Transient Testing of Nuclear Fuels Performed in the Original Operation of TREAT (2nd ed.)

This report provides summary information on experiments performed in the Transient Reactor Test Facility (TREAT) during its original operation from 1959-1994, and more specifically, before the TREAT core was upgraded at the end of the 1980s. The tests performed since about 1970 are summarized in considerable detail. Earlier tests are noted by their designated series and by some parameters that help to identify and distinguish each series from the others. The detailed summary descriptions are intended to help inform future researchers regarding the large, historical, empirical data base generated from that 35-year span during which hundreds of TREAT experiments were performed to investigate and demonstrate the transient behavior of a wide variety of nuclear fuels during severe off-normal and accident conditions -- using direct nuclear heating of the test samples. That empirical basis is foundational and valuable for guiding future qualification and safety evaluation of improved fuel designs and for future transient test planning and performance in TREAT. Since Edition 1 of this report, descriptions of the following test series have been added: D, E, EOS, F, H, J, R, RX, and S.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2023 SRNL Aging and Lifetimes Report: Tritium Aging of Welded and Additively Manufactured Austenitic Stainless Steels

This report documents work performed in fiscal year 2023 at Savannah River National Laboratory (SRNL) collaborating with Sandia National Laboratories in support of the Aging and Lifetimes program. This work supports Gas Transfer Systems (GTS) design by measuring the mechanical behavior of structural materials used in GTS. Data on properties in relevant conditions are crucial for GTS lifetime assessments and predictions. To simulate relevant conditions, SRNL, in concert with the Savannah River Site, thermally pre-charges test specimens with tritium and stores them at -80°C to allow the tritium decay product, helium-3, to build up while limiting tritium diffusion. According to test plans based on how much helium-3 has accumulated, specimens are removed from storage and tested. Results from mechanical testing provide an empirical basis for GTS design as well as insight to how these structural materials degrade in a tritium environment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Iodine Removal in the DFLAW Flow-Sheet

In support of the WTP project, off-gas system and regulatory testing has been conducted previously on the DM1200 pilot melter equipped with a prototypical off-gas system installed at The Catholic University of America’s Vitreous State Laboratory (VSL). During the regulatory tests, an AC-S test bed filled with Kombisorb BAT 37 was included in the prototypical off-gas system and evaluated for response to HLW and LAW exhaust streams. Offline testing and small-scale testing of that media were also conducted. Testing demonstrated that a temperature rise occurred in the activated carbon media when water vapor was first introduced to virgin Kombisorb BAT 37, in response to high nitrogen oxide concentrations, and in response to the presence of organic compounds. Conditioning of the test bed by gradually increasing the NOx concentration prior to the introduction of organics was found to be an important operational strategy for preventing larger temperature excursions. However, no mercury was present in the exhaust stream during DM1200 testing and therefore comparable test data for mercury removal efficiency or temperature response of the carbon media in the presence of mercury were not collected in the DM1200 tests. In view of the need for data on mercury removal performance, BNI contracted with Atkins and the VSL to install and operate a suitable test system at VSL to collect the required data. That testing was designed to assess the performance of Kombisorb BAT-37 and the guard bed material, Sofnolime RG, for simulated melter exhaust streams that contain the highest concentrations of mercury, nitrogen oxides, acid gases, and organic compounds expected in WTP LAW melter exhaust. During shakedown testing with the new system, however, it became evident that a number of issues with Sofnolime RG as the guard bed material would render it unsuitable for this application. BNI subsequently determined that the guard bed was redundant for removal of acid gases since they could be adequately removed by the SBS and WESP. However, since the guard bed material was also credited with significant iodine removal , there was a need for a replacement material that would adequately perform that role. BNI identified several candidate media but performance data in gas compositions that are representative of the WTP LAW off-gas were not available. Accordingly, there was a need to test and evaluate the performance of these candidate media prior to performing the originally-planned tests. To that end, small scale tests were conducted to assess the performance of various adsorbents in simulated melter exhaust streams that contain mercury, iodine, nitrogen oxides, acid gases, and acetonitrile, which are expected to be present in WTP LAW melter exhaust.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Form of Chromium on Spinel Formation

