Search NASA⌕ Search

SEARCH · Search NASA

Results for “Unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Low-Cost Sulfur Thermal Storage for Solar Industrial Process Heat Applications

Industrial process heat (IPH) is one of the largest energy demands in U.S., representing about 10% of all domestic energy consumption. Fuel costs to generate this industrial process heat are generally a top three cost for industry, a major component in American manufacturing competitiveness. Roughly 60% of US IPH demand (about 6,500 TBtu annually) falls in the medium-temperature range of 100–250 °C. While concentrated solar thermal (CST) technologies can provide a cost-effective source of heat in this temperature range, solar intermittency limits their adoption in industries that operate 24/7. Element 16 Technologies, Inc. developed a low-cost sulfur thermal energy storage (TES) technology to bridge this gap by capturing excess solar heat during the day and dispatching it reliably during non-solar hours. The core innovation is the use of sulfur, an abundant, industrial waste byproduct that costs ten times less than molten salt used in commercial TES systems. The overall goal of the project was to advance the design and development of molten sulfur TES to a manufacturing-relevant prototype stage for solar industrial process heat applications, while establishing and validating a realistic pathway to commercial success. Key tasks included corrosion and mechanical durability testing to identify cost-effective materials, design investigations using physics-based simulation tools, techno-economic evaluations of system lifetime costs, and pilot-scale testing for performance verification. Corrosion testing of steel alloys under cyclic molten sulfur conditions showed that austenitic stainless steels in the 300 series performed particularly well, with no structural degradation of welds or joints. Thermal cyclic testing of pilot sulfur TES units up to 1.5 MWh quantified charge/discharge rates, heat losses, round-trip efficiency and validated the system's capability to operate effectively under intermittent charging conditions. A techno-economic model, informed by sulfur TES performance model validated using pilot test data, showed that hybrid solar+sulfur TES+NG boiler systems are economically competitive with incumbent natural gas boilers for multiple locations in the southwest US. In summary, this project established molten sulfur TES as a technically viable pathway to improve economic competitiveness of American manufacturing by lowering the cost of solar industrial process heat.

14 SOLAR ENERGY↗

AMS/CEA Joint Aerial Campaign: Nevada Test Site AMS Data Analysis Procedure

The United States NNSA AMS (Aerial Measuring Systems) and the French Commissariat à l’Énergie Atomique (CEA) participated in joint aerial survey activities during the period November 6-19, 2007. Survey activities were conducted near Las Vegas, Nevada, and at selected areas of the Nevada Test Site (NTS) under the auspices of the Accident Response Working Group (ARWG). The intent of the activities was to compare technologies, procedures, and data analysis techniques related to specific AMS and the CEA aerial radiation detection systems.

54 ENVIRONMENTAL SCIENCES↗

AMS/CEA Joint Aerial Campaign Nevada Test Site AMS Data Analysis Procedure

The United States NNSA AMS (Aerial Measuring Systems) and the French Commissariat à l’Énergie Atomique (CEA) participated in joint aerial survey activities during the period November 6-19, 2007. Survey activities were conducted near Las Vegas, Nevada, and at selected areas of the Nevada Test Site (NTS) under the auspices of the Accident Response Working Group (ARWG). The intent of the activities was to compare technologies, procedures, and data analysis techniques related to specific AMS and the CEA aerial radiation detection systems.

61 RADIATION PROTECTION AND DOSIMETRY↗

BP-5 Remedial Investigation Slug-Test Characterization Results for Well 699-52-55A

Pacific Northwest National Laboratory conducted slug-test characterization at the final, completed BP-5 Remedial Investigation well 699-52-55A near the 200-East Area at the Hanford Site on April 22, 2008. The slug-test characterization was in support of the BP-5 Remedial Investigation. The portion of the unconfined aquifer tested is composed of sediments of the lower Ringold Formation and the underlying Elephant Mountain basalt flowtop. The basalt flowtop unit was included as part of the effective test-interval length for the slug-test analysis because the flowtop unit is hydraulically communicative with the unconfined aquifer. Estimates of hydraulic conductivity for the effective test-interval length represent composite values for the lower Ringold Formation and the underlying Elephant Mountain basalt flow top.

