Search NASA⌕ Search

SEARCH · Search NASA

Results for “program implementation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

INTERNATIONAL COOPERATION IN SPACE EXPLORATION

It is becoming increasingly better understood that our national space program is a response to a major international challenge. That challenge is not, simply to our prestige. The challenge is to our ability to organize and implement long-range programs which can produce the basic knowledge and technology needed for security and economic well-being in a highly competitive world. The space program is one important national vehicle for answering this challenge because it comprehends an incredible range of sciences and technologies which reach into far corners of our university and industrial life. It gives us an unparalleled opportunity to stimulate our scientific and engineering cum- munities, our educational systems, our industries, and government at all levels, to new accomplishment, to higher standards, to new awareness of their interdependence, and to joint effort which can immeasurably strengthen our society.

SPACE EXPLORATION↗

Space Shuttle operational logistics plan

The Kennedy Space Center plan for logistics to support Space Shuttle Operations and to establish the related policies, requirements, and responsibilities are described. The Directorate of Shuttle Management and Operations logistics responsibilities required by the Kennedy Organizational Manual, and the self-sufficiency contracting concept are implemented. The Space Shuttle Program Level 1 and Level 2 logistics policies and requirements applicable to KSC that are presented in HQ NASA and Johnson Space Center directives are also implemented.

Botts, J. W.↗

A Hybrid Cadre Concept for International Space Station (ISS) Operations

The International Space Station (ISS) is a continuously operating on-orbit facility, with a ten to fifteen year lifetime. The staffing and rotation concepts defined and implemented for the ISS program must take into account the unique aspects associated with long duration mission operations. Innovative approaches to mission design and operations support must be developed and explored which address these unique aspects. Previous National Aeronautics and Space Administration (NASA) man-based space programs, with the exception of Skylab, dealt primarily with short duration missions with some amount of down time between missions; e.g., Shuttle, Spacelab, and Spacehab programs. The ISS Program on the other hand requires continuous support, with no down time between missions. ISS operations start with the first element launch and continue through the end of the program. It is this key difference between short and long duration missions that needs to be addressed by the participants in the ISS Program in effectively and efficiently staffing the positions responsible for mission design and operations. The primary drivers considered in the development of staffing and rotation concepts for the ISS Program are budget and responsiveness to change. However, the long duration aspects of the program necessitate that personal and social aspects also be considered when defining staffing concepts. To satisfy these needs, a Hybrid Cadre concept has been developed and implemented in the area of mission design and operations. The basic premise of the Hybrid Cadre concept is the definition of Increment-Independent and Increment-Dependent cadre personnel. This paper provides: definitions of the positions required to implement the concept, the rotation scheme that is applied to the individual positions, and a summary of the benefits and challenges associated with implementing the Hybrid Cadre concept.

Hagopian, Jeff↗

Precision Casting via Advanced Simulation and Manufacturing

A two-year program was conducted to develop and commercially implement selected casting manufacturing technologies to enable significant reductions in the costs of castings, increase the complexity and dimensional accuracy of castings, and reduce the development times for delivery of high quality castings. The industry-led R&D project was cost shared with NASA's Aerospace Industry Technology Program (AITP). The Rocketdyne Division of Boeing North American, Inc. served as the team lead with participation from Lockheed Martin, Ford Motor Company, Howmet Corporation, PCC Airfoils, General Electric, UES, Inc., University of Alabama, Auburn University, Robinson, Inc., Aracor, and NASA-LeRC. The technical effort was organized into four distinct tasks. The accomplishments reported herein. Task 1.0 developed advanced simulation technology for core molding. Ford headed up this task. On this program, a specialized core machine was designed and built. Task 2.0 focused on intelligent process control for precision core molding. Howmet led this effort. The primary focus of these experimental efforts was to characterize the process parameters that have a strong impact on dimensional control issues of injection molded cores during their fabrication. Task 3.0 developed and applied rapid prototyping to produce near net shape castings. Rocketdyne was responsible for this task. CAD files were generated using reverse engineering, rapid prototype patterns were fabricated using SLS and SLA, and castings produced and evaluated. Task 4.0 was aimed at developing technology transfer. Rocketdyne coordinated this task. Casting related technology, explored and evaluated in the first three tasks of this program, was implemented into manufacturing processes.

Source record↗

Exploration Technology Program plans and directions

A summary of the proposed Space Exploration Initiative (SEI) needs that have been identified is presented along with a detailed review of the status of SEI technology planning. Plans are also being formulated to implement an Exploration Technology Program (ETP) that will develop the major technologies required for SEI. The ETP will provide in the near term clear demonstrations of potential exploration technologies, results of research to support SEI architecture decisions, and a foundation of mature technology that is ready to be applied in the first round of SEI missions. A family of functional building blocks has been defined from which both lunar and Mars SEI mission architectures can be constructed.

