Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

SU-E-T-25: A Dosimetric Comparison of Three-Dimension Conformal and Intensity-Modulated Radiation Therapy in Esophageal Cancer

Purpose: dosimetric comparison of 3DCRT and IMRT in 9 esophageal cancer. The aim of this paper is to know which of these two techniques is dosimetrically more favorable dosimetrically at both the CTV coverage and dose obtained in the relevant organs at risk, in this case, lungs and heart, as the spinal cord received in all cases below 45 Gy. Methods: we chose 9 patients from our center (CHN) with the same type of esophageal cancer and in which the prescribed dose was the same, 54 Gy. For these treatments we have used the same fields and the same angles (AP (0 °), OPD (225°–240°) and OPI (125°–135°)).All plans have been implemented using Eclipse (version 11.0) with AAA( Analytical Anisotropic Algorithm )(Version 11.0.31). Results: To analyze the coverage of the CTV, we have evaluated the D99% and found that the average dose received by 99% of CTV with IMRT is 53.8 ± 0.4 Gy (99.6% of the prescribed dose) and the mean value obtained with 3DCRT is 52.3 ± 0.6 Gy (96.8% of the prescribed dose).The last data analyzed was the D2% of PTV, a fact that gives us information on the maximum dose received by our PTV. D2% of the PTV for IMRT planning is 55.4 ± 0.4 Gy (102.6% of the prescribed dose) and with 3DCRT is 56.8 ± 0.7 Gy (105.2% of the prescribed dose).All parameters analyzed at risk organs (V30, V40, V45 and V50 for the case of heart and V5, V10, V15 and V20 for the case of the lungs) provide us irradiated volume percentages lower in IMRT than 3DCRT. Conclusion: IMRT provides a considerable improvement in the coverage of the CTV and the doses to organs at risk.

60 APPLIED LIFE SCIENCES↗

Tools of the Future: How Decision Tree Analysis Will Impact Mission Planning

The universe is infinitely complex; however, the human mind has a finite capacity. The multitude of possible variables, metrics, and procedures in mission planning are far too many to address exhaustively. This is unfortunate because, in general, considering more possibilities leads to more accurate and more powerful results. To compensate, we can get more insightful results by employing our greatest tool, the computer. The power of the computer will be utilized through a technology that considers every possibility, decision tree analysis. Although decision trees have been used in many other fields, this is innovative for space mission planning. Because this is a new strategy, no existing software is able to completely accommodate all of the requirements. This was determined through extensive research and testing of current technologies. It was necessary to create original software, for which a short-term model was finished this summer. The model was built into Microsoft Excel to take advantage of the familiar graphical interface for user input, computation, and viewing output. Macros were written to automate the process of tree construction, optimization, and presentation. The results are useful and promising. If this tool is successfully implemented in mission planning, our reliance on old-fashioned heuristics, an error-prone shortcut for handling complexity, will be reduced. The computer algorithms involved in decision trees will revolutionize mission planning. The planning will be faster and smarter, leading to optimized missions with the potential for more valuable data.

Otterstatter, Matthew R.↗

Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Implementation of A Small Satellite Systems Engineering Webinar Series: A Collaboration Between the United Nations Office for Outer Space Affairs and the National Aeronautics and Space Administration

The United Nations Office for Outer Space Affairs (UNOOSA) in collaboration with the National Aeronautics and Space Administration (NASA) established a webinar series on NASA systems engineering standards and practices for the purpose of sharing knowledge in this area. UNOOSA’s “Access to Space for All” initiative provides capacity-building opportunities in space science, technology, and space applications for United Nations member states. Due to the cooperation among established space actors, the United Nations, and emerging space entities, the initiative enables students from developing countries from all over the world to carry out projects using technologies and space applications. Through NASA’s Small Spacecraft Systems Virtual Institute (S3VI), the four-part webinar series was designed to cover basic systems engineering and project management skills that are fundamental to planning, developing, and implementing an experiment or a space project and that serve as critical knowledge for those engaged in space activities, whether as a designer, builder, or manager of space infrastructure and services. The first series of webinars was convened over the course of November 2023 through February 2024.

