwest National Labor↗