Search NASA⌕ Search

SEARCH · Search NASA

Results for “Program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Novel Earned Value Management System Maturity Framework and Its Relation to Project Performance

Earned value management systems (EVMS) are used by industry practitioners to successfully manage projects and programs; however, there has been no past study to characterize and evaluate the impact of EVMS maturity on project performance. This paper introduces a novel framework, developed to measure the EVMS maturity, composed of 56 attributes arrayed across ten subprocesses, which together make up an integrated project/program management system. This paper describes how the framework was conceived and developed, based on literature review and data collected from industry workshops. Then, it examines the relationship between EVMS maturity and ten project performance metrics through statistical analyses. The study analyzed project data from 35 projects and programs worth over $21.8 billion in total cost. For this sample, results showed statistically significant differences between projects with high and low EVMS maturity; on average, projects exhibiting high EVMS maturity have 54% less cost overruns and 19% less change orders versus their performance measurement baseline. Higher maturity projects and programs also achieve better customer satisfaction, meet business objectives more often, and are more often in compliance with EVMS standards and guidelines. This paper contributes to the body of knowledge by providing a practical and novel framework for assessing the maturity of earned value management systems. Practitioners can use the framework to improve their integrated project and program management.

99 GENERAL AND MISCELLANEOUS↗

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of a Technical Standard for Radiological Characterization of DAW - 18062

Throughout its 70+-year history, the U.S. Department of Energy (DOE) and its predecessor agencies have performed a wide mission involving nuclear materials and weapons development, production, testing, and modernization. While the initial mission components relied heavily upon reactor physics and chemistry, the environmental programs have increasingly relied upon development of more accurate and effective measurement methodologies to determine the radiological and chemical properties of the unique waste streams that were generated during the weapons production and testing mission. Over time, the DOE laboratories and former production sites have developed a wide range of site-specific processes and procedures for conducting radiological characterization of dry active waste (DAW) that is managed as low-level radioactive waste. This has resulted in a Complex-wide variability among sites with respect to the methodologies and instrumentation used to characterize individual waste streams. The DAW-type waste was selected for development of a characterization standard since it is a simple, voluminous, and repetitive waste stream with a substantial knowledge base, established experience history at multiple site locations, and the potential for realization of programmatic benefits though standardization. The Energy Facility Contractors Group (EFCOG) Waste Management Working Group (WMWG) has proposed the development of a new DOE Technical Standard for radiological characterization of DAW. The purpose of the proposed new standard is to provide a technical resource that integrates and enhances the utilization of current site-specific methodologies and processes. A Technical Basis Document (TBD) has been prepared to support the development and utilization of the new standard by providing detailed information for use by site personnel when implementing the guidance provided in the standard. It also provides the rationale for and details concerning the recommended technical approaches for radiological characterization of representative DAW-type waste streams. The TBD will be included as an appendix to the proposed standard. Adoption of a standardized approach to DAW characterization will take advantage of multiple applications for a technology that is both mature and stable. The DAW characterization process is repetitive and lends itself to implementation at a wide range of operating locations - resulting in economies of scale, compliance with regulatory requirements, and consistent implementation of procedures which support design, operations, maintenance, and management of facilities, activities and programs. The purpose of the proposed new Technical Standard for DAW Radiological Characterization is to integrate and improve the utilization of current site-specific methodologies and processes and will include a comprehensive evaluation and comparison of current radiological characterization methodologies to determine which ones are most reliable and effective in producing relevant and valid data. In view of the long history and participation by several agencies in the regulation of nuclear programs, existing Voluntary Consensus Standards have also been reviewed for relevancy and applicability to the new proposed standard. The proposed new Standard will be developed in concert with existing scientific and regulatory guidance to produce a document that incorporates the state of current knowledge and site practices with a graded approach to applying those methodologies that are applicable and effective for characterizing a wide range of DAW-type wastes - including, but not limited to, debris, low specific activity (LSA) material, and surface contaminated objects (SCO). Under the leadership of the National Laboratory Subgroup of the EFCOG/WMWG), an EFCOG team will develop the proposed technical standard. This process will incorporate the information gathered during preparation of the TBD, which will serve as a technical resource to support the technical approach for selection of DAW characterization methodologies. Preparation of the TBD included a detailed survey of historical site practices and examination of the characterization approaches and measurement methodologies currently being applied to DAW-type wastes. Future activities include the development and submittal of a Project Justification Statement that will be submitted to the DOE Technical Standards Program for review and comment. The EFCOG/WMWG Team will respond to reviewer comments, as required. Following final concurrence by affected organizations through the DOE Technical Standards Coordination process, the EFCOG/WMWG Team will prepare the draft technical standard and respond to comments generated during RevCom review and final format review by the DOE Technical Standards Management Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IRIS: A Portable Runtime System Exploiting Multiple Heterogeneous Programming Systems

