WTA offers big efficiency gains

The next major step forward for brown coal fired power generation looks like being the RWE-developed fluidised bed based WTA process for precombustion drying of this high moisture fuel. WTA stands for Wirbelschicht-Trocknung mit interner Abwaermenutzung (fluidized bed drying with internal heat recovery). A large scale pilot plant is due to start operation early next year at Niederaussem K in Germany, while a WTA system is to be retrofitted to the Hazlewood plant in Australia. 1 ref., 7 figs.

01 COAL, LIGNITE, AND PEAT↗

CFB: technology of the future?

Fuel flexibility and a smaller carbon footprint are behind renewed interest in circulating fluidized bed (CFB) technology. The article explains the technology of CFB and discusses development of CFB units since the late 1990s. China is seeing an explosion in the number of utility-size CFBs. Alstom, Foster Wheeler, Babcock and Wilson and Alex Kvaener are today's major CFB boiler manufacturers. Alstom is testing and developing oxy-firing and post-combustion carbon capture strategies on CFB boilers. One CFB asset is its ability to burn a variety of fuels including waste coal, high sulfur coal and even discarded tires. The article mentions successful CFB projects at the Seward Station using waste coal and at the Gilbert 3 plant in the USA. Lamar is converting its Light and Power Plant from natural gas to burn coal in a 38.5 MW CFB boiler. 1 tab., 3 photos.

01 COAL, LIGNITE, AND PEAT↗

Lamar repowering project's creative modeling of old and new wins Marmaduke award

Lamar Light and Power is a municipal utility that has been generating the south eastern Colorado city's electricity since 1920. Rising natural gas and oil costs pushed LL & P to retire its steam plant five years ago and begin hunting for more economic power sources. The answer: repower the existing plant with a state-of-the-art coal-fired circulating fluidized-bed combustor and cross-connect old and new steam turbines. The 120 million dollar project will stabilize the region's electricity rates for many years to come. 10 figs. 1 tab.

20 FOSSIL-FUELED POWER PLANTS↗

Greenidge multi-pollutant project achieves emissions reduction goals

Performance testing at the Greenridge Multi-Pollutant Project has met or exceeded project goals, indicating that deep emission reduciton sin small, difficult-to-retrofit power plants can be achieved. The technology fitted at the 107 MWe AES Greenridge Unit 4 includes a hybrid selective non-catalytic reduction/selective catalytic reduction system for NOx control (NOxOUT CASCADE) and a Turbosorp circulating fluidized bed dry scrubber system for SO{sub 2}, mercury, SO{sub 3} HC and Hf control. 2 figs.

01 COAL, LIGNITE, AND PEAT↗

Combustion engineering issues for solid fuel systems

The book combines modeling, policy/regulation and fuel properties with cutting edge breakthroughs in solid fuel combustion for electricity generation and industrial applications. This book provides real-life experiences and tips for addressing the various technical, operational and regulatory issues that are associated with the use of fuels. Contents are: Introduction; Coal Characteristics; Characteristics of Alternative Fuels; Characteristics and Behavior of Inorganic Constituents; Fuel Blending for Combustion Management; Fuel Preparation; Conventional Firing Systems; Fluidized-Bed Firing Systems; Post-Combustion Emissions Control; Some Computer Applications for Combustion Engineering with Solid Fuels; Gasification; Policy Considerations for Combustion Engineering.

01 COAL, LIGNITE, AND PEAT↗

Power from coal and biomass via CFB

Circulating fluidized bed technology enables burning coal and biomass to generate power while reducing emissions at the same time. Flexi-Burn CFB is being developed. It produces a CO{sub 2} rich flue gas, form which CO{sub 2} can be captured.

01 COAL, LIGNITE, AND PEAT↗

Postcombustion and its influences in 135 MWe CFB boilers

In the cyclone of a circulating fluidized bed (CFB) boiler, a noticeable increment of flue gas temperature, caused by combustion of combustible gas and unburnt carbon content, is often found. Such phenomenon is defined as post combustion, and it could introduce overheating of reheated and superheated steam and extra heat loss of exhaust flue gas. In this paper, mathematical modeling and field measurements on post combustion in 135MWe commercial CFB boilers were conducted. A novel one-dimensional combustion model taking post combustion into account was developed. With this model, the overall combustion performance, including size distribution of various ashes, temperature profile, and carbon content profiles along the furnace height, heat release fraction in the cyclone and furnace were predicted. Field measurements were conducted by sampling gas and solid at different positions in the boiler under different loads. The measured data and corresponding model-calculated results were compared. Both prediction and field measurements showed post combustion introduced a temperature increment of flue gas in the cyclone of the 135MWe CFB boiler in the range of 20-50{sup o}C when a low-volatile bituminous coal was fired. Although it had little influence on ash size distribution, post combustion had a remarkable influence on the carbon content profile and temperature profile in the furnace. Moreover, it introduced about 4-7% heat release in the cyclone over the total heat release in the boiler. This fraction slightly increased with total air flow rate and boiler load. Model calculations were also conducted on other two 135MWe CFB boilers burning lignite and anthracite coal, respectively. The results confirmed that post combustion was sensitive to coal type and became more severe as the volatile content of the coal decreased. 15 refs., 11 figs., 4 tabs.

