Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Ensuring Reliable Natural Gas-Fired Generation with Fuel Contracts and Storage - DOE/NETL-2017/1816

This report finds that natural gas-fired power plants purchase fuel both on the spot market and through firm supply contracts; there do not appear to be clear drivers propelling power plants toward one or the other type. Most natural gas-fired power generators are located near major natural gas transmission pipelines, and most natural gas contracts are currently procured on the spot market. Although there is some regional variation in the type of contract used, a strong regional pattern does not emerge. Whether gas prices are higher with spot or firm contracts varies by both region and year. Natural gas prices that push the generators higher in the supply curve would make them less likely to dispatch. Most of the natural gas generators discussed in this report would be unlikely to enter firm contracts if the agreed price would decrease their dispatch frequency. The price points at which these generators would be unlikely to enter a firm contract depends upon the region that the generator is in, and how dependent that region is on natural gas. The Electric Reliability Council of Texas (ERCOT) is more dependent on natural gas than either Eastern Interconnection or Western Interconnection. This report shows that above-ground storage is prohibitively expensive with respect to providing storage for an extended operational fuel reserve comparable to the amount of on-site fuel storage used for coal-fired plants. Further, both pressurized and atmospheric tanks require a significant amount of land for storage, even to support one day’s operation at full output. Underground storage offers the only viable option for 30-day operational storage of natural gas, and that is limited by the location of suitable geologic formations and depleted fields.

01 COAL, LIGNITE, AND PEAT↗

Multi-Speed Transmission For Commercial Delivery Medium Duty PEDVs

Successful completion of the proposed project will set a course for improving quality of life by overcoming key challenges in the gearbox for commercial-delivery, medium-duty, plug-in electric drive vehicles: It will reduce US dependency on foreign oil through the use of electric driven propulsion instead of fuel driven. It will reduce health risks by replacing tailpipe emissions in densely populated city centers. Finally, it will improve the performance-cost basis to meet or exceed the expectations of the targeted medium duty vehicle fleet owners and the independent customers. The proposed multi-speed transmission will narrow motor operation to the peak efficiency region, thereby increasing the electric powertrain efficiency to help close the range gap. Further, it will enhance customer satisfaction by improving vehicle acceleration, top speed and gradeability over the baseline. The project was conducted in three budget periods: In BP1: Technology Development, High-level vehicle powertrain models were used to optimize candidate transmission architectures and ratios along with a variety of traction motor characteristics for concept selection. The detailed driveline designs and component dynamics were investigated to meet medium-duty EV requirements; In BP2: Technology Development and Prototype Demonstration, The modeling and simulations with multi-speed transmissions were extended to other MD and HD EV platforms. Clean sheet design of a compact, lightweight, flexible, and modular, four-speed transmission was completed. Development of novel shifting and controls strategies were started and procurement of the prototype transmission and the controller hardware was begun; In BP3: Technology Integration, Testing, and Demonstration, Prototyping the four-speed automated mechanical transmission was completed. The transmission controls system and software development and preliminary gearbox dyno tests were done at Eaton. ORNL conducted integrated powertrain HIL tests. One of the prototype units was fully integrated into a Proterra BE35 demonstration electric bus. The shift control strategy was fine-tuned on the integrated vehicle at Eaton Marshall Proving Grounds. NREL tested the vehicle and validated the performance gains. Simulations predicted up to 20% increase in system energy efficiency depending on drive cycles, a top speed of greater than70 mph on flat road, 40% faster acceleration and a doubled gradeability with four-speed transmission as compared to the baseline EVs. Chassis Dyno Tests at NREL verified the simulation results of Eaton team and the HIL test results of ORNL team. The new four-speed EV transmission is efficient, reliable, modular, scalable, light weight, small size, and will be affordable. Furthermore, four-speed transmission enables downsizing of motor, battery and final drive, thereby reducing the total system cost.

