Search NASA⌕ Search

SEARCH · Search NASA

Results for “OPERATION AND MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Implementation Plan for Combined Heat and Power Systems VOLTTRON Controller: Performance Monitoring and Real-Time Commissioning Algorithm Verification

Building-integrated cooling, heating, and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV, and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of clean, efficient, reliable, and affordable next-generation integrated energy system. Previous report listed the components for which PM, real-time CxV, and AFDD algorithms will be developed, how the algorithms will be tested, and the metrics that will be used to validate the algorithms and their ease of deployment. Deployment of these algorithms in the field will result in a reduction in energy consumption of between 10% and 20% (for both CHP and conventional building systems). This report builds upon the previous report by detailing the process by which PNNL will implement performance monitoring and real-time commissioning algorithms for CHP systems in conjunction with the use of the VOLTTRON CHP economic dispatch agent in host facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The characteristic of evaporative cooling magnet for ECRIS

Compared with traditional de-ionized pressurized-water cooled magnet of ECRIS, evaporative cooling magnet has some special characteristics, such as high cooling efficiency, simple maintenance, and operation. The analysis is carried out according to the design and operation of LECR4 (Lanzhou Electron Cyclotron Resonance ion source No. 4, since July 2013), whose magnet is cooled by evaporative cooling technology. The insulation coolant replaces the de-ionized pressurized-water to absorb the heat of coils, and the physical and chemical properties of coolant remain stable for a long time with no need for purification or filtration. The coils of magnet are immersed in the liquid coolant. For the higher cooling efficiency of coolant, the current density of coils can be greatly improved. The heat transfer process executes under atmospheric pressure, and the temperature of coils is lower than 70 °C when the current density of coils is 12 A/mm{sup 2}. On the other hand, the heat transfer temperature of coolant is about 50 °C, and the heat can be transferred to fresh air which can save cost of water cooling system. Two years of LECR4 stable operation show that evaporative cooling technology can be used on magnet of ECRIS, and the application advantages are very obvious.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Power Converter Control Algorithm Design and Simulation for the NREL Next-Generation Drivetrain: July 8, 2013 - January 7, 2016

The National Renewable Energy Laboratory (NREL) and NREL Next-Generation Drivetrain Partners are developing a next-generation drivetrain (NGD) design as part of a Funding Opportunity Announcement award from the U.S. Department of Energy. The proposed NGD includes comprehensive innovations to the gearbox, generator, and power converter that increase the gearbox reliability and drivetrain capacity, while lowering deployment and operation and maintenance costs. A key task within this development effort is the power converter fault control algorithm design and associated computer simulations using an integrated electromechanical model of the drivetrain. The results of this task will be used in generating the embedded control software to be utilized in the power converter during testing of the NGD in the National Wind Technology Center 2.5-MW dynamometer. A list of issues to be addressed with these algorithms was developed by review of the grid interconnection requirements of various North American transmission system operators, and those requirements that presented the greatest impact to the wind turbine drivetrain design were then selected for mitigation via power converter control algorithms.

