At least 901 records · Page 50

Simulation of CO 2 Storage

This report is a compilation of Lawrence Livermore National Laboratory’s (LLNL) accomplishments on CO 2 storage simulation and modeling research, performed for the US-­China Clean Energy Research Center (CERC). Within the CERC project management structure, this work is referred to as Subtask 6.4.a Simulation and Modeling. The task falls under CERC’s Advanced Coal Technology Consortium (ACTC) Research Theme 6—CO 2 Sequestration Capacity and Near-­Term Opportunities. The goals of the task were to develop new CO 2 sequestration simulation approaches and tools, then apply them to CO 2 storage projects in the U.S. and China. Work on this task paused when funding was redirected to CERC’s other efforts. Two sections of this report provide valuable snapshot of LLNL’s progress when funding was curtailed: 1) Section 5.2.2 is a 14-­page presentation written January 8, 2013; and 2) Section 5.1.3 is a progress report from the first quarter of Fiscal year 2013.

20 FOSSIL-FUELED POWER PLANTS↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗

AmeriFlux FLUXNET-1F US-xBR NEON Bartlett Experimental Forest (BART)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xBR NEON Bartlett Experimental Forest (BART). This is the FLUXNET version of the carbon flux data for the site US-xBR NEON Bartlett Experimental Forest (BART) produced by applying the standard ONEFlux (1F) software. Site Description - The Bartlett Experimental Forest is an actively managed forest; managed portions (30%) reflect a range of forest patch sizes and structural distributions. The Bartlett forest has a history of logging dating from colonial times through the beginning of the 20th century. Approximately 70% of the land area has remained uncut since the early 1900s. Natural disturbances include late 19th century fire, beech scale-Nectria complex (beech bark disease) beginning in the 1940s, severe wind disturbance resulting from hurricanes in 1938 and 1954 and a damaging ice storm in 1998.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F US-RC1 Cook Agronomy Farm - No Till

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-RC1 Cook Agronomy Farm - No Till. This is the FLUXNET version of the carbon flux data for the site US-RC1 Cook Agronomy Farm - No Till produced by applying the standard ONEFlux (1F) software. Site Description - RC1 operated from 2013-2016 at the R.J. Cook Agronomy Farm, as part of a cluster of 5 towers (RC1 to RC5) operated for the Regional Approaches to Climate Change (REACCH) USDA-supported research project. The tower predates the Longterm Agroecosystem Research (LTAR) site common experiment, which was established in nearby fields at the Cook Agronomy Farm in 2017. Cook Agronomy Farm is in the high precipitation agroecological zone of the Columbia Plateau’s dryland cropping region. Wheat-based crop rotations are grown on an annual planting schedule. RC1 was in no-till management since 1998, and was contrasted with RC2, which had conventional, reduced-tillage management. RC1 captured the same tillage practices as the US-CF1 site established in 2017 as part of LTAR common experiment. However, the towers have distinct footprints, aspects, and soil series composition.

Chi, Jinshu [The Hong Kong University of Science a↗

Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

Source record↗

Risk analysis simulation of rover operations for Mars surface exploration

Risk management advocates have long sought to directly influence the early stages of the systems engineering process through a more effective role in system design trade studies. The principal obstacle to this has been the lack of credible ways to represent and quantify mission risk—that is, a combination of the probability of mission success (“system safety”) and science value—for the project manager and the rest of the design team. If it were possible to quantify mission risk, then the effects of proposed mission and system design changes could be calculated, and along with life-cycle costs, could be used to explore the design space more extensively and select better designs. JPL has been working to build the capability to quantify the probability of mission success using a federation of diverse simulations and models, each of which contributes some vital piece of the puzzle. The initial institutional focus has been on Mars surface operations. This ensemble computing framework enables the diverse models and simulations to work together seamlessly. Recent work at JPL has demonstrated the capability to exercise this ensemble from end-to-end using an Oracle-based database to automatically move results from one model/simulation to the next stage in the analysis.