A number of Hanford high level waste (HLW) streams contain sufficiently high concentrations of chromium for it to become the waste loading limiting component in the waste. Chromium has relatively low solubility in borosilicate glasses and leads to the formation of various crystal phases including spinels. The extent of crystal formation must be managed during melter processing to prevent operational issues and potential premature melter failure that can result from excessive accumulation of crystals in the melter. In previous work for the Department of Energy (DOE) Office of River Protection (ORP), high-waste loading glass formulations were developed for representative HLW streams that are high in chromium. Results from those studies suggested that there may be differences in the crystallization behavior between glasses prepared in crucible melts and those prepared in DuraMelter 100 (DM100) joule heated melter runs. Understanding the cause of those differences has the potential to lead to the development of methods to further increase waste loadings for high chromium HLW streams through control of the formation of chromium-bearing crystals. As noted previously, the potential causes include differences in the form of components in the batch, including the form of chromium, as well as redox effects. This report describes the results from work to elucidate the origins of the observed differences and to identify melter feed composition modifications to control the formation of chromium-bearing crystal phases. The work focused on determining the effects of the form of chromium and the concentrations of oxidants in feed batches on spinel crystallization. Also evaluated was the use of potential melter feed additives to influence the redox state of chromium in the melt and its effect on spinel crystallization. As described in the Test Plan for this work, the objectives were accomplished through a combination of crucible-scale tests, small-scale tests with additives to influence redox state, and melter tests. This work builds on previous work performed at the Vitreous State Laboratory (VSL) of The Catholic University of America (CUA) for ORP to increase the waste loadings and processing rates of HLW glass formulations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Definition of ground test for Large Space Structure (LSS) control verification

An overview for the definition of a ground test for the verification of Large Space Structure (LSS) control is given. The definition contains information on the description of the LSS ground verification experiment, the project management scheme, the design, development, fabrication and checkout of the subsystems, the systems engineering and integration, the hardware subsystems, the software, and a summary which includes future LSS ground test plans. Upon completion of these items, NASA/Marshall Space Flight Center will have an LSS ground test facility which will provide sufficient data on dynamics and control verification of LSS so that LSS flight system operations can be reasonably ensured.

Waites, H. B.↗

Automated flight test management system

The Phase 1 development of an automated flight test management system (ATMS) as a component of a rapid prototyping flight research facility for artificial intelligence (AI) based flight concepts is discussed. The ATMS provides a flight engineer with a set of tools that assist in flight test planning, monitoring, and simulation. The system is also capable of controlling an aircraft during flight test by performing closed loop guidance functions, range management, and maneuver-quality monitoring. The ATMS is being used as a prototypical system to develop a flight research facility for AI based flight systems concepts at NASA Ames Dryden.

Hewett, M. D.↗

Satellite Communications for Aeronautics Applications: Technology Development and Demonstration

The National Aeronautics and Space Administration (NASA) is performing research and development to improve the safety and increase the capacity of the National Airspace System (NAS). Improved communications, especially to and from the aircraft flight deck, has been identified as an essential enabling technology for future improvements to the air traffic management system and aviation safety. NASA's Glenn Research Center is engaged in research and development of satellite communications technologies for aeronautical applications. A mobile aero terminal has been developed for use with Ku band commercial communications satellites. This experimental terminal will be used in mobile ground and air-based tests and demonstrations during 2000-2004. This paper will describe the basic operational parameters of the Ku Band aero terminal, the communications architecture it is intended to demonstrate, and the key technology issues being addressed in the tests and demonstrations. The design of the Ku Band aero terminal and associated ground testbed, planned tests and demonstrations, and results to date will be presented.

