Search NASA⌕ Search

SEARCH · Search NASA

Results for “Engineering Directorate”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Initiated chemical vapor deposited nanoadhesive for bonding National Ignition Facility's targets

Currently, the target fabrication scientists in National Ignition Facility Directorate at Lawrence Livermore National Laboratory (LLNL) is studying the propagation force resulted from laser impulses impacting a target. To best study this, they would like the adhesive used to glue the target substrates to be as thin as possible. The main objective of this research project is to create adhesive glue bonds for NIF’s targets that are ≤ 1 μm thick. Polyglycidylmethacrylate (PGMA) thin films were coated on various substrates using initiated chemical vapor deposition (iCVD). Film quality studies using white light interferometry reveal that the iCVD PGMA films were smooth. The coated substrates were bonded at 150 °C under vacuum, with low inflow of Nitrogen. Success in bonding most of NIF’s mock targets at thicknesses ≤ 1 μm indicates that our process is feasible in bonding the real targets. Key parameters that are required for successful bonding were concluded from the bonding results. They include inert bonding atmosphere, sufficient contact between the PGMA films, and smooth substrates. Average bond strength of 0.60 MPa was obtained from mechanical shearing tests. The bonding failure mode of the sheared interfaces was observed to be cohesive. Future work on this project will include reattempt to bond silica aerogel to iCVD PGMA coated substrates, stabilize carbon nanotube forests with iCVD PGMA coating, and kinetics study of PGMA thermal crosslinking.

36 MATERIALS SCIENCE↗

Mass and Reliability System (MaRS)

The Safety and Mission Assurance (S&MA) Directorate is responsible for mitigating risk, providing system safety, and lowering risk for space programs from ground to space. The S&MA is divided into 4 divisions: The Space Exploration Division (NC), the International Space Station Division (NE), the Safety & Test Operations Division (NS), and the Quality and Flight Equipment Division (NT). The interns, myself and Arun Aruljothi, will be working with the Risk & Reliability Analysis Branch under the NC Division's. The mission of this division is to identify, characterize, diminish, and communicate risk by implementing an efficient and effective assurance model. The team utilizes Reliability and Maintainability (R&M) and Probabilistic Risk Assessment (PRA) to ensure decisions concerning risks are informed, vehicles are safe and reliable, and program/project requirements are realistic and realized. This project pertains to the Orion mission, so it is geared toward a long duration Human Space Flight Program(s). For space missions, payload is a critical concept; balancing what hardware can be replaced by components verse by Orbital Replacement Units (ORU) or subassemblies is key. For this effort a database was created that combines mass and reliability data, called Mass and Reliability System or MaRS. The U.S. International Space Station (ISS) components are used as reference parts in the MaRS database. Using ISS components as a platform is beneficial because of the historical context and the environment similarities to a space flight mission. MaRS uses a combination of systems: International Space Station PART for failure data, Vehicle Master Database (VMDB) for ORU & components, Maintenance & Analysis Data Set (MADS) for operation hours and other pertinent data, & Hardware History Retrieval System (HHRS) for unit weights. MaRS is populated using a Visual Basic Application. Once populated, the excel spreadsheet is comprised of information on ISS components including: operation hours, random/nonrandom failures, software/hardware failures, quantity, orbital replaceable units (ORU), date of placement, unit weight, frequency of part, etc. The motivation for creating such a database will be the development of a mass/reliability parametric model to estimate mass required for replacement parts. Once complete, engineers working on future space flight missions will have access a mean time to failures and on parts along with their mass, this will be used to make proper decisions for long duration space flight missions

