Search NASA⌕ Search

SEARCH · Search NASA

Results for “program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

A detailed description of the uncertainty analysis for high area ratio rocket nozzle tests at the NASA Lewis Research Center

A preliminary uncertainty analysis was performed for the High Area Ratio Rocket Nozzle test program which took place at the altitude test capsule of the Rocket Engine Test Facility at the NASA Lewis Research Center. Results from the study establish the uncertainty of measured and calculated parameters required for the calculation of rocket engine specific impulse. A generalized description of the uncertainty methodology used is provided. Specific equations and a detailed description of the analysis is presented. Verification of the uncertainty analysis model was performed by comparison with results from the experimental program's data reduction code. Final results include an uncertainty for specific impulse of 1.30 percent. The largest contributors to this uncertainty were calibration errors from the test capsule pressure and thrust measurement devices.

Davidian, Kenneth J.↗

Authentication Protocol for ICS without Encryption

Industrial control systems (ICS) describes the different types of control systems and associated instrumentation, which includes the devices, systems, networks, and controls used to operate and/or automate industrial processes. Depending on the industry, each ICS functions differently and are built to electronically manage tasks efficiently. Historically, industrial plants have included networking, and changes have been made over time without consideration for security. Many ICS devices currently have inadequate security features. Adding encryption in ICS is undesirable because many of the new detection method involves deep packet inspection. Therefore, we propose to develop a method of providing authentication between devices without encrypting the data. This testbed design will allow rapid development and experimentation with Cyber Physical Systems. Modbus connects to a supervisory computer with a Remote Terminal Unit (RTU) in Supervisory Control and Data Acquisition (SCADA) systems. Our project seeks to enhance security in the ICS environment by adding device authentication to the lower levels of the plant floor. This approach was selected as it allows verification of the sender of data from level 1/level 0 devices up to supervisory systems. This addition is desirable as it adds enhanced verification to the integrity of system data without obscuring (via encryption) the data being transmitted across the network. This is important because many ICS systems are real time critical (decryption adds to latency) and many other good security options require deep packet inspection (which encryption completely defeats). To accomplish this, a proof of concept of adding an authentication scheme was designed and will be tested with a common ICS protocol. The setup includes a single serial cable connecting the serial ports on two devices, a Master and a Minion. Authentication will occur in the following methods: - Data layer involving Transport Layer Security/Secure Socket Layer (TLS/SSL); - TCP/IP route implementation; - Key exchange algorithm; - Raspberry Pi programming for authentication. A portion of the setup includes adding Raspberry Pi into the system as the device is handling the authentication for the network traffic. Modbus is the chosen ICS protocol. It is used to transmit signals from instrumentation and control devices back to a main controller or data gathering system. Typically, the device identity is assumed but not verified. For verifying device identity, we constructed a digital signature architecture with TLS. A novel adaptation of this is to use only the digital signature that is provided and not the encryption capability. This allows ICS traffic to flow unobscured while still providing verification for the integrity of the data. Verification of this process will involve adding additional I/O level network devices with spoofed IP addresses and detecting the authenticated versus unauthenticated traffic. Our TLS implementation will have encryption disabled but should still allow for digital signing of data. This will enable our system to distinguish between real end devices and spoofed end devices. This experiment is presently building the test setup. It is focusing on a small setting to identify authenticated and unauthenticated devices on the network. This should allow for scaling to a larger network size after the initial proof of concept. One concern with this scheme is a certificate deployment has a large scale key management. Network size will thus increase the key management task for security. In addition, we believe that further research should be done on exploring the use of this method to defeat man-in-the-middle attacks.

42 ENGINEERING↗

GHEP WIBT (Guidelines for Home Energy Professionals Weatherization Installer Badges Toolkit) [SWR-20-69]