Shishko, Robert↗

AmeriFlux FLUXNET-1F US-HB2 Hobcaw Barony Mature Longleaf Pine

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-HB2 Hobcaw Barony Mature Longleaf Pine. This is the FLUXNET version of the carbon flux data for the site US-HB2 Hobcaw Barony Mature Longleaf Pine produced by applying the standard ONEFlux (1F) software. Site Description - A mature longleaf pine forest that is periodically managed with fire

Forsythe, Jeremy D.↗

Synergy for a Strong Future FY 2008

Lawrence Livermore National Security, LLC is committed to delivering the best combination of scientific research, technology development, business management, and safe, secure operations in support of Lawrence Livermore National Laboratory's critical national security mission. LLNS was formed specifically to manage LLNL for the Department of Energy's National Nuclear Security Administration. LLNS consists of a team of five organizations renowned for their expertise and accomplishments throughout the U.S. nuclear weapons complex and beyond - Bechtel National, University of California, Babcock & Wilcox, Washington Division of URS Corporation, and Battelle. Bechtel is the nation's largest engineering and construction firm and a leader in project management. The University of California is the world's largest public research institution. Babcock & Wilcox and the Washington Division of URS Corporation are top nuclear facilities contractors and between them manage four of DOE's five safest sites. Battelle is a global leader in science and technology development and commercialization. The LLNS Board of Governors provides oversight for the management of the Laboratory and holds the Director and LLNS President responsible for the Laboratory's performance. The Board has seven standing committees that assist in assessing Laboratory performance and monitoring risks and internal controls. Through the Board of Governors, the Laboratory can reach back to LLNS partner organizations to help ensure that it fulfills its national security mission with excellence in scientific research, technology development, business management, and safe, secure operations. LLNS assumed management of LLNL on October 1, 2007. This report highlights LLNS accomplishments in FY2008, its first year as the Laboratory's managing contractor. It is clear that LLNS and the Laboratory have exploited numerous synergies inherent in their relationship - for example, science and engineering, mission and operations, LLNS partners and LLNL directorates - to notable success.

99 GENERAL AND MISCELLANEOUS↗

The Value of Successful MBSE Adoption

The value of successful adoption of Model Based System Engineering (MBSE) practices is hard to quantify. Most engineers and project managers look at the success in terms of cost. But there are other ways to quantify the value of MBSE and the steps necessary to achieve adoption. The Glenn Research Center (GRC) has been doing Model-Based Engineering (design, structural, etc.) for years, but the system engineering side has not. Since 2010, GRC has been moving from documents centric to MBSE/SysML. Project adoption of MBSE has been slow, but is steadily increasing in both MBSE usage and complexity of generated products. Sharing of knowledge of lessons learned in the implementation of MBSE/SysML is key for others who want to be successful. Along with GRC's implementation, NASA is working hard to increase the successful implementation of MBSE across all the other centers by developing guidelines, templates and libraries for projects to utilize. This presentation will provide insight into recent GRC and NASA adoption efforts, lessons learned and best practices.

MBSE↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AmeriFlux FLUXNET-1F US-xCL NEON LBJ National Grassland (CLBJ)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xCL NEON LBJ National Grassland (CLBJ). This is the FLUXNET version of the carbon flux data for the site US-xCL NEON LBJ National Grassland (CLBJ) produced by applying the standard ONEFlux (1F) software. Site Description - The LBJ Grasslands is 16,800 acres of land managed by the US Forest Service under the US Department of Agriculture. There is a rich legacy of land use, ranging back to the mid-19th century. Currently, LBJ Grasslands are used for recreation and hunting, livestock grazing, and fossil fuel extraction. Ongoing ecological monitoring is performed at the site, along with prescribed burning.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F US-Twt Twitchell Island

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Twt Twitchell Island. This is the FLUXNET version of the carbon flux data for the site US-Twt Twitchell Island produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Island site is a rice paddy that is owned by the state and managed by the California Department of Water Resources. While Bare Peat field was leveled for rice planting, the tower was installed on April 3, 2009. The rice paddy was converted from corn in 2007. In Summer 2009, Bispyribac-sodium and Pendimethalin herbicides were applied to the fields prior to rice planting and flooding, then pesticide and fertilizer application took place. Each year after rice is planted in the spring by drilling, the field is flooded. Then, the field is drained in early fall, rice is harvested, and the field site is moved.