Kerczewski, Robert J.↗

Full-Scale Test and Analysis of a PRSEUS Fuselage Panel to Assess Damage-Containment Features

Stitched composite technology has the potential to substantially decrease structural weight through enhanced damage containment capabilities. The most recent generation of stitched composite technology, the Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) concept, has been shown to successfully arrest damage at the sub-component level through tension testing of a three stringer panel with damage in the form of a two-bay notch. In a joint effort undertaken by the National Aeronautics and Space Administration (NASA), the Federal Aviation Administration (FAA), and the Boeing Company, further studies are being conducted to characterize the damage containment features of the PRSEUS concept. A full-scale residual strength test will be performed on a fuselage panel to determine if the load capacity will meet strength, deformation, and damage tolerance requirements. A curved panel was designed, fabricated, and prepared for residual strength testing. A pre-test Finite Element Model (FEM) was developed using design allowables from previous test programs to predict test panel deformation characteristics and margins of safety. Three phases of testing with increasing damage severity include: (1) as manufactured; (2) barely visible impact damage (BVID) and visible impact damage (VID); and (3) discrete source damage (DSD) where the panel will be loaded to catastrophic failure. This paper presents the background information, test plan, and experimental procedure. This paper is the first of several future articles reporting the test preparations, results, and analysis conducted in the test program.

Bergan, Andrew↗

Ground Vibration Testing Options for Space Launch Vehicles

New NASA launch vehicles will require development of robust systems in a fiscally-constrained environment. NASA, Department of Defense (DoD), and commercial space companies routinely conduct ground vibration tests as an essential part of math model validation and launch vehicle certification. Although ground vibration testing must be a part of the integrated test planning process, more affordable approaches must also be considered. A study evaluated several ground vibration test options for the NASA Constellation Program flight test vehicles, Orion-1 and Orion-2, which concluded that more affordable ground vibration test options are available. The motivation for ground vibration testing is supported by historical examples from NASA and DoD. The approach used in the present study employed surveys of ground vibration test subject-matter experts that provided data to qualitatively rank six test options. Twenty-five experts from NASA, DoD, and industry provided scoring and comments for this study. The current study determined that both element-level modal tests and integrated vehicle modal tests have technical merits. Both have been successful in validating structural dynamic math models of launch vehicles. However, element-level testing has less overall cost and schedule risk as compared to integrated vehicle testing. Future NASA launch vehicle development programs should anticipate that some structural dynamics testing will be necessary. Analysis alone will be inadequate to certify a crew-capable launch vehicle. At a minimum, component and element structural dynamic tests are recommended for new vehicle elements. Three viable structural dynamic test options were identified. Modal testing of the new vehicle elements and an integrated vehicle test on the mobile launcher provided the optimal trade between technical, cost, and schedule.

Patterson, Alan↗

Chug and Dynamics of the RS-84 Subscale Preburner

The development of the RS-84 engine began in 2002 as part of the Space Launch Initiative. It was intended to be a reusable liquid oxygen/RP-1 booster engine of approximately 1 Mlbf thrust. Part of the test campaign consisted of testing subscale components to study key technologies such as oxygenrich, liquid oxygen/RP-1 combustion. In late 2003, the subscale preburner completed 4 hot-fire tests at Stennis Space Center with various hardware configurations and operating conditions, but before all planned tests could be completed the RS-84 engine development program was canceled in 2004. Recently, there has been a renewed interest in the development of an oxygen-rich, liquid oxygen/RP-1 combustion engine. Aerojet Rocketdyne and NASA completed testing of the subscale preburner in 2014 at Marshall Space Flight Center in an effort to better understand the chug encountered during the 2003 testing and to collect performance information over a wider range of operating conditions. The 2003 and 2014 data sets included extreme chug oscillations that reached nearly 200% of the chamber pressure and were reduced to well below 10% of the chamber pressure by incorporating a fuel orifice upstream of the fuel manifold. Depending on the hardware configuration and operating condition, a wide range of chug oscillation amplitudes were encountered. The dynamics for both test series were characterized and the data were used in the development of a chug model.