33 ADVANCED PROPULSION SYSTEMS↗

Community Solar Value Project

The Community Solar Value Project (CSVP) is designed to assist electric utilities in designing better community solar programs. Better programs seek new sources of value to promote “win-win” solutions between utilities and their customers. The CSVP focused on five “challenge areas” in identifying new sources of value: - Strategic solar design for community solar projects (including technology choices, siting, orientation, and related issues) - Market research and targeted marketing approaches (for program design and for customer recruitment) - Procurement and financing (for establishing best practices that can bring economies of scale and economies of expertise) - Integration of “companion measures” (such as storage and demand-response options that can benefit customer and utility net load shapes) - Pricing in program design (including best practices for integration of identified value in program prices or credits) The CSVP directly engaged the Sacramento Municipal Utility District (SMUD), the Public Service Company of New Mexico (PNM), and more than a dozen other utilities to develop improved community solar program designs. The outcomes include a plan at SMUD for over 100 MW or more of community and shared solar and support for new or expanded programs at 15 other utilities so far. Resulting best-practice solutions have not only informed program applications, but also have generated discussion among experts and industry associations about the new opportunities and challenges CSVP has brought forth. In these ways, the CSVP has impacted community solar programs and DER plans, competitive innovations and policies nationwide. The CSVP team has been led by Extensible Energy under John Powers, President and CEO. Jill Cliburn, of Santa Fe, NM-based Cliburn and Associates, has served as Principal Investigator. The team also benefitted from expertise from Navigant, Olivine Inc. and Millennium Energy, LLC, in addition to the collaborative and cost-sharing contributions of its utility partners. The CSVP team participated fully in the Solar Market Pathways Program, which was initiated under the U.S. Department of Energy SunShot program and reports to the U.S. Department of Energy Solar Energy Technologies Office. This report summarizes a multi-disciplinary project that took place over 33 months from January, 2015 through September, 2017.

14 SOLAR ENERGY↗

Scaling Studies for Advanced High Temperature Reactor Concepts, Final Technical Report: October 2014—December 2017

Computer simulations of nuclear reactor thermal-hydraulic phenomena are often used in the design and licensing of nuclear reactor systems. In order to assess the accuracy of these computer simulations, computer codes and methods are often validated against experimental data. This experimental data must be of sufficiently high quality in order to conduct a robust validation exercise. In addition, this experimental data is generally collected at experimental facilities that are of a smaller scale than the reactor systems that are being simulated due to cost considerations. Therefore, smaller scale test facilities must be designed and constructed in such a fashion to ensure that the prototypical behavior of a particular nuclear reactor system is preserved. The work completed through this project has resulted in scaling analyses and conceptual design development for a test facility capable of collecting code validation data for the following high temperature gas reactor systems and events— 1. Passive natural circulation core cooling system, 2. pebble bed gas reactor concept, 3. General Atomics Energy Multiplier Module reactor, and 4. prismatic block design steam-water ingress event. In the event that code validation data for these systems or events is needed in the future, significant progress in the design of an appropriate integral-type test facility has already been completed as a result of this project. Where applicable, the next step would be to begin the detailed design development and material procurement. As part of this project applicable scaling analyses were completed and test facility design requirements developed. Conceptual designs were developed for the implementation of these design requirements at the Oregon State University (OSU) High Temperature Test Facility (HTTF). The original HTTF is based on a ¼-scale model of a high temperature gas reactor concept with the capability for both forced and natural circulation flow through a prismatic core with an electrical heat source. The peak core region temperature capability is 1400°C. As part of this project, an inventory of test facilities that could be used for these experimental programs was completed. Several of these facilities showed some promise, however, upon further investigation it became clear that only the OSU HTTF had the power and/or peak temperature limits that would allow for the experimental programs envisioned herein. Thus the conceptual design and feasibility study development focused on examining the feasibility of configuring the current HTTF to collect validation data for these experimental programs. In addition to the scaling analyses and conceptual design development, a test plan was developed for the envisioned modified test facility. This test plan included a discussion on an appropriate shakedown test program as well as the specific matrix tests. Finally, a feasibility study was completed to determine the cost and schedule considerations that would be important to any test program developed to investigate these designs and events.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enabling Technologies for Medium Additive Manufacturing (MAAM)

ORNL has worked with Cosine Additive, Inc. on the design of MAAM extrusion components. The objective is to improve the print speed and part quality. A pellet extruder has been procured and integrated into the MAAM printer. Print speed has been greatly enhanced. In addition, ORNL and Cosine Additive have worked on alternative designs for a pellet drying and feed system.