17 WIND ENERGY↗

Review of Time-Series Data for the Agra Interim Measure, Fall 2013

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at Agra, Kansas, from the 1950s to the early 1970s. No structures remain on the property, and the land is used for agricultural purposes, specifically wheat production. The property is currently owned by the Kyle Railroad Co. and is leased to Mr. Herb VanEaton. The Pro-Ag Marketing grain storage facility is directly south of the former CCC/USDA facility. In 1985, carbon tetrachloride was detected in groundwater samples collected from Agra public water supply wells PWS-3 and PWS-4, located approximately 2,000 ft south of the former CCC/USDA facility and approximately 1,800 ft south of the Pro-Ag Marketing Facility, at levels below the maximum contaminant level of 5.0 μg/L. In 1986, in response to an increase in carbon tetrachloride to 12 μg/L in well PWS-3, the city was required to remove both PWS-3 and PWS-4 from service. The Agra public water supply system is served by three other wells (PWS-1, PWS-2, and PWS-5) that are outside the area of contamination. In 2005, the Environmental Science Division of Argonne National Laboratory conducted a comprehensive investigation of potential contaminant source areas at Agra, on behalf of the CCC/USDA. Data collected during the 2005 investigation identified three primary source areas for the carbon tetrachloride contamination (Argonne 2006). One source is located on the former CCC/USDA property, and the other two sources are on property owned by Pro-Ag Marketing. In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA initiated source area cleanup as an interim measure (IM) in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup employs five large-diameter boreholes (LDBs) that were excavated by auger drilling. The purposes of these borings were to (1) physically remove soils impacted by carbon tetrachloride from the most contaminated area for treatment by onsite land farming and (2) provide locations for the installation of coupled soil vapor extraction (SVE) and air sparging (AS) wells to facilitate in situ treatment of the remaining carbon tetrachloride in the soils and groundwater. Construction data for the SVE wells, the AS wells, and groundwater and soil gas observation points installed to monitor the progress of the cleanup (as reported on the Kansas Review of Time-Series Data for the Agra Interim Measure 1-2 Version 01, 10/24/13 WWC-5 forms for these installations) are summarized in Table 1.1. The locations of the wells are shown in Figure 1.1. The IMWP/D was approved by the Kansas Department of Health and Environment in November 2008 (KDHE 2008), and operation of the SVE/AS systems began in May 2009. With the approval of the KDHE (2009), landfarming operations to treat the contaminated soils excavated from the LDBs were completed on October 12, 2010. Since start-up, the IM activities have been documented periodically (Argonne 2009a,b,c; Argonne 2010a,b,c,d, 2011a,b,c, 2012, 2013a,b), in accord with the requirements of the KDHEapproved IMWP/D (Argonne 2008). Each of the reports primarily summarizes the operations and maintenance of the SVE and AS equipment and the results of sampling of the groundwater, soil gas, and system effluents for analyses for volatile organic compounds (VOCs) over a specific 3- to 6-month period. Hence, the focus is the incremental performance of the IM. To complement these documents, this report provides a broader perspective by examining the collective data acquired since start-up on May 29, 2009, and through June 2013. The objectives of this approach are to evaluate possible longer-term trends in (1) the operational characteristics of the remedial systems and (2) the corresponding responses in the subsurface environment and their potential relationships to the progress of the cleanup. To facilitate this investigation, time-series diagrams have been developed to illustrate key parameter data for the SVE and AS systems, as well as sampling and additional supporting data obtained from the monitoring program. An overview of the information compiled is in Section 2. In Section 3, observations drawn from these data are discussed. The principal findings of the evaluation and recommendations for consideration are summarized in Sections 4 and 5, respectively.

54 ENVIRONMENTAL SCIENCES↗

Research and Development of a Ventilation-Integrated Comfort System

From an indoor air quality perspective, the best residential ventilation strategies include filtering outdoor air and distributing that air to all occupied parts of a home. From an energy standpoint, it is desirable that energy be transferred from the exhaust air to the incoming outdoor air to limit heating and cooling impacts. Heat or energy recovery ventilators (HRVs or ERVs) can provide these functions, but researchers have seen many poor installations related to design, installation, and operation and maintenance. More robust ventilation systems may involve an ERV with a dedicated duct distribution system and controls. Such a duct system can be costly to install, and many builders reduce these costs by connecting an ERV to a central heating and cooling duct system. Although this can sometimes be done effectively, researchers have seen consistent challenges with low, inconsistent, or imbalanced flow rates; high electricity consumption; and—of greatest concern—outdoor air short-circuiting or not being delivered to occupied spaces at all. Most ERVs are designed to operate with their own duct system; they are not designed as an add-on to much larger heating, ventilating, and air-conditioning (HVAC) systems. The ventilation-integrated comfort system (VICS) is expressly designed to integrate with low-capacity, efficient, ducted heating and cooling systems. Overall, the latest VICS prototype consumed 40–75 watts (W), including the air handler power, to deliver 50–120 cfm of whole-dwelling ventilation. The large, cross-flow ERV core performed to match manufacturer values (73% winter sensible effectiveness, 64% summer total effectiveness), but further improvements are possible. The VICS system researched and tested during this project will provide efficient, controllable, balanced energy recovery ventilation that is integrated with heating and cooling systems. The integration reduces space and ductwork needed for separate ventilation systems, and there are no compromises to heating, cooling, or ventilation performance. The integrated nature of the device also reduces risks for improper installation and commissioning. Even when using the air handler blower to distribute outdoor air, the total power consumption is lower than that of most available ERV products in the same airflow range. This system has the potential to offer very high-performance ventilation with much smoother and simpler installation than conventional systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Research and Development of a Ventilation-Integrated Comfort System