Knox, Sara [University of California, Berkeley]↗

AmeriFlux FLUXNET-1F US-UTD UFLUX Dugout Ranch

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-UTD UFLUX Dugout Ranch. This is the FLUXNET version of the carbon flux data for the site US-UTD UFLUX Dugout Ranch produced by applying the standard ONEFlux (1F) software. Site Description - The station is located along a fence line between two fields that are managed indentically. The land manager plants an alfalfa mix crop and uses wheel line irrigation.

Inkenbrandt, Paul [Utah Geological Survey]↗

Mining Air for Fuels and Fine Chemicals

The Intergovernmental Panel on Climate Change’s 2021 report underscores that Direct Air Capture (DAC) is an essential component to limiting global warming to 2 °C, yet separating CO 2 from air and its subsequent concentration for conversion into carbon neutral fuels/chemicals or permanent storage remains energy intensive and costly. Further, most DAC technologies rely on repetitive capture and release cycles that reduces the amount of time the DAC materials are able to collect CO 2 and increases wear and tear. Moisture swing (MS) sorption within anion exchange materials utilizes differences in relative humidity to capture and concentrate CO 2 up to 500-fold with negligible energy inputs and low-cost sorbents. Molecular modeling predicts that membranes with a dry and wet side would actively transport CO 2 from its dry side to its wet side against a counter flow of H 2 O evaporating on the dry side, however, existing MS materials are too brittle to be processed into membranes to test this hypothesis. This project brought together experts in DAC materials and design, techno-economic analysis and project management at Arizona State University (ASU), polymer processing at University of Texas at Austin (UTA) and modeling gas transport and exchange at Norther Arizona University (NAU) to develop hollow fiber membranes that use energy from water evaporation to continuously pump CO 2 from air against a concentration gradient to the membranes interior and requiring significantly less energy than current DAC technologies. While this project did not meet its ultimate objectives of demonstrating an active CO 2 pumping membrane, a number of key accomplishments were made in developing low-cost, flexible anion exchange membranes (AEM) at 3.5 m 2 scale, characterizing the ionic and molecular transport within MS materials, and developing several analytical and mathematical models of the MS and pumping process leading to new fundamental knowledge about key rate limiting steps of CO 2 flux in anion exchange membranes at low water activity. Technoeconomic models show that if CO 2 fluxes ≥ 25 µmol CO 2 m -2 s -1 (membrane surface area) are achieved that cost ≤ $\$$100/tonne CO 2 captured, purified and compressed to pipeline quality is possible. The knowledge gained in this research will guide future research in developing new materials toward overcoming these rate limiting steps that in turn could enable transformative and disruptive DAC technologies needed for capturing gigatons of CO 2 per year needed to limiting global warming to 2 °C.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

AmeriFlux FLUXNET-1F US-GLE GLEES

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-GLE GLEES. This is the FLUXNET version of the carbon flux data for the site US-GLE GLEES produced by applying the standard ONEFlux (1F) software. Site Description - The Glacier Lakes Ecosystem Experiments Site (GLEES) site is located on land owned by the U.S. government and managed by US Forest Service as part of the Medicine Bow National Forest. Many of the trees in the immediate vicinity of the site are older than 400 years, inter-dispersed among trees much younger in age. This widespread age distribution is most likely a derivation of one of two scenarios: 1) A widespread stand replacement about 400 years ago followed by a slow replacement; 2) Intermittent random disturbances over the past 400 years (Bradford et al. 2008). A decade long spruce beetle outbreak that peaked in 2008 resulted in the mortality of 85% of the forested basal area. There are a few private land holdings in the area, with scattered uncorked mining claims. Following the establishment of the National Forest, mining was banned and grazing was closed in the early 1990's in the upper portion of the GLEES site. Recreation in the winter, when snow can remain in patches into the summer months, snow mobiling and cross country skiing are popular. During the limited summer, hiking, camping and fishing are common activities. The site is accessible by vehicle only during the summer on Forest Road FDR 317, and in the winter, the tower is only reachable via snowmobile.

