Search NASA⌕ Search

SEARCH · Search NASA

Results for “surface contamination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Understanding and Mitigating the Contamination of Intrinsic poly-Si Gaps in Passivated IBC Solar Cells

We investigate factors that are critical for the performance of interdigitated back contact (IBC) solar cells based on polycrystalline silicon (poly-Si) passivated contacts. During patterning of doped lines using direct plasma deposition through a shadow mask, we show that the intrinsic poly-Si gap becomes contaminated with dopants, leading to shunting. Possible contamination mechanisms during masked deposition and high- temperature annealing are tested. Strategies developed to mitigate the contamination, such as reactive ion etching after deposition and amorphous to poly-Si crystallization in oxygen, will lead to improved IBC fabrication methods.

14 SOLAR ENERGY↗

Investigation of Radiological Contamination at Parks in the Gateway National Recreation Area - 20350

In 2005, the National Park Service was notified that elevated radiation levels were detected at Great Kills Park during a baseline radiological mapping effort conducted by the Counter Terrorism Bureau of the New York City Police Department and the United States Department of Energy. Great Kills Park is in the Staten Island Unit of the Gateway National Recreation Area. A records search determined that approximately 280 acres of the park was established over an area in which the New York City Department of Sanitation placed approximately 15.1 million cubic yards of waste fill from 1944 to 1948. Since 2005, a series of response actions and investigations were conducted on behalf of the National Park Service to mitigate risk to human health and the environment and to determine the nature of radiological contamination at Great Kills Park. The findings support that radiological contamination is related to certain components of waste fill, including incinerator residue from both on and offsite incinerators, coal ash from the historical use of coal-fired boilers for heating, and incidental radiological artifacts in the waste fill due to their historical use and subsequent disposal. A majority of the radiological artifacts were determined to contain radium-226 and included radioluminescent markers, radium impregnated switch board buttons, radium paint containers, and brachytherapy devices. The National Park Service has several other Parks in the Gateway National Recreation Area that were established in areas with a similar history to Great Kills Park, and overlie waste fill historically placed during landfilling operations, including Spring Creek Park and Dead Horse Bay. Over the last year, the National Park Service has performed additional radiological investigations at Great Kills Park as part of the ongoing Remedial Investigation under the Comprehensive Environmental Response, Compensation, and Liability Act. In addition, preliminary radiological investigations were performed at Spring Creek Park and Dead Horse Bay Park in the Jamaica Bay Unit of Gateway National Recreation Area. These investigation activities identified gamma radiation levels above the ambient level, several of which were attributable to radiological artifacts similar in nature to those recovered at Great Kills Park. Ongoing investigations at Parks in the Gateway National Recreation Area support an association between radiological contamination and historical landfilling practices that were common prior to the regulation and control of radioactive materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cs-137 Body-burdens in Wild Pigs on the Department of Energy's Savannah River Site: Determination of an Appropriate Framework for Spatiotemporal Analysis of Hunter Dose Tracking System Data