From an indoor air quality perspective, the best residential ventilation strategies include filtering outdoor air and distributing that air to all occupied parts of a home. From an energy standpoint, it's desirable that energy be transferred from the exhaust air to the incoming outdoor air to limit heating and cooling impacts. Heat or energy recovery ventilation systems (HRVs or ERVs) can provide these functions, but researchers have seen many poor installations related to design, installation, and operation and maintenance. More robust ventilation systems may involve an ERV with a dedicated duct distribution system and controls. Such a duct system can be costly to install, and many builders reduce these costs by connecting an ERV to a central heating and cooling duct system. While this can sometimes be done effectively, researchers have seen consistent challenges with low, inconsistent, or imbalanced flow rates; high electricity consumption; and - of greatest concern - outdoor air short-circuiting or not being delivered to occupied spaces at all. Most ERVs are designed to operate with their own duct system; they are not designed as an add-on to much larger HVAC systems. With support from the US DOE Building Technologies Office, Steven Winter Associates, Inc. (SWA) partnered with Mitsubishi Electric Trane US, CORE Energy Recovery Solutions, and Therma-Stor LLC to design and test VICS prototypes. A conceptual diagram is shown in Figure 1, and the latest prototype (shown in Figure 2) was manufactured by Therma-Stor and tested in SWA's facility in Norwalk, CT. The ERV heat exchanger was provided by CORE, and the VICS was installed in conjunction with a 1-ton, inverter heat pump provided by Mitsubishi.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reducing Cost of Chlorinated Volatile Organic Compound Remediation by Transitioning from Active to Passive Soil Vapor Extraction - 20157

Areas of high chlorinated volatile organic compound (cVOC) contamination at the Savannah River Site (SRS) have been undergoing remediation via soil vapor extraction, sometimes coupled with thermal treatments to enhance extraction rates. These active systems are effective in removing large amounts of contaminant mass from the subsurface and mitigating the impacts to groundwater. However, as extraction rates decline, costs must be evaluated with respect to the benefit of continued active operation. A decision framework for identifying conditions when a transition to a more passive remediation is appropriate has been developed with state and federal regulatory agencies. Two remediation areas have recently been transitioned from active soil vapor extraction (ASVE) to passive soil vapor extraction (PSVE) at the SRS. Performance evaluation goals including plume stabilization, overall mass removal trends, environmental sustainability and costs were considered in transitioning from active remediation to passive technologies at both sites. At the Dynamic Underground Stripping (DUS) project at the M-Area Settling Basin, ASVE was combined with steam injection to extract cVOCs during active operations. Steam injection occurred from September 2005 to September 2009. DUS utilized 63 steam injection wells, 34 active vapor extraction wells, and 3 active soil vapor extraction units (SVEUs). Two active SVEUs had 60 horsepower blowers; the third had a 25-horsepower blower. Mass removal was closely tracked during DUS operations; over 181,437 kilograms (400,000 pounds) of cVOCs were removed while active steam injection occurred. After steaming was stopped, ASVE continued. The 34 active wells were evaluated in 2012. The ASVE wells were grouped into categories of high, medium, and low extraction rates. High producing wells remained connected to a single active SVEU. Low producing wells were abandoned, and the medium producing wells were transitioned to PSVE (Microblowers{sup TM}). Microblowers{sup TM} utilize a dedicated blower per well and are solar powered. This passive technology provides energy, maintenance, and operation costs savings while still providing an efficient reduction in cVOC migration to groundwater. In 2018, the remaining ASVE wells were evaluated again. The purpose of this testing was to identify which wells removed the most mass. An optimal well configuration was determined. The criteria to discontinue ASVE was removal of less than 18 kilograms (40 pounds) per week of cVOCs. After 3 months of shutdown (rebound conditions), 2.7 kilograms (5.9 pounds) of cVOCs per week were being removed. Data from the rebound test justified ending ASVE and transitioning wells with higher extraction rates to PSVE. Wells that had depleted the cVOC mass within their zone of influence were abandoned. Performance data from existing PSVE wells justified ending PSVE at wells with depleted extraction rates. Currently the system has 16 PSVE wells operating. Another ASVE system was being used to treat cVOC contaminated soil at the A-Area Miscellaneous Rubble Pile (AMRP) at SRS. System operation began in 2004, with 7 ASVE wells connected to a 60- horsepower blower. Mass removal rates and contaminant concentrations remained consistently low over the ASVE lifespan at AMRP. This indicated that mass removal was diffusion limited. With this data, the 7 ASVE wells were transitioned to PSVE in 2017. Twelve pressure monitoring points were also transitioned to PSVE wells. AMRP currently has 19 PSVE wells operating. Both transitions from active to passive remediation had concurrence from the United States Environmental Protection Agency and the South Carolina Department of Health and Environmental Control. These transitions ensure that only the necessary amount of energy is being exerted to remediate the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PV Field Reliability Status--Analysis of 100,000 Solar Systems

