Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Experiments in infrared multispectral mapping of earth resources

Two evolutionary infrared remote sensing experiments provide the basis for the development of an operational mapping capability for geology exploration. A 10-band radiometer scheduled for an early Shuttle flight has completed an aircraft flight program which demonstrated the utility of a number of narrow spectral channels. A multispectral mapper utilizing an infrared area array detector to acquire simultaneous images in multiple wavelengths is being assembled. A design concept for an operational sensor which employs area arrays for registered multispectral image data acquisition is under study. The sensor would utilize onboard spectral band selection, radiometric correction, and data compression to satisfy the demanding requirements of the user community.

Wellman, J. B.↗

Simultaneous personnel and vehicle shift scheduling in the waste management sector

Highlights: • We consider the problem of simultaneously schedule personnel and vehicle shifts in the waste management sector. • We propose both an optimization model and a heuristic approach. • Important monetary savings can be achieved in the waste collection operations. - Abstract: Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the definition of shift schedules for both personnel and vehicles. This activity has a great incidence on the tactical and operational cost for companies. In this paper, we propose an integer programming model to find an optimal solution to the integrated problem. The aim is to determine optimal schedules at minimum cost. Moreover, we design a fast and effective heuristic to face large-size problems. Both approaches are tested on data from a real-world case in Southern Italy and compared to the current practice utilized by the company managing the service, showing that simultaneously solving these problems can lead to significant monetary savings.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Production Experiences with the Cray-Enabled TORQUE Resource Manager

High performance computing resources utilize batch systems to manage the user workload. Cray systems are uniquely different from typical clusters due to Cray s Application Level Placement Scheduler (ALPS). ALPS manages binary transfer, job launch and monitoring, and error handling. Batch systems require special support to integrate with ALPS using an XML protocol called BASIL. Previous versions of Adaptive Computing s TORQUE and Moab batch suite integrated with ALPS from within Moab, using PERL scripts to interface with BASIL. This would occasionally lead to problems when all the components would become unsynchronized. Version 4.1 of the TORQUE Resource Manager introduced new features that allow it to directly integrate with ALPS using BASIL. This paper describes production experiences at Oak Ridge National Laboratory using the new TORQUE software versions, as well as ongoing and future work to improve TORQUE.

Adaptive Comput- ing↗

Enforcing End-to-end I/O Policies for Scientific Workflows using Software-Defined Storage Resource Enclaves

Data-intensive knowledge discovery requires scientific applications to run concurrently with analytics and visualization codes executing in situ for timely output inspection and knowledge extraction. Consequently, I/O pipelines of scientific workflows can be long and complex because they comprise many stages of analytics across different layers of the I/O stack of high-performance computing systems. Performance limitations at any I/O layer or stage can cause an I/O bottleneck resulting in greater than expected end-to-end I/O latency. In this paper, we present the design and implementation of a novel data management infrastructure called Software-Defined Storage Resource Enclaves (SIREN) at system level to enforce end-to-end policies that dictate an I/O pipeline's performance. SIREN provides an I/O performance interface for users to specify the desired storage resources in the context of in-situ analytics. If suboptimal performance of analytics is caused by an I/O bottleneck when data are transferred between simulations and analytics, schedulers in different layers of the I/O stack automatically provide the guaranteed lower bounds on I/O throughput. Lastly, our experimental results demonstrate that SIREN provides performance isolation among scientific workflows sharing multiple storage servers across two I/O layers (burst buffer and parallel file systems) while maintaining high system scalability and resource utilization.

97 MATHEMATICS AND COMPUTING↗

Characterizing and Modeling Cloud Applications/Jobs on a Google Data Center

In this paper, we characterize and model Google applications and jobs, based on a 1-month Google trace from a large-scale Google data center. We address four contributions: (1) we compute the valuable statistics about task events and resource utilization for Google applications, based on various types of resources and execution types; (2) we analyze the classification of applications via a K-means clustering algorithm with optimized number of sets, based on task events and resource usage; (3) we study the correlation of Google application properties and running features (e.g., job priority and scheduling class); (4) we finally build a model that can simulate Google jobs/tasks and dynamic events, in accordance with Google trace. Experiments show that the tasks simulated based on our model exhibit fairly analogous features with those in Google trace. 95+ % of tasks' simulation errors are 20 %, confirming a high accuracy of our simulation model.