Across embedded, mobile, enterprise, and HPC systems, computer architectures are becoming more heterogeneous and complex. This complexity is causing a crisis in programming systems and performance portability. Several programming systems are working to address these challenges, but the increasing architectural diversity is forcing software stacks and applications to specialize for each architecture. As we show, all of these approaches critically depend on their runtime system for discovery, execution, scheduling, and data orchestration. To address this challenge, we believe that a more agile and proactive runtime system is essential to increase performance portability and improve user productivity. In this regard, we have designed and implemented IRIS: a portable runtime system exploiting multiple heterogeneous programming systems. IRIS can discover available resources, manage multiple diverse programming systems (e.g., CUDA, Hexagon, HIP, Level Zero, OpenCL, OpenMP) simultaneously in the same execution, respect data dependencies, orchestrate data movement proactively, and provide for user-configurable scheduling. Our evaluation on three architectures, ranging from Qualcomm Snapdragon to a Summit supercomputer node, shows that IRIS improves portability across a wide range of diverse heterogeneous architectures with negligible overhead.

Kim, Jungwon↗

Evaluation of Lower East Fork Poplar Creek Mercury Sources - Model Update

The purpose of this report is to assess new data that has become available and provide an update to the evaluations and modeling presented in the Oak Ridge National Laboratory (ORNL) Technical Manuscript Evaluation of lower East Fork Poplar Creek (LEFPC) Mercury Sources (Watson et al., 2016). Primary sources of field and laboratory data for this update include multiple US Department of Energy (DOE) programs including Environmental Management (EM; e.g., Biological Monitoring and Abatement Program, Mercury Remediation Technology Development [TD], and Applied Field Research Initiative), Office of Science (Mercury Science Focus Areas [SFA] project), and the Y-12 National Security Complex (Y-12) Compliance Department.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Wildland Fire Management Plan

The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

54 ENVIRONMENTAL SCIENCES↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

High Energy Physics Network Requirements Review: Final Report, July 2024–December 2024

The world-class research infrastructure at the US Department of Energy (DOE) Office of Science (SC) provides the research community with premier observational, experimental, computational, and network capabilities. Each user facility is designed to provide unique capabilities to advance the core DOE mission in science and technology for its SC program to stimulate rich scientific discoveries and enhance its innovation ecosystem. Research communities gather and flourish around each user facility, bringing together new and enhanced perspectives. The continual reinvention of the practice of science — as users and staff forge novel approaches expressed in research workflows — unlocks new discoveries and propels scientific progress. Within this research ecosystem, the high-performance computing (HPC) and networking user facilities stewarded by the SC’s Advanced Scientific Computing Research (ASCR) program play a dynamic cross-cutting role, enabling complex workflows demanding high-performance data, networking, and computing solutions. The ASCR facilities enterprise seeks to understand and meet the needs and requirements across SC and DOE domain science programs and priority efforts, highlighted by the formal requirements review methodology. Between July and December 2024, the Energy Sciences Network (ESnet) and the Office of High Energy Physics (HEP) of the DOE-SC organized an ESnet requirements review of HEP-supported program activities. Preparation for these events included identification of key stakeholders: program and facility management, research groups, and technology providers. Each stakeholder group was asked to prepare formal case study documents about its relationship to the HEP program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Evaluating the effectiveness of program data features for guiding memory management