36 MATERIALS SCIENCE↗

Gated Field-Emission Cathode Radio-Frequency (RF) Gun

The goal of this CRADA was to procure the carbon nanotube cathode from Radiabeam, install it in HBESL and make current measurements as a function of the gun gradient. The gun was operated at 1.3 GHz. After testing, send the cathode back to RadiaBeam for surface analysis.

43 PARTICLE ACCELERATORS↗

Lignite-plus-Biomass to Synthetic Jet Fuel with CO2 Capture and Storage: Design, Cost, and Greenhouse Gas Emissions Analysis for a Near-Term First-of-a-Kind Demonstration Project and Prospective Future Commercial Plants

We report on a 30-month design study for a first-of-a-kind (FOAK) demonstration plant that would be built at a site near Meridian, Mississippi, to coprocess lignite coal and woody biomass into jet fuel. The design uses an oxygen-blown TRIG™ gasifier developed by KBR and Southern Company. Fischer-Tropsch conversion of the syngas produces synthetic paraffinic kerosene (SPK) as the primary product, plus naphtha. Other co-products include electricity sold to the grid and CO 2 sold for use in enhanced oil recovery (EOR). Previous studies have identified coprocessing of various coals and biomass with CO 2 capture as promising options for cost-competitive production of low net lifecycle greenhouse gas (GHG) emissions synthetic fuels. The effort reported here goes beyond earlier studies in the level of detail in process design and cost estimation with the aim of improving the understanding of the economic prospects for lignite and woody biomass coprocessing systems. Key objectives in the design of the FOAK lignite/biomass-to-jet (LBJ) plant were to achieve net lifecycle GHG emissions for the SPK that are less than for conventional petroleum-derived jet fuel and to make process design and equipment selections such that the plant could be built and operated in the near term, e.g., before 2025. The process design was developed by researchers at Princeton University and the University of Queensland and validated by engineers at the WorleyParsons Group (WP). Commercial vendors provided design and cost estimates for several major plant components. Bare-erected capital costs and operating and maintenance costs were estimated by WP. The primary objective in building and operating the FOAK plant would be to demonstrate the technical viability of the LBJ concept as an essential first step toward launching commercial-scale plants in the longer term. With this in mind, the project team developed a set of principles to help guide the process design: the total plant cost should be less than 2 billion USD (to limit investment risk); the level of input biomass should be both proportionally significant to reflect biomass/lignite co-gasification and sufficient to achieve GHG emissions goals; process design decisions and vendor/equipment selections should prioritize the likelihood of technical success over minimizing the cost of jet fuel production. The resulting FOAK plant design capacity is 1,551 metric t/d (45.5% moisture) lignite and 556 t/d (43.3% moisture) biomass, for a total input of 295 MW HHV , of which 25% is biomass. The design output is 1,252 actual barrels per day of liquids, of which 80% is SPK (62.3 MW LHV ) and 20% is naphtha (13.9 MW LHV ). It exports 15 MW e of electricity after satisfying a 38 MW e onsite auxiliary load. Additional products are 1,326 t/d of pressurized pipeline-quality CO 2 and 49 t/day of sulfuric acid (93 wt% H 2 SO 4 ). With thinnings from sustainably-managed southern pine plantations as the biomass, and with captured CO 2 stored underground via EOR, the net lifecycle emissions for the SPK product are estimated to be about one-quarter of those for petroleum-derived jet fuel. The bare-erected cost (BEC) estimated by WP for this plant is 588 million USD (2015). The authors’ best estimate of total plant cost (TPC) is 1,230 million USD, arrived at by assuming engineering, procurement and construction management services (20% of BEC), process 5 contingencies (35% of BEC), and project contingencies (35% of the sum of all other costs, i.e., 35% of 1.55xBEC). Not surprisingly, an annual discounted cash flow (DCF) analysis determined that it would be impossible to generate a positive net present value (NPV) over a wide range in key input assumptions. An SPK production cost subsidy of nearly 400/bbl USD over a 20-year plant life would be required to achieve zero NPV under a baseline set of assumptions (including 3% real weighted average cost of capital and a levelized crude oil price of 80/bbl USD). Alternatively, a capital grant in excess of the TPC value would also achieve zero NPV. The poor financial results reflect the small scale of the plant, the design principle to prioritize technical success, the levels of contingencies appropriate for the relatively early stage of project development, and the first-of-a-kind nature of the plant. Technology innovations, learning via construction and operating experience, alternative plant configurations, and larger scale should improve economics of future plants. To help understand these prospects, a preliminary analysis of N th -of-a-kind (NOAK) plants was developed, but with the limitation that plants would use only equipment components that for the most part are already commercial today: consideration of advanced, not-yet-commercial technologies and of R&D-driven improvements in existing technologies were beyond the scope of this analysis. The analysis found that a variety of NOAK plant designs that coprocess lignite and woody biomass to make jet fuel are unlikely to be economically competitive without subsidy even in the presence of a high future carbon tax or equivalent greenhouse gas mitigation policy. This conclusion applies to process configurations and input biomass/lignite ratios that result in net GHG emissions as high as those for petroleum-derived jet fuel and as low as zero. In contrast, encouraging results were found for plants processing only biomass. The economics of these “BECCS” plants (biomass energy with CCS) improve dramatically with the strength of carbon mitigation policies because of their strongly negative net GHG emissions. These findings do not imply that coal/biomass coprocessing strategies for making synfuels with CCS are not economically promising – only that, in the case of lignite, much more than a 25% biomass coprocessing rate would be needed. However, our analysis shows that all such systems are unlikely to be economic in the absence of a strong carbon mitigation policy. Future R&D driven technological innovations could modify this conclusion. Among other R&D priorities, an emphasis on better understanding and reducing plant auxiliary loads is warranted.