01 COAL, LIGNITE, AND PEAT↗

Startup of the New 200 West Pump-and-Treat, Hanford Site, Richland, Washington - 13214

On June 28, 2012, CH2M HILL Plateau Remediation Company (CHPRC) completed the construction and acceptance testing for a new 2,500 gallon-per-minute (gpm) pump-and-treat (P and T) system in the 200 West Area of the Hanford Site in Washington State. This system is designed to remove Tc-99, carbon tetrachloride, trichloroethene (TCE), nitrate, and total and hexavalent chromium from groundwater using ion exchange, anoxic and aerobic bioreactors, and air stripping. The system will eventually remove uranium from groundwater using ion exchange as well. The startup of the P and T system is important because it will ensure that contaminants from the 200 West Area never reach the Columbia River. When fully operational, the 200 West P and T will include approximately 23 extraction wells and 21 injection wells. The extraction wells are 8 inches in diameter, are completed with well screens 100 feet or more in length, and are distributed throughout the central portion of the 5-square-mile carbon tetrachloride plume. The injection wells are also 8 inches in diameter and are installed up-gradient of the plumes to recharge the aquifer and down-gradient of the plumes for flow-path control. Groundwater in the 200 West Area is approximately 250 feet below ground surface, and the aquifer is 200 feet or more in thickness. All of the contaminants (except nitrate) are found within the perimeter of the carbon tetrachloride plume and occur at various depths throughout the aquifer. The 200 West P and T consists of two separate buildings to conduct groundwater treatment. The RAD building contains an ion exchange system to remove Tc-99 from groundwater at a maximum flow rate of 600 gpm. The RAD building only accepts water from those extraction wells showing elevated Tc-99 concentrations. Groundwater initially fills an influent tank, is then pumped through particulate filters (to remove suspended materials), and then passes through two parallel treatment trains containing Purolite{sup R} A530E resin (which has been proven effective in removing Tc-99). The water is then transferred to the biological treatment building for further treatment. When the lead vessel in each of the two treatment trains becomes fully loaded with Tc-99, the Purolite A530E resin is transferred to a separate tank where it is heated to 160 deg. F to remove volatile organics prior to disposal at the Environmental Restoration Disposal Facility. The biological treatment building has a maximum flow capacity of 2,500 gpm. Groundwater from the nonradiological extraction wells and treated groundwater from the RAD building are initially pumped into an equalization tank and then into two parallel fluidized bed reactors (FBRs). The FBRs contain granulated activated carbon in suspension for microbes to populate, a carbon-based food source for the microbes to eat (e.g., MicroCg{sup TM}, molasses, or sodium lactate), and nitrate for the microbes to breathe (represents 'anoxic' conditions that contain little or no dissolved oxygen). The FBRs are maintained at a temperature between 55 deg. F and 90 deg. F, and at a pH between 6.5 and 6.8, to maximize microbial growth. The FBRs break down the nitrate, reduce the hexavalent chromium to trivalent chromium, and break down a good portion of the carbon tetrachloride and TCE. From the FBRs, groundwater is pumped through a carbon separation tank, then through a splitter box that divides the water evenly between four membrane bioreactors (MBRs) that further break down the contaminants. The MBRs have aeration capacity to provide sufficient oxygen for maintaining the aerobic biological process. The MBRs use submerged membranes for filtration. Vertically strung fibers are found in the membrane zone where a vacuum draws water through tiny pores in the fibers. The liquid is then pumped to air strippers to remove any volatile organics that have passed through the bioreactors. Solids from the MBRs are pumped to rotary drum thickeners and centrifuges for dewatering prior to lime being added to kill the bacteria and control odor. The conditioned sludge is then disposed at the Environmental Restoration Disposal Facility. The final treated water is then pumped to the injection well field. The 200 West P and T is a Leadership in Energy and Environmental Design (LEED) gold-certified facility that has an expected 70% energy cost savings over the lifetime of the plant. Fifty percent of the steel used in construction was recycled, 420 tons of recycled concrete were used, and over 75% of construction waste was diverted from landfills. The plant is only staffed one shift per day, and it uses a call-out system if the plant goes down during off-shift hours. Initial sampling results have shown that the 200 West P and T is successfully reducing contaminant levels well below the cleanup levels specified in the Record of Decision, Hanford 200 Area 200-ZP-1 Superfund Site, Benton County, Washington [1]. CHPRC and the U.S. Department of Energy are continuing to look for ways to reduce operational costs, such as testing alternative resins for removing radionuclides and finding less expensive carbon substrate sources. The benefit to others is a LEED gold-certified, 2,500 gpm P and T system that may be used as a model for other complex sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Bench-scale Steam Reformer Demonstration of a Monolithic Steam Reformed Mineralized Waste Form for Hanford Waste Treatment Plant Secondary Waste - 12306