54 ENVIRONMENTAL SCIENCES↗

An Engineered Minimal-Set Stimulus for Periodic Information Leakage Fault Detection on a RISC-V Microprocessor

Recent evaluations of counter-based periodic testing strategies for fault detection in Microprocessor (μP) have shown that only a small set of counters is needed to provide complete coverage of severe faults. Severe faults are defined as faults that leak sensitive information, e.g., an encryption key on the output of a serial port. Alternatively, fault detection can be accomplished by executing instructions that periodically test the control and functional units of the μP. In this paper, we propose a fault detection method that utilizes an ’engineered’ executable program combined with a small set of strategically placed counters in pursuit of a hardware Periodic Built-In-Self-Test (PBIST). We analyze two distinct methods for generating such a binary; the first uses an Automatic Test Generation Pattern (ATPG)-based methodology, and the second uses a process whereby existing counter-based node-monitoring infrastructure is utilized. We show that complete fault coverage of all leakage faults is possible using relatively small binaries with low latency to fault detection and by utilizing only a few strategically placed counters in the μP.

42 ENGINEERING↗

A measured energy use, solar production, and building air leakage dataset for a zero energy commercial building

This paper provides an open dataset of measured energy use, solar energy production, and building air leakage data from a 328 m 2 (3,531 ft 2 ) all-electric, zero energy commercial building in Virginia, USA. Over two years of energy use data were collected at 1-hour intervals using circuit-level energy monitors. Over six years of solar energy production data were measured at 1-hour resolution by 56 microinverters (presented as daily and monthly data in this dataset). The building air leakage data was measured post-construction per ASTM-E779 Standard Test Method for Determining Air Leakage Rate by Fan Pressurization and the United States Army Corps (USACE) Building Enclosure Testing procedure; both pressurization and depressurization results are provided. The architectural and engineering (AE) documents are provided to aid researchers and practitioners in reliable modeling of building performance. The paper describes the data collection methods, cleaning, and convergence with weather data. This dataset can be employed to predict, benchmark, and calibrate operational outcomes in zero energy commercial buildings.

14 SOLAR ENERGY↗

DARHT Axis 1 Performance Results with and without a Blumlein Charge Unit

The Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility provides flash radiography capabilities using two electron Linear Induction Accelerators (LIA’s). Axis 1 of DARHT produces a 20- MeV, 2-kA, 80-ns-FWHM electron beam. As DARHT Axis 1 enters its twentieth year of operation, the probability of Blumlein Charge Unit (BCU) failure has increased and the risk of a failure on the day of an explosive experiment has become more likely. Replacement time for a BCU is four to six hours. This report examines the radiographic and beam transport effect of operating the accelerator with a missing or reduced charge voltage BCU. The results are compared with normal, full machine operation. A prescription for alternate operation with missing or reduced charge voltage on BCU22 is given.

47 OTHER INSTRUMENTATION↗

Micro-Environmental Control System (Final Report)

This project developed an innovative micro-environmental control system (µX) that enables office buildings to reduce energy used for heating and cooling by 15% or more. The µX is a compact, quiet, and ergonomic device that is designed to be installed under an office workstation; it is designed to maintain occupant comfort when room thermostat setpoints are incremented by 4°F or more (warmer in the summer and cooler in the winter) to save energy. When ambient room temperatures are outside of the usual comfort range, the µX maintains occupant comfort by delivering personalized cooling or heating locally to each office worker. The µX provides personalized cooling using a micro vapor compression system that includes a new high-performance micro-scroll compressor and a novel thermal storage unit. The vapor compression system operates at night to freeze a phase-change material (PCM). During the workday, the cooling stored in the PCM is released as a cool breeze of air to make occupants more comfortable. The micro-scroll compressor was developed specifically for this application; it is smaller than any of its type, minimizing the amount of power needed. In heating mode, the µX maintains occupant comfort using a foot heating mat with an infrared reflective box. The µX R&D project was conducted by Syracuse University in collaboration with United Technologies Research Center, Air Innovations, Bush Technical, and Cornell University. Over the course of the initial three-year project, the team developed and evaluated four versions of the unit, advancing the concept to Technology Readiness Level 6. The capabilities of individual proof-of-concept prototypes were verified in tests that were conducted with: 1) units in psychrometric chambers, 2) an instrumented manikin in a laboratory, and 3) human subjects in laboratories that simulate office environments. The tests verified that the µX prototypes met or exceeded all performance targets required to enable office buildings to reduce energy used for heating and cooling by 15% or more by maintaining occupant comfort when thermostat setpoints are incremented by 4°F or more.