Casiano, M. J↗

Full Submersion Water Testing of SAVY-4000 Nuclear Material Storage Containers

SAVY-4000 (SAVY) containers are the primary container used at Technical Area (TA) TA-55 plutonium facility for the prevention of water ingress to mitigate against a criticality event. The basis for water resistance of these containers has long been attributed to the Polytetrafluoroethylene (PTFE) membrane that is assembled on the outermost surface of the filter assembly. On August 22nd a test of a container used inside of a glovebox was performed that brought into question this long-standing-basis. This test was performed by inverting a SAVY-lid onto a specialized piece of equipment for evaluating the integrity of the PTFE membrane. During the test water was observed passing through the filter indicating that the filter membrane was no longer preventing the ingress of water through the filter. The assumption after making this observation was that alpha-particles were rapidly degrading the membrane creating a leak path through the underlying aluminosilicate media (Fiberfrax®). The apparatus used was designed to only test the lid rather than the entire SAVY assembly. A test plan, PA-PLAN-01921, was developed to investigate whether a fully assembled container with a fully degraded PTFE membrane would be capable of meeting the criteria defined in PA-RD-1009 of not allowing more than 200 ml of water to enter the container with a water column of 6-inches applied over a 2-hour period. This report provides the results of the testing performed against PA-PLAN-01921.

36 MATERIALS SCIENCE↗

SU-F-T-574: MLC Based SRS Beam Commissioning - Minimum Target Size Investigation

Purpose: To implement a MLC accelerator based SRS program using small fields down to 1 cm × 1 cm and to determine the smallest target size safe for clinical treatment. Methods: Computerized beam scanning was performed in water using a diode detector and a linac-head attached transmission ion chamber to characterize the small field dosimetric aspects of a 6 MV photon beam (Trilogy-Varian Medical Systems, Inc.). The output factors, PDD and profiles of field sizes 1, 2, 3, 4, and 10 cm{sup 2} were measured and utilized to create a new treatment planning system (TPS) model (AAA ver 11021). Static MLC SRS treatment plans were created and delivered to a homogeneous phantom (Cube 20, CIRS, Inc.) for a 1.0 cm and 1.5 cm “PTV” target. A 12 field DMLC plan was created for a 2.1 cm target. Radiochromic film (EBT3, Ashland Inc.) was used to measure the planar dose in the axial, coronal and sagittal planes. A micro ion chamber (0.007 cc) was used to measure the dose at isocenter for each treatment delivery. Results: The new TPS model was validated by using a tolerance criteria of 2% dose and 2 mm distance to agreement. For fields ≤ 3 cm{sup 2}, the max PDD, Profile and OF difference was 0.9%, 2%/2mm and 1.4% respectively. The measured radiochromic film planar dose distributions had gamma scores of 95.3% or higher using a 3%/2mm criteria. Ion chamber measurements for all 3 test plans effectively met our goal of delivering the dose accurately to within 5% when compared to the expected dose reported by the TPS (1 cm plan Δ= −5.2%, 1.5 cm plan Δ= −2.0%, 2 cm plan Δ= 1.5%). Conclusion: End to end testing confirmed that MLC defined SRS for target sizes ≥ 1.0 cm can be safely planned and delivered.

