Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Module”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

International Space Station Radiation Shielding Model Development

The projected radiation levels within the International Space Station (ISS) have been criticized by the Aerospace Safety Advisory Panel in their report to the NASA Administrator. Methods for optimal reconfiguration and augmentation of the ISS shielding are now being developed. The initial steps are to develop reconfigurable and realistic radiation shield models of the ISS modules, develop computational procedures for the highly anisotropic radiation environment, and implement parametric and organizational optimization procedures. The targets of the redesign process are the crew quarters where the astronauts sleep and determining the effects of ISS shadow shielding of an astronaut in a spacesuit. The ISS model as developed will be reconfigurable to follow the ISS. Swapping internal equipment rack assemblies via location mapping tables will be one option for shield optimization. Lightweight shield augmentation materials will be optimally fit to crew quarter areas using parametric optimization procedures to minimize the augmentation shield mass. The optimization process is being integrated into the Intelligence Synthesis Environment s (ISE s) immersive simulation facility at the Langley Research Center and will rely on High Performance Computing and Communication (HPCC) for rapid evaluation of shield parameter gradients.

Qualls, G. D.↗

Mapping the ISS with the Autonomous Free-Flying Astrobee Robots

Space intra-vehicular robots (IVR) can provide coverage survey and targeted close-up inspection imagery capabilities that improve ground operator situation awareness. We report on a series of activities using the autonomous Astrobee robotic free-flyers that mapped the interior of three ISS modules, generating a panoramic tour of the ISS interior without astronaut manual photography. For the ISS, these capabilities can complement or replace time-consuming crew inspection tasks, providing panoramic data products that are easier to navigate than the baseline crew safety videos. For future exploration vehicles with extended uncrewed mission phases, robotic inspection will play a more critical role of providing the primary “eyes in the sky” for vehicle operators.

robotics↗

Safe Haven Configurations for Deep Space Transit Habitats

Throughout the human space flight program there have been instances where smoke, fire, and pressure loss have occurred onboard space vehicles, putting crews at risk for loss of mission and loss of life. In every instance the mission has been in Low-Earth-Orbit (LEO) with access to multiple volumes that could be used to quickly seal off the damaged module or escape vehicles for a quick return to Earth. For long duration space missions beyond LEO, including Mars transit missions of about 1000 days, the mass penalty for multiple volumes has been a concern as has operating in an environment where a quick return will not be possible. In 2016 a study was done to investigate a variety of dual pressure vessel configurations for habitats that could protect the crew from these hazards. It was found that for a modest increase in total mass it should be possible to provide significant protection for the crew. Several configurations were developed that either had a small safe haven to provide 30-days to recover, or a full duration safe haven using two equal size pressure vessel volumes. The 30-day safe haven was found to be the simplest, yielding the least total mass impact but still with some risk if recovery is not possible during that timeframe. The full duration safe haven was the most massive option but provided the most robust solution. This paper provides information on the various layouts considered in the study and provides a discussion of the findings for implementing a safe haven in future habitat designs.

Smitherman, David↗

Recreation Embedded State Tuning for Optimal Readiness and Effectiveness (RESTORE)

Physiological self-regulation training is a behavioral medicine intervention that has demonstrated capability to improve psychophysiological coping responses to stressful experiences and to foster optimal behavioral and cognitive performance. Once developed, these psychophysiological skills require regular practice for maintenance. A concomitant benefit of these physiologically monitored practice sessions is the opportunity to track crew psychophysiological responses to the challenges of the practice task in order to detect shifts in adaptability that may foretell performance degradation. Long-duration missions will include crew recreation periods that will afford physiological self-regulation training opportunities. However, to promote adherence to the regimen, the practice experience that occupies their recreation time must be perceived by the crew as engaging and entertaining throughout repeated reinforcement sessions on long-duration missions. NASA biocybernetic technologies and publications have developed a closed-loop concept that involves adjusting or modulating (cybernetic, for governing) a person's task environment based upon a comparison of that person's physiological responses (bio-) with a training or performance criterion. This approach affords the opportunity to deliver physiological self-regulation training in an entertaining and motivating fashion and can also be employed to create a conditioned association between effective performance state and task execution behaviors, while enabling tracking of individuals psychophysiological status over time in the context of an interactive task challenge. This paper describes the aerospace spin-off technologies in this training application area as well as the current spin-back application of the technologies to long-duration missions - the Recreation Embedded State Tuning for Optimal Readiness and Effectiveness (RESTORE) concept. The RESTORE technology is designed to provide a physiological self-regulation training countermeasure for maintaining and reinforcing cognitive readiness, resilience under psychological stress, and effective mood states in long-duration crews. The technology consists of a system for delivering physiological self-regulation training and for tracking crew central and autonomic nervous system function; the system interface is designed to be experienced as engaging and entertaining throughout repeated training sessions on long-duration missions. Consequently, this self-management technology has threefold capability for recreation, behavioral health problem prophylaxis and remediation, and psychophysiological assay. The RESTORE concept aims to reduce the risk of future manned exploration missions by enhancing the capability of individual crewmembers to self-regulate cognitive states through recreation-embedded training protocols to effectively deal with the psychological toll of long-duration space flight.