09 BIOMASS FUELS↗

Safety Analysis Report for Packaging, Y-12 National Security Complex, Model ES-3100 Package with Bulk HEU Contents

This safety analysis report for packaging (SARP) presents the results of the safety analysis prepared in support of the Consolidated Nuclear Security, LLC (CNS) request for licensing of the Model ES-3100 package with bulk highly enriched uranium (HEU) contents and issuance of a Type B(U) Fissile Material Certificate of Compliance. This SARP, published in the format specified in the U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide 7.9 and using information provided in UCID-21218 and NRC Regulatory Guide 7.10, demonstrates that the Y-12 National Security Complex (Y-12) ES-3100 package with bulk HEU contents meets the established NRC regulations for packaging, preparation for shipment, and transportation of radioactive materials given in Title 10, Part 71, of the Code of Federal Regulations (CFR) [10 CFR 71] as well as U.S. Department of Transportation (DOT) regulations for packaging and shipment of hazardous materials given in Title 49 CFR. To protect the health and safety of the public, shipments of radioactive materials are made in packaging that is designed, fabricated, assembled, tested, procured, used, maintained, and repaired in accordance with the provisions cited above. Safety requirements addressed by the regulations that must be met when transporting radioactive materials are containment of radioactive materials, radiation shielding, and assurance of nuclear subcriticality.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-term Prediction of Emissivity of Structural materials for High Temperature Reactor Systems

The purpose of this research was to extend the recent short-term studies of emissivity of reactor materials performed independently at the University of Missouri and University of Wisconsin to tests aimed at longerterm predictions of emissivity. The University of Missouri measured hemispherical emissivity, which provides an integrated measurement, while the University of Wisconsin measured spectral emissivity (2 to 10 μm wavelength) from which the integrated quantity can be obtained. Hemispherical emissivity is needed for MELCOR, RELAP and FLUENT type heat transfer code calculations, while spectral emissivity is needed for a detailed Monte Carlo Transport theory computation of heat transfer and fundamental modeling verification. The objectives of the study were: Objective 1: Defining materials for long-term emissivity in cross-cutting reactor applications - procurement, preparation, and analyses of materials. Objective 2: High temperature materials testing in various environments and post-test surface analysis Objective 3: Independent hemispherical and spectral emissivity testing. Objective 4: Development of models to gain a predictive capability for long-term emissivity and application and validation in current RCCS research programs. The research has been performed at two universities over a four-year term with the participation of students, scientific staff, and faculty. The report describes progress in realizing the objectives, and the accomplishments at the two universities. There was considerable progress with respect to Objectives 1-3. The model development was redirected towards modeling of interrelationships between the spectra and hemispherical emissivities and uncertainty analysis of total hemispherical emissivity measurements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Strawman for an HPC PowerStack