Aldrich, Arnold↗

DORMAN computer program (study 2.5). Volume 1: Executive summary

The DORCA Applications study has been directed at development of a data bank management computer program identified as DORMAN. Because of the size of the DORCA data files and the manipulations required on that data to support analyses with the DORCA program, automated data techniques to replace time-consuming manual input generation are required. The Dynamic Operations Requirements and Cost Analysis (DORCA) program was developed for use by NASA in planning future space programs. Both programs are designed for implementation on the UNIVAC 1108 computing system. The purpose of this Executive Summary Report is to define for the NASA management the basic functions of the DORMAN program and its capabilities.

Stricker, L. T.↗

Error Analysis System for Spacecraft Navigation Using the Global Positioning System (GPS)

The Flight Dynamics Division (FDD) at the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is currently developing improved space-navigation filtering algorithms to use the Global Positioning System (GPS) for autonomous real-time onboard orbit determination. In connection with a GPS technology demonstration on the Small Satellite Technology Initiative (SSTI)/Lewis spacecraft, FDD analysts and programmers have teamed with the GSFC Guidance, Navigation, and Control Branch to develop the GPS Enhanced Orbit Determination Experiment (GEODE) system. The GEODE system consists of a Kalman filter operating as a navigation tool for estimating the position, velocity, and additional states required to accurately navigate the orbiting Lewis spacecraft by using astrodynamic modeling and GPS measurements from the receiver. A parallel effort at the FDD is the development of a GPS Error Analysis System (GEAS) that will be used to analyze and improve navigation filtering algorithms during development phases and during in-flight calibration. For GEAS, the Kalman filter theory is extended to estimate the errors in position, velocity, and other error states of interest. The estimation of errors in physical variables at regular intervals will allow the time, cause, and effect of navigation system weaknesses to be identified. In addition, by modeling a sufficient set of navigation system errors, a system failure that causes an observed error anomaly can be traced and accounted for. The GEAS software is formulated using Object Oriented Design (OOD) techniques implemented in the C++ programming language on a Sun SPARC workstation. The Phase 1 of this effort is the development of a basic system to be used to evaluate navigation algorithms implemented in the GEODE system. This paper presents the GEAS mathematical methodology, systems and operations concepts, and software design and implementation. Results from the use of the basic system to evaluate navigation algorithms implemented on GEODE are also discussed. In addition, recommendations for generalization of GEAS functions and for new techniques to optimize the accuracy and control of the GPS autonomous onboard navigation are presented.

Truong, S. H.↗

Alternative to Nitric Acid Passivation

The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC), Florida, has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described as the launch support and infrastructure modernization program in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of NASA and the GSDO Program, the objective of this project is to qualify citric acid as an environmentally-preferable alternative to nitric acid for passivation of stainless steel alloys. This project is a direct follow-on to United Space Alliance (USA) work at KSC to optimize the parameters for the use of citric acid and verify effectiveness. This project will build off of the USA study to further evaluate citric acids effectiveness and suitability for corrosion protection of a number of stainless steels alloys used by NASA, the Department of Defense (DoD), and the European Space Agency (ESA).

stainless steel↗

Environmentally-Preferable Launch Coatings

The Ground Systems Development and Operations (GSDO) Program at NASA Kennedy Space Center (KSC), Florida, has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described as the launch support and infrastructure modernization program in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of NASA and the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion protecting coatings for launch facilities and ground support equipment (GSE). The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. The project compares coating performance of the selected alternatives to existing coating systems or standards.

ground support equipment↗

Traditional versus rule-based programming techniques: Application to the control of optional flight information

To the software design community, the concern over the costs associated with a program's execution time and implementation is great. It is always desirable, and sometimes imperative, that the proper programming technique is chosen which minimizes all costs for a given application or type of application. A study is described that compared cost-related factors associated with traditional programming techniques to rule-based programming techniques for a specific application. The results of this study favored the traditional approach regarding execution efficiency, but favored the rule-based approach regarding programmer productivity (implementation ease). Although this study examined a specific application, the results should be widely applicable.

Ricks, Wendell R.↗

Aerospace Ground Equipment for model 4080 sequence programmer. A standard computer terminal is adapted to provide convenient operator to device interface

The Aerospace Ground Equipment (AGE) provides an interface between a human operator and a complete spaceborne sequence timing device with a memory storage program. The AGE provides a means for composing, editing, syntax checking, and storing timing device programs. The AGE is implemented with a standard Hewlett-Packard 2649A terminal system and a minimum of special hardware. The terminal's dual tape interface is used to store timing device programs and to read in special AGE operating system software. To compose a new program for the timing device the keyboard is used to fill in a form displayed on the screen.