Systems Engineering↗

Fiber-reinforced ceramic composites for Earth-to-orbit rocket engine turbines

Fiber reinforced ceramic matrix composites (FRCMC) are emerging materials systems that offer potential for use in liquid rocket engines. Advantages of these materials in rocket engine turbomachinery include performance gain due to higher turbine inlet temperature, reduced launch costs, reduced maintenance with associated cost benefits, and reduced weight. This program was initiated to assess the state of FRCMC development and to propose a plan for their implementation into liquid rocket engine turbomachinery. A complete range of FRCMC materials was investigated relative to their development status and feasibility for use in the hot gas path of earth-to-orbit rocket engine turbomachinery. Of the candidate systems, carbon fiber-reinforced silicon carbide (C/SiC) offers the greatest near-term potential. Critical hot gas path components were identified, and the first stage inlet nozzle and turbine rotor of the fuel turbopump for the liquid oxygen/hydrogen Space Transportation Main Engine (STME) were selected for conceptual design and analysis. The critical issues associated with the use of FRCMC were identified. Turbine blades were designed, analyzed and fabricated. The Technology Development Plan, completed as Task 5 of this program, provides a course of action for resolution of these issues.

Brockmeyer, Jerry W.↗

Evolution and Reengineering of NASA's Flight Dynamics Facility (FDF)

The NASA Goddard Space Flight Center's Flight Dynamics Facility (FDF) is a multimission support facility that performs ground navigation and spacecraft trajectory design services for a wide range of scientific satellites. The FDF also supports the NASA Space Network by providing orbit determination and tracking data evaluation services for the Tracking Data Relay Satellite System (TDRSS). The FDF traces its history to early NASA missions in the 1960's, including navigation support to the Apollo lunar missions. Over its 40 year history, the FDF has undergone many changes in its architecture, services offered, missions supported, management approach, and business operation. As a fully reimbursable facility (users now pay 100% of all costs for FDF operations and sustaining engineering activities), the FDF has faced significant challenges in recent years in providing mission critical products and services at minimal cost while defining and implementing upgrades necessary to meet future mission demands. This paper traces the history of the FDF and discusses significant events in the past that impacted the FDF infrastructure and/or business model, and the events today that are shaping the plans for the FDF in the next decade. Today's drivers for change include new mission requirements, the availability of new technology for spacecraft navigation, and continued pressures for cost reduction from FDF users. Recently, the FDF completed an architecture study based on these drivers that defines significant changes planned for the facility. This paper discusses the results of this study and a proposed implementation plan. As a case study in how flight dynamics operations have evolved and will continue to evolve, this paper focuses on two periods of time (1992 and the present) in order to contrast the dramatic changes that have taken place in the FDF. This paper offers observations and plans for the evolution of the FDF over the next ten years. Finally, this paper defines the mission model of the future for the FDF based on NASA's current mission list and planning for the Constellation Program. As part of this discussion the following are addressed: the relevance and benefits of a multi-mission facility for NASA's navigation operations in the future; anticipated technologies affecting ground orbit determination; continued incorporation of Commercial Off-the-shelf (COTS) software into the FDF; challenges of a business model that relies entirely on user fees to fund facility upgrades; anticipated changes in flight dynamics services required; and considerations for defining architecture upgrades given a set of cost drivers.

Stengle, Thomas↗

SU-F-T-47: MRI T2 Exclusive Based Planning Using the Endocavitary/interstitial Gynecological Benidorm Applicator: A Proposed TPS Library and Preplan Efficient Methodology

Purpose: ABS and GEC-ESTRO have recommended MRI T2 for image guided brachytherapy. Recently, a new applicator (Benidorm Template, TB) has been developed in our Department (Rodriguez et al 2015). TB is fully MRI compatible because the Titanium needles and it allows the use of intrauterine tandem. Currently, TPS applicators library are not currently available for non-rigid applicators in case of interstitial component as the TB.The purpose of this work is to present the development of a library for the TB, together with its use on a pre-planning technique. Both new goals allow a very efficient and exclusive T2 MRI based planning clinical TB implementation. Methods: The developed library has been implemented in Oncentra Brachytherapy TPS, version 4.3.0 (Elekta) and now is being implemented on Sagiplan v 2.0 TPS (Eckert&Ziegler BEBIG). To model the TB, free and open software named FreeCAD and MeshLab have been used. The reconstruction process is based on three inserted A-vitamin pellets together with the data provided by the free length. The implemented preplanning procedure is as follow: 1) A MRI T2 acquisition is performed with the template in place just with the vaginal cylinder (no uterine tube nor needles). 2) The CTV is drawn and the required needles are selected using a developed Java based application and 3) A post-implant MRI T2 is performed. Results: This library procedure has been successfully applied by now in 25 patients. In this work the use of the developed library will be illustrated with clinical examples. The preplanning procedure has been applied by now in 6 patients, having significant advantages: needle depth estimation, needle positions and number are optimized a priori, time saving, etc Conclusion: TB library and pre-plan techniques are feasible and very efficient and their use will be illustrated in this work.