07 ISOTOPE AND RADIATION SOURCES↗

Ion Exchange Testing with SRF Resin FY2012

Ion exchange using spherical resorcinol-formaldehyde (SRF) resin has been selected by the U.S. Department of Energy’s Office of River Protection (DOE-ORP) for use in the Pretreatment Facility (PTF) of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and for potential application in at-tank deployment. Numerous studies have shown SRF resin to be effective for removing 137Cs from a wide variety of actual and simulated tank waste supernatants (Adamson et al. 2006; Blanchard et al. 2008; Burgeson et al. 2004; Duignan and Nash 2009; Fiskum et al. 2006a; Fiskum et al. 2006b; Fiskum et al. 2006c; Fiskum et al. 2007; Hassan and Adu-Wusu 2003; King et al. 2004; Nash et al. 2006). Prior work at the Pacific Northwest National Laboratory (PNNL) has focused primarily on the loading behavior for 4 to 6 M Na solutions at 25 to 45°C. Recent proposed changes to the WTP ion exchange process baseline indicate that loading may include a broader range of sodium molarities (0.1 to 8 M) and higher temperatures (50°C) to alleviate post-filtration precipitation issues. This report discusses ion exchange loading kinetics testing activities performed in accordance with Test Plan TP-WTPSP-002, Rev. 3.0, which was prepared and approved in response to the Test Specification 24590 PTF-TSP-RT-09-002, Rev. 0 (Lehrman 2010) and Test Exception 24590 PTF TEF RT-11-00003, Rev. 0 (Meehan 2011). This testing focused on column tests evaluating the impact of elevated temperature on resin degradation over an extended period of time and batch contacts evaluating the impact on Cs loading over a broad range of sodium concentrations (0.1 to 5 M). These changes may be required to alleviate post-filtration precipitation issues and broaden the data range of SRF resin loading under the conditions expected with the new equipment and process changes.

Hanford Tank Waste Treatment and Immobilization Pl↗

Ion Exchange Testing with SRF Resin FY 2012

Ion exchange using spherical resorcinol-formaldehyde (SRF) resin has been selected by the U.S. Department of Energy’s Office of River Protection (DOE-ORP) for use in the Pretreatment Facility (PTF) of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and for potential application in at-tank deployment. Numerous studies have shown SRF resin to be effective for removing 137Cs from a wide variety of actual and simulated tank waste supernatants (Adamson et al. 2006; Blanchard et al. 2008; Burgeson et al. 2004; Duignan and Nash 2009; Fiskum et al. 2006a; Fiskum et al. 2006b; Fiskum et al. 2006c; Fiskum et al. 2007; Hassan and Adu-Wusu 2003; King et al. 2004; Nash et al. 2006). Prior work at the Pacific Northwest National Laboratory (PNNL) has focused primarily on the loading behavior for 4 to 6 M Na solutions at 25 to 45°C. Recent proposed changes to the WTP ion exchange process baseline indicate that loading may include a broader range of sodium molarities (0.1 to 8 M) and higher temperatures (50°C) to alleviate post-filtration precipitation issues. This report discusses ion exchange loading kinetics testing activities performed in accordance with Test Plan TP-WTPSP-002, Rev. 3.01, which was prepared and approved in response to the Test Specification 24590-PTF-TSP-RT-09-002, Rev. 0 (Lehrman 2010) and Test Exception 24590-PTF-TEF-RT-11-00003, Rev. 0 (Meehan 2011). This testing focused on column tests evaluating the impact of elevated temperature on resin degradation over an extended period of time and batch contacts evaluating the impact on Cs loading over a broad range of sodium concentrations (0.1 to 5 M). These changes may be required to alleviate post-filtration precipitation issues and broaden the data range of SRF resin loading under the conditions expected with the new equipment and process changes.

Ion exchange↗

Defense Waste Processing Facility Canister Closure Weld Current Validation Testing

Two closure welds on filled Defense Waste Processing Facility (DWPF) canisters failed to be within the acceptance criteria in the DWPF operating procedure SW4-15.80-2.3 (1). In one case, the weld heat setting was inadvertently provided to the canister at the value used for test welds (i.e., 72%) and this oversight produced a weld at a current of nominally 210 kA compared to the operating procedure range (i.e., 82%) of 240 kA to 263 kA. The second weld appeared to experience an instrumentation and data acquisition upset. The current for this weld was reported as 191 kA. Review of the data from the Data Acquisition System (DAS) indicated that three of the four current legs were reading the expected values, approximately 62 kA each, and the fourth leg read zero current. Since there is no feasible way by further examination of the process data to ascertain if this weld was actually welded at either the target current or the lower current, a test plan was executed to provide assurance that these Nonconforming Welds (NCWs) meet the requirements for strength and leak tightness. Acceptance of the welds is based on evaluation of Test Nozzle Welds (TNW) made specifically for comparison. The TNW were nondestructively and destructively evaluated for plug height, heat tint, ultrasonic testing (UT) for bond length and ultrasonic volumetric examination for weld defects, burst pressure, fractography, and metallography. The testing was conducted in agreement with a Task Technical and Quality Assurance Plan (TTQAP) (2) and applicable procedures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Turbocompound Reheat Gas Turbine Combined Cycle