In this paper, we analyzed annual production data from 100 000 photovoltaic systems as well as comments relating to their performance and maintenance. Our analysis revealed that 80% to 90% of all systems performed within 10% of the predicted production or better. Also, 56% of the systems were still performing above P50 or the median at 5 years. However, a small but significant tail of about 7000 systems perform below P90 expectations. In general, residential systems have a lower rate of failure than utility or commercial systems. Despite higher rates of component failures, utility systems lose less power than residential or commercial systems. This outcome is likely due to closer monitoring and better operations and maintenance practices. Inverters are still the components that reportedly fail most often (4%-6%), but other failures such as unspecified repair and meters cause more production loss. Reported module failures are relatively rare (0.2%) and are within the range of historical values. Installation quality affects performance and safety as indicated by data showing connector, wiring, breaker, and fuse failures due to undersizing, electrical design, and improper connection. Lastly, early detection of degradation and proactive response resulted in less impact on production than reactive, unplanned repairs.

14 SOLAR ENERGY↗

Windage Power Loss in Gas Foil Bearings and the Rotor-Stator Clearance of High Speed Generators Operating in High Pressure Environments

Closed Brayton Cycle (CBC) and Closed Supercritical Cycle (CSC) engines are prime candidates to convert heat from a reactor into electric power for robotic space exploration and habitation. These engine concepts incorporate a permanent magnet starter/generator mounted on the engine shaft along with the requisite turbomachinery. Successful completion of the long-duration missions currently anticipated for these engines will require designs that adequately address all losses within the machine. The preliminary thermal management concept for these engine types is to use the cycle working fluid to provide the required cooling. In addition to providing cooling, the working fluid will also serve as the bearing lubricant. Additional requirements, due to the unique application of these microturbines, are zero contamination of the working fluid and entirely maintenance-free operation for many years. Losses in the gas foil bearings and within the rotor-stator gap of the generator become increasingly important as both rotational speed and mean operating pressure are increased. This paper presents the results of an experimental study, which obtained direct torque measurements on gas foil bearings and generator rotor-stator gaps. Test conditions for these measurements included rotational speeds up to 42,000 revolutions per minute, pressures up to 45 atmospheres, and test gases of nitrogen, helium, and carbon dioxide. These conditions provided a maximum test Taylor number of nearly one million. The results show an exponential rise in power loss as mean operating density is increased for both the gas foil bearing and generator windage. These typical "secondary" losses can become larger than the total system output power if conventional design paradigms are followed. A nondimensional analysis is presented to extend the experimental results into the CSC range for the generator windage.