Barnes, Sarah↗

V31 Test Report

The V31 containment vessel was procured by the US Army Recovered Chemical Material Directorate (RCMD) as a third - generation EDS containment vessel. It is the fifth EDS vessel to be fabricated under Code Case 2564 of the 2019 ASME Boiler and Pressure Vessel Code, which provides rules for the design of impulsively loaded vessels. The explosive rating for the vessel, based on the code case, is twenty-four (24) pounds TNT - equivalent for up to 1092 detonations. This report documents the results of explosive tests that were performed on the vessel at Sandia National Laboratories in Albuquerque, New Mexico to qualify the vessel for field operations use. There were three design basis configurations for qualification testing. Qualification test (1) consisted of a simulated M55 rocket motor and warhead assembly of 24lbs of Composition C-4 (30 lb TNT equivalent). This test was considered the maximum load case, based on modeling and simulation methods performed by Sandia prior to the vessel design phase. Qualification test (2) consisted of a regular, right circular cylinder, unitary charge, located central to the vessel interior of 19.2 lb of Composition C-4 (24 lb TNT equivalent). Qualification test (3) consisted of a 12-pack of regular, right circular cylinders of 2 lb each, distributed evenly inside the vessel (totaling 19.2 lb of C-4, or 24 lb TNT equivalent). All vessel acceptance criteria were met.

42 ENGINEERING↗

Office of the Chief Financial Officer Annual Report 2010

In March, a review team consisting of CFOs from other national laboratories, industry, and members of the University of California Office of the President (UCOP) convened for three days to conduct a comprehensive peer review of the OCFO. This was the first time in almost a decade that the financial operations of the Laboratory had been reviewed. The Committee relayed their observations on our strengths, and their very thoughtful recommendations for improvement, which we are actively pursuing. These improvements, when implemented, will benefit the entire Laboratory for many years to come. The complete report is available on the OCFO website (www.lbl.gov/Workplace/CFO). In August, the senior management team of the OCFO participated in a strategic planning retreat. The purpose of the two and a half day exercise was, of course, to update our strategic plan, but instead of spending days developing a written document, we enlisted the expertise of a seasoned journalist who also happens to be a very talented graphic artist. He listened carefully to our ideas and committed them to a visual roadmap. All members of the OCFO, Business Managers, and the Laboratory Leadership Team reviewed this draft roadmap. By having a completely visual strategic plan that is posted widely throughout the OCFO, all employees can easily see and identify with the goals that we are all working towards. FY2010 was an extraordinary year. The Laboratory welcomed its seventh Director, Dr. Paul Alivisatos, who wasted no time communicating his vision and priorities for Berkeley Lab. They include five very ambitious initiatives: Carbon Cycle 2.0, The Next Generation Light Source, a Safe and Efficient Lab, Building Community, and Space. In response, the Office of the Chief Financial Officer (OCFO) developed twelve specific initiatives that align completely with these five priorities. We will be very focused on these in the coming fiscal year, but for now, let's review what happened in FY2010. FY2010 was a pivotal year for the Procurement and Property Department. A provision of the management contract that was signed fives years ago required us to achieve cost savings of $30M. I am proud to announce that this last fiscal year we reached that goal, in large part due to the implementation of eBuy, and the negotiation of strategic sourcing contracts. Our last wall-to-wall inventory exceeded all the Department of Energy's (DOE) national targets and DOE approved the LBNL property system unconditionally. Of the total inventory, 92.3% or 25,601 assets were accounted for using barcode scanning that made the inventory process much more efficient. The effective management of the American Recovery and Reinvestment Act (ARRA) funds was strengthened by the continued successful partnership that LBNL shares with our DOE Site Office. They provided authority, support and clarity to this very complex task. The Laboratory's ARRA Stimulus Committee played a critical role in assuring internal controls, compliance with DOE regulations and quality financial management. The LBNL Budget Officer led a DOE complex-wide effort to identify and share how various DOE facilities track and report ARRA-funded projects, share best practices, evaluate issues and discuss solutions. LBNL has been recognized as a leader in this process and will continue to share knowledge and best practices with other DOE laboratories. Continuous education of our staff as well as the greater Laboratory population was still a major focus of the OCFO. With the help of many OCFO senior managers and staff that acted as subject-matter experts, the Core Financial Management Program was completely re-engineered and resulted in a revised classroom and web-based curriculum that will be formally rolled out Lab-wide in early FY2011. The Office of Sponsored Projects and Industry Partnerships (OSPIP) led the effort to select and purchase four Click Commerce software modules for the LBNL electronic Scientific Research Administration (eSRA) project. In early FY2010, the implementation of the Institutional Review Board (IRB) module, responsible for the human subjects review process, began and should be completed in early FY2011. OSPIP also began implementation of the grants and contracts module and we expect an early go-live of 'Grants Express' in mid-FY2011 with a full completion date in FY2012. The peer review's most substantial recommendation for improvement involved the Laboratory's central financial systems. To quote: 'financial reporting system is outdated and inadequate. There is an inability to easily extract data; the field has little confidence in data; people spend more time mining data than analyzing data; requires field users to create & rely upon shadow systems; causes proliferation of program administrators and resource analysts. These issues impact the quality & execution of research; and the data warehouse lacks understanding & ownership.'