The landscape of High-Performance Computing (HPC) is changing as we enter the exascale era and power and energy management are key design points for any next generation of supercomputers. Efficiently utilizing procured power and optimizing performance of scientific applications under power and energy constraints is challenging due to several reasons including dynamic phase behavior, processor manufacturing variability and increasing heterogeneity of node-level components. Extending the scope from the node- and application-level up to the system-level introduces further challenges on top of power-unaware job scheduling, which is known to be NP-hard on its own. While there exists several individual efforts across the community to research automatic techniques for managing power and energy better, the majority of these techniques have been specialized to meet the needs of a specific HPC center or specific optimization goals and provide little support to connect them to each other. Some projects, most notably the PowerAPI efforts [1], discuss interfaces that form a good starting point for full stack integration, but these interfaces still need to be hooked up to the wide range of software components offered by academic partners, developers or vendors. Furthermore, a recent survey conducted by the EE HPC WG concluded that the majority of such techniques have lacked the application-awareness required to achieve the best system performance and throughput. Other observations were that each technique tended to target management of power and energy for a different subset of the site or system hardware and that the different techniques tended to perform management at different (and often conflicting) granularities. Unfortunately, the existing techniques have not been designed to coexist simultaneously on one site and cooperate on management in an integrated manner [2]. The lack of application-awareness, lack of coordinated management across different granularities, and the lack of widely accepted interfaces and consequent limited connectivity between modules, can result in substantially underutilized Watts and FLOPS. To address these gaps, the HPC community needs a holistic stack for power and energy management and none currently exists. In our view, a holistic stack is one that is extensible enough to support the present and anticipated future needs of various different HPC centers, one that achieves best system performance and throughput through application-awareness, one that is designed to coordinate management at different granularities, and one that enables the seamless integration of software components from different developers and vendors. In this seminar, our goal is bring together experts from academia, research laboratories, and industry in order to take stock of existing approaches, design points and power management concepts and requirements at the various participant’s institutions, and to design concepts for a holistic power and energy management stack, which we refer to as the HPC PowerStack. Further, we hope to take steps toward defining the interfaces necessary for providing a complete prototype shared among many groups. The intention is to align development and research efforts across the community so that we may share development resources, avoid duplicating effort, agree on common interfaces and reap the rewards together as a community. The intended final outcome of this collaboration will be a holistic, flexible and extensible concept of a software stack ecosystem that allows us to combine product-grade open-source software components to enable runtime optimization of system power, energy, and performance.

97 MATHEMATICS AND COMPUTING↗

High-Pressure, High-Temperature Thermal Hydraulic Test Facility for Nuclear-Renewable Hybrid Energy System Studies; Facility Design Description and Status Report

A high-pressure, high-temperature water flow loop has been designed at Idaho National Laboratory (INL) for deployment in the INL Dynamic Energy Transport and Integration Laboratory (DETAIL) within the Energy Systems Laboratory (ESL) D100 northwest high bay. This loop is the first of three thermally coupled flow loops that will comprise the Advanced Reactor Technology Integral System Test (ARTIST) facility. The ARTIST facility will ultimately include a high temperature helium loop and a liquid salt loop, in addition to the PWR loop. The high-pressure water loop will operate at Pressurized Water Reactor (PWR) conditions. It will support experimental research on nuclear-renewable hybrid energy systems as well as advanced reactor technology topics. Within DETAIL, the water flow loop will also serve as a thermal energy source, emulating a reactor system. The loop will be thermally integrated with co-located energy systems including a thermal energy transport loop, thermal energy storage system, and a 25 kW high-temperature electrolysis system for hydrogen production. DETAIL will include additional energy systems such as an integrated microgrid and renewable energy systems including solar photovoltaics. The electrically heated flow loop will be dynamically controlled to simulate nuclear fuel behavior under normal and off-normal operating conditions. DETAIL will be designed for characterization of complex system dynamics. The various components will be interfaced with Digital Real-Time Simulators for supervisory control and dynamic simulation of complete systems. The design and assembly of the high-pressure water flow loop and supporting systems has been subdivided into two Phases. Phase 1, which will be completed by the end of FY17, includes installation of cable trays and supports, electrical conduit, DI water system, drain lift station and the concrete pad for the chiller located outside of the laboratory. Phase 2 includes the detailed design and final assembly of the flow loop, supporting structures and personnel platforms, the chiller and associated piping. As of September, 2017, the final detailed design of the flow loop is complete. Funding for Phase 2 procurement, assembly, system operability checkout, shakedown testing and initial operation of the flow loop is requested for FY18.