60 APPLIED LIFE SCIENCES↗

Planning and Execution for Front Delineation and Tracking with Multiple Underwater Vehicles

This work describes a planning architecture for a heterogeneous fleet of marine assets as well as a method for detecting and tracking ocean fronts using multiple autonomous underwater vehicles. Multiple vehicles — equally-spaced along the expected frontal boundary — complete near parallel transects orthogonal to the front. Lateral gradients are used to determine the location of the front crossing from each individual vehicle transect by detecting a change in the observed water property. Adaptive control of the vehicles ensure they remain perpendicular to the estimated frontal boundary as it evolves over time. This method was demonstrated in several experiment periods totaling weeks, in and around Monterey Bay, California in May and June of 2017. We discuss the challenges associated with the implementation of the planning system. We show the capability of this method for repeated sampling across a dynamic two-dimensional ocean front using a fleet of three types of platforms: short-range Iver AUVs, Tethys-Class Long-Range AUVs, and Seagliders. This method extends to tracking gradients of different properties using a variety of vehicles.

Chavez, Francisco P.↗

A Process for Technology Prioritization in a Competitive Environment

This slide presentation reviews NASA's process for prioritizing technology requirements where there is a competitive environment. The In-Space Propulsion Technology (ISPT) project is used to exemplify the process. The ISPT project focuses on the mid level Technology Readiness Level (TRL) for development. These are TRL's 4 through 6, (i.e. Technology Development and Technology Demonstration. The objective of the planning activity is to identify the current most likely date each technology is needed and create ISPT technology development schedules based on these dates. There is a minimum of 4 years between flight and pacing mission. The ISPT Project needed to identify the "pacing mission" for each technology in order to provide funding for each area. Graphic representations show the development of the process. A matrix shows which missions are currently receiving pull from the both the Solar System Exploration and the Sun-Solar System Connection Roadmaps. The timeframes of the pacing missions technologies are shown for various types of propulsion. A pacing mission that was in the near future serves to increase the priority for funding. Adaptations were made when budget reductions precluded the total implementation of the plan.

Stephens, Karen↗

MO-B-BRB-00: Optimizing the Treatment Planning Process

The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.

60 APPLIED LIFE SCIENCES↗

MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.

60 APPLIED LIFE SCIENCES↗

MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.

60 APPLIED LIFE SCIENCES↗

MO-B-BRB-03: Systems Engineering Tools for Treatment Planning Process Optimization in Radiation Medicine

The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.

60 APPLIED LIFE SCIENCES↗

Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary

The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.

Klus, W. J.↗

Technology Thrust for Future Earth Science Applications

This paper presents NASA's recent direction to invest in the critical science instrument and platform technologies in order to realize more reliable, frequent and versatile missions for future Earth Science measurements. Traditionally, NASA's Earth Science Enterprise has developed and flown science missions that have been large in size, weight and volume. These missions have taken much longer implementation due to technology development time and have carried a large suite of instruments on a large-size spacecraft. NASA is also facing an era where the budget for the future years is more or less flat and the possibility for any major new start does not vividly appear on the horizon. Unfortunately, the scientific goals have not shrunk to commensurate with the budget constraints. In fact, the challenges and scientific appetite in search of answers to a score of outstanding questions have been gradually expanding. With these factors in mind, for the last three years NASA has been changing its focus to concentrate on how to take advantage of smaller missions by relying on industry, and minimizing the overall life cycle by infusing technologies that are being developed independently of any planned mission's implementation cycle. The major redirection of early investment in the critical technologies should have its rewards and significantly reduce the mission development period. Needless to say, in the long run this approach should save money, minimize risk, promote or encourage partnering, and allow for more frequent missions or earth science measurements to occur. This paper gives an overview of some of the identified crucial technologies and their intended applications for meeting the future Earth Science challenges.