Recent trends have led to the adoption of larger and more complex memory systems, often with multiple tiers of memory performance within the same platform. To utilize complex memory systems efficiently, current data management strategies must be altered to map usage demands to the underlying hardware. Applications, as the generators of memory accesses, are well-suited to guide this process, but building and maintaining separate source code versions for different memory systems is not feasible in most cases. One potential solution is to employ automated program profiling and analysis to facilitate the production of application-based guidance. By attaching memory usage information to static or lightweight program features, compilers and runtime systems can generate fine-grained guidance without additional efforts from users or developers. Recent works have employed this approach with some success, but it is not clear which program features are most useful for guiding data management.This work evaluates the effectiveness of using different program data features to predict memory usage and guide memory management. It employs a custom set of simulation tools, based in the Intel® Pin framework, to collect and analyze the usage characteristics of application data associated with common program data features, such as allocation sites, types, and context. The results show that even relatively simple features, such as object size, are useful for selecting data with similar usage properties, but finer-grained features, such as the instructions that access a particular object, are often much more effective. Additionally, this work evaluates the performance of using different data features and different program inputs to guide data placement on a heterogeneous memory platform with a limited amount of high performance memory.

Effler, T. Chad↗

Successful Deployment of System for the Storage and Retrieval of Spent/Used Nuclear Fuel from Hanford K-West Fuel Storage Basin-13051

In 2012, a system was deployed to remove, transport, and interim store chemically reactive and highly radioactive sludge material from the Hanford Site's 105-K West Fuel Storage Basin that will be managed as spent/used nuclear fuel. The Knockout Pot (KOP) sludge in the 105-K West Basin was a legacy issue resulting from the spent nuclear fuel (SNF) washing process applied to 2200 metric tons of highly degraded fuel elements following long-term underwater storage. The washing process removed uranium metal and other non-uranium constituents that could pass through a screen with 0.25-inch openings; larger pieces are, by definition, SNF or fuel scrap. When originally retrieved, KOP sludge contained pieces of degraded uranium fuel ranging from 600 microns (μm) to 6350 μm mixed with inert material such as aluminum hydroxide, aluminum wire, and graphite in the same size range. In 2011, a system was developed, tested, successfully deployed and operated to pre-treat KOP sludge as part of 105-K West Basin cleanup. The pretreatment process successfully removed the vast majority of inert material from the KOP sludge stream and reduced the remaining volume of material by approximately 65 percent, down to approximately 50 liters of material requiring management as used fuel. The removal of inert material resulted in significant waste minimization and project cost savings because of the reduced number of transportation/storage containers and improvement in worker safety. The improvement in worker safety is a result of shorter operating times and reduced number of remote handled shipments to the site fuel storage facility. Additionally in 2011, technology development, final design, and cold testing was completed on the system to be used in processing and packaging the remaining KOP material for removal from the basin in much the same manner spent fuel was removed. This system was deployed and successfully operated from June through September 2012, to remove and package the last of the SNF fragments from the 105-K West Basin, ending the long and complex history of the KOP sludge materials. The planning and execution of this project demonstrated how the graded application of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets[1], DOE-STD-1189-2008, Integration of Safety into the Design Process[2], and DOE G 413.3-4, U.S. Department of Energy Technology Readiness Assessment Guide[3], can positively affect the outcome of project implementation in the DOE Complex. Provided herein are relevant information, ideas, and tools for use by other projects facing similar issues in managing high risk waste streams in a complex regulatory environment. Positive aspects are also provided of appropriate time spent in detailed planning, design, and testing in non-hazardous environments to reduce project risks in both cost and safety performance, as well as improving confidence in meeting project goals through predictable and reliable performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Y-12 Site Sustainability Plan

The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP), while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. The mission of the Y-12 Energy Management program is to incorporate energy-efficient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

