Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Get away special the low-cost route to orbit

NASA has established the Get Away Special (GAS) program as a means for providing anyone who wishes the opportunity to place a small self-contained experimental payload aboard a Space Shuttle mission for a very low cost. The GAS program is now well established, and has a respectable history with 53 payloads flown to date. The GAS experimenters are a diverse group who have demonstrated that people from all walks of life, and from many nations, are interested in working in space. This paper traces the history of the program from its concept through the development phase to the present time, and takes a brief look at the future. It also addresses the steps involved in making a payload reservation and the programmatic and technical relationships that are established between NASA and GAS customers.

Prouty, C.↗

Space Station microgravity and materials processing facility A national laboratory dedicated to U.S. interests

The Microgravity and Materials Processing Facility (MMPF) of the Space Station is examined. The MMPF is designed to accommodate individual experiments and associated hardware and is to be housed in the Manufacturing and Technology Laboratory Module. The objectives of the microgravity and materials processing study and the user, experiment/equipment, MMPF system requirements, and programmatics and planning development tasks of the study are described. Consideration is given to the acceleration environment, on-orbit sample preparation and analysis, mission-time-line analyses, and payload complement trades. Diagrams of the MMPF are presented.

Atkins, H. L.↗

Role of the manned maneuvering unit for the Space Station

The performance specifications to be realized in the Manned Maneuvering Unit (MMU) for Space Station operations will be the culmination of design efforts which began during the Gemini project. The types of MMUs which have been built and tested over the past two decades are described, including handheld, jet shoe, and initial rigid backpack configurations. Efforts to enhance the control laws and human factors aspects of the Skylab MMU to meet long-duration, flexible use Space Station requirements are summarized, noting the successes and deficiencies with the Shuttle MMU. The design requirements which must be met to allow the Space Station MMU to be used to perform rescue, transportation, inspection, assembly, contingency, and programmatic missions are explored.

Whitsett, C. E.↗

Status and projections of the NAS Program

NASA's Numerical Aerodynamic Simulation (NAS) Program has completed development of the initial operating configuration of the NAS Processing System Network (NPSN). This is the first milestone in the continuing and pathfinding effort to provide state-of-the-art supercomputing for aeronautics research and development. The NPSN, available to a nation-wide community of remote users, provides a uniform UNIX environment over a network of host computers ranging from the new Cray-2 supercomputer to advanced scientific workstations. This system, coupled with a vendor-independent base of common user interface and network software, presents a new paradigm for supercomputing environments. Presented here is the background leading to the NAS Program, its programmatic goals and strategies, technical goals and objectives, and the development activities leading to the current NPSN configuration. Program status, near-term plans and plans for the next major milestone, the extended operating configuration, are also discussed.

Bailey, F. R.↗

Assembly of user systems at Space Station

The technical and programmatic benefits of on-orbit assembly are outlined. Operational and automation considerations relating to on-orbit assembly are reviewed. Space Station capabilities for orbital assembly are discussed.

Cline, Helmut P.↗

Customer concerns regarding satellite servicing

The organization of orbital servicing of satellites is discussed. Provision of servicing equipment; design interfaces between the satellite and the servicing equipment; and the economic viability of the concept are discussed. The proposed solution for satisfying customer concerns is for the servicing organizations to baseline an adequate inventory of servicing equipment with standard interfaces and established servicing costs. With this knowledge, the customer can conduct tradeoff studies and make programmatic decisions regarding servicing options. A dialog procedure between customers and servicing specialists is outlined.

Rysavy, Gordon↗

Turnaround operations analysis for OTV. Volume 2: Detailed technical report

The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

Source record↗

The space station assembly phase: Flight telerobotic servicer feasibility, volume 1

The question is addressed which was raised by the Critical Evaluation Task Force (CETF) analysis of the space station: if a Flight Telerobotic Servicer (FTS) of a given technical risk could be built for use during space station assembly, could it save significant extravehicular (EVA) resources. Key issues and trade-offs associated with using an FTS to aid in space station assembly phase tasks such as construction and servicing are identified. A methodology is presented that incorporates assessment of candidate assembly phase tasks, telerobotics performance capabilities, development costs, operational constraints (STS and proximity operations), maintenance, attached payloads, and polar platforms. A discussion of the issues is presented with focus on potential FTS roles: (1) as a research-oriented test bed to learn more about space usage of telerobotics; (2) as a research-based test bed with an experimental demonstration orientation and limited assembly and servicing applications; or (3) as an operational system to augment EVA, to aid the construction of the space station, and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations. During the course of the study, the baseline configuration was modified into Phase 1 (a station assembled in 12 flights), and Phase 2 (a station assembled over a 30 flight period) configuration.

Smith, Jeffrey H.↗

NASA aerospace battery system program initiation

Preflight and flight battery system problems in flight programs at NASA created high-level concern and interest in the current battery technology status. As a result, NASA conducted an in-house review of problems experienced both internally and by other government users. The derived issues which encompassed the programmatic scope from cell manufacturing to in-flight operations of the system are discussed. From the identified deficiencies, a modestly scaled battery program was established to alleviate or minimize the risks of future occurrences.

Schulze, Norman R.↗

Space Station ground data management system

KSC is planning a Space Station Ground Data Management System (GDMS) for support of functional interface verification, integration and test of Space Station modules and elements. This computer system, planned for initial operational support in 1992, currently is entering a definition and prototyping stage. This paper provides an overview of the GDMS system concept. It synopsizes system functional capabilities, and discusses software and hardware architectural approaches currently under evaluation. It identifies programmatic constraints and their influence upon the concept, as well as specific technical issues planned for study or evaluation via prototyping.

