Search NASA⌕ Search

SEARCH · Search NASA

Results for “Logistics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Simulating Pelletization Strategies to Reduce the Biomass Supply Risk at America’s Biorefineries

Demand for cellulosic ethanol and other advanced biofuels has been on the rise, due in part to federal targets enacted in 2005 and extended in 2007. The industry faces major challenges in meeting these worthwhile and ambitious targets. The challenges are especially severe in the logistics of timely feedstock delivery to biorefineries. Logistical difficulties arise from seasonal production that forces the biomass to be stored in uncontrolled field-side environments. In this storage format physical difficulties arise; transportation is hindered by the low bulk density of baled biomass and the unprotected material can decay leading to unpredictable losses. Additionally, uncertain yields and contractual difficulties can exacerbate these challenges making biorefineries a high-risk venture. Investors’ risk could limit business entry and prevent America from reaching the targets. This paper explores pelletizer strategies to convert the lignocellulosic biomass into a denser form more suitable for storage. The densification of biomass would reduce supply risks, and the new system would outperform conventional biorefinery supply systems. Pelletizer strategies exhibit somewhat higher costs, but the reduction in risk is well worth the extra cost if America is to grow the advanced biofuels industry in a sustainable manner.

09 BIOMASS FUELS↗

Electronic health record analysis via deep poisson factor models

Electronic Health Record (EHR) phenotyping utilizes patient data captured through normal medical practice, to identify features that may represent computational medical phenotypes. These features may be used to identify at-risk patients and improve prediction of patient morbidity and mortality. We present a novel deep multi-modality architecture for EHR analysis (applicable to joint analysis of multiple forms of EHR data), based on Poisson Factor Analysis (PFA) modules. Each modality, composed of observed counts, is represented as a Poisson distribution, parameterized in terms of hidden binary units. In-formation from different modalities is shared via a deep hierarchy of common hidden units. Activation of these binary units occurs with probability characterized as Bernoulli-Poisson link functions, instead of more traditional logistic link functions. In addition, we demon-strate that PFA modules can be adapted to discriminative modalities. To compute model parameters, we derive efficient Markov Chain Monte Carlo (MCMC) inference that scales efficiently, with significant computational gains when compared to related models based on logistic link functions. To explore the utility of these models, we apply them to a subset of patients from the Duke-Durham patient cohort. We identified a cohort of over 12,000 patients with Type 2 Diabetes Mellitus (T2DM) based on diagnosis codes and laboratory tests out of our patient population of over 240,000. Examining the common hidden units uniting the PFA modules, we identify patient features that represent medical concepts. Experiments indicate that our learned features are better able to predict mortality and morbidity than clinical features identified previously in a large-scale clinical trial.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Evaluating Opportunities for a Circular Economy: An Investigation of Economic and Decision-Making Factors Underlying Recycling, Reusing and Remanufacturing Habits in U.S. Consumers and Manufacturers

Aluminum is increasingly used in consumer products and in lightweighting applications for airplanes, passenger cars and other vehicles. However, smelting primary aluminum is an energy-intensive process, and advanced low-energy smelting technologies have not yet been successfully scaled up to commercial production. Another way to reduce energy consumption associated with aluminum use is to increase the amount of secondary aluminum (recovered from manufacturing scrap and from recycled products) used as a raw material, thereby increasing the circularity of aluminum flows. This too has proven difficult due to the relatively low rates of recycling for most aluminum-containing products in the U.S., and the inevitable alloy mixing that occurs when end-of-life products are broken down during recycling. We previously investigated strategies for increasing secondary aluminum use, within limitations imposed by the presence of alloying elements and alloy requirements for new products. In this work, we provide context and assess the feasibility of those strategies by investigating established patterns and attitudes around recycling, remanufacturing, and other methods that promote circular material flows. Our objective is to identify technological, logistical, economic, and other barriers that exist to implementing such methods in aluminum-intensive sectors. A secondary objective is to construct a hypothetical blue-sky scenario in which aluminum use in the U.S. approaches a fully circular material flow. The blue-sky scenario allows us to identify future barriers to increasing material flow circularity and to gauge the scenario's attainability relative to current industrial practice. Our focus goes beyond recycling, in which an end-of-life product is disassembled, processed, and then separated into its component materials which serve as inputs for new products. While common in the U.S. and globally, this type of recycling involves non-trivial energy expenditures in the scrapping and processing stages and leads to impure streams of mixed secondary materials that may not be feasible or economical to use. We also consider consumer and manufacturer practices including refurbishing, remanufacturing, repair and reuse. None of these practices require that products are broken down into separate material streams before reconstitution into new products; the energy requirements are therefore lower, and the secondary components potentially easier and more economical to use. We evaluate each of these methods in terms of their economic viability for the consumer, the (re-)manufacturing firm and the scrapping and recycling firm. We also investigate barriers to and drivers of these circular practices, with particular attention paid to consumer attitudes. Initial research indicates that for consumer recycling, convenience of the recycling system is of paramount importance, with pre-existing attitudes towards recycling on a personal and community level almost as important. On the manufacturer side, a variety of logistical and economic barriers exist to instituting widespread product take-back and refurbishment programs. To better understand these barriers and how they can be overcome, we investigate several U.S. manufacturers that currently operate take-back, refurbishment and repair programs for their products, and conduct a review of similar programs in European countries where such programs are mandated by law rather than being conducted voluntarily.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Geothermal Drilling: A Baseline Study of Nonproductive Time Related to Lost Circulation