The National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy's (DOE) Weatherization Assistance Program (WAP) are collaborating with the home energy retrofit industry to support the development of skilled workers. The Installer Badges Toolkit provides a flexible, customizable, and voluntary approach to training and skills recognition for WAP implementers, utility programs, private-sector workers, and contractors. In Fiscal Year 2018, DOE, along with the Crew Leader scheme committee, determined the Retrofit Installer Technician (RIT) Job Task Analysis (JTA) could be eliminated and its tasks inserted in the Crew Leader JTA. The RIT tasks became the basis of the Installer Badges. The Badges Toolkit was updated in 2020 to add licensing and copyright agreements. Users must cite the copyright information when using or distributing copies of the Badges Toolkit in any way. The technical content has remained unchanged from previous versions of the Badges Toolkit. The Toolkit for home retrofits consists of 25 Badges, each representing different energy efficiency tasks that an installer could perform on a home. Each Badge defines the desired outcome, criteria to verify, applicable material requirements, and references to Standard Work Specifications (SWS) or other relevant standards. The Badges provide a consistent approach to training by ensuring that installers in different regions are learning the same skills nationwide. Organizations can also customize the Toolkit by choosing only those Badges that are relevant to their program. The Badges Toolkit includes five pieces: "How to Use the Badges Toolkit" provides a brief overview of how a Grantee, Subgrantee, or training provider may approach using the toolkit. The "Badges Toolkit: Worksheet" includes what to consider when determining whether and how to best incorporate the Badges into a weatherization assistance program. The "Crew Leader Job Task Analysis Spreadsheet" indicates how the Badges align with specific areas of the JTA. The "Installer Badges Passport" features separate pages for each Badge, which include places for the installer and the supervisor/trainer to record the number of times a task has been successfully completed. The "Installer Badges Verification Criteria" includes sample inspection checklists for each Badge. These can be modified as needed based on approved variance requests or more stringent requirements. They also provide a basis for consistent inspections and awarding of Badges. Note: All elements of the Badges Toolkit are designed for use by potential program implementers. They are not off-the-shelf products intended for immediate deployment. Program implementers must review and modify as needed, revise verification criteria to match local requirements, complete worksheets, and otherwise define the parameters of their own badging program.

Desai, Jal↗

NASA's Evolutionary Xenon Thruster (NEXT) Component Verification Testing

Component testing is a critical facet of the comprehensive thruster life validation strategy devised by the NASA s Evolutionary Xenon Thruster (NEXT) program. Component testing to-date has consisted of long-duration high voltage propellant isolator and high-cycle heater life validation testing. The high voltage propellant isolator, a heritage design, will be operated under different environmental condition in the NEXT ion thruster requiring verification testing. The life test of two NEXT isolators was initiated with comparable voltage and pressure conditions with a higher temperature than measured for the NEXT prototype-model thruster. To date the NEXT isolators have accumulated 18,300 h of operation. Measurements indicate a negligible increase in leakage current over the testing duration to date. NEXT 1/2 in. heaters, whose manufacturing and control processes have heritage, were selected for verification testing based upon the change in physical dimensions resulting in a higher operating voltage as well as potential differences in thermal environment. The heater fabrication processes, developed for the International Space Station (ISS) plasma contactor hollow cathode assembly, were utilized with modification of heater dimensions to accommodate a larger cathode. Cyclic testing of five 1/22 in. diameter heaters was initiated to validate these modified fabrication processes while retaining high reliability heaters. To date two of the heaters have been cycled to 10,000 cycles and suspended to preserve hardware. Three of the heaters have been cycled to failure giving a B10 life of 12,615 cycles, approximately 6,000 more cycles than the established qualification B10 life of the ISS plasma contactor heaters.

Herman, Daniel A.↗

An assessment of space shuttle flight software development processes

In early 1991, the National Aeronautics and Space Administration's (NASA's) Office of Space Flight commissioned the Aeronautics and Space Engineering Board (ASEB) of the National Research Council (NRC) to investigate the adequacy of the current process by which NASA develops and verifies changes and updates to the Space Shuttle flight software. The Committee for Review of Oversight Mechanisms for Space Shuttle Flight Software Processes was convened in Jan. 1992 to accomplish the following tasks: (1) review the entire flight software development process from the initial requirements definition phase to final implementation, including object code build and final machine loading; (2) review and critique NASA's independent verification and validation process and mechanisms, including NASA's established software development and testing standards; (3) determine the acceptability and adequacy of the complete flight software development process, including the embedded validation and verification processes through comparison with (1) generally accepted industry practices, and (2) generally accepted Department of Defense and/or other government practices (comparing NASA's program with organizations and projects having similar volumes of software development, software maturity, complexity, criticality, lines of code, and national standards); (4) consider whether independent verification and validation should continue. An overview of the study, independent verification and validation of critical software, and the Space Shuttle flight software development process are addressed. Findings and recommendations are presented.

