Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerators, Instrumentation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Neutrino Program at Fermilab - Enhancing Proton Beam Power and Accelerator Infrastructure

The upcoming long baseline neutrino experiments aim to enhance proton beam power to multi-MW scale and utilize large-scale detectors to address the challenge of limited event statistics. The DUNE experiment at LBNF will test the three-neutrino flavor paradigm and directly search for CP violation by studying oscillation signatures in the high intensity (anti-) beam to (anti-) measured over a long baseline. Higher beam power and improved accelerator up-time will enhance neutrino flux for the neutrino program by increasing the number of protons on target. LBNF/DUNE, as well as PIP-II upgrade and Accelerator Complex Evolution (ACE) plan, play a vital role in this effort. The scientific potential of ACE plan extends beyond neutrino physics, encompassing endeavors such as the Muon Collider, Charged Lepton Flavor Violation (CLFV), Dark Sectors, and exploration of neutrinos beyond DUNE.\par In the era of higher-power accelerator operation, research in target materials and beam instrumentation is crucial for optimizing design modifications. This abstract discusses Fermilab ACE, the science opportunities it provides, and how Fermilab is pushing the limits of proton beam power and accelerator infrastructure. By tackling neutrino beam challenges and exploring research and development ideas, we are advancing our understanding of fundamental particles and their interactions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Neutrino Program at Fermilab - Enhancing Proton Beam Power and Accelerator Infrastructure

The upcoming long baseline neutrino experiments aim to enhance proton beam power to multi-MW scale and utilize large-scale detectors to address the challenge of limited event statistics. The DUNE experiment at LBNF will test the three neutrino flavor paradigm and directly search for CP violation by studying oscillation signatures in the high intensity $\nu_{\mu}$ (anti-$\nu_{\mu}$) beam to $\nu_e$ (anti-$\nu_e$) measured over a long baseline.\par Higher beam power and improved accelerator up-time will enhance neutrino flux for the neutrino program by increasing the number of protons on target. LBNF/DUNE, as well as PIP-II upgrade and Accelerator Complex Evolution (ACE) plan, play a vital role in this effort. The scientific potential of ACE plan extends beyond neutrino physics, encompassing endeavors such as the Muon Collider, Charged Lepton Flavor Violation (CLFV), Dark Sectors, and exploration of neutrinos beyond DUNE. In the era of higher-power accelerator operation, research in target materials and beam instrumentation is crucial for optimizing design modifications. This abstract discusses Fermilab ACE, the science opportunities it provides, and how Fermilab is pushing the limits of proton beam power and accelerator infrastructure. By tackling neutrino beam challenges and exploring research and development ideas, we are advancing our understanding of fundamental particles and their interactions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Neutrino Program at Fermilab -- Enhancing proton beam power and accelerator infrastructure

The upcoming long baseline neutrino experiments aim to enhance proton beam power to multi-MW scale and utilize large-scale detectors to address the challenge of limited event statistics. The DUNE experiment at LBNF will test the three neutrino flavor paradigm and directly search for CP violation by studying oscillation signatures in the high intensity $\nu_{\mu}$ (anti-$\nu_{\mu}$) beam to $\nu_{e}$ (anti-$\nu_{e}$) measured over a long baseline. Higher beam power and improved accelerator up-time will enhance neutrino flux for the neutrino program by increasing the number of protons on target. LBNF/DUNE, as well as PIP-II upgrade and Accelerator Complex Evolution (ACE) plan, play a vital role in this effort. The scientific potential of ACE plan extends beyond neutrino physics, encompassing endeavors such as the Muon Collider, Charged Lepton Flavor Violation (CLFV), Dark Sectors, and exploration of neutrinos beyond DUNE.\par In the era of higher-power accelerator operation , research in target materials and beam instrumentation is crucial for optimizing design modifications. This abstract discusses Fermilab ACE, the science opportunities it provides, and how Fermilab is pushing the limits of proton beam power and accelerator infrastructure. By tackling neutrino beam challenges and exploring research and development ideas, we are advancing our understanding of fundamental particles and their interactions.

43 PARTICLE ACCELERATORS↗

Implementing Legacy-C Algorithms in FPGA Co-Processors for Performance Accelerated Smart Payloads

Accurate, on-board classification of instrument data is used to increase science return by autonomously identifying regions of interest for priority transmission or generating summary products to conserve transmission bandwidth. Due to on-board processing constraints, such classification has been limited to using the simplest functions on a small subset of the full instrument data. FPGA co-processor designs for SVM1 classifiers will lead to significant improvement in on-board classification capability and accuracy.

co-processor↗

Development of a new instrument for direct skin friction measurements

A device developed for the direct measurement of wall shear stress generated by flows is described. Simple and symmetric in design with optional small moving mass and no internal friction, the features employed in the design eliminate most of the difficulties associated with the traditional floating element balances. The device is basically small and can be made in various sizes. Vibration problems associated with the floating element skin friction balances were found to be minimized due to the design symmetry and optional damping provided. The design eliminates or reduces the errors associated with conventional floating element devices: such as errors due to gaps, pressure gradient, acceleration, heat transfer, and temperature change. The instrument is equipped with various sensing systems and the output signal is a linear function of the wall shear stress. Dynamic measurements could be made in a limited range and measurements in liquids could be performed readily. Measurement made in the three different tunnels show excellent agreement with data obtained by the floating element devices and other techniques.