99 GENERAL AND MISCELLANEOUS↗

Workshop on Improving Holdup Monitoring in the US

The characterization and quantification of nuclear deposits, or residual nuclear material retained in process equipment, generally referred to as holdup, continues to challenge nuclear processing facilities in DOE program areas such as nuclear criticality safety, material control and accountability, environmental management. The efficiency and effectiveness of nuclear operations in these facilities depends heavily on the results from nondestructive techniques designed to measure nuclear materials in situ. The traditional methods used to measure holdup were established more than 30 years ago and assume unrealistic conditions for most measurement cases. These blind, in situ measurements present unique challenges due to the following attributes: unique, non-ideal geometries; unknown deposit thicknesses; lack of representative calibration standards; large number of holdup deposit locations; and poor accessibility for many measurement locations. These difficulties and the poor assumptions made to handle them have resulted in measurement uncertainties that are often too large for many programs to effectively utilize. In an effort to address and identify solutions to the current holdup challenges facing the US nuclear industry, Oak Ridge National Laboratory hosted the Technical Workshop on Improving Holdup Monitoring in the US. The two-day workshop held August 21–22, 2019, was attended by 35 holdup measurement practitioners, program managers, stakeholders from US Department of Energy sites, the Nuclear Regulatory Commission, and representatives from commercial industry. The primary objectives were to identify critical elements of a successful and defensible holdup measurement program; identify technical challenges, needs, and potential improvements associated with measurement of holdup; and share best practices and lessons learned from recent accumulation events. Fourteen presentations were delivered on holdup topics including necessary elements for effective program management, measurement needs, emerging technologies and other measurement solutions, and lessons learned from recent events. These presentations highlighted best practices related to accumulation monitoring, considerations and proactive steps to facilitate holdup in new facility designs, imaging solutions to improve holdup assumptions, and new software developed in support of holdup measurements. Breakout sessions were also employed to determine additional needs and identify potential solutions to common holdup challenges. The primary discussions focused on causes and prevention of material accumulations, needs for uranium and plutonium measurements, and reduction of measurement uncertainty, all of which were explicitly identified as critical needs during the 2018 Workshop on Technical and Programmatic Needs for a Sustainable NDA Program for the US DOE.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Achieving the End State for the Pahute Mesa Corrective Action Units at the Nevada National Security Site - 20355

Underground nuclear testing at the Nevada National Security Site (NNSS) ended in 1992. To address the impact of radionuclide contamination from underground nuclear testing on the groundwater resources of Nevada, the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program created the Underground Test Area (UGTA) activity to characterize the radionuclides in groundwater, understand the nature and extent of radionuclide migration, and forecast the distribution of radionuclides in groundwater for 1,000 years. The UGTA activity is regulated by the Federal Facility Agreement and Consent Order (FFACO), an agreement negotiated between the Nevada Division of Environmental Protection (NDEP), DOE, and the U.S. Department of Defense (DoD). DOE is close to achieving the end state (closure in place with monitoring and institutional control) for three of the five UGTA corrective action units (CAUs) on the NNSS. A number of challenges remain to achieve the end state of the other two CAUs, both located on Pahute Mesa. Pahute Mesa was the location of 82 underground nuclear tests, less than 10% of the total number of tests on the NNSS. Yet, Pahute Mesa contains slightly more than 60% of the total radionuclides (in curies). Based on groundwater sampling in monitoring wells, two radionuclide plumes have migrated several kilometers (km) in groundwater from selected test cavities and have crossed the boundary of the NNSS (yet remain within the boundaries of Federally controlled land). The path to achieve the end state continues to evolve as more data are collected and a better understanding of radionuclide migration in groundwater is developed. DOE has invested in drilling and sampling more than 50 characterization and monitoring groundwater wells over the past 25 years. The data indicate that the primary radionuclide of concern is tritium as it is about 89% of the total radionuclide inventory (in curies). As well, only tritium has been measured in groundwater outside of cavities at concentrations exceeding the Safe Drinking Water Act (SDWA) standard. For one of the tritium plumes that has migrated across the NNSS boundary, the average rate of migration has been measured as about 45 meters (m) per year with the rate of migration at the leading edge of the plume of about 85 meters per year. At that rate of migration, the tritium plume will decay to safe levels and not reach the publicly accessible environment at concentrations above the SDWA standard. Other radionuclides, at concentrations below the SDWA standards, will be monitored to ensure they remain at safe levels. Consequently, the end state path forward for Pahute Mesa has evolved to take full advantage of the data from the monitoring network to constrain uncertainty in model forecasts and to reduce reliance on probabilistic simulations. The focus of the end state approach relies on developing a monitoring well network that is protective of human health by increasing confidence that no radionuclide plume in the groundwater will migrate undetected to the accessible environment, located about 22 km from the nearest up-gradient underground nuclear test. Using the measured data to remove uncertainty, the evaluation of radionuclide migration from Pahute Mesa is directed toward meeting the goals of the end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Energy Physics Network Requirements Review (Final Report, July-October 2020)