Pope, Alan T.↗

Performance Testing of a Photocatalytic Oxidation Module for Spacecraft Cabin Atmosphere Revitalization

Photocatalytic oxidation (PCO) is a candidate process technology for use in high volumetric flow rate trace contaminant control applications in sealed environments. The targeted application for PCO as applied to crewed spacecraft life support system architectures is summarized. Technical challenges characteristic of PCO are considered. Performance testing of a breadboard PCO reactor design for mineralizing polar organic compounds in a spacecraft cabin atmosphere is described. Test results are analyzed and compared to results reported in the literature for comparable PCO reactor designs.

Perry, Jay L.↗

One Year in the Extreme Isolation of Antarctica—Is This Enough to Modulate an “Allergic” Sensitization?

(1) Background: After spending a year wintering in Antarctica, individual expedition members have reported increased or even new allergic reactions to environmental allergens after their return. (2) Methods: Blood samples from five overwintering crews were analyzed using the chip based multiplex ALEX Allergy Explorer (MacroArray Diagnostics GmbH, Austria). (3) Results: About one third of the 39 participants displayed specific IgEs against pollen. In most individuals, kinetics showed a reduction in the specific IgE at the time about nine months after deployment to Antarctica. Five participants had the highest specific IgE levels after returning to the “normal” world. The examination of the specific IgE relative to house dust mites and storage mites showed different kinetics. Six out of 10 had the highest specific IgE concentrations at the inner Antarctic measurement time point. These data corresponded well to the general situation in the stations. At the stations themselves, there were almost no pollen particle load, especially at Concordia. (4) Conclusions: Antarctic long-term confinement can induce an altered immune function, which is in some individuals pronounced after return to the familiar allergen environment. Future prospective studies in larger cohorts are needed to further specify these first results.

Matthias Feuerecker↗

Crew Activity Report / Flight Day 7

The Atlantis Space Shuttle crew (Mission Commander James D. Halsell, Jr., Pilot Scott J. Horowitz, Mission Specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev) completed several activities including: (1) installation of final battery in the International Space Station; (2) installation of new storage compartments behind panels in the Zarya module; (3) installation of a new Radio Telemetry System; (4) firing of Atlantis steering jets to perform the second part of three-day maneuver to raise the station's altitude; and (5) transferring more than a ton of gear to the station to await use by the first resident crew.

Source record↗

Payload carrier systems for conducting sortie mode science

The capabilities and characteristics of the payload carriers developed to provide structural and operational interfaces between the Space Shuttle and the various types of experiments designed to operate in the sortie mode are discussed. The Spacelab is a flexible laboratory system composed of interchangeable elements that can be put together in eight different combinations of pallets and pressurized modules, and provides considerable standard services to users in such areas as equipment installation, power distribution, thermal control, command and data management, software, pointing systems and crew participation. A modular three-axis pointing control system designated the Annular Suspension and Pointing System, is being developed to provide additional pointing capabilities to those payloads that require capabilities not provided by the Spacelab instrument pointing system. Two engineering models of the Spacelab pallet have been designated Orbital Flight Test Pallets which, together with a special experiment support structure, are intended for initial and operational payloads that do not constitute a complete Spacelab mission. The simplest and smallest payload carriers are the Getaway Special cans, intended for small, self-contained, self-sufficient payloads, and the orbiter middeck lockers. In this way, most of the user requirements for Shuttle sortie missions identified to date can be fulfilled.