42 ENGINEERING↗

Fundamental Power Coupler Technical Development - Final CRADA Report

The SLAC ‘Linac Coherent Light Source -II’ project (LCLS II) is a hard X-ray Free Electron Laser now under construction in support of photon-based material science. LCLS II uses a superconducting linac design based on the twenty year-long TESLA- Technology development effort. The TESLA proposal, the European XFEL (EU-XFEL) project, and the ILC design employ a pulsed superconducting linac with roughly 0.5% duty factor. This aspect was changed for LCLS II so that the FEL could be operated continuous-wave (CW) namely with a 100% duty factor. Several critical changes to the linac design were required including RF power distribution, cryogenic heat-load management and cavity preparation. This note lists the changes required to the fundamental power coupler (FPC). All of these changes were made by the SLAC physics and engineering teams and reviewed by the cryomodule design lead (Fermilab) and international partners. Testing was done by the LCLS II cryomodule teams (Jefferson Lab and Fermilab). The SLAC LCLS II project team managed the design and procurement process. The LCLS II fundamental power coupler design is based upon the DESY TESLA Test Facility (TTF-3) design. DESY shared their drawings with LCLS II and SLAC copied and modified them to meet the LCLS II CW operation power and heat-load requirements. LCLS II had an external reviewer evaluate and compare SLAC drawings to EU-XFEL drawings. SLAC used the same industrial partners that EU-XFEL used.

47 OTHER INSTRUMENTATION↗

Light Water Reactor Sustainability Program: Report on the Completion of the Machining of Zion Unit 1 Reactor Pressure Vessel Blocks into Mechanical and Microstructural Test Specimens and Chemical Analysis Coupons

The decommissioning of the Zion Units 1 and 2 Nuclear Generating Station in Zion, Illinois, presented a unique opportunity for developing a better understanding of materials degradation and other issues associated with extending the lifetime of existing nuclear power plants (NPPs) beyond 60 years of service. In support of extended service and current operations of the US nuclear reactor fleet, the Oak Ridge National Laboratory (ORNL), through the Department of Energy (DOE), Light Water Reactor Sustainability (LWRS) Program, coordinated with Zion Solutions, LLC, a subsidiary of Energy Solutions (ES), the selective procurement of materials, structures, and components, from the decommissioned reactors including multiple segments of the Zion Unit 1 Reactor Pressure Vessel (RPV).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Comparison of Cargo X-Ray Attenuation as Measured by Top-Down versus Side-View Imaging Systems

Because millions of cargo containers enter the United States each year, there are millions of opportunities for terrorists to smuggle in dangerous radiological or special nuclear materials. The Department of Homeland Security (DHS) has been tasked to ensure that the United States remains safe from the illicit transportation, development, or procurement of a radiological/ nuclear (R/N) device or materials. The Nuclear and Radiological Imaging Platform (NRIP) program within DHS/CWMD aims to develop and characterize the performance of an integrated R/N detection platform and to determine if it performs better than previous screening systems. The cargo scanner developed by Passport features several technologies that have never been fielded, including the subsystem that my project involved. I concentrated on the high-energy Xray transmission imaging subsystem for producing 2D (top-down view) attenuation images. This subsystem was created to help identify highly-attenuating potential threats, but I focused on a smaller, more specific topic for my project. I worked on converting attenuations in the top-down X-ray transmission images into equivalent steel thickness. For example, a slab of material with a given attenuation would be converted into an equivalent thickness of steel that would have the same attenuation. Equivalent steel thickness provides a consistent way to compare data acquired by different inspection systems.