Bruckner, Robert J.↗

Digitalization Guiding Principles and Method for Nuclear Industry Work Processes

The commercial U.S. light-water reactor fleet has been operating at historical efficiency, reliability, and safety over the last decade. Nuclear power has the highest capacity factor of any other power generation technology while also serving as the largest baseload source for carbon-free energy. Despite this remarkable achievement, continued operations for many plants are threatened due to fierce electricity market competition and rising operations and maintenance costs of which continued maintenance of obsolete analog equipment is a contributor. The digital age and associated technologies are where the future lies in process control, and nuclear has yet to take full advantage of the capabilities offered therein. The Light Water Reactor Sustainability Program (LWRS) at Idaho National Laboratory (INL), sponsored by the Department of Energy, has a mission to help the light-water reactor fleet manage its foundational capabilities to continue providing safe and reliable carbon-free power. LWRS helps support that mission by providing scientific, technology-based solutions for advanced concepts of operations with a more viable business model that will allow the fleet to continue to operate at peak levels through extended plant operation. The LWRS Digitalization Project at INL seeks to leverage digital technologies to synthesize and transform work processes. We provide a state-of-the-art analysis of digitalized work processes in nuclear power and investigate ways in which researchers at INL and the nuclear industry can work together to identify what data to access, how to access it, what to do with the data, and most importantly, how to use the insights for decision-making across all levels within the business. Borne from these considerations, we present four guiding principles for digitalization: develop a coherent digitalization plan, apply human factors engineering, establish data governance, and anticipate unintended consequences. Together, these principles form a method that plants can use to effectively to digitalize nuclear industry work processes. Our guiding principles are informed by multiple knowledge sources. First, we document activities from the Work Digitalization Initiative, which was conceived as a means for nuclear organizations to help define and standardize the industry’s approach to digitalizing work. Second, we detail primary research conducted with industry professionals regarding drivers and barriers to digitalization adoption. We present survey results that demonstrate what the industry hopes to get out of digitalization and the ways that INL can continue to support the industry’s digital transformation. Third, we present a digitalization use case with industry partners NextAxiom Technology and Xcel Energy. The project objective was to transform the current condition report work process from paper to digital, incorporating digitalized principles. We report the development of the application and lessons learned. The accomplishments achieved by this research and development serve to identify critical needs for plant guidance in support of digitalization implementation and contribute to the knowledge and strategies available for utilities considering or undertaking digitalization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Increasing the Cost-efficiency of the DSN

JPL has operated the Deep Space Network (DSN) on behalf of NASA since the 1960's. Over the last two decades, the DSN budget has generally declined in real-year dollars while the aging assets required more attention, and the missions became more complex. As a result, the budget has been increasingly consumed by Operations and Maintenance (O and M), significantly reducing the funding wedge available for technology investment and for enhancing the DSN capability and capacity. Responding to this budget squeeze, the DSN launched an effort to improve the cost-efficiency of the O and M. In this paper we: Analyze the components of O&M. We note for example that, for the DSN, less than 20% of the staff engage in the traditional human-in-front-a-console role, so any effort to increase the cost efficiency must go beyond reducing the number of "Real-time operators." Explain the underlying organizational and cultural structures. Any cost-efficiency activities changes either accept, or carefully modify these structures. For example, the DSN O&M is based on the concept that there are three nearly identical antenna complexes separated by approximately 1200 in latitude and that each antenna complex is operated by a different contractor (driven by international agreements). Explore planned changes in the customer interface, e.g. web-based automated scheduling, and the processes required for a transition. Changes have to be evaluated in the larger end-to-end context, e.g. do the changes provide a net cost-efficiency for the DSN and the missions, or do they merely shift cost from the DSN to the missions. Consider possible significant changes in real-time pass management, e.g. full-remoting of operations, and lights-dim operations, while maintaining (or improving) the performance metrics of the DSN. Investigate how procedural and administrative changes could increase cost-efficiency, in conjunction with changes in the customer interfaces and real-time pass management. Examples would be handling of inter-governmental agreements, improved sharing of resources with other agencies, and better use of commercial (rather than government) resources