This is the Final Report of the Phase I research project Turbocompound Reheat Gas Turbine Combined Cycle (TC-RHT GTCC) (DE-FE0031618). It contains a comprehensive description of the results of the tasks completed during the 18-month project duration in compliance with the requirements of the pertinent Area of Interest: Investigation of market opportunities for the TC-RHT GTCC; Investigation of the capability of the TC-RHT GTCC to utilize different fuels - Conceptual design of a nominal 120-MWe power plant including operability and cost estimate; Maturity plan to bring the TC-RHT GTCC technology from TRL 3 to TRL 6; and, Test plan to be undertaken in Phase II (if awarded).

03 NATURAL GAS↗

Williston Basin Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) Program

The U.S. Department of Energy’s Office of Fossil Energy awarded 13 CORE-CM programs as part of the CORE-CM Initiative, designed to develop the technology and upstream and midstream supply chains to extract rare-earth elements (REEs) and critical minerals (CMs) from the nation’s coal supplies. The intent is to catalyze regional economic growth and job creation while strengthening the use of domestic resources. The Williston Basin CORE-CM Program aims to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce REEs, CMs, and nonfuel carbon-based products (CBPs). The work constitutes Phase 1 of a long-term program. The objectives of Phase 1 are to identify the existing knowledge base and gaps and to develop a series of assessments/plans, including an initial basinal assessment; a characterization and data acquisition plan; a waste stream reuse plan; a basinal strategies assessment for infrastructure, industries, and business; a technology assessment, development, and field testing plan; a technology innovation center plan(s); and a stakeholder outreach and education plan. The goal of this project is to initiate the development of a new industry in the resource-rich Williston Basin that will catalyze economic growth and job creation through a coalition team of private industry, university, and state, local, and federal government entities. A coalition team of nearly 30 private industry, university, and state, local, and federal government partners was formed for this program. Partners include the University of North Dakota Energy & Environmental Research Center, Institute for Energy Studies, and Nistler College; North Dakota State University; Montana Tech University; Pacific Northwest National Laboratory; Critical Materials Institute; North Dakota Geological Survey; South Dakota Geological Survey; U.S. Geological Survey; North American Coal Corporation; BNI Energy; Basin Electric Power Cooperative; Minnkota Power Cooperative; and many more.

Kay, John P.↗

Transient Testing of Nuclear Fuels Performed in the Original Operation of TREAT, Third Edition

TREAT core was upgraded at the end of the 1980s. The tests performed since about 1970 are summarized in considerable detail. Earlier tests are noted by their designated series and by some parameters that help to identify and distinguish each series from the others. The detailed summary descriptions are intended to help inform future researchers regarding the large, historical, empirical data base generated from that 35-year span during which hundreds of TREAT experiments were performed to investigate and demonstrate the transient behavior of a wide variety of nuclear fuels during severe off-normal and accident conditions -- using direct nuclear heating of the test samples. That empirical basis is foundational and valuable for guiding future qualification and safety evaluation of improved fuel designs and for future transient test planning and performance in TREAT. The second edition of this report added descriptions of the following test series: D, E, EOS, F, H, J, R, RX, and S. This third edition includes descriptions of an additional four test series: the HUT, HOP (& HUC), ORNL-TR, and PNL.