The Savannah River Site (SRS) is a U.S. Department of Energy facility with an area of 310 square miles. Since its opening in 1951, SRS has produced and processed nuclear materials for national defense and industrial purposes. These activities have resulted in the release of radiocesium (Cs-137) which has led to contamination of associated streams, floodplains, man-made reservoirs, soil and vegetation. Contamination is spread to wild pigs as they move about SRS, consume vegetation, drink water and wallow in soil. SRS provides annual deer hunts open to the public in which wild pigs may be taken as well. The Cs-137 concentration of each animal is determined before it is released to the hunter for consumption and a cumulative dose is retained for each individual hunter. These tasks are accomplished using the Hunter Dose Tracking System (HDTS). The data collected on SRS by the HDTS for White-Tailed deer has been extensively analyzed. A repeatable method for calculating the background radiocesium body burden for the SRS deer population was established by Gaines and Novak (2009,2016). This model was framed using Cs-137 contamination obtained via gamma over-flight data, the decay rate of radiocesium and the historical behavior observed in the SRS deer population. These parameters were used in a spatiotemporal analysis to estimate background Cs-137 body burdens (from global fallout, etc.), as well as the effect SRS activities may have. The purpose of this project is to modify the framework to represent the behavior of the wild pig population on SRS such that HDTS data collected may be analyzed similarly. The 2018 data were collected via the HDTS in the field to screen wild pigs dispatched by Forest Service - Savannah River. These data will provide insight for an analysis of seasonal variance in the body burdens of the SRS wild pig population. The HDTS quickly provided Cs-137 concentrations in the field, as well as automatically updated the electronic database. Space: Historically, the average home range of wild pigs on the Savannah River Site has been reported at approximately six square miles. This range was confirmed accurate as of July 2018, with the observed minimum and maximum at one and ten square miles respectively. This range was geoprocessed using ArcMap to project buffers based on 1991 gamma over-flight data. The buffers were constructed to originate at all Cs-137 contamination point coordinates and protrude outward in all directions for 1.5, 2.45 and 6 square miles. While the 2.45 mile buffer is theoretically representative of potential hog exposure based on the average home range, it does not consider the possibility of home ranges not uniform in shape. Therefore, the 1.5 and 6 mile buffers were also constructed as visual aids for determining the appropriate hunt compartments for background level considerations. The SRS is divided into numbered hunt compartments of varying size and shape. These compartment numbers are used during sponsored hunts to record the location in which a wild pig was dispatched. Time: The Gaines report determined deer analysis should be carried out at the half-decade level for the best representation of true body burdens. This is due to the impact natural factors, such as drought or flood, can have on the bioaccumulation of Cs-137. To determine the appropriate time scale for hog analysis, all available data was totaled and averaged at 1, 2, 3 and 7 year increments. The annual averages and running average are provided. The appropriate compartments for the determination of the SRS hog population background level should be: 2, 3, 4, 9, 10, 14 and 15. Hogs dispatched within other compartments are most likely exposed to Cs-137 contamination and should not be included in the background level. The current dataset is small, but was still able to demonstrate the relationship between where hogs on SRS and the Cs-137 body burdens they incur. Geoprocessing the data using the average home range of wild pigs highlighted the importance of collecting additional samples from areas surrounding SRS if an accurate background is to be determined. When the average concentration of Cs-137 in pigs from background compartments is compared against that of pigs from contaminated compartments, a significant difference can be seen. A Table provides a summary of the analyzed data from the 15 years processed thus far.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Friction behavior of members of the platinum metals group with gold

The adhesion and friction behavior of the platinum metals group was examined with clean surfaces and surfaces selectively contaminated with oxygen, vinyl chloride (C2H3Cl), and methyl mercaptan (CH3SH). A pin or disk specimen configuration was used with the pin being a single crystal of gold of the (111) orientation and with the platinum metal disks also being single crystals of the (111) or (0001) orientation. Loads applied ranged from 1 to 10 g and a sliding velocity of 0.7 mm/min was employed. Results indicate adhesion and transfer of gold to all of the platinum metals. Despite this observation friction differences existed among the metals in the group. These differences are related to surface chemical activity. Adsorption of various friction reducing species was selective. With some adsorbates present strong adhesive forces between metals were still observed.

Buckley, D. H.↗

Ignition propagation and heat effects of propellant chips embedded in castable inhibitor using a laser flux test bomb