Deep Space Network (DSN)↗

The Fuel Cell Powered Club Car Carryall

The NASA Glenn Research Center initiated development of the Fuel Cell Powered Club Car Carryall as a way to reduce pollution in industrial settings, reduce fossil fuel consumption and reduce operating costs for transportation systems. The Club Car Carryall provides an inexpensive approach to advance the state of the art in electric vehicle technology in a practical application. The project transfers space technology to terrestrial use via non-traditional partners, and provides power system data valuable for future aeronautics and space applications. The work was done under the Hybrid Power Management (HPM) Program. The Carryall is a state of the art, dedicated, electric utility vehicle. Hydrogen powered proton exchange membrane (PEM) fuel cells are the primary power source. Ultracapacitors were used for energy storage as long life, maintenance free operation, and excellent low temperature performance is essential. Metal hydride hydrogen storage was used to store hydrogen in a safe and efficient low-pressure solid form. The report concludes that the Fuel Cell Powered Club Car Carryall can provide excellent performance, and that the implementation of fuel cells in conjunction with ultracapacitors in the power system can provide significant reliability and performance improvements.

Eichenberg, Dennis J.↗

Scalable Wind Turbine Generator Bearing Fault Prediction Using Machine Learning: A Case Study

Operation and maintenance (O&M) costs for wind turbines pose a risk to competitiveness and asset owners. With machine-learning technologies and digitalization rapidly maturing, the wind industry is actively investigating these new technologies to optimize O&M practices and reduce costs. This paper reviews recent work on machine-learning approaches to generator bearing failure prediction and presents a relevant real-world case study through a collaboration between the National Renewable Energy Laboratory and Envision Digital Corporation. In the case study, we evaluate the performance of representative machine-learning algorithms for predicting wind turbine generator bearing failures. Operational supervisory control and data acquisition data from one wind power plant was used to train and test the machine-learning models. The investigated data channels are chosen based on whether physically they reflect the failed generator bearing conditions and the component historical usage, including both environmental and operational conditions. Benefits and drawbacks of different methods are identified.

generator bearing failures↗

Computational Analysis of Different Sparging Systems and their Influence in the Fluid-Dynamic Behavior of Bubble Column Reactors

Bubble column bioreactors are being actively considered for gas fermentation applications, specifically for CO2 utilization, and sugars to fuels conversion. Their main advantages include good mass transfer without any moving parts and low-cost of operation and maintenance. However, the design and scale-up of such reactors is challenging specifically for carbon capture applications where a mixture of gases (e.g. CO2/CO/H2) with variable solubilities is used. The overall performance of scaled-up bioreactors (e.g., mass transfer rate) is largely affected by gas holdup, bubble size distribution (BSD), and multiphase hydrodynamics. We investigate the effect of gas sparger designs on the performance of these large-scale bioreactors using computational fluid dynamics simulations in this work, so as to improve CO2 conversion at scale. The gas distribution systems in bubble column reactors not only determines operational regime, but also affects the evolution of the BSD, which in turn influences interfacial mass transfer and ultimately the efficiency of the gas-liquid exchange process. In addition to the BSD, uniformity in gas sparging affects gas holdup and bubble residence time which constitute important metrics of performance in gas-liquid systems. In this work, we use computational models to simulate high fidelity representations of different sparger designs and their effect on the operation of a bubble column reactor. Four different types of spargers have been selected for the computational study (Fig. 1): ladder, multi-ring, single-ring and toroidal. Their effect on superficial velocity, gas holdup mixing efficiency, and BSD will be evaluated in this work. The model uses a multiphase Eulerian framework similar to [1] and include a composition of mixtures of H2/CO/CO2 gases, common in fermentation applications.