A single production geothermal well costs up to seven million dollars and a typical geothermal field contains 10 to 20 wells for a development cost of potentially $140 million according to a Geothermal Resources Group study. Capital cost coupled with exploration and resource uncertainty lead to high upfront project risk. This study analyzed the time and cost of detailed geothermal drilling operations. We found the largest cause of nonproductive time in geothermal wells is advancing through lost circulation zones, where drilling fluid is lost from the well. Mitigation measures implemented during lost circulation events can increase drilling time by a significant fraction of the drilling days. There is opportunity to reduce the drilling costs by addressing logistical inefficiencies and ineffective mitigation measures to minimize nonproductive time. This study reviewed daily drilling data for 38 geothermal wells drilled since 2009 in the U.S. The analysis presented here summarizes the lost circulation events identified in the available drilling data by assessing time per event, costs incurred, materials used, success of mitigation strategies, and resolution time. This study found that wells averaged over 100 hours of unprogrammed nonproductive time due to lost circulation, adding an estimated $185,000 to each well in rig costs. A plan for future research aimed at reducing lost circulation nonproductive time and cost is presented. operations. We found the largest cause of nonproductive time in geothermal wells is advancing through lost circulation zones, where drilling fluid is lost from the well. Mitigation measures implemented during lost circulation events can increase drilling time by a significant fraction of the drilling days. There is opportunity to reduce the drilling costs by addressing logistical inefficiencies and ineffective mitigation measures to minimize nonproductive time. This study reviewed daily drilling data for 38 geothermal wells drilled since 2009 in the U.S. The analysis presented here summarizes the lost circulation events identified in the available drilling data by assessing time per event, costs incurred, materials used, success of mitigation strategies, and resolution time. This study found that wells averaged over 100 hours of unprogrammed nonproductive time due to lost circulation, adding an estimated $185,000 to each well in rig costs. A plan for future research aimed at reducing lost circulation nonproductive time and cost is presented.

15 GEOTHERMAL ENERGY↗

The EGS Collab Hydroshear Experiment at the Sanford Underground Research Facility – Siting Criteria and Evaluation of Candidate Sites

The objective of the EGS Collab project is to establish a suite of intermediate-scale (~10-20 m) field test beds coupled with stimulation and interwell flow tests to provide a basis to better understand fracture stimulation methods, resulting fracture geometries, and processes that control heat transfer between rock and stimulated fractures. Experiment 1 of the project is being conducted at a depth of ~1.5 km in the Sanford Underground Research Facility (SURF) on the 4850 Level (ft. below the ground surface). The stimulation method planned for Experiment 2 of this project is hydroshearing of an existing natural fracture. In siting this experiment, there are several key geologic criteria that need to be met. These include: 1) the fracture should be least 10 m in length so that it could be intersected by two boreholes that are spaced that far apart; 2) it should be optimally oriented relevant to the stress field so that it is critically stressed; 3) the site should have appropriate stress conditions (not too shallow a depth); 4) the fracture should have sufficient permeability to allow for prestimulation flow testing, but not too high a permeability that would preclude permeability enhancement via shear stimulation; 5) the fracture should not intersect other features (permeable fractures, boreholes, adjacent drifts) that could serve as major leak-off zones; 6) the site should not be complicated by geology (a single lithology would be preferred). In addition, there are logistical criteria that will also influence site selection, including: 1) site availability/access, 2) logistical support, e.g., power, internet, water, operating rail system; 3) drift size and orientation compatible with drilling and site operations; 4) appropriate ground support. There are only two deep levels at SURF that can be accessed by the Yates Shaft: the 4100 and the 4850, so we limited our search to these two levels. Currently, three candidate sites are being evaluated: the existing Experiment 1 site and its surroundings on the West Drift on the 4850 level, and two locations on the 4100 level. This paper will evaluate advantages, disadvantages, and risks associated with these three options at SURF.