Heuser, Jan↗

Space Station Electrical Power System

The purpose of this paper is to describe the design of the Space Station Electrical Power System. This includes the Photovoltaic and Solar Dynamic Power Modules as well as the Power Management and Distribution System (PMAD). In addition, two programmatic options for developing the Electrical Power System will be presented. One approach is defined as the Enhanced Configuration and represents the results of the Phase B studies conducted by the NASA Lewis Research Center over the last two years. Another option, the Phased Program, represents a more measured approach to reaching about the same capability as the Enhanced Configuration.

Labus, Thomas L.↗

The Magellan mission to Venus

The Magellan mission will be the next NASA mission to Venus. This paper describes the mission as it is currently planned, showing how the design of the science payload, the spacecraft, and the mission satisfies the science objectives and requirements as well as other programmatic constraints. The Magellan mission is dedicated to obtaining SAR images of at least 70 percent of the surface of Venus at a resolution of 1 km per line-pair, or better, which is comparable to the coverage and resolution of the Mars Mariner 9 mission. Other investigations will study the geophysical characteristics of the planet using altimetric data and gravity field measurements, and measurements to determine global surface emissivity.

Dallas, S. S.↗

Telescience Testbed Pilot Project - Evaluation environment for Space Station operations

The objectives of the Telescience Testbed Pilot Program (TTPP) are discussed. The purpose of the TTPP, which involves 15 universities in cooperation with various NASA centers, is to demonstrate the utility of a user-oriented rapid prototyping testbed approach to developing and refining science requirements and validation concepts and approaches for the information systems of the Space Station era and beyond. It is maintained that the TTPP provides an excellent environment, with low programmatic schedule and budget risk, for testing and evaluating new operations concepts and technologies.

Wiskerchen, Michael J.↗

Exploration Studies Technical Report - Volume 3: Special Reports, Studies, and Indepth Systems Assessments

The NASA Office of Exploration has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report describes the process that has been developed in a case study approach. The four case studies that were developed in FY88 include: 1. Human expedition to Phobos 2. Human expeditions to Mars 3. Lunar observatory 4. Lunar outpost to early Mars evolution The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work. Volume III is a collection of trade study results, indepth systems assessments, and workshop reports which describe aspects of FY 1988 analyses in more depth.

Interplanetary flight↗

Exploration Studies Technical Report - Volume 1: Technical Summary

The Office of Exploration (OEXP) at NASA Headquarters has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Lyndon B. Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report, produced by the MASE, describes the process that has been developed in a case study approach. The four case studies developed in FY88 include: 1. Human Expedition to Phobos 2. Human Expedition to Mars 3. Lunar Observatory 4. Lunar Outpost to Early Mars Evolution The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work.

Lunar Mining & Oxygen Production↗

Exploration Studies Technical Report - Volume 2: Studies Approach and Results

The NASA Office of Exploration has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report describes the process that has been developed in a case study approach. The four case studies that were developed in FY88 include: 1. Human expedition to Phobos 2. Human expeditions to Mars 3. Lunar observatory 4. Lunar outpost to early Mars evolution The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work. Volume 2 describes the case study process, the technical results of each of the case studies, and opportunities for additional study. Included in the discussion of each case study is a description of the mission key features and profile. Mission definition and manifesting are detailed, followed by a description of the mission architecture and infrastructure. Systems concepts for the required orbital nodes, transportation systems, and planetary surface systems are discussed. Prerequisite implementation plans resulting from the synthesized case studies are described and in-depth assessments are presented.

Interplanetary flight↗

A methodology for automation and robotics evaluation applied to the space station telerobotic servicer

The efforts of a recent study aimed at identifying key issues and trade-offs associated with using a Flight Telerobotic Servicer (FTS) to aid in Space Station assembly-phase tasks is described. The use of automation and robotic (A and R) technologies for large space systems would involve a substitution of automation capabilities for human extravehicular or intravehicular activities (EVA, IVA). A methodology is presented that incorporates assessment of candidate assembly-phase tasks, telerobotic performance capabilities, development costs, and effect of operational constraints (space transportation system (STS), attached payload, and proximity operations). Changes in the region of cost-effectiveness are examined under a variety of systems design assumptions. A discussion of issues is presented with focus on three roles the FTS might serve: (1) as a research-oriented testbed to learn more about space usage of telerobotics; (2) as a research based testbed having an experimental demonstration orientation with limited assembly and servicing applications; or (3) as an operational system to augment EVA and to aid the construction of the Space Station and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations.

Smith, Jeffrey H.↗

System engineering techniques for establishing balanced design and performance guidelines for the advanced telerobotic testbed

Novel system engineering techniques have been developed and applied to establishing structured design and performance objectives for the Telerobotics Testbed that reduce technical risk while still allowing the testbed to demonstrate an advancement in state-of-the-art robotic technologies. To estblish the appropriate tradeoff structure and balance of technology performance against technical risk, an analytical data base was developed which drew on: (1) automation/robot-technology availability projections, (2) typical or potential application mission task sets, (3) performance simulations, (4) project schedule constraints, and (5) project funding constraints. Design tradeoffs and configuration/performance iterations were conducted by comparing feasible technology/task set configurations against schedule/budget constraints as well as original program target technology objectives. The final system configuration, task set, and technology set reflected a balanced advancement in state-of-the-art robotic technologies, while meeting programmatic objectives and schedule/cost constraints.

Zimmerman, W. F.↗