Frank, John↗

Greenbuilt Retrofit Test House Final Report

The Greenbuilt house, is an all-electric, 1980's era home in the eastern Sacramento suburb of Fair Oaks that was retrofit by Greenbuilt Construction as part of Sacramento Municipal Utility District's (SMUD) Energy Efficient Remodel Demonstration (EERD) Program. The project was a joint effort between the design-build team at Greenbuilt Construction, led by Jim Bayless, SMUD and their project manager Mike Keesee, and the National Renewable Energy Laboratory (NREL). The goal of the Energy Efficient Remodel Demonstration program is to work with local builders to renovate homes with cost-effective energy efficient retrofit measures. The homes remodeled under the EERD program are intended to showcase energy efficient retrofit options for homeowners and other builders. The Greenbuilt house is one of five EERD projects that NREL has supported. NREL's main role in these projects is to provide energy analysis and to monitor the home's performance after the retrofit to verify that the energy consumption is in line with the modeling predictions. NREL also performed detailed monitoring on the more innovative equipment included in these remodels, such as an add-on heat pump water heater.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Principle Findings from Development of a Recirculated Exhaust Gas Intake Sensor (REGIS) Enabling Cost-Effective Fuel Efficiency Improvement

Kick-off of the Bosch scope of work for the REGIS project started in October 2012. The primary work-packages included in the Bosch scope of work were the following: overall project management, development of the EGR sensor (design of sensor element, design of protection tube, and design of mounting orientation), development of EGR system control strategy, build-up of prototype sensors, evaluation of system performance with the new sensor and the new control strategy, long-term durability testing, and development of a 2nd generation sensor concept for continued technology development after the REGIS project. The University of Clemson was a partner with Bosch in the REGIS project. The Clemson scope of work for the REGIS project started in June 2013. The primary work-packages included in the Clemson scope of work were the following: development of EGR system control strategy, and evaluation of system performance with the new sensor and new control strategy. This project was split into phase I, phase II and phase III. Phase I work was completed by the end of June 2014 and included the following primary work packages: development of sensor technical requirements, assembly of engine testbench at Clemson, design concept for sensor housing, connector, and mounting orientation, build-up of EGR flow test benches at Bosch, and build-up of first sensor prototypes. Phase II work was completed by the end of June 2015 and included the following primary work pack ages: development of an optimizing function and demonstration of robustness of sensor, system control strategy implementation and initial validation, completion of engine in the loop testing of developed control algorithm, completion of sensor testing including characteristic line, synthetic gas test stand, and pressure dependency characterization, demonstration of benefits of control w/o sensing via simulation, development of 2nd generation sensor concept. Notable technical achievements from phase II were the following: publication of two new technical papers by Clemson detailing the control strategies used for the EGR system control. The two papers was published in the 2016 SAE World Congress in April 2016. The titles of each paper are, “Physics-Based Exhaust Pressure and Temperature Estimation for Low Pressure EGR Control in Turbocharged Gasoline Engines,” by K. Siokos, and “A Control Algorithm for Low Pressure – EGR Systems using a Smith Predictor with Intake Oxygen Sensor Feedback”, by R. Koli. All phase III work packages have been completed. The primary work packages in phase III were the following: completion of long-term sensor durability testing, final demonstration of benefits of EGR control w/o sensing, final decision of the second generation sensor development path.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

AmeriFlux FLUXNET-1F US-Tw5 East Pond Wetland

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Tw5 East Pond Wetland. This is the FLUXNET version of the carbon flux data for the site US-Tw5 East Pond Wetland produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Wetland site is a 6.5 acre restored wetland on Twitchell Island, that is managed by the California Department of Water Resources (DWR) and the U.S. Geological Survey (USGS). In the fall of 1997, the site was permanently flooded to a depth of approximately 55 cm. The wetland remained fairly unvegetated in patches increasing in size towards the east. The site underwent a major disturbance in 2013 when the vegetation was removed to seed a nearby restored wetland. A flux tower equipped to analyze energy, H2O, CO2, and CH4 fluxes was installed on April 17, 2018.

Valach, Alex↗