Radiological Verification for the Remediation of LLRW at the Port Granby Project - 19210
The Port Granby Project is part of the Port Hope Area Initiative (PHAI) that Canadian Nuclear Laboratory (CNL) is using to manage long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure and excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) which accepted waste until the 1980's to the newly constructed LTWMF. The PGWMF contains an estimated 450,000 cubic meters of LLRW deposited in unmarked and unlined trenches throughout the southern portion of the site that borders Lake Ontario. Project requirements include excavating contaminated material, verifying that the trench bottoms are below action levels using Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance, and final restoration. This paper describes challenges of meeting remediation verification requirements using traditional field and laboratory confirmation methods in areas of deep trench areas located in rugged terrain with ponded water and mud and presents a process that has expedited the traditional MARSSIM method for verification with greater productivity, and with enhanced safety and reliability as compared to the use of traditional methods alone. This enhanced process has been successfully employed for in-situ verification so that the excavated area can be backfilled and returned to a vegetative state. This enhanced process has been examined by federal regulatory staff through the course of their onsite audits and outcomes from these examinations have all been positive. The method involves a visual inspection and traditional walkover of the area to identify any areas with radiation measurements above the region's background followed by a full area survey performed using Wood's proprietary Orion ScanPlotSM system. The ScanPlotSM data is evaluated, mapped and overlaid on top of an aerial image of the surveyed area allowing remaining radiological material at surface or near surface to be quickly and easily identified for removal. Field staff then collect soil samples from evenly distributed points within the surveyed area and field screen the samples using an X-ray fluorescence (XRF) analysis for the three primary contaminates of potential concern (CoPCs) (arsenic, uranium and lead) that are indicative of the historical contamination. Samples passing XRF field screening are packaged and sent to a local laboratory for a full suite of analyses and checked against the CoPC list to assess whether the soil matches the profile for nearby native soils and passes the remediation goals. (authors)