Jean, O. C.↗

Open Cherry Picker simulation results

The Open Cherry Picker (OCP) is a manned platform, mounted at the end of the Remote Manipulator System (RMS), which is used to enhance extravehicular activities. The objective of the simulation program described was to reduce the existing complexity of those OCP design features that are mandatory for initial Space Shuttle applications. The OCP development test article consists of a torque box, a rotating foot restraint, a rotating stanchion that houses handholds, and a tool storage section with an interface with payload modules. If the size or complexity of the payload increases, payload handling devices may be added at a later data. The simulations have shown that the crew can control the RMS from the Aft Flight Deck of the Shuttle, using voice commands from the EVA crewman. No need for a stabilizer was evident, and RMS dynamics due to crew-induced workloads were found to be minor.

Nathan, C. A.↗

Space Station Systems Analysis Study. Volume 2: Program options, book 1, parts 1 and 2

Program options are defined and requirements are determined for integrating crew, mass, volume, and electrical power for a space construction base which incorporates the space shuttle external tanks. Orbits, stabilization, flight control hardware, as well as modules and aids for orbital assembly and servicing are considered. The effectiveness of various program options for life science and radio astronomy missions, for the solar terrestrial observatory, and for public service platforms is assessed. Technology development items are identified and costs are estimated.

Source record↗

Apollo Lightcraft Project

This second year of the NASA/USRA-sponsored Advanced Aeronautical Design effort focused on systems integration and analysis of the Apollo Lightcraft. This beam-powered, single-stage-to-orbit vehicle is envisioned as the shuttlecraft of the 21st century. The five person vehicle was inspired largely by the Apollo Command Module, then reconfigured to include a new front seat with dual cockpit controls for the pilot and co-pilot, while still retaining the 3-abreast crew accommodations in the rear seat. The gross liftoff mass is 5550 kg, of which 500 kg is the payload and 300 kg is the LH2 propellant. The round trip cost to orbit is projected to be three orders of magnitude lower than the current space shuttle orbiter. The advanced laser-driven 5-speed combined-cycle engine has shiftpoints at Mach 1, 5, 11 and 25+. The Apollo Lightcraft can climb into low Earth orbit in three minutes, or fly to any spot on the globe in less than 45 minutes. Detailed investigations of the Apollo Lightcraft Project this second year further evolved the propulsion system design, while focusing on the following areas: (1) man/machine interface; (2) flight control systems; (3) power beaming system architecture; (4) re-entry aerodynamics; (5) shroud structural dynamics; and (6) optimal trajectory analysis. The principal new findings are documented. Advanced design efforts for the next academic year (1988/1989) will center on a one meter+ diameter spacecraft: the Lightcraft Technology Demonstrator (LTD). Detailed engineering design and analyses, as well as critical proof-of-concept experiments, will be carried out on this small, near-term machine. As presently conceived, the LTD could be constructed using state of the art components derived from existing liquid chemical rocket engine technology, advanced composite materials, and high power laser optics.

Myrabo, Leik N.↗

STS-79 Flight Day 8

On this eighth day of the STS-79 mission, the flight crew, Cmdr. William F. Readdy, Pilot Terrence W. Wilcutt, Mission Specialists, Thomas D. Akers, Shannon Lucid, Jay Apt, and Carl E. Walz, are seen bidding the crew of Mir farewell and then closing the hatches between their two spacecraft in preparation for undocking. The nine astronauts and cosmonauts gathered in the Core Module of the Russian space station for a formal goodbye. With the official ceremony complete, the crewmembers shared a final meal together and exchanged private farewells as Shannon Lucid prepared to return home in Atlantis and her replacement on Mir, John Blaha, began a four month stay on the station. Walz and Apt and Mir 22 Commander Valery Korzun with assistance from Flight Engineer 2 John Blaha, swung the hatches between their spacecraft closed concluding five days of joint operations. The vestibule between Atlantis and Mir was depressurized and leak checks were performed in readiness for undocking.