EGS Collab, Sanford Underground Research Facility↗

Evaluating Safeguards Statistical Assumptions via Stochastic Simulation

Herein, the authors built and tested a stochastic simulation to estimate achieved detection probabilities (DPs) on a stratum basis, over a tailorable range of diverted amounts from 0 to 2 SQ, using typical IAEA inspection data: i.e., SQ in stratum, number of items, number of gross/partial/bias defect measurements conducted, and realistic relative standard deviation (RSD) values for typical IAEA verification measurements. For bulk strata, the model calculates achieved DP at 0.01 SQ diversion increments; for item strata, the model calculates DP using the smallest realistic diversion increment (e.g., a plate, pin, or coupon). After successfully benchmarking against IAEA deterministic models, the simulation was used to test the sensitivity of DP to certain standard assumptions and selected input parameters. First, the equal defect assumption was tested; the results suggest significant complexity in the effectiveness of partial defect measurements. Next, the authors explored the sensitivity of DP to the assumed RSD of attribute tests. Then, the authors compared non-normal models for instrument performance (e.g., logistic, step, or arbitrary functions) to the typical results from a normal distribution (characterized by RSD). This last comparison was supplemented with experimentally derived performance data for an HM-5. The HM-5 was used to make enrichment measurements on both LEU and HEU MTR fuel elements as plates were removed, and the results fit with logistic and step curves and applied in the simulation. These stochastic DP results were compared to DP estimates from a deterministic model assuming a normal curve and typical RSD, yielding insights that could improve effectiveness in the field. These early results illustrate the potential of stochastic models to better understand achieved DP and to improve safeguards effectiveness.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Multimodal Freight Energy Model for Emerging Freight Technology Analysis

While freight movement represents a small portion of the volume in the transportation sector, they are a critical contributor for energy consumed in that sector. To reduce logistics costs, energy consumption and negative environmental impact, emerging technologies, such as digitalization of logistics and alternative powertrain, have been developed and extended applications in freight. These trends are expected to grow and provide opportunities for greater efficiencies in freight movement and corresponding energy use. Still, the complexity of freight systems present challenges in evaluating these benefits, especially in the multimodal inter-city freight. Addressing the research need, this paper develops a multimodal freight energy modeling framework for the analysis of emerging freight technology scenarios. The framework is a bi-level optimization problem: network cost minimization problem (lower-level) and energy minimization problem (upper-level). The lower-level problem is a mode-path assignment problem in multimodal inter-city freight networks, where commodity-specific congestion effects on trans-shipment links are considered. For this model, an inverse modeling approach is applied to infer parameters of the lower-level model. The upper-level problem is designed to search for an optimal scenario that has the lowest energy consumption among different levels of technology applications. The proposed model is empirically tested to analyze truck load-pooling and multimodal load-pooling scenarios through stand-alone and mixed applications using freight shipments originating from or destined to the Chicago region. This framework can be used to explore the impact of emerging freight technologies on mode-path freight flow and energy consumption in the national multimodal freight network.

ADVANCED PROPULSION SYSTEMS↗

Clean-out and Reuse of GCEP Facilities at Portsmouth

PORTS began operations in 1956 to enrich uranium for both civilian and military use. It operated under Goodyear Atomic Corporation and Lockheed-Martin as a government-owned contractor-operated facility until the formation of the United States Enrichment Corporation (USEC) as a government corporation in 1993. In 1998, USEC was privatized as a publicly traded corporation. USEC leases the Portsmouth and Paducah GDPs from the U.S. Department of Energy (DOE). Enrichment operations were terminated at Portsmouth in 2001, although USEC continues to lease and maintain the Portsmouth GDP in Cold Shutdown and conduct some DOE projects there. LPP found that removal of old equipment to allow reuse of a facility can present unexpected challenges. Classified components create significant logistics issues. In this case, teamwork and attention to detail by USEC, LATA/Parallax, and DOE resulted in solutions and success. Lessons learnt: - Transportation logistics are particularly important when shipping waste streams with special requirements. - Investment in extra equipment yields tangible benefits where other resources (cleared drivers) are scarce. - An early start to providing specially qualified drivers, in this case providing security clearances, is essential. Availability is limited, and the time required to qualify new drivers may be lengthy. - A dedicated communications station, rather than reliance on existing resources (shift superintendent), is invaluable.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial Process and Expected Outcomes for Preliminary Identification of Routes to Yucca Mountain, Nevada

The Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for developing and implementing a safe, secure and efficient transportation system to ship spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from commercial and DOE sites to the proposed Yucca Mountain repository. The Office of Logistics Management (OLM) within OCRWM has begun to work with stakeholders to identify preliminary national suites of highway and rail routes that could be used for future shipments OLM is striving to develop a planning-basis set of routes that will support long-lead time logistical analyses (i.e., five or more years before shipment). The results will represent a starting point for discussions between DOE and corridor jurisdictions, and for shipping arrangements between DOE and carriers. This fulfills a recommendation of the National Academy of Sciences report on SNF and HLW transportation that 'DOE should identify and make public its suite of preferred highway and rail routes for transporting spent fuel and high level waste to a federal repository as soon as practicable to support State, Tribal and local planning, especially for emergency responder preparedness'. OLM encourages and supports participation of program stakeholders in a process to identify suites of national routes. The principal objective is to identify preliminary suites of national routes that reflect responsible consideration of the interests of a broad cross-section of stakeholders. This will facilitate transportation planning activities to help meet program goals, including providing an advanced planning framework for State and Tribal authorities; supporting a pilot program for providing funding under Section 180(c) of the Nuclear Waste Policy Act; allowing sufficient time for security and operational reviews in advance of shipments to Yucca Mountain; and supporting utility planning and readiness for transportation operations. Concepts for routing and routing criteria have been considered by several state regional groups supported by cooperative agreements with OLM. OCRWM is also working with other Federal agencies, transportation service providers and others involved in the transportation industry to ensure the criteria are consistent with operating practices and regulations. These coordination efforts will ensure the experience, knowledge, and expertise of those involved are considered in the process to identify the preliminary national suites of routes. This paper describes the current process and timeline for preliminary identification and analyses of routes. In conclusion: The path toward developing a safe, secure, and efficient transportation system for shipments of SNF and HLW to Yucca Mountain will require the participation of many interested parties. Real cooperative planning is sometimes challenging, and requires a commitment from all involved parties to act in good faith and to employ their best efforts in developing mutually beneficial solutions. Identifying routes to the proposed repository at Yucca Mountain, and engaging in planning and preparedness activities with affected jurisdictions and other stakeholders, will take time. OCRWM is committed to a cooperative approach that will ultimately enhance safety, security, efficiency and public confidence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the use of genetic algorithm to optimize industrial assets lifecycle management under safety and budget constraints

The purpose of this paper is to describe the method and tool dedicated to optimize investments planning for industrial assets. These investments may either be preventive maintenance tasks, asset enhancements or logistic investments such as spare parts purchases. The two methodological points to investigate in such an issue are: 1. The measure of the profitability of a portfolio of investments 2. The selection and planning of an optimal set of investments 3. The measure of the risk of a portfolio of investments The measure of the profitability of a set of investments in the IPOP tool is synthesised in the Net Present Value indicator. The NPV is the sum of the differences of discounted cash flows (direct costs, forced outages...) between the situations with and without a given investment. These cash flows are calculated through a pseudo-Markov reliability model representing independently the components of the industrial asset and the spare parts inventories. The component model has been widely discussed over the years but the spare part model is a new one based on some approximations that will be discussed. This model, referred as the NPV function, takes for input an investments portfolio and gives its NPV. The second issue is to optimize the NPV. If all investments were independent, this optimization would be an easy calculation, unfortunately there are two sources of dependency. The first one is introduced by the spare part model, as if components are indeed independent in their reliability model, the fact that several components use the same inventory induces a dependency. The second dependency comes from economic, technical or logistic constraints, such as a global maintenance budget limit or a safety requirement limiting the residual risk of failure of a component or group of component, making the aggregation of individual optimum not necessary feasible. The algorithm used to solve such a difficult optimization problem is a genetic algorithm. After a description of the features of the software a test case is presented showing the influence of the optimization algorithm parameters on its efficiency to find an optimal investments planning. (authors)