A castable inhibitor is applied to the aft face of the Space Shuttle Redesigned Solid Rocket Motor (RSRM) forward segment propellant grain to control propellant surface burn area. During fabrication, the propellant surface is trimmed prior to the inhibitor application. This produces a potential for small propellant chips to remain undetected on the propellant surface and contaminate the inhibitor during application. The concern was that undetected propellant chips in the inhibitor might provide a fuse path for premature propellant ignition underneath the inhibitor. To evaluate the fuse path potential, testing was performed on inhibitor samples with embedded propellant. The internal motor environment was simulated with a calibrated CO2 laser beam directed onto a sample which was placed in a 4100 kPa (600 psi) nitrogen pressurized bomb (laser bomb). The testing showed definitive results pertaining to fuse path formation. Embedded propellant chips did not autoignite until the receding heat affected inhibitor surface reached, or passed, the propellant chip. Samples with embedded propellant chips in alignment did not propagate ignition from one chip to another with separation distances as small as 0.010 cm(0.004 inc) and some as little as 0.0051 cm (0.002 in). Propellant chips with volumes approximately less than 0.025 cu cm (0.0015 cu in) (which did not propagate ignition) did not increase the inhibitor material decomposition depth more than the resulting void cavity of the burned out propellant chip. In addition, the depth of this void cavity did not increase until it was overtaken by the surrounding material decomposition depth. This was due, in part, to the retention of the protective inhibitor char layer. Samples with embedded propellant strings, whose thicknesses were below 0.023 cm (0.009 in), did not propagate ignition. Propellant string thicknesses above 0.038 cm (0.015 in) did propagate ignition. Test sample char and heat affected layer measurements and observations compared well with those from the Space Shuttle Solid Rocket Motor (SRM) Technical Evaluation Motor no. 9(TEM-9).

Bolton, Douglas E., Jr.↗

Sources of Conservatism in Making Corrective Action Decisions at the NNSS - 20477

During the course of closing nuclear testing release sites at the Nevada National Security Site (NNSS) under the Federal Facility Agreement and Consent Order (FFACO) using the Risk-Based Corrective Action (RBCA) evaluation process, conservative assumptions and estimates were used in many phases of the work. These assumptions and estimates were agreed to during Data Quality Objective (DQO) meetings and published in the FFACO documents. However, the potential cumulative effect of these multiple sources of conservatism was not evaluated. The RBCA process ensures that corrective action decisions minimize the risk of making Type I errors (not applying corrective action to areas that exceed action levels) at the expense of making Type II errors (applying corrective action to areas that do not exceed action levels). Rather than fully characterizing the spatial distribution of contaminants throughout each site, the RBCA process uses a bounding methodology that conservatively estimates spatial boundaries beyond which contamination is not present that exceed corrective action levels. This process accepts that these boundaries may encompass areas that do not exceed corrective action levels and, therefore, may be somewhat larger than for fully characterized sites. This is justified at sites where the reduction in investigation costs are more than any potential increase in corrective action costs. To minimize the risk of making Type I errors, conservatism was used throughout the process. This study documents the many sources of conservatism used in the RBCA process. Conservatism was used in the RBCA process in determining potential receptors, determining action levels, collecting samples, converting sample results into receptor dose, and accounting for uncertainty. This provides decision-makers with a high level of confidence that unacceptable risk to receptors will not result from exposure to residual contamination outside the corrective action boundaries. However, it does not provide an estimate of the actual extent of areas exceeding action levels. This study provides an evaluation of the effects of compounding conservatism on RBCA process decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 6: Interagency Community of Practice in Risk and Performance Assessments

This panel focused on the status of the Inter-agency Performance and Risk Assessment Community of Practice (P and RA COP). Representatives from the P and RA COP and subject matter experts discussed lessons learned and provide feedback on building the P and RA COP to support risk-informed environmental decision making. Each panelist provided a brief presentation followed by open discussion. Presentations proposed include: 1 - Applying Lessons Learned on Engineered Barrier Service Life to Performance Assessment (Craig Benson, University of Virginia - CRESP (USA)); 2 - Decision Analysis in Integrated Risk and Performance Assessment: Challenges (Paul Black, Neptune and Company, Inc. (USA)); 3 - Managing Uncertainty (Roger Seitz, IEI (USA)); 4 - U.S. EPA Superfund Program's Need for Model Comparison for Radioactive Contamination (Stuart Walker, Office of Remediation and Technology Innovation (OSRTI), US EPA (USA)); 5 - CRESP Activities Supporting Performance and Risk Assessments (Kevin Brown, Vanderbilt University - CRESP (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3-D Radiation Mapping and Data Fusion for Environmental Remediation and Cleanup - 18449