Nissley, L. E.↗

PPM Receiver Implemented in Software

A computer program has been written as a tool for developing optical pulse-position- modulation (PPM) receivers in which photodetector outputs are fed to analog-to-digital converters (ADCs) and all subsequent signal processing is performed digitally. The program can be used, for example, to simulate an all-digital version of the PPM receiver described in Parallel Processing of Broad-Band PPM Signals (NPO-40711), which appears elsewhere in this issue of NASA Tech Briefs. The program can also be translated into a design for digital PPM receiver hardware. The most notable innovation embodied in the software and the underlying PPM-reception concept is a digital processing subsystem that performs synchronization of PPM time slots, even though the digital processing is, itself, asynchronous in the sense that no attempt is made to synchronize it with the incoming optical signal a priori and there is no feedback to analog signal processing subsystems or ADCs. Functions performed by the software receiver include time-slot synchronization, symbol synchronization, coding preprocessing, and diagnostic functions. The program is written in the MATLAB and Simulink software system. The software receiver is highly parameterized and, hence, programmable: for example, slot- and symbol-synchronization filters have programmable bandwidths.

Gray, Andrew↗

NASA ELV Payload Safety Program Information Exchange

This presentation details the Expendable Launch Vehicle (ELV) Payload Safety Program in its development and plan for implementation. It is an overview of the program's policies, process and requirements.

Staubus, Cal↗

TWINTN4: A program for transonic four-wall interference assessment in two-dimensional wind tunnels

A method for assessing the wall interference in transonic two-dimensional wind tunnel tests including the effects of the tunnel sidewall boundary layer was developed and implemented in a computer program named TWINTN4. The method involves three successive solutions of the transonic small disturbance potential equation to define the wind tunnel flow, the equivalent free air flow around the model, and the perturbation attributable to the model. Required input includes pressure distributions on the model and along the top and bottom tunnel walls which are used as boundary conditions for the wind tunnel flow. The wall-induced perturbation field is determined as the difference between the perturbation in the tunnel flow solution and the perturbation attributable to the model. The methodology used in the program is described and detailed descriptions of the computer program input and output are presented. Input and output for a sample case are given.

Kemp, W. B., Jr.↗

Energy Management Programs at the John F. Kennedy Space Center

The Energy Management internship over the summer of 2011 involved a series of projects related to energy management on the John. F. Kennedy Space Center (KSC). This internship saved KSC $14.3 million through budgetary projections, saved KSC $400,000 through implementation of the recycling program, updated KSC Environmental Management System's (EMS) water and energy-related List of Requirements (LoR) which changed 25.7% of the list, provided a incorporated a 45% design review of the Ordnance Operations Facility (OOF) which noted six errors within the design plans, created a certification system and timeline for implementation regarding compliance to the federal Guiding Principles, and gave off-shore wind as the preferred alternative to on-site renewable energy generation.

Huang, Jeffrey H.↗

Europa Clipper Payload Verification and Validation: Early Architecture and Implementation

NASA’s Europa Clipper mission will investigate the Jovian icy moon Europa with a sophisticated payload consisting of a suite of nine instruments. Clipper’s observations will help provide answers to a broad range of scientific objectives related to Europa’s habitability. As the project proceeds through Phase C, we are building confidence in the system’s ability to achieve these science goals by implementing a rigorous payload verification and validation (V&V) program. This paper details the planned structure and implementation of the Europa Clipper payload V&V program as it exists leading up to the project critical design review (CDR), before the bulk of instrument- or payload- level V&V activities have begun. We first explain the context for payload V&V on Europa Clipper, including its interfaces with other parts of the project system. We then describe the taxonomy of V&V concepts and their interrelationships, followed by a discussion on how this framework allows us to codify interfaces, processes, and ideas that are key to a successful V&V program. We focus on key aspects of the planning phases of V&V, especially establishing a complete set of verification items and accurately mapping them into appropriate verification activities. The second half of the paper describes the logistics of implementing this framework onto our actual payload system, including the processes and tools we use to manage and communicate agreements, changes, and risks across the project. We conclude with a reflection on the unique drivers and challenges of the V&V program concept development so far and the work that is planned for phase D implementation.

Srivastava, Priyanka↗

Networks consolidation program system design

The general system design for the Mark 4-A Deep Space Network to be implemented in the Networks Consolidation Program is discussed. The arrangement and complement of antennas and the list of subsystem equipment at the Signal Processing Center are described.

Gatz, E. C.↗

Mars Exploration Rover (MER) project environmental assurance program

This paper presents a comprehensive summary of the environmental assurance program for the MER project. A series of test and analysis metrics are generated. Selections of the numerous lessons that have been learned from implementation of the MER environmental assurance program are documented in this paper. They include both technical and programmatic lessons that would be helpful in improving implementation of the environmental program for future projects.

Hoffman, Alan R↗