BIOMASS FUELS,MATHEMATICS AND COMPUTING↗

Space Telescope maintenance and refurbishment

The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

Trucks, H. F.↗

Experimental study of solar simulator mirror cryocontamination

The background and tasks formulation of the study of Solar Simulator collimation mirror cryocontamination in Large Thermal Vacuum Facility are outlined, research methods and experiment procedures are described, experimental relationships obtained are analyzed and practical recommendations are given. The accepted procedure of thermal vacuum tests as a rule defines the sequence of operations for verifying the spacecraft under test without taking into account measures for preventing Solar Simulator collimation mirror contamination and degradation. On the other hand, evacuation procedures is defined for conditions of achieving the required vacuum in the shortest possible time with using the available evacuation equipment at a regime close to the optimum one. Similarly, cryopanel cooling down cyclogram and test object preparation process are not analyzed from the viewpoint of ways of reducing environmental detrimental effects on thermal vacuum facility contamination-sensitive systems. Solar Simulator mirror contamination and its reflective characteristics change results in degradation of solar flux parameters and reduction of simulator continuous operation time. Methods of consideration of optical effects due to mirror surface contamination are actually missing. The effects themselves are not quite understood and data cited in literature as a rule, were obtained under conditions different from real thermal vacuum facility and therefore should be subjected to additional experimental verification. Only in the last few years contamination effect on optical surfaces degradation has been considered with using empirical relations. Mirror reflective properties degradation leads to the increase of Solar Simulator errors. This ultimately has an adverse effect on S/C ground development, schedule and cost of thermal vacuum tests. Besides, the mirror maintenance in operable state becomes more expensive. The present paper is dedicated to the study of Solar Simulator collimation mirror contamination and to the search of ways for improving the mirror design and thermal vacuum test procedure. On the basis of tests performed, recommendations are devised on reducing chamber inner-optical surfaces cryocontamination and degradation.

Galjaev, V. L.↗

Can We Fix It Automatically? Development of Fault Auto-Correction Algorithms for HVAC and Lighting Systems

A fault detection and diagnostics (FDD) tool is a type of energy management and information system designed to continuously identify the presence of faults and efficiency improvement opportunities through a one-way interface to the building automation system and application of automated analytics. Building owners and operators at the leading edge of technology adoption are using FDD tools to enable average whole-building portfolio savings of 8 percent. Although FDD tools can inform building operators of operational faults, currently a manual action is always required to correct faults and generate the associated energy savings. A subset of faults, however, such as biased sensors and manual override, can be addressed automatically, removing the need for operations and maintenance staff intervention. Automating this fault “correction” can significantly increase the savings generated by FDD tools and reduce the reliance on human intervention. Doing so is expected to advance the usability, as well as the technical and economic performance, of FDD technologies. In this paper, we present the development of 10 innovative fault auto-correction algorithms for HVAC and lighting systems. When the auto-correction routine is triggered, it will overwrite the control setpoints or other variables (via BACnet or other protocol) to implement the intended changes. These algorithms are able to automatically correct the faults or improve the operation associated with an incorrectly programmed schedule, override manual control, sensor bias, control hunting, rogue zone, and less aggressive setpoints/setpoints setback. The paper will also discuss the implementation of the auto-correction algorithms in FDD software products.

Lin, Guanjing↗

Chapter 11: Concentrating Solar Power

This chapter summarizes the applications of the supercritical CO2 (sCO2) Brayton cycle in concentrating solar power (CSP) plants. The design and operation of CSP plants are reviewed to highlight the requirements for the power cycle and attributes that are advantageous for the solar-thermal application. The sCO2 Brayton cycle offers the potential of higher cycle efficiency versus superheated or supercritical steam cycles at temperatures relevant for CSP applications. In addition, Brayton cycle systems using sCO2 are anticipated to have smaller weight and volume, lower thermal mass, and less complex power blocks compared with Rankine cycles due to the higher density of the fluid and simpler cycle design. The simpler machinery and compact size of the sCO2 process may also reduce the installation, maintenance, and operation cost of the system. Power cycle capacities in the range of 10-150 MWe are anticipated for the CSP application. In this chapter, we explore sCO2 Brayton cycle configurations that have attributes that are desirable from the perspective of a CSP application, such as the ability to accommodate dry cooling and daily cycling, as well as integration with thermal energy storage.

14 SOLAR ENERGY↗