Recent developments in radiation detection and imaging in combination with the enormous advances in computer vision and data processing enable new and improved means in the assessment of radiological contamination relevant for environmental remediation. We have developed a new concept called 3-D Scene Data Fusion (SDF) that allows us to map scenes in three dimensions and fuse this scene data with nuclear radiation data in near real time while the instrument is freely moving through the scene. This new technology provides more accurate radio-isotopic mapping at higher speed than currently possible. SDF is designed to be independent of the deployment platform and can be implemented with gamma-ray imaging and non-imaging instruments. We have demonstrated this concept in a large range of configurations on unmanned aerial and ground-based systems, in hand-portable configurations or mounted on cars or manned helicopters. While it can be utilized in a wide range of applications, this paper focuses on the mapping of radiological and nuclear materials in the context of environmental remediation and clean-up specifically in urban environments. We show results from measurements in the evacuated areas in the Fukushima Prefecture to demonstrate the new concept in the mapping of contamination and hot spots and the verification of decontamination activities in urban environments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the Chernobyl NPP: Problems, Progress, Prospects - 18485

Decommissioning of the Chernobyl NPP provides a special case due to a number of peculiarities: it is prescheduled decommissioning, the facilities undergone a major accident with off-site contamination, no previous experience of decommissioning of RBMK-type nuclear power units, unavailability of proper spent fuel and radioactive waste management infrastructure, special types of waste. The most challenging issue is the final decommissioning of the Unit 4 destroyed by the major accident on 26 April 1986. Neither of four RBMK-1000 nuclear power units was in operation till the end of the design-based lifetime, Units 1 and 3 being in operation for 19 years each, Units 2 and 4 even less. The last operating unit, Unit 3, was permanently shutdown on December 15 2000, however the main obstacle to complete a complex technological and radiological survey was spent fuel left in reactor pools and in the core due to lack of capacity in the existing interim spent fuel storage of wet type (ISF-1). So removal of spent fuel from the core and reactor pools was considered as one of the priority tasks. While construction of ISF-2 (of dry type) was delayed due to different reasons, safety reassessment and modernization of ISF-1 enabled capacity increase and transfer of all non-damaged fuel assemblies into ISF-1. Thus Chernobyl NPP Units were fully vacated from spent fuel. Since that Chernobyl NPP Units are considered as the radioactive waste facility. Dismantlement of Units 1,2 turbine hall equipment is on the way and some progress is achieved in technical solution for fragmentation of long-size equipment. All dismantled equipment after decontamination and characterization is either released from regulatory control or disposed as solid radioactive waste. The details are discussed in the paper. Eventually the comprehensive technological and radiological survey of Chernobyl NPP Units had been completed and detailed decommissioning programme had been endorsed. The decommissioning strategy chosen for the Chernobyl NPP is based on the deferred dismantlement approach, so final dismantlement of all equipment and constructions is supposed after some period of decay storage. However, the issue of the final state of the site and its further use is still open. The main reason for it is the lack of clear picture as for the destroyed Unit 4, as technical solutions concerning its highly damaged and contaminated constructions and so called fuel containing masses (FCM) are not available yet. It could be reasonably predicted also that the internal part of the so called exclusion zone will not be released into non-restricted use in near future due to characteristics of its contamination. Possible implications of these and other factors on further decommissioning activities and some approaches to find solutions are discussed in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Occurrence of Radiological Contamination in Urban Parks Established over Former Landfill Sites - 19433