47 OTHER INSTRUMENTATION↗

A Modular and Flexible High-Frequency-Link Transformer with a Reduced Device Count and Zero High-Side Devices

In general, large power transformers (LPTs) are not interchangeable with each other and their high costs prohibit extensive spare inventories more so considering that on an average only 1.3 LPTs are manufactured for individual design. The latter pose a further challenge since given that the several existing LPTs are reaching their end of service lives, loss of plurality of such LPTs, that form the backbone of U.S. power grid, will clearly run into the problem of energy security related to the non-availability of sufficient spares (and extended lead time) exacerbated further by the fact that these spares are not interchangeable for installations at different locations. Conventional LPT cost millions of dollars and weighs significantly between approximately 100 and 400 tons. Two raw materials—copper and electrical steel—account for over 50 percent of the total cost of an LPT. In recent years, the price volatility of these two commodities in the global market has affected the manufacturing conditions and procurement strategy for LPTs. Transportation is also an important element of the total LPT cost, because an LPT can weigh significantly and often requires long-distance transport. Transporting an LPT is challenging—its large dimensions and heavy weight pose unique requirements to ensure safe and efficient transportation. Current road, rail, and port conditions are such that transportation is taking more time and becoming more expensive. Conventional low-frequency LPTs typically follow a monolithic approach to design due to historical reasons that need to transition to more modular and flexible (e.g., in voltage, impedance, and power flow) designs with ability to seamlessly/near-seamlessly scale. They should also have the ability to incorporate new technologies without in all cases redoing a LPT design from scratch. Given that the cost of raw materials has continued to increase, next-generation LPTs need to pursue avenues for reducing these costs. An added necessity is to reduce the transportability cost, which is significant in conventional LPTs. Further, given that LPTs are for the long term, they need to be durable, efficient, and fault tolerant with overloading capability. Given this backdrop, the objective and accomplishment of this one-year DOE (SPONSOR) R&D project, led by small business NextWatt LLC (PRIME, Lead PI: Dr. Sudip K. Mazumder) and University of Arkansas at Fayetteville (SUBAWARDEE, PI: Dr. Juan Balda) were to explore the design of a (8 – 20 kHz) high-frequency-link (HFL) based 100-MVA LPT with nominal voltage of 115/69 kV, with $15 - $22 dollars US per kVA when manufactured in “moderate” volume, with 99% energy-conversion efficiency, with 300% reduction in both volume and weight compared to a conventional LPT with the same electrical ratings, with impedance variation greater than 5%, with direct AC/AC power conversion capability, with very-high energy-conversion efficiency (using wide-bandgap SiC based field effect MOSFET devices) over a wide operating temperature, with reduction in both volume and weight with regard to conventional low frequency LPT, and with significant reduction in number of devices compared to state of the art solid state transformer topology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lidar Buoy Data Analysis: Basic Assessment of Observed Conditions and Instrument Performance Off Virginia and New Jersey

One of the challenges for developing offshore wind energy in the United States has been a lack of long-term observations to characterize the wind resource and design load conditions and to provide validation for the numerical weather prediction models. To address this challenge, the U.S. Department of Energy supported the procurement in 2014 and subsequent deployment of two buoys equipped with motion-compensated lidars and a comprehensive set of supporting meteorological and oceanographic (“metocean”) measurement systems. Each of the systems was deployed off the U.S. East Coast in excess of one year—one each near the coasts of Virginia and New Jersey. One notable observation from both buoys is the dramatic dependence of the wind shear on atmospheric stability as indicated by the air-sea temperature difference. This observation suggests that the commonly used neutral log law will not be a fully suitable representation of wind shear off the U.S. East Coast. This report provides a basic summary of observations at each location from key systems on each of the buoys as well as an assessment of instrument performance. These data are beginning to fill a long-standing observational gap for the wind energy community in the United States.

17 WIND ENERGY↗