Source record↗

STS-96 FD Highlights and Crew Activities Report: Flight Day 04

On this fourth day of the STS-96 Discovery mission, the flight crew, Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev are seen performing final preparations for their space walk. Views of the crew helping Barry and Jernigan suit up for their mission is also presented. Ochoa uses the robot arm to maneuver Jernigan up to the space station module. During the space walk Barry and Jernigan move two cranes, and three bags containing handrails and tools to the outside of the Unity module. They also install a thermal cover on a Unity trunnion pin, inspect peeling paint on Zarya and one of the two Early Communications System antennas on Unity.

Source record↗

STS-111 Mission Highlights Resource Tape: Flight Days 1 - 4 - Part 1 of 4

This video, Part 1 of 4, shows the activities of the STS-111 crew (Kenneth Cockrell, Commander; Paul Lockhart, Pilot; Franklin Chang-Diaz, Phillipe Perrin, Mission Specialists) during flight days 1 through 4. Also shown are the incoming Expedition 5 (Valeri Korzun, Commander; Peggy Whitson, NASA ISS Science Officer; Sergei Treschev, Flight Engineer) and outgoing Expedition 4 (Yuri Onufriyenko, Commander; Carl Walz, Daniel Bursch, Flight Engineers) crews of the ISS (International Space Station). The activities from other flight days can be seen on 'STS-111 Mission Highlights Resource Tape' Part 2 of 4 (internal ID 2002139469), 'STS-111 Mission Highlights Resource Tape' Part 3 of 4 (internal ID 2002139468), and 'STS-111 Mission Highlights Resource Tape' Part 4 of 4 (internal ID 2002139474). The primary activity of flight day 1 is the launch of Space Shuttle Endeavour. The crew is seen before the launch at a meal and suit-up, and some pre-flight procedures are shown. Perrin holds a sign with a personalized message. The astronauts communicate with Mission Control extensively after launch, and an inside view of the shuttle cabin is shown. The replays of the launch include close-ups of the nozzles at liftoff, and the fall of the solid rocket boosters and the external fuel tank. Flight day 2 shows footage of mainland Asia at night, and daytime views of the eastern United States and Lake Michigan. Flight day three shows the Endeavour orbiter approaching and docking with the ISS. After the night docking, the crews exchange greetings, and a view of the Nile river and Egypt at night is shown. On flight day 4, the MPLM (Multi-Purpose Logistics Module) Leonardo was temporarily transferred from Endeavour's payload bay to the ISS.

Source record↗

Apollo 14 - Press Kit

Apollo 14, the sixth United States manned flight to the Moon and fourth Apollo mission with an objective of landing men on the Moon, is scheduled for launch Jan. 31 at 3:23 p.m. EST from Kennedy Space Center, Fla. The Apollo 14 lunar module is to land in the hilly upland region north of the Fra Mauro crater for a stay of about 33 hours, during which the landing crew will leave the spacecraft twice to set up scientific experiments on the lunar surface and to continue geological explorations. The two earlier Apollo lunar landings were Apollo 11 at Tranquility Base and Apollo 12 at Surveyor 3 crater in the Ocean of Storms.

Source record↗

Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are underway with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex S.↗

NASA's Space Launch System: Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are under way with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances the odds of mission success. SLS will be powered by four liquid fuel RS-25 engines and two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex↗

Gateway Integrated Environmental Control and Life Support System (ECLSS) Overview and Status

The Gateway comprised of modules provided by commercial and international partners will be a lunar orbiting platform that is a critical element in the Moon to Mars architecture. Of the 4 modules that comprise the Gateway, the core Environmental Control and Life Support System (ECLSS) is provided by the Habitation and Logistics Outpost (HALO) module provided by NASA, and the International Habitat (I-Hab) provided by the European Space Agency (ESA) with the ECLSS provided by the Japanese Space Agency (JAXA). These modules work together to provide pressure control, air revitalization, and air conditioning capabilities for the Gateway integrated habitable volumes and attached visiting vehicles during open hatch crewed operations. Individually, they maintain the internal atmosphere during the long periods of dormancy between crewed operations to support payload operations and ensure a safe environment when the crew returns. Additionally, NASA bolsters crew survivability by providing government furnished equipment (GFE) to support crew survival in the face of catastrophic hazards (such as fire or a cabin air leak) until the Gateway stack reaches a point in the orbit where crew can safely abort on Orion. This paper explains the key driving requirements, architecture, and development status of the Gateway ECLSS.

Gateway↗