Hanford currently has 212,000 m{sup 3} (56 million gallons) of highly radioactive mixed waste stored in the Hanford tank farm. This waste will be processed to produce both high-level and low-level activity fractions, both of which are to be vitrified. Supplemental treatment options have been under evaluation for treating portions of the low-activity waste, as well as the liquid secondary waste from the low-activity waste vitrification process. One technology under consideration has been the THOR{sup R} fluidized bed steam reforming process offered by THOR Treatment Technologies, LLC (TTT). As a follow-on effort to TTT's 2008 pilot plant FBSR non-radioactive demonstration for treating low-activity waste and waste treatment plant secondary waste, TTT, in conjunction with Savannah River National Laboratory, has completed a bench scale evaluation of this same technology on a chemically adjusted radioactive surrogate of Hanford's waste treatment plant secondary waste stream. This test generated a granular product that was subsequently formed into monoliths, using a geo-polymer as the binding agent, that were subjected to compressibility testing, the Product Consistency Test and other leachability tests, and chemical composition analyses. This testing has demonstrated that the mineralized waste form, produced by co-processing waste with kaolin clay using the TTT process, is as durable as low-activity waste glass. Testing has shown the resulting monolith waste form is durable, leach resistant, and chemically stable, and has the added benefit of capturing and retaining the majority of Tc-99, I-129, and other target species at high levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Water Treatment at a United States Environmental Protection Agency Superfund Site - 12322

A water treatment system at a United States Environmental Protection Agency (USEPA) Superfund site impacted by radiological contaminants is used to treat water entering the site. The United States Army Corps of Engineers (USACE) is actively managing the remedial action for the USEPA using contracts to support the multiple activities on site. The site is where former gas mantle production facilities operated around the turn of the century. The manufacturing facilities used thorium ores to develop the mantles and disposed of off-specification mantles and ore residuals in the surrounding areas. During Site remedial actions, both groundwater and surface water comes into contact with contaminated soils and must be collected and treated at an on-site treatment facility. The radionuclides thorium and radium with associated progeny are the main concern for treatment. Suspended solids, volatile organic compounds, and select metals are also monitored during water treatment. The water treatment process begins were water is pumped to a collection tank where debris and grit settle out. Stored water is pumped to a coagulant tank containing poly-aluminum chloride to collect dissolved solids. The water passes into a reaction tube where aspirated air is added or reagent added to remove Volatile Organic Compounds (VOC'S) by mass transfer and convert dissolved iron to a solid. The water enters the flocculent polymer tank to drop solids out. The flocculated water overflows to a fluidized bed contact chamber to increase precipitation. Flocculation is where colloids of material drop out of suspension and settle. The settled solids are periodically removed and disposed of as radioactive waste. The water is passed through filters and an ion exchange process to extract the radionuclides. Several million liters of water are processed each year from two water treatment plants servicing different areas of the remediation site. Ion exchange resin and filter material are periodically replaced and disposed of as radioactive waste. A total of 0.85 m{sup 3} of waste sludge per year requires disposal on average, in addition to another 6.6 m{sup 3} of waste cartridge filters. All water discharges are regulated by a state of New Jersey Pollutant Discharge Elimination System Permit implemented by the Federal Water Pollution Control Act (Clean Water Act). Laboratory analyses are required to satisfy requirements of the state NPDES permit. Specific monitoring parameters and discharge rates will be provided. Use of the water treatment systems drastically reduces the amount of contaminated water requiring solidification and water disposal to near zero. Millions of liters of potentially contaminated water from excavation activities is treated and released within permit limits. A small volume of solid radioactive waste (21 cubic meters) is generated annually from water treatment process operations. Management of ground and surface water is effectively controlled in remediation areas by the use of sumps, erosion control measures and pumping of water to storage vessels. Continued excavations can be made as water impacting the site is effectively controlled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Finding balance between biological groundwater treatment and treated injection water - 15237