In 2005, the National Park Service was notified that elevated radiation levels were detected at Great Kills Park during a baseline radiological mapping effort conducted by the Counter Terrorism Bureau of the New York City Police Department and the United States Department of Energy. Great Kills Park is in the Staten Island Unit of Gateway National Recreation Area. A records search determined that approximately 1.1 x 10{sup 6} square meters (280 acres) of the park was established over an area in which the New York City Department of Sanitation placed approximately 1.2 x 10{sup 7} cubic meters (15.1 million cubic yards) of waste fill from 1944 to 1948. Since 2005, a series of response actions and investigations were conducted on behalf of the National Park Service to mitigate risk to human health and the environment and to determine the nature of radiological contamination at Great Kills Park. The findings support that radiological contamination is related to certain components of waste fill, including incinerator residue from both on and offsite incinerators, coal ash from the historical use of coal-fired boilers for heating, and incidental radiological artifacts in the waste fill due to their historical use and subsequent disposal. A majority of the radiological artifacts were determined to contain Ra-226 and included radioluminescent markers, radium buttons, radium paint containers, and brachytherapy devices. The National Park Service is currently performing a Remedial Investigation for the waste-filled area of Great Kills Park under the Comprehensive Environmental Response, Compensation and Liability Act. Several other Parks in Gateway National Recreation Area were established in areas with a similar history to Great Kills Park, and overlie waste fill historically placed during landfilling operations. Recently, radiological surveys were performed over limited portions of Spring Creek Park in the Jamaica Bay Unit of Gateway National Recreation Area. These surveys identified several locations with gamma radiation levels above the ambient level, several of which were attributable to radiological artifacts similar in nature to those recovered at Great Kills Park. Ongoing investigations at Great Kills Park and the recent findings at Spring Creek Park suggest that radiological contamination may be associated with historical landfilling practices that were common prior to the regulation and control of radioactive materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination Process of Internal Part Pipes - 13442

The Marcoule Site, created in 1955 is one of the first nuclear sites in France. It combines the activities of the Research Centre of the French Atomic Energy Commission (CEA) and AREVA industrial operations. Today, a large part of the operations on this site consists of the cleaning and the dismantling of nuclear Installations, once the end of their life cycle has been reached. An example can be the reprocessing plant UP1. This unit, started in 1958 has been stopped in 1997 and its dismantling started quickly thereafter. Technical challenges of the UP1 dismantling are mainly linked to a very high risk of exposure due to a large variety of contaminated equipments and residuals of fission products, potential sources of irradiation. The dismantling of Hall 71 is a typical example of such challenge. This paper will present a solution developed by AREVA Clean-Up business unit, in collaboration with COFIM Industry, to remove contamination incrusted inside the pipes before starting the cutting operations, thus reducing irradiation risk. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Stability of a Uranium-Contaminated Plume in a Karst Aquifer in Northwest New Mexico - 19574

The US Department of Energy (DOE) Office of Legacy Management monitors groundwater contamination resulting from ore processing operations conducted between 1953 and 1982 at a former uranium mill site on property that is now part of the Bluewater, New Mexico, Disposal Site. The site is located in the Grants Mineral Belt in northwest New Mexico at the base of the Zuni Mountains. It is estimated that prior to mill tailings encapsulation in 1995, approximately 21.6 billion liters (5.7 billion gallons) of tailings fluid seeped from the main tailings impoundment into the underlying aquifers. Today, there is remnant groundwater contamination from the mill in two aquifers: the San Andres-Glorieta (SAG) bedrock aquifer and the Ancestral Rio San Jose alluvial aquifer. Groundwater contamination in the SAG aquifer is of particular concern, as the aquifer is the primary water source in the region for municipal, agricultural, and industrial use. Municipal wells for the region are located as close as 6.4 kilometers (4 miles) southeast of the Main Tailings Disposal Cell. The SAG uranium plume extends east for more than 4.8 kilometers (3 miles) beyond the site's eastern boundary, along the direction of groundwater flow. The plume intersects the Homestake Mining Company site, another former uranium mill site undergoing active remediation. The SAG aquifer contains two formations, the Lower Permian San Andres Limestone and the Glorieta Sandstone. Most of the groundwater moving through the SAG aquifer is in ancient karst features consisting of open conduits where the limestone has dissolved, resulting in flow through solution cavities, solution channels, cavernous zones, and enlarged fracture openings. These features make the San Andres Limestone extremely permeable and capable of rapidly transporting groundwater. In addition, the karst characteristics make the aquifer difficult to evaluate and the uranium plume difficult to characterize. Numerous faults in the area, including two directly under the Main Tailings Disposal Cell, further complicate characterization by impacting groundwater flow both onsite and in the vicinity. A DOE study of the SAG aquifer uranium plume at the Bluewater site, conducted in 2014, indicated that the plume had moved offsite soon after the start of milling and effectively stabilized in its present location prior to the 1980's. An updated study completed in 2018 confirmed previous information regarding general plume stability and provided insight regarding potential localized trends east and south of the Main Tailings Disposal Cell. One such trend may be decreasing uranium concentrations east of the Main Tailings Disposal Cell, potentially attributable to regional groundwater elevation decreases. Both the 2013 and 2017 plumes suggest that the dissolved uranium contamination is derived from the leaching of a secondary mineralized zone derived from seeped tailings fluids in the geologic formations and fault zones below the Main Tailings Disposal Cell at the Bluewater site. In developing the 2013 and 2017 SAG aquifer uranium plume depictions, DOE had to address challenges associated with data quality and comparability. Analytical results used to determine the plume extent were compiled from multiple sources, including the state of New Mexico, Homestake Mining Company, and DOE. Each source used different well identifiers and coordinate systems, and well information between sources was inconsistent. Also, the integrity of some wells was questionable and necessitated review; casing integrity was found to be compromised in multiple wells. Given these uncertainties, some of these wells were excluded from the characterization. Another source of uncertainty is the paucity of wells, particularly monitoring wells, near or immediately downgradient of the leading edge of the plume. Therefore, the exact extent of the SAG aquifer uranium plume is not known at this time. There is, however, no evidence or indication of milling-related contamination in municipal wells. Furthermore, due to plume stability and direction of groundwater flow, the municipal wells are not expected to be impacted. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploration and Analysis of Legacy Data at the Hanford Site Using PHOENIX - 19044