Throughout 2020, ESnet and the Office of High Energy Physics (HEP) of the DOE SC organized an ESnet requirements review of HEP-supported activities. Preparation for this event included identification of key stakeholders: program and facility management, research groups, technology providers, and a number of external observers. These individuals were asked to prepare formal case study documents about their relationship to the HEP program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward. A series of pre-planning meetings better prepared case study authors for this task, along with guidance on how the review would proceed in a virtual fashion.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

IRIS Reimagined: Advancements in Intelligent Runtime System for Task-Based Programming

Task-based programming models are gaining traction in scientific computing. IRIS is a portable runtime system that exploits multiple heterogeneous programming systems and can discover available resources and manage multiple diverse programming systems (e.g., CUDA, Hexagon, HIP, Level Zero, OpenCL, and OpenMP) simultaneously. It accounts for the constraints of task dependencies and provides customizable scheduling policies to map those tasks to heterogeneous devices. In this paper, we present new capabilities added to IRIS to improve its portability for heterogeneous programming, build-friendliness, and performance efficiency. The new additions include vendor-specific kernel support, a runtime system with a foreign function interface to eliminate writing wrapper or boilerplate code for heterogeneous kernels, an easy-to-use and configurable CMake-based build environment, automatic and efficient data transfers and orchestration, and the Hunter and DAGGER toolchains to evaluate IRIS’s task scheduling algorithms.

Miniskar, Narasinga Rao↗

Waste Treatment of Acidic Solutions from the Dissolution of Irradiated LEU Targets for 99-Mo Production

One of the missions of the Reduced Enrichment for Research and Test Reactors (RERTR) program (and now the National Nuclear Security Administrations Material Management and Minimization program) is to facilitate the use of low enriched uranium (LEU) targets for 99 Mo production. The conversion from highly enriched uranium (HEU) to LEU targets will require five to six times more uranium to produce an equivalent amount of 99 Mo. The work discussed here addresses the technical challenges encountered in the treatment of uranyl nitrate hexahydrate (UNH)/nitric acid solutions remaining after the dissolution of LEU targets. Specifically, the focus of this work is the calcination of the uranium waste from 99 Mo production using LEU foil targets and the Modified Cintichem Process. Work with our calciner system showed that high furnace temperature, a large vent tube, and a mechanical shield are beneficial for calciner operation. One- and two-step direct calcination processes were evaluated. The high-temperature one-step process led to contamination of the calciner system. The two-step direct calcination process operated stably and resulted in a relatively large amount of material in the calciner cup. Chemically assisted calcination using peroxide was rejected for further work due to the difficulty in handling the products. Chemically assisted calcination using formic acid was rejected due to unstable operation. Chemically assisted calcination using oxalic acid was recommended, although a better understanding of its chemistry is needed. Overall, this work showed that the two-step direct calcination and the in-cup oxalic acid processes are the best approaches for the treatment of the UNH/nitric acid waste solutions remaining from dissolution of LEU targets for 99 Mo production.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

QuarkNet Center Summer Programs

The purpose of this CRADA is to provide the contractual vehicle for Fermilab to receive funds from Notre Dame in support of the QuarkNet Local Programs that are managed by Fermilab. Local QuarkNet Centers provide professional development programs to high school teachers and high energy physics research opportunities to high school teachers and students who participate in the local programs. Fermilab administers a local program that combines two QuarkNet Centers, for Fermilab and the University of Chicago.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 577 AREA 5 CHROMIUM CONTAINING WASTE DISPOSAL CELLS

Report will be submitted to the state of Nevada Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site (NNSS) Area 5 Radioactive Waste Management Site (RWMS) where buried waste received from Nuclear Fuel Services, Inc. (NFS), was subsequently determined to contain chromium that exceeded the Toxicity Characteristic Leaching Procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office on April 25, 2019. The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste cells and documentation of that closure through FFACO-type documents (NDEP 2019). As stipulated in Paragraph 5C of the SA, a Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) was prepared that identified and evaluated risks and corrective action alternatives (CAAs) for CAU 577, provided the plan for implementing the recommended CAA, and presented the post-closure plan (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