Source record↗

An Overview-NASA LeRC Structures Program

The Structures and Acoustics Division of the NASA Lewis Research Center has its genesis dating back to 1943. It has been an independent Division at Lewis since 1979. Its two primary capabilities are performance and life analysis of static and dynamic systems such as those found in aircraft and spacecraft propulsion systems and experimental verification of these analyses. Research is conducted in-house, through university grants and contracts, and through cooperative programs with industry. Our work directly supports NASA's Advanced Subsonic Technology (AST), Smart Green Engine, Fast Quiet Engine, High-Temperature Materials and Processing (HiTEMP), Hybrid Hyperspeed Propulsion, Rotorcraft, High-Speed Research (HSR), and Aviation Safety Program (AvSP). A general overview is given discussing these programs and other technologies that are being developed at NASA LeRC.

Zaretsky, Erwin V.↗

Fieldable Nuclear Material Identification System

The Fieldable Nuclear Material Identification System (FNMIS), funded by the NA-241 Office of Dismantlement and Transparency, provides information to determine the material attributes and identity of heavily shielded nuclear objects. This information will provide future treaty participants with verifiable information required by the treaty regime. The neutron interrogation technology uses a combination of information from induced fission neutron radiation and transmitted neutron imaging information to provide high confidence that the shielded item is consistent with the host's declaration. The combination of material identification information and the shape and configuration of the item are very difficult to spoof. When used at various points in the warhead dismantlement sequence, the information complimented by tags and seals can be used to track subassembly and piece part information as the disassembly occurs. The neutron transmission imaging has been developed during the last seven years and the signature analysis over the last several decades. The FNMIS is the culmination of the effort to put the technology in a usable configuration for potential treaty verification purposes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

99 GENERAL AND MISCELLANEOUS↗

Software Development Technologies for Reactive, Real-Time, and Hybrid Systems: Summary of Research

This research is directed towards the implementation of a comprehensive deductive-algorithmic environment (toolkit) for the development and verification of high assurance reactive systems, especially concurrent, real-time, and hybrid systems. For this, we have designed and implemented the STCP (Stanford Temporal Prover) verification system. Reactive systems have an ongoing interaction with their environment, and their computations are infinite sequences of states. A large number of systems can be seen as reactive systems, including hardware, concurrent programs, network protocols, and embedded systems. Temporal logic provides a convenient language for expressing properties of reactive systems. A temporal verification methodology provides procedures for proving that a given system satisfies a given temporal property. The research covered necessary theoretical foundations as well as implementation and application issues.

Manna, Zohar↗

A Formalization of Core Why3 in Coq

Intermediate verification languages like Why3 and Boogie have made it much easier to build program verifiers, transforming the process into a logic compilation problem rather than a proof automation one. Why3 in particular implements a rich logic for program specification with polymorphism, algebraic data types, recursive functions and predicates, and inductive predicates; it translates this logic to over a dozen solvers and proof assistants. Accordingly, it serves as a backend for many tools, including Frama-C, EasyCrypt, and GNATProve for Ada SPARK. But how can we be sure that these tools are correct? The alternate foundational approach, taken by tools like VST and CakeML, provides strong guarantees by implementing the entire toolchain in a proof assistant, but these tools are harder to build and cannot directly take advantage of SMT solver automation. As a first step toward enabling automated tools with similar foundational guarantees, we give a formal semantics in Coq for the logic fragment of Why3. We show that our semantics are useful by giving a correct-by-construction natural deduction proof system for this logic, using this proof system to verify parts of Why3's standard library, and proving sound two of Why3's transformations used to convert terms and formulas into the simpler logics supported by the backend solvers.

97 MATHEMATICS AND COMPUTING↗

Spitzer Space Telescope in-orbit checkout and science verification operations

Spitzer Space Telescope, the fourth and final of NASA's great observatories, and the first mission in NASA's Origins Program was launched 25 August 2003 into an Earth-trailing solar orbit. The observatory was designed to probe and explore the universe in the infrared. Before science data could be acquired, however, the observatory had to be initialized, characterized, calibrated, and commissioned. A two phased operations approach was defined to complete this work. These phases were identified as In-Orbit Checkout (IOC) and Science Verification (SV). Because the observatory lifetime is cryogen-limited these operations had to be highly efficient. The IOC/SV operations design accommodated a pre-defined distributed organizational structure and a complex, cryogenic flight system. Many checkout activities were inter-dependent, and therefore the operations concept and ground data system had to provide the flexibility required for a 'short turn-around' environment. This paper describes the adaptive operations system design and evolution, implementation, and lessons-learned from the completion of IOC/SV.