97 MATHEMATICS AND COMPUTING↗

Siting considerations for a deep borehole disposal facility - 15403

This paper describes considerations for siting and designing a facility for deep borehole disposal of spent nuclear fuel (SNF) and/or high-level radioactive waste (HLW). Technical considerations include geological, hydrogeochemical, and geophysical characteristics that are related to the suitability of the site for deep drilling and borehole construction, waste emplacement activities, waste isolation (seals and surrounding geology), and long-term safety of the deep borehole disposal system. Logistical factors to be considered include: local or regional availability of drilling contractors (equipment, services, and materials) capable of drilling a large-diameter hole to approximately 5,000 m depth; construction of surface facilities and waste handling and emplacement equipment; legal and regulatory requirements associated with drilling, operation, and post-closure; and access to transportation systems. Social and political considerations include the distance from population centers and the support or opposition of local and state entities and other stakeholders to the facility and its operations. These technical, logistical, and socio-political factors are examined in the context of a consent-based siting process for a deep disposal borehole, which would be the first phase in developing an operating facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska - 16147

Cape Thompson, Alaska, is located approximately 120 miles north of Kotzebue, Alaska, within the Ogotoruk Creek valley. The remote Alaskan location is also home to the US Atomic Energy Commission (AEC) Project Chariot study area. Project Chariot was part of the Plowshare Program, created in 1957 by the AEC to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. Between 1959 and 1962, AEC was responsible for over 40 pretest bio-environmental and geotechnical studies of the Cape Thompson area. Strong public opposition to the tests developed, which caused the project to be cancelled with no nuclear explosions ever conducted at the site. In the early 1960's, several deep boreholes were drilled to obtain subsurface, temperature, and high-explosive testing data. Refrigerated diesel was used as a drilling fluid to keep the boreholes open so that thermistors could measure subsurface temperatures. The test boreholes were named Able, Baker, Charlie, Dog, and X-1. In the summer of 2014, the US Department of Energy, Office of Legacy Management (LM) completed the remediation of remnant diesel at these sites. Prior to the 2014 remediation activities, LM conducted two separate characterization field studies to determine the nature and extent of the contamination from the 1960's drilling activities. In 2013, LM developed a remediation plan that was submitted and approved by the Alaska Department of Environmental Conservation (ADEC). The 2014 Project Chariot remediation had some unique logistical challenges and historic issues with stakeholders to overcome. Many of the historic issues centered on previous AEC scientific actions and a general mistrust of the government by the local stakeholders. Prior to and during the 2014 remediation work, an outreach campaign was implemented to discuss prior activities at the site and include stakeholders from Point Hope, Alaska, in the remediation-planning process. The remoteness of the region also provided unique logistical challenges. Because of the short field season, LM initiated several subcontracts over a year in advance. The field camp, heavy equipment, and soil storage containers were shipped by barge to the site. Personnel, food, and small materials were flown in by bush plane from Kotzebue, Alaska. Previous site characterization had identified diesel-range organics (DROs) as the primary contaminant. The cleanup levels for the site were provided by the Alaska Administrative Code (AAC) for the Arctic Zone region. The AAC cleanup level for DROs on gravel pads is 500 mg/kg and 12,500 mg/kg tundra in the arctic-zone region. To help determine the extent and direct soil excavation in the field, photoionization detectors (PIDs) were used for field screening. While the PID results provided rough limits for excavation, laboratory confirmation sampling was required to provide actual excavation guidance. All excavation locations remained open until laboratory results met AAC criteria and ADEC approved closure. The laboratory sample protocol required the bush plane to pick up samples almost daily and transfer them to Anchorage for analysis. In order to meet holding time requirements, all laboratory samples were analyzed on an expedited basis. Analytical results and ADEC approval notifications were e-mailed back to the site via satellite connection. A total of 202 laboratory analyses were needed to complete the remediation effort. At each location (Able, Baker, Charlie, Dog, and X-1), the boreholes were plugged and abandoned in accordance with ADEC regulations. Contaminated soil was excavated, and the material was placed in super-sacks and hauled to connex boxes located near the sea shore. Approximately 786 tons of material was removed and shipped by barge to the Columbia Ridge Landfill in Arlington, Oregon, for disposal. The well casings were cut and sealed below ground surface. Each location was graded to its original contours and reclaimed with native vegetation, and a geodetic survey was conducted. Tours with leaders of the Village of Point Hope and the land owner (Arctic Slope Regional Corporation) were conducted prior to the final demobilization. All remediation equipment and camp facilities were removed at the completion of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Design, Fabrication, and Test Program for NREL's Wave-Powered Desalination System: Preprint