Di, Sheng↗

Quantum Noise Mitigation: Introducing the Robust Quantum Circuit Scheduler for Enhanced Fidelity and Throughput

Undoubtedly, quantum computing offers valuable acceleration for solving intricate problems. One of the primary hurdles lies in executing large-scale quantum applications on backend machines. Qubit noise, among other factors, dramatically influences the execution process. Implementing effective scheduling techniques for quantum circuits is crucial for practical quantum computing and preventing excessive waiting times. The quantum realm is distinct from classical computing in terms of optimization, performance, utilization, and waiting periods. Consequently, the parameters and components of quantum circuit scheduling diverge from those of classical computing. This paper presents Quantum Noise Mitigation: Introducing the Robust Quantum Circuit Scheduler for Enhanced Fidelity and Throughput, a straightforward yet effective scheduling framework and policy that enhances noise resilience, throughput, and the fidelity of quantum circuits. Drawing inspiration from classical methods, our scheduling approach incorporates additional constraints tailored for quantum logic. The outcome demonstrates a substantial improvement in fidelity and resource management, which is vital for real-world quantum applications.

Baheri, Betis↗

Space Network Control Conference on Resource Allocation Concepts and Approaches

The results are presented of the Space Network Control (SNC) Conference. In the late 1990s, when the Advanced Tracking and Data Relay Satellite System is operational, Space Network communication services will be supported and controlled by the SNC. The goals of the conference were to survey existing resource allocation concepts and approaches, to identify solutions applicable to the Space Network, and to identify avenues of study in support of the SNC development. The conference was divided into three sessions: (1) Concepts for Space Network Allocation; (2) SNC and User Payload Operations Control Center (POCC) Human-Computer Interface Concepts; and (3) Resource Allocation Tools, Technology, and Algorithms. Key recommendations addressed approaches to achieving higher levels of automation in the scheduling process.

Moe, Karen L.↗

NASA aerospace pyrotechnically actuated systems: Program plan

The NASA Aerospace Pyrotechnically Actuated Systems (PAS) Program, a focused technology program, is being initiated to enhance the reliability, safety, and performance of pyrotechnically actuated systems. In broad terms, this Program Plan presents the approach that helps to resolve concerns raised by the NASA/DOD/DOE Aerospace Pyrotechnic Steering Committee. This Plan reflects key efforts needed in PAS technology. The resources committed to implement the Program will be identified in the Program Implementation Plan (PIP). A top level schedule is included along with major Program milestones and products. Responsibilities are defined in the PIP. The Plan identifies the goals and detailed objectives which define how those goals are to be accomplished. The Program will improve NASA's capabilities to design, develop, manufacture, and test pyrotechnically actuated systems for NASA's programs. Program benefits include the following: advanced pyrotechnic systems technology developed for NASA programs; hands-on pyrotechnic systems expertise; quick response capability to investigate and resolve pyrotechnic problems; enhanced communications and intercenter support among the technical staff; and government-industry PAS technical interchange. The PAS Program produces useful products that are of a broad-based technology nature rather than activities intended to meet specific technology objectives for individual programs. Serious problems have occurred with pyrotechnic devices although near perfect performance is demanded by users. The lack of a program to address those problems in the past is considered a serious omission. The nature of problems experienced as revealed by a survey are discussed and the origin of the program is explained.

Schulze, Norman R.↗

Coordinated scheduling for dynamic real-time systems

In this project, we addressed issues in coordinated scheduling for dynamic real-time systems. In particular, we concentrated on design and implementation of a new distributed real-time system called R-Shell. The design objective of R-Shell is to provide computing support for space programs that have large, complex, fault-tolerant distributed real-time applications. In R-shell, the approach is based on the concept of scheduling agents, which reside in the application run-time environment, and are customized to provide just those resource management functions which are needed by the specific application. With this approach, we avoid the need for a sophisticated OS which provides a variety of generalized functionality, while still not burdening application programmers with heavy responsibility for resource management. In this report, we discuss the R-Shell approach, summarize the achievement of the project, and describe a preliminary prototype of R-Shell system.

Natarajan, Swaminathan↗

Assemby, test, and launch operations for the Mars Exploration Rovers

In January of 2004, NASA's twin Mars rovers, Spirit and Opportunity, successfully landed on opposite sides of the Red Planet after a seven month Earth to Mars cruise period. Both vehicles have operated well beyond their 90 day primary mission design life requirements. The Assembly, Test, and Launch Operations (ATLO) program for these missions presented unique technical and schedule challenges to the team at the Jet Propulsion Laboratory (JPL). Among these challenges were a highly compressed schedule and late deliveries leading to extended double shift staffing, dual spacecraft operations requiring test program diversification and resource arbitration, multiple atypical test configurations for airbag/rocket landings and surface mobility testing, and verification of an exceptionally large number of separations, deployments, and mechanisms. This paper discusses the flight system test philosophies and approach, and presents lessons learned.

