Task Graphs: Why aren't we all using them?
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Knowledge gaps have been identified in phosphate solubility in almost every single- and multi-component system, and particularly for aluminate in phosphate/hydroxide, where uncertainties in predicted values of aluminum solubility are greater than 50%. Solubility data of multicomponent, aqueous electrolytes containing sodium hydroxide, sodium fluoride, sodium phosphate, sodium nitrite, sodium nitrate, and dissolved gibbsite are also sparse. For example, for solutions of (i) sodium nitrate and sodium phosphate, data are only available at 30 and 50 °C, and for (ii) dissolved gibbsite in sodium hydroxide and sodium phosphate, only two data points are available at 20 and 40 °C. There is no data available on mixtures of sodium hydroxide, sodium phosphate, sodium fluoride, and dissolved gibbsite. These knowledge gaps were identified in a technical review of waste solubility data and the impact of dilution on solution stabilities and will be addressed in this work to predict aluminum hydroxide and sodium phosphate solubility in multicomponent electrolytes upon dilution, and upon variation of temperature. Results will provide the technical basis to develop accurate models for (i) gibbsite solubility and mass transfer of aluminum between solid and liquid forms following the sluicing of sludge and saltcake with water; and (ii) further blending of these suspensions with bismuth from bismuth phosphate waste, and zirconium and uranium left from the fuel decladding. This work will be essential to developing a disposition path for retrieval solutions from bismuth phosphate wastes. This effort would also support sludge washing to further reduce phosphate concentration if that process were to be added back to the flowsheet in the future.
The Lahaina Energy Partnership (LEP) is an initiative funded by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) to support energy planning and rebuilding efforts in Hawaii's historic town of Lahaina on Maui as the community recovers from a devastating fire on August 8, 2023, with technical assistance provided by the National Laboratory of the Rockies. NLR has partnered with Hawaii-based community organizations to engage with Lahaina the community on energy priorities and inform the technical assistance scope. This virtual workshop presentation is the second in a two-part series to provide progress updates and request community input to guide next steps. Workshop 1 on November 18 focused on hydropower resource potential, building energy modeling, and workforce development. Workshop 2 on December 11 (this presentation) will focus on microgrids, electric grid hardening, policy and regulation.
The Lahaina Energy Partnership (LEP) is an initiative funded by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) to support energy planning and rebuilding efforts in Hawaii's historic town of Lahaina on Maui as the community recovers from a devastating fire on August 8, 2023, with technical assistance provided by the National Laboratory of the Rockies. NLR has partnered with Hawaii-based community organizations to engage with Lahaina the community on energy priorities and inform the technical assistance scope. This virtual workshop presentation is the first in a two-part series to provide progress updates and request community input to guide next steps. Workshop 1 on November 18 (this presentation) will focus on Hydropower resource potential, building energy modeling, workforce development. Workshop 2 on December 11 (presentation forthcoming) will focus on microgrids, electric grid hardening, policy and regulation.
Forecasting electricity usage is a foundational planning activity for utilities, underpinning billions of dollars in grid investments that ensure system reliability. Historically, forecasting relied on trends in economic and population growth; however, transportation electrification presents a new and complex planning challenge. Unlike conventional loads, electric vehicle (EV) charging has relatively limited usage history. In addition, charging is driven by complex human behaviors, is mobile, and at the same time can concentrate geographically in ways that, without proper planning, can quickly overwhelm local distribution systems.
Explore the source record for details and available documents.
The Integrated Renewable Energy System (IRES) testbed demonstration at the Pacific Northwest National Laboratory (PNNL) Sequim campus includes development of a suite of capabilities for tracking the performance of photovoltaic (PV) renewable energy components located on a floating platform (floating PV) and on a shoreline building rooftop. The marine environment represents potentially harsh and corrosive conditions for PV modules. Compared to terrestrial PV, potential concerns for offshore PV arising from high humidity and occasional contact with saltwater, marine wildlife, and aquaculture. These environmental factors can reduce electricity generation efficiency and increase the risk of electrical faults, polymer insulation or jacketing degradation and hydrolysis of the PV cell encapsulant materials. Offshore PV modules may also be exposed to lower temperatures and buoyant and vibrating motions with a floating platform. It is not clear how the long-term performance of floating PV will be affected by these factors. To understand expected energy generation through solar cells on a floating platform, monitoring of the performance of PV modules in the marine environment is needed. This report outlines a plan for long-term testing of IRES PV components utilizing resources of the PNNL Material Aging and Detection (MAaD) Science team and the Marine and Coastal Research Laboratory (MCRL). Equipment applicable for onsite testing and real-time monitoring of the PV performance associated with environmental conditions including temperature, solar irradiance, shading and soiling is included. In case of performance loss, equipment for fault detection, failure analysis, material testing, and further troubleshooting are also available. Through establishment of this capabilities, the enabling IRES project sets the stage for future research to advance off-shore and near-shore energy options for businesses and communities.
Verbal presentation to introduce more detailed posters, submitted under other IR requests.
The project has two primary objectives: (1) down select three-dimensional (3D) printing and post-processing approaches for solid-state electrolyte (SSE) / cathode integration, and (2) understand battery failure mechanisms via ex situ and in situ characterization.
The project has two primary objectives: (1) down select three-dimensional (3D) printing and post-processing approaches for solid-state electrolyte (SSE) / cathode integration, and (2) understand battery failure mechanisms via ex situ and in situ characterization.