Starting in 2018, the U.S. Department of Energy's Water Power Technologies Office (WPTO), initiated the development of a prize competition as a foundational investment of Powering the Blue Economy, The prize encouraged the development of small, modular, cost-competitive wave-powered desalination systems. The National Renewable Energy Laboratory (NREL) was tasked with managing the prize, known as the Waves to Water Prize (W2W), and providing technical input based on prior desalination research performed at the lab. NREL partnered with the Coastal Studies Institute (CSI) and Jennette's Pier in North Carolina for their expertise in deploying research articles at the Jennette's Pier research facility. The prize consisted of five stages that included high-level concept proposals, numerical modelling, site- specific design, subsystem prototyping, and a final ocean demonstration. Due to the logistical risks of installing numerous prototypes in the ocean at the same time, NREL was tasked with designing and building a test article to de- risk the final event. The test article design needed to represent the technologies expected in the final stage of the prize. This meant that the design was expected to follow the same rules as the competitors, providing CSI with an opportunity to practice installations and develop a final logistics plan prior to the final event. After concluding the W2W event in April 2022, the NREL test article was redeployed in August 2022 to better understand the challenges of anchoring wave energy converters (WECs) in shallow water conditions with breaking waves. For the Spanish version of this report, see NREL/CP-5700-88482 (https://www.nrel.gov/docs/fy24osti/88482.pdf).

deployment↗

Management of Metals from Decommissioning of Nuclear Facilities - 18411

The EDF group companies within the Cyclife platform have for decades performed treatment and recycling of metals. With different approaches but all considered international Good Practice, as valuable materials are recovered for safe recycling and volumes in the repositories for radioactive waste are saved. For an efficient decommissioning project, a well-defined waste management process is one of the critical paths, not least when it comes to routes for clearance and recycling of materials. It is easy to underestimate the complexity and bottlenecks caused by shortage of logistic space. In order to mitigate these risks, activities such as strengthening categorization, quantification and adopting different routes based on the material properties should be implemented. By categorization of the of waste and materials considered/classified as contaminated or potentially contaminated it is obvious that the management of the metals is a key parameter in nuclear decommissioning. Analyses performed by the EDF companies shows that a majority of the materials, classified as contaminated, from a BWR/PWR plant are metals. Experience gives that a high percentage of these metals from decommissioning can be subject to recycling either directly upon completion of the clearance process or after certain treatment. Non-technical key parameters like the regulatory requirements on applying the waste hierarchy, the impact on repository programs as well as, not at least, the regulatory and public acceptance of recycling of materials from the nuclear industry are, together with costs essential factors when forming the routing of metals and other waste materials from a decommissioning project. Today the EDF group companies are positioned to provide a wide range of services for management of the contaminated metals from decommissioning projects, spanning from industrial management of metals which directly will be subject general clearance after verification measurements up to decontamination and melting of selected reactor internals for recycling to public domain or within the nuclear industry. In this paper the typical waste material composition for BWR and PWR plants, the different ways to treat/manage the radioactive and potentially radioactive metals including a comparison of the different approach commonly used in a technical, logistical and economical perspectives. A few success stories will be resented as well as lessons learned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Next Generation System Analysis Model: Capabilities for Simulating a Waste Management System - 19131