Radioactive contaminants pose risks to human health and the environment. These risks are influenced by factors such as disposal/release and transport mechanisms, location in the environment, potential exposure receptors, and the presence of comingled contaminants. Understanding the behavior, transport, and distribution of radionuclides in the environment is essential to facilitating risk-informed decision-making related to remedial design, action, and monitoring. These decisions are based on significant amounts of complex data that must be accessed, integrated, and analyzed to effectively evaluate data and formulate appropriate conclusions and recommendations. Often, data volume, complexity, and legacy access issues pose severe challenges for analysts, regulators, and stakeholders interested in evaluating scientific data to support decision-making. To address these challenges at the U.S. Department of Energy Hanford Site, Pacific Northwest National Laboratory (PNNL) has developed PHOENIX (PNNL-Hanford Online Environmental Information exchange) to facilitate risk-informed decision-making by streamlining investigative and analytical processes through the integration and visualization of previously isolated datasets created under distinct regulatory or operational regimes, each serving a specific purpose. With the large volume of data dispersed across many Hanford environmental databases, finding the correct sources of relevant data, accessing them, and relating them in a meaningful way can prove challenging and time consuming. By analyzing Hanford databases, performing substantial optimization using modern data processing methods and developing extensive queries on the refactored data, PHOENIX enables users to access, integrate, display, visualize, and retrieve data that would have been historically unfeasible to examine. The data and information accessible through PHOENIX help inform remediation-related assessments and evaluations, predict and quantify the risks that radioactive and chemical contaminants pose to human health and the environment, and communicate this information to decision makers responsible for risk-based remediation actions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 19217

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Characterization of Thermal Properties of Intumescent Foams for D and D Activities

DOE-EM, SRNL, and sites across the complex have identified an operational requirement for a fire resistant fixative technology that is intended to immobilize and/or fixate residual radioactive contamination within a 3-dimensional void of varying volumes that might result from anticipated to unanticipated events to include normal operating conditions, D and D activities, and radiological release. Foaming fixative shall not generate heat sufficient to compromise any of the components within the enclosure to which it is applied, The foaming fixative shall not generate heat sufficient to self-ignite the foaming fixative material. (as per ASTM Standard E3191- 18, Section 7.10 and 7.11). Introduction to Intumescent Technologies: Intumesce: to grow and to increase in volume against heat, or to show an expanding effect by bubbling. The fundamental processes involved in polymer flammability include: preheating, decomposition, ignition, and combustion and propagation. When heated beyond its critical temperature, an intumescent foam will swell 50-100 times its original size. Goals: To explore the feasibility of applying intumescent foams to fill symmetrical and asymmetrical 3-dimensional large void areas. Use a thermodynamics approach to develop viable nondestructive evaluation methods to determining anomalies and inconsistencies in the application and foam curing process. Intumescent foams as a permanent foaming fixative: ASTM foam standard was developed (ASTM E3191-18 Standard Specification for Permanent Foaming Fixatives Used to Mitigate Spread of Radioactive Contamination). Test objective: To determine a possible correlation between temperature profile during curing and inconsistencies in application or curing. Hypothesis: There is a correlation between temperature profile and curing/application. Future Work: Adapting intumescent foams to serve as a radioactive/radiological fixative.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 108: Technology Transfer and Commercialization: Innovative Solutions for Global Opportunities