At the U.S. Department of Energy's Hanford Site, CH2M HILL Plateau Remediation Company operates the 200 West Pump and Treat which was engineered to treat radiological and chemical contaminants in groundwater as a result of the site's former plutonium production years. Fluidized bed bioreactors (FBRs) are used to remove nitrate, metals, and volatile organic compounds. Increasing nitrate concentrations in the treatment plant effluent and the presence of a slimy biomass (a typical microorganism response to stress) in the FBRs triggered an investigation of nutrient levels in the system. Little, if any, micro-nutrient feed was coming into the bioreactors. Additionally, carbon substrate (used to promote biological growth) was passing through to the injection wells, causing biological fouling of the wells and reduced specific injectivity. Adjustments to the micro-nutrient feed improved microorganism health, but the micro-nutrients were being overfed (particularly manganese) plugging the injection wells further. Injection well rehabilitation to restore specific injectivity required repeated treatments to remove the biological fouling and precipitated metal oxides. A combination of sulfamic and citric acids worked well to dissolve metal oxides and sodium hypochlorite effectively removed the biological growth. Intensive surging and development techniques successfully removed clogging material from the injection wells. Ultimately, the investigation and nutrient adjustments took months to restore proper balance to the microbial system and over a year to stabilize injection well capacities. Carefully tracking and managing the FBRs and well performance monitoring are critical to balancing the needs of the treatment system while reducing fouling mechanisms in the injection wells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Waste Treatment Unit Plan for Vessel and Canister Decontamination - 19283

The Integrated Waste Treatment Unit (IWTU) was designed to use a proprietary fluidized-bed steam reforming process to treat 3,400,000 L (898,184 gal) of radioactive sodium bearing waste (SBW). IWTU is currently in commissioning and startup phase prior to future processing of SBW. The current simulant SBW is introduced into the denitration mineralization reformer and transformed into a dry, granular product that is filtered and eventually transferred into a product canister. The intention of the facility is to process the SBW and store the product canisters in vaults to await shipping to a depository at a later date. The IWTU is a part of the Idaho Cleanup Project Core, located at the INL Site and operated by Fluor Idaho, LLC. During early operation and testing of the facility, it was observed that the original process equipment decontamination system did not possess the capability to recover from plant shutdowns that result from upset conditions or maintenance outages; thus, a need for a redesigned decontamination system was identified. This paper discusses current decontamination methods and their capabilities and areas where these methods fall short of decontaminating process equipment and product canisters. This paper discusses the design and purpose of the decontamination methods being tested and developed for implementation into the IWTU. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Filter 'Cook-Off': Filter Selection via Side-by-Side Testing at Actual Process Conditions - 20040

In 2005, the THOR steam reforming fluidized-bed reactor technology was selected by the U.S. Department of Energy for treatment of sodium-bearing waste at the INL. During the final phase of commissioning prior to radiological operations, regeneration of the high temperature filters in the process gas filter (PGF) vessel became ineffective. After approximately 50 days of testing, the differential pressure across the filters began increasing exponentially and the plant had to be shutdown. Subsequent investigation revealed that the Inconel 625 (I625) sintered metal filter media was corroding in the 550 deg. C reducing environment. A pilot plant run tested four candidate replacement filter media. The top candidate was further tested during a long-term pilot plant run to validate the selection. Data from the testing indicate the selected filters will provide reliable service throughout the life of the project, including after in-situ radiological decontamination. This paper presents the data from this effort and reinforces the value of pilot plant testing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Preparation of SiC-ZrC Composite Coating Layers by FB-CVD Used in TRISO Coated Fuel Particles - 18417

Tri-structural-isotropic (TRISO) particle has been successful in high temperature gas cooled reactor (HTGR), but an improved design is required for future development. In this paper, two alternative designs of TRISO particle are proposed by introducing ZrC to the coating layers. One design is to add an individual ZrC layer between the inner PyC layer and the SiC layer. Another design is to construct a periodic coating layer with the repeated sequence of SiC/SiC-ZrC by doping pulsed ZrCl{sub 4} at proper time intervals during the SiC preparation process. The designed coating layers were successfully prepared on the ZrO{sub 2}/buffer/IPyC particles by the fluidized bed chemical vapor deposition (FB-CVD) method. Microstructures and characterizations of the composite coating layers were given based on XRD, SEM, EDX and Raman scattering analysis. By controlling the pulse parameter, the grain size of SiC is significantly decreased which means doping ZrCl{sub 4} can interrupt normal growth of SiC crystals. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Jet penetration into a riser operated in dense suspension upflow: experimental and model comparisons