The project has two primary objectives: (1) down select three-dimensional (3D) printing and post-processing approaches for solid-state electrolyte (SSE) / cathode integration, and (2) understand battery failure mechanisms via ex situ and in situ characterization.
The project has two primary objectives: (1) down select three-dimensional (3D) printing and post-processing approaches for solid-state electrolyte (SSE) / cathode integration, and (2) understand battery failure mechanisms via ex situ and in situ characterization.
Explore the source record for details and available documents.
This report consists of the following chapters: CHAPTER A: LIFE Requirements for Materials. Part 1: The structure of the First Wall--Basic requirements; A qualitative view of the challenge; The candidate materials; and Base-line material's properties. CHAPTER B: Summary of Existing Knowledge--Brief historical introduction; Design window; The temperature window; Evolution of the design window with damage; Damage calculations; He and H production; Swelling resistance; Incubation dose for swelling; Design criterion No. 1, Strength; Design criterion No. 2, Corrosion resistance; Design criterion No. 3, Creep resistance; Design criterion No. 4, Radiation induced embrittlement; and Conclusions. CHAPTER C: Identification of Gaps in Knowledge & Vulnerabilities. CHAPTER D: Strategy and Future Work.
The Energy & Environmental Research Center (EERC) conducted remediation of hydrocarbon-contaminated soils and groundwater at the Vining Oil site in Carrington, North Dakota. The primary technological synergies included (1) contaminant recovery using simultaneous operation of multiphase recovery and high-vacuum soil vapor extraction (SVE) and (2) vacuum-controlled air and ozone sparging on the periphery of an induced hydraulic and pneumatic depression. Final risk reduction steps included design and retrofit for the municipal well. The successful remediation effort resulted in the reduction of long-term health risks associated with rate-limited contaminant release within the capture zone for the municipal well and allowed for its reintegration into the water supply system. Contaminant recovery for the remediation period of September 2006 to June 2008 totaled over 12,653 lb (5,740 kg) of hydrocarbons, an equivalent to 2022 gallons (7653 l) of product. Integration of the air-sparging subsystem operated simultaneously with multiphase extraction and SVE systems resulted in accelerated volatile organic contaminant transport from the saturated zone and increased contaminants of concern recovery. Delivery of over 7.7 million ft{sup 3} of oxygen (219.8 thousand m{sup 3}) into the contaminated aquifer would translate into in situ biodegradation of 2007 kg (4424 lb) of benzene and provide for long term stimulation of the natural attenuation process.
The Energy & Environmental Research Center (EERC) initiated remediation of hydrocarbon-contaminated soils and groundwater associated with gasoline release at the Farmers Union Oil station in Garrison, North Dakota. The remedial strategy implemented is based on application of two innovative concepts: (1) simultaneous operation of soil vapor and multiphase extraction systems allowing for water table control in challenging geotechnical conditions and (2) controlled hot-air circulation between injection and extraction wells to accelerated in situ volatilization and stripping of contaminants of concern (COC) alternatively using the same wells as either extraction or injection points. A proactive remedial approach is required to reduce high COC levels in the source and impacted areas and to eliminate long-term health risks associated with contaminant migration to water-bearing zones used as a regional water supply source. This report compiles results of Phase I focused on design, construction, and start-up of remediation systems.
In the aftermath of a Radiological Dispersal Device (RDD, also known as a dirty bomb) it will be necessary to remediate the site including building exteriors and interiors, equipment, pavement, vehicles, personal items etc. Remediation will remove or reduce radioactive contamination from the area using a combination of removing and disposing of many assets (including possible demolition of buildings), decontaminating and returning to service other assets, and fixing in place or leaving in place contamination that is deemed 'acceptable'. The later will require setting acceptable dose standards, which will require negotiation with all involved parties and a balance of risk and cost to benefit. To accomplish the first two, disposal or decontamination, a combination of technologies will be deployed that can be loosely classified as: Decontamination; Equipment removal and size reduction; and Demolition. This report will deal only with the decontamination technologies that will be used to return assets to service or to reduce waste disposal. It will not discuss demolition, size reduction or removal technologies or equipment (e.g., backhoe mounted rams, rock splitter, paving breakers and chipping hammers, etc.). As defined by the DOE (1994), decontamination is removal of radiological contamination from the surfaces of facilities and equipment. Expertise in this field comes primarily from the operation and decommissioning of DOE and commercial nuclear facilities as well as a small amount of ongoing research and development closely related to RDD decontamination. Information related to decontamination of fields, buildings, and public spaces resulting from the Goiania and Chernobyl incidents were also reviewed and provide some meaningful insight into decontamination at major urban areas. In order to proceed with decontamination, the item being processed needs to have an intrinsic value that exceeds the cost of the cleaning and justifies the exposure of any workers during the decontamination process(es). In the case of an entire building, the value may be obvious; it's costly to replace the structure. For a smaller item such as a vehicle or painting, the cost versus benefit of decontamination needs to be evaluated. This will be determined on a case by case basis and again is beyond the scope of this report, although some thoughts on decontamination of unique, personal and high value items are given. But, this is clearly an area that starting discussions and negotiations early on will greatly benefit both the economics and timeliness of the clean up. In addition, high value assets might benefit from pre-event protection such as protective coatings or HEPA filtered rooms to prevent contaminated outside air from entering the room (e.g., an art museum).
This report outlines the status of U.S. biomass resources currently and future potentials for domestic and export markets of residues, energy crops, and woody resources. Includes energy and fuel production and consumption statistics, driving policies, targets, and government investment in bioenergy industry development.