space verification↗

Source Term Reduction for Advanced and Small Modular Boiling Water Reactors

The United States Department of Energy (US DOE) is currently supporting the development of various advanced and small modular reactor (SMR) designs. Several of these designs have commenced license application with the US Nuclear Regulatory Commission (US NRC). These reactors have improved safety features that may significantly reduce radiological source terms in the event of design and beyond-design basis accidents. Specifically, some reactors feature a smaller containment volume relative to the available fission product depositional surface area, which supports increased fission product retention in the containment vessel. Pressurized water reactors (PWR) and boiling water reactors (BWR) with this feature include the integral pressurized water reactor (iPWR) and the BWRX-300 design by General Electric. A prior research program supported by the US DOE quantified the source term reduction associated with light water iPWRs and developed iPWR-specific theoretical models for fission product deposition rates. This program included a sequence of research projects that started with a feasibility study, development of theoretical models that predict higher deposition rates, and finally, development of empirical data for verification and validation of the theoretical models. The current project, which is a feasibility study, is the first step in a similar program to quantify the source term reduction associated with small and advanced light water BWRs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Control Requirements to Support Manual Piloting Capability

The manual piloting requirements specified under the NASA Constellation Program involved Cooper-Harper ratings, which are a qualitative and subjective evaluation from experienced pilots. This type of verification entails a significant investment of resources to assess a completed design and is not one that can easily or meaningfully be applied upfront in the design phase. The evolution of the Multi-Purpose Crew Vehicle Program to include an independently developed propulsion system from an international partner makes application of Cooper-Harper based design requirements inadequate. To mitigate this issue, a novel solution was developed to reformulate the necessary piloting capability into quantifiable requirements. A trio of requirements was designed which specify control authority, precision, and impulse residuals enabling propulsion design within specified guidance and control boundaries. These requirements have been evaluated against both the existing Orion design and the proposed ESA design and have been found to achieve the desired specificity. The requirement set is capable of being applied to the development of other spacecraft in support of manual piloting.

Merancy, Nujoud↗

Space transportation system payload interface verification

The paper considers STS payload-interface verification requirements and the capability provided by STS to support verification. The intent is to standardize as many interfaces as possible, not only through the design, development, test and evaluation (DDT and E) phase of the major payload carriers but also into the operational phase. The verification process is discussed in terms of its various elements, such as the Space Shuttle DDT and E (including the orbital flight test program) and the major payload carriers DDT and E (including the first flights). Five tools derived from the Space Shuttle DDT and E are available to support the verification process: mathematical (structural and thermal) models, the Shuttle Avionics Integration Laboratory, the Shuttle Manipulator Development Facility, and interface-verification equipment (cargo-integration test equipment).

Everline, R. T.↗

Programming - What is Next?

The paper provides an introduction to the track: “Program- ming - What is Next?”, organized by the authors as part of ISoLA 2021: the 9th International Symposium On Leveraging Applications of Formal Methods, Verification and Validation. A total of 14 papers were pre- sented in the track, with responses to the question: what are the trends in current more recent programming languages, and what can be expected of future languages?. The track covers such topics as general-purpose programming languages, domain-specific languages, formal methods and modeling languages, textual versus graphical languages, and application programming versus embedded programming.

Steffen, Bernhard↗

Recommendations on the Use of Commercial-Off-The-Shelf (COTS) Electrical, Electronic, and Electromechanical (EEE) Parts for NASA Missions - Phase II