The U.S. Department of Energy (DOE) Office of Nuclear Energy Office of Spent Fuel and Waste Disposition's Integrated Waste Management System (IWMS) program is applying integrated waste management system architecture analysis, system engineering, and decision analysis principles to inform potential future decisions regarding potential nuclear waste management system architectures. Architecture analyses of the IWMS are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all major aspects of the back end of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The system architecture analyses consider alternative disposition pathways for commercial spent nuclear fuel (SNF) being stored dry in at-reactor Independent Spent Fuel Storage Installations (ISFSIs) or wet in spent-fuel pools. One method for evaluating these alternatives is simulating the movement of SNF throughout the system components. Successfully simulating a system on the scale of a national waste management system requires - accurate baseline information (e.g., historic fuel discharges from reactors and dry storage loadings at reactor sites), - modeling all logistic interactions between components of the proposed system, and - tracking and reporting all relevant details regarding the simulation's execution. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool designed for the express purpose of modeling the IWMS. It is based on the Performance Analysis Tool, a simulation platform that has been used to model logistics for the Department of Defense and the Federal Emergency Management Agency. Using existing, government-owned software allows NGSAM developers to modify the software at the level of source code and to develop flexible usability and modeling solutions for developing and running simulations of the IWMS. NGSAM imports data from the Oak Ridge National Laboratory (ORNL) Unified Database (e.g., historic assembly information, thermal profiles for assembly heat, at-reactor dry storage loadings) to ensure that the simulation initializes with a realistic representation of the state of commercial SNF in the United States. NGSAM is designed with the flexibility to model and track the behavior of virtually any IWMS architecture assumptions or design considerations. For example, NGSAM can model multiple interim storage facilities or repositories or none at all. Similarly, all assumptions regarding shipment schedules, operating schedules, and reactor operation assumptions can be modeled and adjusted in NGSAM with relative ease. The development of NGSAM was targeted to waste management system analysts as the primary users. With that in mind, analysts from ORNL, Sandia National Laboratories (SNL), and Argonne National Laboratory (ANL) were intimately involved in the development process. That involvement extended beyond merely defining requirements. System analysts have been involved with design decisions and software benchmarking and tests, and they have provided subject-matter expertise where necessary. The result is a high degree of interaction between professional software developers and system analysts, with a multitude of benefits to both groups. This paper explores some of the underlying methodology of the agile software development process used in the creation of NGSAM. It illustrates the capabilities of NGSAM. Some example use cases are discussed as well, with relevant results providing context for how NGSAM is used by system analysts to gain a greater understanding of alternative waste management system architectures. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed-to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation of Radioactive Waste in Support of Ontario Power Generation's Darlington Nuclear Generating Station Refurbishment Project - 19384

Ontario Power Generation's (OPG) Darlington Nuclear Generating Station (DNGS) is currently executing a major refurbishment of the first of their four Candu reactors. As expected, the volumes of Low and Intermediate Level Waste (LILW) generated from this large-scale project have been significant. As a result, unique solutions were needed for the safe and efficient transportation of radioactive waste from the Darlington Nuclear Generating Station to OPG's Western Waste Management Facility for volume reduction and interim storage. OPG's Nuclear Waste Management Division and the Darlington Refurbishment Project worked together to identify unique radioactive waste transportation solutions. These solutions included staging and temporary storage facilities, new waste containers and specialized transportation packages, additional human resources and enhanced planning and logistics required to transport large volumes of routine and non-routine radioactive waste in a manner that minimized the impact on employee and public safety, project schedule and project costs. From a facilities perspective a shielded 'Marshalling Area' that allowed for loaded transportation packages to be staged was built on the Darlington site and a temporary licensed off-site radioactive waste storage facility close to the DNGS was contracted through a third party vendor. These two facilities allowed for more consistent and efficient schedules that limited radioactive waste shipments during off-hours and avoided peak traffic periods thereby limiting the risk to Refurbishment critical path activities. Special purpose-built transportation packages and waste containers were designed and fabricated to handle unique waste streams such as feeder pipes and other miscellaneous intermediate level waste items associated with reactor dismantling. Twenty-four Type A qualified transportation packages mounted to six flat deck trailers were designed and fabricated to support the shipment of contaminated feeder pipes. An Intermediate Level Waste Utility Container (ILWUC) to be used in conjunction with the Type B qualified Trillium Transportation Package was designed and fabricated to handle unique intermediate level waste streams arising from the reactor dismantling process. Logistics software was used to plan the shipments to ensure waste transportation packages could be loaded, transported, unloaded and returned safely to the project site in a timely manner without impacting project schedules. Several shipping scenarios were simulated and adjusted using the software to ensure that the most efficient use of equipment and resources for the radioactive waste transportation aspects of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EPA's Suite of Tools for Managing Waste Following a Large-Scale Incident - 19420