Assembly, Test, and Launch Operations (ATLO)↗

A Look at the Impact of High-End Computing Technologies on NASA Missions

From its bold start nearly 30 years ago and continuing today, the NASA Advanced Supercomputing (NAS) facility at Ames Research Center has enabled remarkable breakthroughs in the space agency s science and engineering missions. Throughout this time, NAS experts have influenced the state-of-the-art in high-performance computing (HPC) and related technologies such as scientific visualization, system benchmarking, batch scheduling, and grid environments. We highlight the pioneering achievements and innovations originating from and made possible by NAS resources and know-how, from early supercomputing environment design and software development, to long-term simulation and analyses critical to design safe Space Shuttle operations and associated spinoff technologies, to the highly successful Kepler Mission s discovery of new planets now capturing the world s imagination.

Biswas, Rupak↗

Regulatory and Permitting Information Desktop (RAPID) Toolkit (Poster)

The Regulatory and Permitting Information Desktop (RAPID) Toolkit combines the former Geothermal Regulatory Roadmap, National Environmental Policy Act (NEPA) Database, and other resources into a Web-based tool that gives the regulatory and utility-scale geothermal developer communities rapid and easy access to permitting information. RAPID currently comprises five tools - Permitting Atlas, Regulatory Roadmap, Resource Library, NEPA Database, and Best Practices. A beta release of an additional tool, the Permitting Wizard, is scheduled for late 2014. Because of the huge amount of information involved, RAPID was developed in a wiki platform to allow industry and regulatory agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users. In 2014, the content was expanded to include regulatory requirements for utility-scale solar and bulk transmission development projects. Going forward, development of the RAPID Toolkit will focus on expanding the capabilities of current tools, developing additional tools, including additional technologies, and continuing to increase stakeholder involvement.

15 GEOTHERMAL ENERGY↗

A Hybrid Stochastic-Interval Operation Strategy for Multi-Energy Microgrids

Increasing deployment of distributed energy resources intensifies interactions among electric, gas, heating, and cooling systems. Inherent uncertainties ranging from internal parameters to external inputs also impose significant challenges on system operation. A coordinated scheduling method is, therefore, desired for facilitating efficient operation of multi-energy microgrids under multiple uncertainties. In this paper, a deterministic coordinated scheduling model is developed first with detailed modeling of system dynamics and device parameters to fully characterize complex interactions among multi-energy carriers. Then, a hybrid stochastic-interval method is proposed to account for heterogeneous uncertainties in decisions of operational strategies. Specifically, performance and efficiency uncertainties of distributed energy resources, and injection uncertainty of renewable sources and multienergy demands are characterized by interval-based uncertain operation regions and probability distributions, respectively. A scenario-based two-stage algorithm is developed to solve the problem so that multiple uncertainties are preserved in the entire decision-making process. Moreover, adjustable operational strategies are determined to hedge uncertainty by considering operators’ risk preferences. The validity of the proposed method is verified by comprehensive case studies on a test system.

hybrid stochastic-interval approach↗

Skylab program. Earth resources experiment package. Sensor performance report. Volume 7 (S190B): SL2, SL3 and SL4 evaluations

The S190B Earth Terrain Camera (ETC) operated acceptably for all of its scheduled EREP passes throughout the SL2 mission. The crew reported no problems in unstowing the camera, changing filters, installing the ETC window in the SAL, or installing the camera onto the window. The ETC was operated for a total of seven times with no failures. The clock on the ETC was checked on DOY 170 (June 19, 1973) and was found to be 30 min. and 58 sec. slower than GMT. The change in time was expected since a similar circumstance was experienced during ETC qualification testing for launch vibration. A leak existed in the seal of the spare magazine to the camera vacuum interface. For EREP passes 08 and 10, black-and-white film EK 3414 (roll no. 82) was installed in this spare magazine. Since there was an audible hiss, the vacuum hose was not connected to the camera. This caused the vacuum platen to be inoperable, resulting in some degradation in resolution for this roll of film. The vegetation of the South American jungle areas proved to be much darker than vegetation found in the United States, and was consequently about 1/2 stop underexposed in all cases.

Kenney, G. P.↗

Flexible operation of batteries in power system scheduling with renewable energy

The fast growing expansion of renewable energy increases the complexities in balancing generation and demand in the power system. The energy-shifting and fast-ramping capability of energy storage has led to increasing interests in batteries to facilitate the integration of renewable resources. In this paper, we present a two-step framework to evaluate the potential value of energy storage in power systems with renewable generation. First, we formulate a stochastic unit commitment approach with wind power forecast uncertainty and energy storage. Second, the solution from the stochastic unit commitment is used to derive a flexible schedule for energy storage in economic dispatch where the look-ahead horizon is limited. Here, analysis is conducted on the IEEE 24-bus system to demonstrate the benefits of battery storage in systems with renewable resources and the effectiveness of the proposed battery operation strategy.