Vakili, A. D.↗

Rapid Production of Graphite Without Contamination for Biomedical AMS

The application of AMS to the detection of 14 C makes possible a new class of sensitive experiments in molecular biology. Such experiments inherently produce large numbers of samples for the determination of biological variability in molecular interactions. The samples vary in 14 C concentration over many orders of magnitude. We added TiH 2 to aid the reduction of CO 2 by zinc in a sealed tube to reproducibly make graphite without sample cross-contamination. The CO 2 is transferred from a combustion tube to the reaction tube through a disposable plastic manifold. The sealed tubes are heated to a single-reaction temperature in a muffle furnace. The process is complete within 5 h. Bulk isotopic fractionation in the finished graphite is less than 0.5%.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Experimental demonstration of optical stochastic cooling

Particle accelerators and storage rings have been transformative instruments of discovery, and, for many applications, innovations in particle-beam cooling have been a principal driver of that success. Stochastic cooling (SC), one of the most important conceptual and technological advances in this area cools a beam through granular sampling and correction of its phase-space structure, thus bearing resemblance to a ‘Maxwell’s demon’. The extension of SC from the microwave regime up to optical frequencies and bandwidths has long been pursued, as it could increase the achievable cooling rates by three to four orders of magnitude and provide a powerful tool for future accelerators. First proposed nearly 30 years ago, optical stochastic cooling (OSC) replaces the conventional microwave elements of SC with optical-frequency analogues and is, in principle, compatible with any species of charged-particle beam. Here we describe a demonstration of OSC in a proof-of-principle experiment at the Fermi National Accelerator Laboratory’s Integrable Optics Test Accelerator. The experiment used 100-MeV electrons and a non-amplified configuration of OSC with a radiation wavelength of 950 nm, and achieved strong, simultaneous cooling of the beam in all degrees of freedom. This realization of SC at optical frequencies serves as a foundation for more advanced experiments with high-gain optical amplification, and advances opportunities for future operational OSC systems with potential benefit to a broad user community in the accelerator-based sciences.

43 PARTICLE ACCELERATORS↗

Toward a Seamless Integration of Computing, Experimental, and Observational Science Facilities: A Blueprint to Accelerate Discovery

The Department of Energy, Office of Science operates world-leading facilities for experimental, observational, and computational science. DOE supercomputing facilities will reach performance at the scale of ExaFLOPs in the coming years, enabling new vistas of scale and precision for large scale simulations and data analysis. Experimental scientific facilities are undergoing similar upgrades that will lead to higher data rates and correspondingly larger computational demands, and will increase the need for near-real-time processing and resilient support for more complex workflows. A transformation of science is underway, with workloads at supercomputing facilities increasingly driven by this explosion of data from instruments and experimental facilities, as well as the accelerating use of Artificial Intelligence (AI) as a tool for scientific discovery. A seamless integration of computing, networking, instruments, and experimental facilities is required to support these emerging workloads and open up a new frontier of U.S. leadership in scientific discovery. We propose to accomplish this by providing frictionless access to the ASCR supercomputing facilities. We describe our vision of combining the power of ASCR supercomputers and networking infrastructure into an integrated scalable fabric, available to end user scientists via interfaces that aim to automate and simplify access to high performance computing systems. This will enable unprecedented computational science capabilities for experimental and observational facilities, and will create new opportunities to combine large simulations and modeling with experimental facility data analysis. This blueprint for creating an integrated network of computational and experimental facilities will provide an enriched discovery environment and open doors for new scientific communities to access the DOE’s world-leading computing and networking capabilities.