Large-scale disasters have the potential to generate a significant amount of waste. For example, Hurricane Katrina and the Joplin Missouri tornado resulted in 100 million and 1.5 million cubic yards of waste respectfully. Man-made chemical, biological, radiological or nuclear (CBRN) incidents either by way of terrorism, war, or accidents have the potential to generate as much or more hazardous waste. Recovery is profoundly impacted by waste management issues. The quantification, segregation, transportation, and storage of waste can be an arduous and costly undertaking. Furthermore, these processes are intricately linked with decisions made throughout the recovery timeline. Therefore, the remediation, including waste management, must be holistically considered. Understanding these complex interactions can be facilitated by using models and tools that adhere to the 'system-of-systems' approach. To better understand and predict waste management issues the Environmental Protection Agency's (EPA's) Homeland Security Research Program (HSRP) is developing a suite of tools and resources for planning and recovery purposes. The waste management suite consists of four tools: - Incident Waste Decision Support Tool (I-WASTE): characterizes and produces order-of-magnitude estimates for the weight and volume of waste materials that may require management and/or disposal, as well as identifies and locates potential treatment and disposal facilities. - Waste Estimation Support Tool (WEST): estimates waste generated from remediation and cleanup activities following a wide-area radiological or biological incident; - Waste Storage and Staging Tool: identifies and prioritizes potential locations for staging and storing waste; - Waste Logistics Tool: estimates optimal routes with consideration to cost, time, and logistical requirements (e.g., resource demand, transportation type, access limitations, etc.) associated with transporting large volumes of waste from disaster-stricken areas to intermediate waste staging/temporary storage/on-site processing sites to off-site waste management facilities; and This paper will present EPA's waste management suite of tools, their purpose and application to large-scale incidents, and a case study demonstrating their use in a hypothetical scenario. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Custom Machine to Convey Radiologically Impacted Cohesive Soils to the Orion ScanSortSM System - 20382

An established method to reduce the volume of material required to be disposed of as radioactive waste is conveyor-based sorting of potentially radiologically impacted soils. With the Orion ScanSortSM system, potentially impacted soils are conveyed beneath radiation detectors and sorted into above and below criteria bins based on the detectors' response. Confident measurements can only be efficiently achieved when the soil column being conveyed has a reasonably consistent geometry. Highly cohesive soils present a very significant challenge as they tend to clump and adhere to the conveyor hopper, strike-off bar, and belt skirting. This causes voids and valleys in the soil column that affect the measurement geometry and reduce the confidence in the measurement. The reduction in confidence necessitates a longer residence time (i.e. reduction in conveyor belt speed and processing rates) or that the soils in highly unfavorable geometries be dispositioned as impacted or segregated for resurvey (should site logistics support that option). These outcomes may increase the volume of material required to be dispositioned as radiological waste and have a negative impact on project cost and schedule. To minimize impact to sorting operations, Wood designed and built a customized Extruder, to optimize the soil column prior to assay. The design was developed and refined to minimize the volume of highly cohesive soils presented in highly unfavorable geometries in the soil column in order to confidently assess and disposition such soils in a high-production environment. The Extruder is a customized 90 cm wide flat conveyor that has an oversized hopper with a pair of motor-driven rollers that force the soils in the hopper through an opening of adjustable height. The soils are extruded through the opening to produce a soil column that is ∼75 cm wide and ∼8-18 cm deep with a design rate of 225 metric tons/hr. The Extruder was recently deployed with the Orion ScanSort{sup SM} System to a site in northeast Ohio. The site has highly cohesive soils that result from the weathering of glacial sediments and consist of clay and clay loam, resulting in poor drainage and high moisture content. The project infrastructure only supported two bins of material (above and below criteria), which necessitated that soils with unfavorable geometries be discharged into the above criteria bin, along with material determined to have been contaminated. The Extruder was extremely successful in producing a stable soil column with favorable geometries for radiological assay. During production, less than 0.5% (by mass) of the soils processed were presented in unsatisfactory geometries requiring disposition as radioactive waste. The Extruder did not get clogged due to the cohesive soils (as is typical with conventional conveyors) and required very little maintenance, again minimizing impacts to sorting operations. The conveyor belt speed was operated at 14 cm/s with a typical belt loading of ∼109 kg/m resulting in a mean process rate of ∼49 metric tons/hr. The process rate was constrained by other project logistics, rather than by the capabilities of the Extruder, which was operated at less than 20% of the maximum design speed (75 cm/s). It is concluded that the Extruder is highly likely to produce a stable highly cohesive soil column suitable for efficient and confident radiological assay in production environments of 250 short tons/hr or more. The Extruder has the capability to drastically reduce the duration and costs of projects with radiologically impacted highly cohesive soils. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