25 ENERGY STORAGE↗

Terrestrial Proving Ground Capabilities Needed for Lunar In Situ Resource Utilization (ISRU) & Construction Concepts of Operation

Incorporating any new technology or system into a human exploration mission or architecture requires development well in advance of the mission to eliminate technology, cost, and schedule risk concerns. It is often stated that technologies need to be at a Technology Readiness Level (TRL) of 6, i.e. ‘system/subsystem model or prototype demonstration in a relevant environment (ground or space)’, by Authority To Proceed (ATP) or by the Preliminary Design Review (PDR) for the mission at the latest. There are two game changing capabilities for sustained human exploration of space that can have a significant effect on the overall exploration architecture and the technologies and systems included in the architecture. The first game changing capability, known as In Situ Resource Utilization (ISRU), involves the search for, acquisition, and processing of resources on the Moon and Mars into mission consumables and usable products, and the second is the ability to utilize space resources in the construction of roads, structures, and surface infrastructure. ISRU and surface construction capabilities have the potential to greatly reduce the cost and risk of human exploration while enabling sustained lunar surface and commercial operations. However, ISRU and surface construction systems are complex and must operate in extremely harsh environments, with abrasive regolith and pervasive dust, for long-periods of time, with potentially limited opportunities for maintenance and repair by humans. The complexity of these capabilities and operations also means that there are a limited number of companies that can design, build, and operate end-to-end systems on their own. The majority of the technologies being developed for these systems are by small companies and at the component or subsystem level. With the overarching strategy of the United States National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) to enable industry to implement ISRU and surface infrastructure for Artemis and space commercialization, it is therefore important to establish processes and capabilities to promote and foster collaborations among large and small companies involved in ISRU and surface infrastructure development. For ISRU and infrastructure systems and capabilities to be used in Artemis missions and future commercial lunar surface operations, a coordinated framework with virtual/physical integration and testing locations, or ‘Proving Grounds’, needs to be established and operated on a regular basis and open to all. This paper will discuss the ISRU and surface construction near and long-term concepts of operations, and review operations and lessons-learned from the previous ISRU analog field tests. From this information, requirements and capabilities will be proposed to support and enable the integration and testing of ISRU and construction systems with industry, academia, and international agencies, as well as what facilities and organizations could help establish these Proving Grounds.

ISRU↗

Design and architecture of the Mars relay network planning and analysis framework

In this paper we describe the design and architecture of the Mars Network planning and analysis framework that supports generation and validation of efficient planning and scheduling strategy. The goals are to minimize the transmitting time, minimize the delaying time, and/or maximize the network throughputs. The proposed framework would require (1) a client-server architecture to support interactive, batch, WEB, and distributed analysis and planning applications for the relay network analysis scheme, (2) a high-fidelity modeling and simulation environment that expresses link capabilities between spacecraft to spacecraft and spacecraft to Earth stations as time-varying resources, and spacecraft activities, link priority, Solar System dynamic events, the laws of orbital mechanics, and other limiting factors as spacecraft power and thermal constraints, (3) an optimization methodology that casts the resource and constraint models into a standard linear and nonlinear constrained optimization problem that lends itself to commercial off-the-shelf (COTS)planning and scheduling algorithms.

Mars relay network planning analysis↗

Network-Aware and Welfare-Maximizing Dynamic Pricing for Energy Sharing

The proliferation of behind-the-meter (BTM) distributed energy resources (DER) within the electrical distribution network presents significant supply and demand flexibilities, but also introduces operational challenges such as voltage spikes and reverse power flows. In response, this paper proposes a network-aware dynamic pricing framework tailored for energy-sharing coalitions that aggregate small, but ubiquitous, BTM DER downstream of a distribution system operator's (DSO) revenue meter that adopts a generic net energy metering (NEM) tariff. By formulating a Stackelberg game between the energy-sharing market leader and its prosumers, we show that the dynamic pricing policy induces the prosumers toward a network-safe operation and decentrally maximizes the energysharing social welfare. The dynamic pricing mechanism involves a combination of a locational ex-ante dynamic price and an ex-post allocation, both of which are functions of the energy sharing's BTM DER. The ex-post allocation is proportionate to the price differential between the DSO NEM price and the energy-sharing locational price. Simulation results using real DER data and the IEEE 13-bus test systems illustrate the dynamic nature of network-aware pricing at each bus, and its impact on voltage.

aggregates↗