This panel focus was to build the connection between innovative solutions and the various industries looking for more efficient methods, products, and processes in Tech Transfer and Commercialization. This panel had interest across the entire conference base, whether they are encountering a challenge, introducing an innovative solution, or are the host that is trying to get from a pure research / Research, Development, Demonstration, Testing, and Evaluation solution to one that is commercially viable and robust enough for long term and/or high risk deployment scenarios and which will support greater chance of success and positive outcomes. Panelists with presentations: Practical, Successful Technology Transfer (Laurie Judd); Technology Needs for Clean-up of Mercury Contamination on the Oak Ridge Reservation (Renee Echols); US DOE Office of Technology Transitions (Kyle Wiley); Technology Transfer in Support of Delivering Clean-up Missions (Kristan Schruder); Mission to Market (J. Chris Ford)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Growth of light-emitting SiGe heterostructures on strained silicon-on-insulator substrates with a thin oxide layer

The possibility of using substrates based on “strained silicon on insulator” structures with a thin (25 nm) buried oxide layer for the growth of light-emitting SiGe structures is studied. It is shown that, in contrast to “strained silicon on insulator” substrates with a thick (hundreds of nanometers) oxide layer, the temperature stability of substrates with a thin oxide is much lower. Methods for the chemical and thermal cleaning of the surface of such substrates, which make it possible to both retain the elastic stresses in the thin Si layer on the oxide and provide cleaning of the surface from contaminating impurities, are perfecte. It is demonstrated that it is possible to use the method of molecular-beam epitaxy to grow light-emitting SiGe structures of high crystalline quality on such substrates.

36 MATERIALS SCIENCE↗

Technical Advances for Sustainable Remediation: In Situ Monitoring and Climate Resiliency - 18436

Recent advances in sustainable remediation techniques show promise as solutions for contaminant removal in soil and groundwater media. Although passive remediation (or natural attenuation) has gained momentum as an acceptable technique, there are still challenges in regulatory frameworks as well as in public acceptance. Leaving contaminants in subsurface requires increased burden of proof to show that plumes are stable and residual contaminants do not pose a significant health risk. Climate changes and frequent extreme climate events contribute another level of complexity and make it difficult to demonstrate system stability and predict future plume conditions. In this study, we show two coupled approaches to tackle this challenge: (1) in situ groundwater monitoring based on advanced sensor and data analytics technologies (i.e., Big Data), and (2) state-of-art modeling for optimizing monitoring and site closure strategies. In the new monitoring approach, in situ sensors are used to continuously measure the key variables that control contaminant plume mobility and its spatial and temporal distribution (such as pH, redox potential, electrical conductivity, and groundwater level). Coupled with a limited number of groundwater sampling, the data analytics methods - data mining and machine learning - allow us to estimate contaminant concentrations, and also to detect any significant changes associated with the plume mobility. In parallel, the state-of-art numerical flow and reactive transport model - ASCEM software under DOE Office of Environmental Management - provides a physical and mechanistic understanding of the system behavior, and predicts the long-term plume migration for optimizing the monitoring and closure strategies. In particular, we focus on the effects of extreme precipitation or drought on the site closure as well as monitoring strategies. We demonstrate this approach at the Savannah River Site (SRS) F-Area, where groundwater is contaminated by various radionuclides, including uranium, tritium and technetium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