This assessment had two Phases. Phase I captured NASA Centers’ current practices for commercial-off-the-shelf (COTS) Electrical, Electronic, and Electromechanical (EEE) parts 1 used in spaceflight systems and ground support equipment (available at https://ntrs.nasa.gov/citations/20205011579) [ref. 1]. The Phase II report provides guidance for selecting and using COTS parts in NASA missions. The approaches proposed in this report differ from current agency practices. This top-level executive summary touches on these new approaches for using COTS parts but does not provide the detailed information that is critical in understanding the rationale behind these new approaches. Readers will need to read the entire report to gain full understanding and effectively use the recommendations herein. NASA’s historical approach to selecting and applying parts has been to define certain parts, primarily specific classes of military specification (MIL-SPEC) parts, as “standard”, leaving all others, including COTS parts, as nonstandard. Standard parts typically are used without further testing (“use-as-is”). Nonstandard parts are subjected to initial screening and subsequent lot acceptance testing of representative samples from each procured lot per MIL-SPEC or similar requirements. Decades later, top-tier commercial part manufacturers have evolved significant manufacturing, statistical control, and technological improvements that can now provide parts as reliable or more reliable than MIL-SPEC parts, when used within their datasheet limits. Concurrently, the space science and exploration community’s needs demand technological advances unavailable with MIL-SPEC parts. This ongoing change necessitates using COTS parts for space missions. Properly selected COTS parts in appropriate applications can offer performance and supply availability advantages compared to MIL-SPEC parts. Their utility and demonstrated reliability result from large volumes and automated production and testing processes. However, careful review and a thorough understanding of their specifications (i.e., datasheet limitations) is needed, and verifying that manufacturer specifications and reliability meet space hardware application needs are necessary. This report recommends MIL-SPEC screening and non-radiation-related lot acceptance testing be reduced or eliminated in cases where evidence of sufficient quality and reliability exists for COTS parts. The extent of NASA's insight into COTS manufacturers and the amount and nature of the needed evidence will differ by mission and will likely be driven by a mission's resources and associated risk posture. To facilitate this goal, two new terminologies have been defined and described: “Industry Leading Parts Manufacturer (ILPM)” and “Established COTS parts.” An ILPM is a COTS manufacturer that produces high quality and reliable parts. Some parts produced by ILPMs, defined as Established COTS parts, do not need any additional MIL-SPEC or NASA screening and lot acceptance testing to be used in space applications. This report provides guidance for selecting, procuring, and applying COTS parts and for performing part-, board-, and system-level COTS parts verification. The recommendation to select Established COTS parts from ILPMs will assure those COTS parts will have comparable quality to corresponding MIL-SPEC parts. Selecting, applying, and verifying Established COTS parts from ILPMs requires a holistic team approach, engaging parts engineers, circuit designers, quality, reliability, and systems engineers, procurement specialists, radiation specialists, avionics leads, and program/project managers. A mission-specific approach tailored to a project’s Mission, Environment, Applications and Lifetime (MEAL) [ref. 2] requirements should be developed and approved by program/project managers. Any associated risks should be clearly identified, quantified, mitigated, and/or accepted. Different approaches are recommended according to program/project Risk Classes A, B, C, and D [ref. 3] and human-rated missions [ref. 4]: 1. Recommend Classes A and B and human-rated missions consider a “MIL-SPEC parts- based design” approach. ”MIL-SPEC parts-based design” approach is one in which most parts are MIL-SPEC parts and Established COTS parts from ILPMs are used only when an equivalent MIL-SPEC part does not meet functional or size, weight, and power (SWaP) or performance requirements, or is not available. 2. Recommend Classes D and Sub-D missions consider a “System of COTS” approach. “System of COTS” approach is one which most parts are Established COTS parts from ILPMs. 3. Recommend Class C missions determine which approach is the best for their projects; that is, use either a “MIL-SPEC parts-based design” approach, “System of COTS” approach, or a combined approach utilizing elements of both. This report intends to provide guidance in using COTS parts for NASA missions with risk classifications of A through D and human-rated missions; but it does not address the costs of using COTS parts. Costs of using COTS parts in different NASA mission classes can vary significantly even if the same parts are used in different risk postures, due to differing verification levels needed. The guidance does not distinguish between critical or non-critical systems, and a given project will need to apply the appropriate guidance based on their risk posture. The intended audience of this report are NASA personnel and commercial practitioners who support NASA’s spaceflight missions, including spaceflight program or project managers, parts engineers, parts manufacturers, radiation engineers, avionics engineers, system engineers, circuit design engineers, reliability engineers, safety and mission assurance (SMA) personnel, and parts procurement specialists. The NEPP Program will perform a pathfinder study to explore implementing the guidance in this NESC report. An ILPM verification process is not the same as conventional vendor qualification processes performed according to military standards and specifications. This NESC report intends to provide guidance in utilizing available parts data from ILPM manufacturers for parts assurance assessments needed for NASA missions. The report also captured the current practices from DoD and Federal Aviation Administration (FAA) in Section 10. Note each DoD and FAA report was provided by the corresponding agencies regarding their practices, which are independent from the NESC recommendations in the report.

Commercial-Off-The-Shelf↗

Ice classification algorithm development and verification for the Alaska SAR Facility using aircraft imagery

The Alaska SAR Facility (ASF) at the University of Alaska, Fairbanks is a NASA program designed to receive, process, and archive SAR data from ERS-1 and to support investigations that will use this regional data. As part of ASF, specialized subsystems and algorithms to produce certain geophysical products from the SAR data are under development. Of particular interest are ice motion, ice classification, and ice concentration. This work focuses on the algorithm under development for ice classification, and the verification of the algorithm using C-band aircraft SAR imagery recently acquired over the Alaskan arctic.

Holt, Benjamin↗