Solids tracers were used to characterize the penetration of a gas-solids jet directed toward the center of the 0.3-m diameter, circulating fluidized bed (CFB) riser. The penetration was measured by tracking phosphorescent particles illuminated immediately prior to injection into the riser. Photosensors and piezoelectric detectors were traversed across the radius of the riser at various axial positions to detect the phosphorescent jet material and particles traveling in the radial direction. Local particle velocities were measured at various radial positions, riser heights, and azimuthal angles using an optical fiber probe. Four (4) variables were tested including the jet velocity, solids feed rate into the jet, the riser velocity, and overall CFB circulation rate over 8 distinct test cases with the central, or base case, repeated each time the test series was conducted. In addition to the experimental measurements made, the entire riser with a side feed jet of solids was simulated using the Eulerian-Eulerian computer model MFIX.

42 ENGINEERING↗

Factors in reactor design for carbon dioxide capture with solid, regenerable sorbents

Fossil-fuel burning power plants, which produce a substantial amount of electric power within the United States, are point sources that can emit significant quantities of carbon dioxide (CO2). In a carbon sequestration scenario, the CO2 must first be captured from the point source, or flue gas, and then be permanently stored. Since the capture/separation step dominates the cost of sequestration, various capture/separation technologies are being investigated, and regenerable, solid sorbents are the basis for one promising technique for capturing CO2 from flue gas. The solid sorbent must be able to absorb the CO2 in the first step and then be regenerated by releasing the CO2 in the second step. Due to the low operating pressure of a conventional pulverized coal-fired combustor and its subsequent low partial pressure of CO2, it is envisioned that temperature swing absorption is applicable to the sorbent capture technology. Various CO2 capture sorbents are being examined in this research area, for example physical adsorbents as well as chemical absorbents. However, with respect to process development, various reactor configurations are presently being considered. The reactor designs range from stationary beds of sorbent to those systems where the sorbent is transported between the absorber and regenerator. Emphasis is placed on design implications of employing a regenerable solid sorbent system. Key sorbent parameters required for the sorbents have been identified, including the heat of adsorption, heat capacity of the solid, delta CO2 loading between the absorption and regeneration steps, and any role co-sorption of competitive gases, such as moisture, may play. Other sorbent properties, such as the effect of acid gases within the flue gas or the attrition of the sorbent, must be considered in the reactor design. These factors all impact the reactor design for a particular type of sorbent. For a generic sorbent, reactor designs have been formulated, including a stationary, isothermal reactor, a fluidized bed, and a moving bed. Through calculations, benefits and disadvantages of the designs have been outlined. The implication of the sorbent properties (and thus desired experimental information) on sorbent reactor design are described, and recommendations for operation of these types of capture systems are discussed.

20 FOSSIL-FUELED POWER PLANTS↗

THE PRODUCT CONSISTENCY TEST HOW AND WHY IT WAS DEVELOPED

The Product Consistency Test (PCT), American Society for Testing Materials (ASTM) Standard C1285, is currently used world wide for testing glass and glass-ceramic waste forms for high level waste (HLW), low level waste (LLW), and hazardous wastes. Development of the PCT was initiated in 1986 because HLW glass waste forms required extensive characterization before actual production began and required continued characterization during production ({ge}25 years). Non-radioactive startup was in 1994 and radioactive startup was in 1996. The PCT underwent extensive development from 1986-1994 and became an ASTM consensus standard in 1994. During the extensive laboratory testing and inter- and intra-laboratory round robins using non-radioactive and radioactive glasses, the PCT was shown to be very reproducible, to yield reliable results rapidly, to distinguish between glasses of different durability and homogeneity, and to easily be performed in shielded cell facilities with radioactive samples. In 1997, the scope was broadened to include hazardous and mixed (radioactive and hazardous) waste glasses. In 2002, the scope was broadened to include glass-ceramic waste forms which are currently being recommended for second generation nuclear wastes yet to be generated in the nuclear renaissance. Since the PCT has proven useful for glass-ceramics with up to 75% ceramic component and has been used to evaluate Pu ceramic waste forms, the use of this test for other ceramic/mineral waste forms such as geopolymers, hydroceramics, and fluidized bed steam reformer mineralized product is under investigation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.