Habib, Shahid↗

National Electric Vehicle Infrastructure Formula Program (ANNUAL REPORT | PLAN YEAR 2023–2024)

The 2021 Infrastructure Investment and Jobs Act, also known as the Bipartisan Infrastructure Law (BIL), invests $\$$7.5 billion to build out a national electric vehicle (EV) charging network and created the Joint Office of Energy and Transportation (Joint Office) to “study, plan, coordinate, and implement issues of joint concern between the two agencies.” The BIL represents a historic effort to electrify the U.S. transportation system, which has significant potential to reduce U.S. greenhouse gas emissions and help tackle the climate crisis. The U.S. transportation sector accounts for one-third of the nation’s greenhouse gas emissions—the largest share of all primary sectors, including electricity production, industry, commercial and residential, and agriculture. The National Electric Vehicle Infrastructure (NEVI) Formula Program, one of the BIL funding programs, was launched in February 2022, providing nearly $\$$5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of EV charging stations beginning with designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with an emphasis on the Interstate Highway System. The funding is made available to the states in allocations each year pending FHWA certification of the state’s annual deployment plan. The NEVI program is in its third year, so there's a lot to celebrate. As of July 2024, 39 states have released solicitations for their NEVI programs and eight states have opened their first NEVI-funded stations (61 ports in total), which have already powered thousands of charging sessions for EV drivers across America. Additional stations are in the pipeline with more than 2,500 additional ports having been awarded or conditionally awarded by the states. All states released their Fiscal Year (FY) 2024 deployment plan updates to reflect the new minimum requirements and guidance, and several states added newly designated EV AFCs in their FY 2024 deployment plan updates, bringing the total AFC network of EV corridors to more than 81,000 miles.

33 ADVANCED PROPULSION SYSTEMS↗

A PI’s Guide to Analog Research

Congratulation on being awarded a grant to conduct research in a spaceflight analog! NASA funded research in a Human Research Program (HRP) managed analog environment is very different from research in a traditional laboratory. This presentation will provide a guide to help investigators successfully plan studies for integration and implementation in an HRP analog platform. There are many things to consider when planning a study for implementation in an analog facility and campaign or mission. How do you get from grant approval to data analysis? This is where HRP’s Research Operations and Integration (ROI) team comes in. The ROI team works with sponsoring HRP elements and PI teams to capture requirements and help the PI teams through the phases of research complement development, integration and implementation. A complement is comprised of a group of studies requiring a common platform and/or scenario that are able to be integrated on a noninterference basis for implementation. Properly defining and documenting requirements and study needs is crucial in successful integration and implementation. This presentation will outline and provide the information needed for PI teams to understand the integration process and the role of the ROI team in the successful integration and implementation of their study. Topics to be discussed will include but not be limited to science requirement definition and documentation, NASA IRB submissions, subject recruitment, screening and selection, study integration process, efficiency in data collection and data sharing, daily crew schedules, hardware and software shipping, receipt and checkout, biological sample collection, mission support, data management and receipt of data.

B. Caldwell↗

ARIM-1: The Atmospheric Refractive Index Measurements Sounding Rocket Mission

A conceptual design study of the ARIM-1 sounding rocket mission, whose goal is to study atmospheric turbulence in the tropopause region of the atmosphere, is presented. The study was conducted by an interdisciplinary team of students at the University of Alaska Fairbanks who were enrolled in a Space Systems Engineering course. The implementation of the ARIM-1 mission will be carried out by students participating in the Alaska Student Rocket Program (ASRP), with a projected launch date of August 1997. The ARIM-1 vehicle is a single stage sounding rocket with a 3:1 ogive nose cone, a payload diameter of 8 in., a motor diameter of 7.6 in., and an overall height of 17.0 ft including the four fins. Emphasis is placed on standardization of payload support systems. The thermosonde payload will measure the atmospheric turbulence by direct measurement of the temperature difference over a distance of one meter using two 3.45-micron 'hot-wire' probes. The recovery system consists of a 6 ft. diameter ribless guide surface drogue chute and a 33 ft. diameter main cross parachute designed to recover a payload of 31 pounds and slow its descent rate to 5 m/s through an altitude of 15 km. This document discusses the science objectives, mission analysis, payload mechanical configuration and structural design, recovery system, payload electronics, ground station, testing plans, and mission implementation.

Ruiz, B. Ian↗