97 MATHEMATICS AND COMPUTING↗

A high-resolution gamma-ray and hard X-ray spectrometer for solar flare observations in Max 1991

A long duration balloon flight instrument for Max 1991 designed to study the acceleration of greater than 10 MeV ions and greater than 15 keV electrons in solar flares through high resolution spectroscopy of the gamma ray lines and hard X-ray and gamma ray continuum is described. The instrument, HIREGS, consists of an array of high-purity, n-type coaxial germanium detectors (HPGe) cooled to less than 90 K and surrounded by a bismuth germanate (BGO) anticoincidence shield. It will cover the energy range 15 keV to 20 MeV with keV spectral resolution, sufficient for accurate measurement of all parameters of the expected gamma ray lines with the exception of the neutron capture deuterium line. Electrical segmentation of the HPGe detector into a thin front segment and a thick rear segment, together with pulse-shape discrimination, provides optimal dynamic range and signal-to-background characteristics for flare measurements. Neutrons and gamma rays up to approximately 0.1 to 1 GeV can be detected and identified with the combination of the HPGe detectors and rear BGO shield. The HIREGS is planned for long duration balloon flights (LDBF) for solar flare studies during Max 1991. The two exploratory LDBFs carried out at mid-latitudes in 1987 to 1988 are described, and the LDBFs in Antarctica, which could in principle provide 24 hour/day solar coverage and very long flight durations (20 to 30 days) because of minimal ballast requirements are discussed.

Lin, R. P.↗

STS-40 orbital acceleration research experiment flight results during a typical sleep period

The Orbital Acceleration Research Experiment (OARE), an electrostatic accelerometer package with complete on-orbit calibration capabilities, was flown for the first time aboard the Space Shuttle on STS-40. This is also the first time an accelerometer package with nano-g sensitivity and a calibration facility has flown aboard the Space Shuttle. The instrument is designed to measure and record the Space Shuttle aerodynamic acceleration environment from the free molecule flow regime through the rarified flow transition into the hypersonic continuum regime. Because of its sensitivity, the OARE instrument defects aerodynamic behavior of the Space Shuttle while in low-earth orbit. A 2-hour orbital time period on day seven of the mission, when the crew was asleep and other spacecraft activities were at a minimum, was examined. During the flight, a 'trimmed-mean' filter was used to produce high quality, low frequency data which was successfully stored aboard the Space Shuttle in the OARE data storage system. Initial review of the data indicated that, although the expected precision was achieved, some equipment problems occurred resulting in uncertain accuracy. An acceleration model which includes aerodynamic, gravity-gradient, and rotational effects was constructed and compared with flight data. Examination of the model with the flight data shows the instrument to be sensitive to all major expected low frequency acceleration phenomena; however, some erratic instrument bias behavior persists in two axes. In these axes, the OARE data can be made to match a comprehensive atmospheric-aerodynamic model by making bias adjustments and slight linear corrections for drift. The other axis does not exhibit these difficulties and gives good agreement with the acceleration model.

Blanchard, R. C.↗

Millimeter Wave Doppler Radar Testing Using the Lunar Regolith Ejecta Simulator

A linear conveyor system has been devised to maintain lunar regolith simulant at a range of velocities, distances, angles, particle densities, and particle sizes. The Lunar Regolith Ejecta Simulator (LuRES) system shall test prototype and potential flight instrumentation for measuring the velocities of regolith particles accelerated by a plume-surface interaction (PSI) and determining effects of particle number densities and particle size distributions on return signals. Here we present the results of initial LuRES testing of the Millimeter Wave Doppler Radar (MWDR) instrument. The LuRES system held a single, ~900 µm BP-1 lunar regolith simulant particle at a continuous ~5 m/s velocity. The return signal of the MWDR from this LuRES configuration was analyzed to calibrate the MWDR instrument. Further testing is planned for the remaining of 2023 to calibrate the MWDR for various particle sizes and densities at a continuous velocity. These results will be presented in the final paper.

PSI↗

Multi-beam operation of LANSCE accelerator facility

The Los Alamos Neutron Science Center (LANSCE) accelerator facility has been in operation for 50 years performing important scientific support for national security. The unique feature of the LANSCE accelerator facility is multi-beam operation, delivering beams to five experimental areas. The near-term plans are to replace obsolete and almost end-of-life systems of the LANSCE linear accelerator with a modern 100-MeV Front End with significant improvement in beam quality. This paper summarizes experimental results obtained during the operation of the LANSCE accelerator facility and considers plans to expand the performance of the accelerator for near- and long-term operations.

47 OTHER INSTRUMENTATION↗

Hypersonic aerodynamics test facility using the external propulsion accelerator

The use of the External propulsion Accelerator (EPA) for launching models of hypersonic aerodynamic configurations into an instrumented ballistic range is discussed. The aerodynamic model is encased inside an axisymmetric projectile designed to be accelerated to high speed in the EPA. Accelerator lengths required to achieve hypersonic speeds are estimated to vary from 10 meters for Mach 7, 40 meters for Mach 10, 150 meters for Mach 15, and 700 meters for Mach 30, assuming a limit of 50,000 g's acceleration. For a model span of 10 cm to 25 cm, the launch tube diameters are 40 cm and 100 cm, respectively. Using this EPA launcher will enable exact simulation of hypersonic flight in ground facilities where both the gas composition and pressure can be controlled in the ballistic range.