25 ENERGY STORAGE↗

New Los Alamos space instrument goes for a spin

Scientists and engineers at Los Alamos National Laboratory are using a unique centrifuge facility to evaluate a flight-ready telemetry system for evaluating a nuclear weapons test missile launch. "The telemetry unit was designed and manufactured by Los Alamos' Intelligence and Space Research Division," said Telemetry Program Manager Myles Fitzgerald. "Telemetry is a data stream of information on temperature, acceleration, vibration, strain, all the conditions a system encounters during a test flight." Because a test missile flight ultimately ends with the test system completely destroyed, telemetry data from the flight must be collected by receiving stations along the flight path. "The purpose of the centrifuge test is to subject the electronics to a high gravitational load (G-load) that's representative of what the system will experience when re-entering the Earth's atmosphere," said weapons test engineer Alex Cusick.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

New Los Alamos space instrument goes for a spin

Scientists and engineers at Los Alamos National Laboratory are using a unique centrifuge facility to evaluate a flight-ready telemetry system for evaluating a nuclear weapons test missile launch. "The telemetry unit was designed and manufactured by Los Alamos' Intelligence and Space Research Division," said Telemetry Program Manager Myles Fitzgerald. "Telemetry is a data stream of information on temperature, acceleration, vibration, strain, all the conditions a system encounters during a test flight." Because a test missile flight ultimately ends with the test system completely destroyed, telemetry data from the flight must be collected by receiving stations along the flight path. "The purpose of the centrifuge test is to subject the electronics to a high gravitational load (G-load) that's representative of what the system will experience when re-entering the Earth's atmosphere," said weapons test engineer Alex Cusick.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Hardtack I

After thirty-four tests, Hardtack I came to an end on August 18, 1958, with the thirty-fifth and final test, Fig. Four days later, President Dwight Eisenhower told Norris Bradbury, “I am today announcing that the United States will suspend nuclear weapons tests for a period of twelve months and, under certain conditions of progress toward real disarmament, continue that suspension on a year-to-year basis.”1 Although not intended, Eisenhower’s announcement made Fig the last nuclear test conducted in the Marshall Islands.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

The Nuclear Non-Proliferation Treaty and the Comprehensive Nuclear-Test-Ban Treaty, the relationship

The Nuclear Non-Proliferation Treaty (NPT) is the most important international security arrangement that we have that is protecting the world community and this has been true for many years. But it did not happen by accident, it is a strategic bargain in which 184 states gave up the right forever to acquire the most powerful weapon ever created in exchange for a commitment from the five states allowed to keep nuclear weapons under the NPT (U.S., U.K., Russia, France and China), to share peaceful nuclear technology and to engage in disarmament negotiations aimed at the ultimate elimination of their nuclear stockpiles. The most important part of this is the comprehensive nuclear test ban (CTBT); the thinking by the 184 NPT non-nuclear weapon states was and is that they understand that the elimination of nuclear weapon stockpiles is a long way off, but at least the NPT nuclear weapon states could stop testing the weapons. The CTBT has been ratified by 161 states but by its terms it can only come into force if 44 nuclear potential states ratify; 36 have of the 44 have ratified it, the remaining eight include the United States and seven others, most of whom are in effect waiting for the United States. No state has tested a nuclear weapon-except for complete outlier North Korea-in 15 years. There appears to be no chance that the U.S. Senate will approve the CTBT for ratification in the foreseeable future, but the NPT may not survive without it. Perhaps it is time to consider an interim measure, for the UN Security Council to declare that any future nuclear weapon test any time, anywhere is a 'threat to peace and security', in effect a violation of international law, which in today's world it clearly would be.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Assessment of the Technical Maturity of Generation IV Concepts for Test or Demonstration Reactor Applications, Revision 2

The United States Department of Energy (DOE) commissioned a study the suitability of different advanced reactor concepts to support materials irradiations (i.e. a test reactor) or to demonstrate an advanced power plant/fuel cycle concept (demonstration reactor). As part of the study, an assessment of the technical maturity of the individual concepts was undertaken to see which, if any, can support near-term deployment. A Working Group composed of the authors of this document performed the maturity assessment using the Technical Readiness Levels as defined in DOE’s Technology Readiness Guide . One representative design was selected for assessment from of each of the six Generation-IV reactor types: gas-cooled fast reactor (GFR), lead-cooled fast reactor (LFR), molten salt reactor (MSR), supercritical water-cooled reactor (SCWR), sodium-cooled fast reactor (SFR), and very high temperature reactor (VHTR). Background information was obtained from previous detailed evaluations such as the Generation-IV Roadmap but other technical references were also used including consultations with concept proponents and subject matter experts. Outside of Generation IV activity in which the US is a party, non-U.S. experience or data sources were generally not factored into the evaluations as one cannot assume that this data is easily available or of sufficient quality to be used for licensing a US facility. The Working Group established the scope of the assessment (which systems and subsystems needed to be considered), adapted a specific technology readiness scale, and scored each system through discussions designed to achieve internal consistency across concepts. In general, the Working Group sought to determine which of the reactor options have sufficient maturity to serve either the test or demonstration reactor missions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2010

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2010 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