Rom, J.↗

Flight Readiness of Mochii S: Portable Spectroscopic Scanning Electron Microscope Facility on the International Space Station (ISS)

The ISS (International Space Station) currently lacks the capability to image and chemically analyze nano-to-micron scale particles from numerous engineering systems. To identify these particles, we must wait for a re-entry vehicle to return them from low earth orbit for ground-based SEM (Scanning Electron Microscope) / EDS (Energy Dispersive X-Ray Spectroscopy) analysis. This may take months, potentially delaying the affected system. Having an EDS-equipped SEM (Mochii S) aboard the ISS will accelerate response time thereby enhancing crew and vehicle safety by rapid and accurate identification of microscopic threats, especially in time-critical situations.The Mochii S payload will be stationed in the Japanese Experiment Module (JEM) powered by 120 VAC (Volts Alternating Current) inverter and connected to station Ethernet and WiFi (Fig. 1). To date the Mochii S payload has undergone testing for command and data handling, power quality, flight vibration, and radiation testing at Johnson Space Center (JSC). Mochii's high-RPM (Revolutions Per Minute) rotating vacuum pumps and high voltage systems have been reviewed to meet safety standards by JSC (Johnson Space Center) Engineering. Topology of the system in the JEM module has been baselined by ISS Safety and JAXA (Japan Space Exploration Agency). Digital controls to and from ISS over Joint Station LAN (Local Area Network) uplink have been simulated and the latencies and data rates have been found to be sufficient for successful operation of the payload from ground.Transporting sensitive electron optical instruments aboard a rocket that sustains 7G acceleration for 8 minutes and then operating it the unique microgravity (micro-g) environment is no trivial matter. To meet strict safety requirements and increase robustness for mission success, over 500 unique verifications must be completed before the payload is certified for spaceflight. Two of which will be discussed in detail are: vibroacoustic testing and magnetic susceptibility shielding and validation.

Mochii↗

Fermilab PXIE Beam Diagnostics Development and Testing at the HINS Beam Facility

Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA CW H- beam up to 30 MeV. Some of the major goals of the project are to test a CW RFQ and H- source, a broadband bunch-by-bunch beam chopper and a low-energy superconducting linac. The successful characterization and operation of such an accelerator place stringent requirements on beamline diagnostics. These crucial beam measurements include bunch currents, beam orbit, beam phase, bunch length, transverse profile and emittance and beam halo and tails, as well as the extinction performance of the broadband chopper. This paper presents PXIE beam measurement requirements and instrumentation development plans. Presented are plans to test key instruments at the Fermilab High Intensity Neutrino Source (HINS) beam facility. Since HINS is already an operational accelerator, utilizing HINS for instrumentation testing will allow for quicker development of the required PXIE diagnostics.

43 PARTICLE ACCELERATORS↗

Toward an integrated multi-gigahertz ionizing particle diagnostic

Needs arising at both current and future accelerator facilities call for the development of radiation-hardened position-sensing diagnostics that can operate with multi-GHz repetition rates. Such instruments are likely to also have applications in the diagnosis of rapid plasma behavior. Here, building on the recent work of our Advanced Accelerator Diagnostics Collaboration, we are exploring the development of integrated multi-GHz ionizing particle detection systems based on chemical-vapor deposition diamond sensors, with the initial goal of producing a quadrant detector that can determine the intensity and centroid position of a particle beam at a repetition rate between 5 and 10 GHz. Results from our initial high-speed characterization work are presented, including those from a single-channel sensor with a GHz response. Approaches to achieving multi-GHz (5–10 GHz) rate capability, including the design of a dedicated Application Specific Integrated Circuit and the use of 3D RF-solver computer aided design software, are presented and discussed in more detail. 3D RF simulations suggest clean pulses of duration less than 250 ps (FWHM less than 125 ps) can be achieved with the approaches developed by this work.

43 PARTICLE ACCELERATORS↗

Plasma physics and environmental perturbation laboratory. Volume 1: Executive summary

Space physics and plasma physics experiments that can be performed from the space shuttle were identified. Potential experiment concepts were analyzed to derive requirements for a spaceborne experiment facility. The laboratory, known as the Plasma Physics and Environmental Perturbation Laboratory consists of a 33-foot pallet of instruments connected to a 25-foot pressurized control module. Two 50-meter booms, two subsatellites, a high power transmitter, a multipurpose accelerator array, a set of deployable canisters, and a gimbaled instrument platform are the primary systems deployed from the pallet. The pressurized module contains all the control and display equipment required to conduct the experiments, and life support and power subsystems.

Source record↗