99 GENERAL AND MISCELLANEOUS↗

V31 Test Report

The V31 containment vessel was procured by the US Army Recovered Chemical Materiel Directorate (RCMD) as a third-generation EDS containment vessel. It is the fifth EDS vessel to be fabricated under Code Case 2564 of the 2019 ASME Boiler and Pressure Vessel Code, which provides rules for the design of impulsively loaded vessels. The explosive rating for the vessel, based on the code case, is twenty-four (24) pounds TNT-equivalent for up to 1092 detonations. This report documents the results of explosive tests that were performed on the vessel at Sandia National Laboratories in Albuquerque, New Mexico to qualify the vessel for field operations use. There were three design basis configurations for qualification testing. Qualification test (1) consisted of a simulated M55 rocket motor and warhead assembly of 24lbs of Composition C-4 (30 lb TNT equivalent). This test was considered the maximum load case, based on modeling and simulation methods performed by Sandia prior to the vessel design phase. Qualification test (2) consisted of a regular, right circular cylinder, unitary charge, located central to the vessel interior of 19.2 lb of Composition C-4 (24 lb TNT equivalent). Qualification test (3) consisted of a 12-pack of regular, right circular cylinders of 2 lb each, distributed evenly inside the vessel (totaling 19.2 lb of C-4, or 24 lb TNT equivalent). All vessel acceptance criteria were met .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterisation Progress at the Windscale Pile Reactors. Challenges and Results

The decommissioning of the Windscale Pile 1 reactor, fifty years after the 1957 fire, is one of the most technically challenging decommissioning projects in the United Kingdom, if not the world. The decommissioning is being performed by an Alliance of the United Kingdom Atomic Energy Authority (UKAEA), CH2M HILL International Nuclear Services (CHNS) Ltd. and AMEC, NNC. The 1957 Windscale Pile 1 accident is summarized. The resulting fire caused significant characterisation challenges. Challenges to intrusive characterization included hypothesized uranium hydride causing re-ignition of the core fire, unknown fuel configurations leading to a reactor criticality and graphite dust explosions. As a result, the Pile 1 facilities were sealed, isolated and managed in a monitoring and surveillance regime while plans for dismantling were developed. For years the intrusive inspection of the fire damaged region of Pile 1, estimated to contain 15 tonnes of fuel, was precluded based on safety grounds. In June of 2006 the United Kingdom Health and Safety Directorate approved a new Pile 1 safety case that successfully demonstrated that Pile 1 presents a minimal safety risk with no credible risk of a core fire, criticality or graphite dust explosion. Adoption of the new safety case enabled the intrusive inspections of the fire damaged region. Characterisation activities planned and performed since the safety case approval, were prioritised relative to the results potential to mitigate decommissioning project risks. D-Void examinations, irradiation foil hole intrusive inspections, bio-shield and thermal shield plate characterizations were performed. Results obtained allow determination of waste stream composition and confirmation of assumed design conditions. Changes to the strategic approach to safely and efficiently decommission the two Windscale Pile Reactors include waste packaging and storage facilities and confirmation of design assumptions. Fuel channel endoscope inspections have confirmed the strategic approach to safely and efficiently decommission the Windscale Pile 1 Reactor. The first detailed images from deep within the Pile 1 fire affected zone(FAZ) since the 1957 fire are discussed. The decommissioning impacts of these images are provided. Characterisation has confirmed design assumptions and supported decommissioning option evaluation. The results confirmed that the decommissioning strategy of a top down approach, employing an array of light weight, high payload robotic arms to remove the damaged fuel, the graphite core, activated metals and concrete remains the most efficient decommissioning method. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering Design Study of Laser Power Beaming for Applications on the Moon

Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanent-ly-shadowed regions (PSR) where solar power is not available, however detailed engineering design studies of the spacecraft for such applications has not previously been undertaken. In this work, we did an engineering design study of two applications of laser power beaming for near-term lunar ap-plications. In the first application studied, an application was studied to provide power during the lunar night for a global network of small landers spread across the lunar surface, at latitudes ranging from equatorial to near polar landing sites. We analyze a proposal to power such small landers from orbit, using a laser to beam power from an orbital power station to photovoltaic arrays on the landers that are tuned to the laser wavelength. A commercially-available high-power 1.07-µ diode-pumped fiber laser was chosen as the source. To minimize beam spread of the a spot at the required distance, a 1.5 meter optical element was provided, using a design based on the Kepler telescope. To provide power to landers at any location, three orbital stations (“beamcraft) are required, each carrying a 3-kW laser. (If the surface science platforms requiring power are only in polar locations, or converse-ly, only in near equatorial locations, only one orbital platform is needed.) The approach is seen to be feasible, and a systems analysis was completed, the concept of operations for the system out-lined and a design for the beamcraft put together. The second design study looked at surface-to-surface power beaming using the VSAT as the la-ser platform, for an application to provide power to the interior of a permanently shadowed lunar crater from a surface platform. To maximize the distance of beaming, taking into account possible surface irregularities and the short distance to the horizon of the moon, it is desirable to emplace the laser at an elevation above the surface. The Vertical Solar Array Technology (VSAT) is a NASA program developing a solar array mounted vertically on a 10-m tall mast, designed for emplacement on a Commercial Lunar Payload Services (CLPS) lander to provide 10-kW (BOL) power near the south polar region of the moon, with a target readiness date of 2028. We used this design as the starting platform and the power source for a laser power beaming station. By mounting the laser beam director at the top of the solar array mast, a viewing distance to power receivers up to 10 km is possible. Requirements for the system were to be able to provide 300 W of continuous usable power to users including CLPS landers, VIPER class rovers, or the proposed Lunar Terrain Vehicle. The specified requirement was to be able to transmit power to a distance of up to 10 km, over a design lifetime of 5 years, and fitting within a total system landed mass under 625 kg. Again, a 1.07-µ fiber laser is mounted on the deck of the lander, with laser output sent to the laser beam director by a fiber-optic cable. A 7 square meter deployable radiator keeps the laser within operating temperature limits. The beam director is based on the design of a prototype unit developed by the University of California Santa Barbara. The system beams power for 57% of the time, with 44% of the time idle (accounting for the time when the VSAT array is itself in shadow). 1595 Watts of optical power are output in the beam. Accounting for receiver efficiency and beam losses, this results in an output onto the 1.5-meter receiving photovoltaic array of 542 watts. Of this, 300 watts is directly available to the user, while 242 watts is directed to the batteries for use while the beam is not available.

laser power↗

Hanford Direct Feed Low Activity Waste Real Time Monitoring Program - 18336

Effective operation of the Low-Activity Waste (LAW) Facility at Hanford will rely on information provided from monitoring and control of chemical process streams to maintain safety and environmental compliance, product quality, and operational efficiency. The LAW Facility has been designed as a contact-maintained facility and it was recognized that establishing a real time, in-line monitoring program could have substantial benefits to the U.S. Department of Energy, Office of River Protection in the long-term, which include significant time savings, increased processing efficiency and effectiveness, reducing worker exposure to radiation and chemical hazards, reducing secondary wastes, and a better understanding of the flowsheet to support direct-feed LAW (DFLAW). The Assistant Manager/Federal Project Director for the Waste Treatment and Immobilization Plant (WTP) Project chartered a multidisciplinary integrated technical team comprised of federal, contractor, and national laboratory staff to develop a phased program to support this initiative. A three-phase approach was adopted: - Phase 1: Requirements and Opportunities Analysis for Sampling Reduction; - Phase 2: Applications and Benefits Determination; - Phase 3: Qualification and Demonstration. The focus of Phase 1 is to identify the drivers behind any requirements for sampling and any opportunities to benefit from a real-time monitoring program. The effort identified 18 sample points and approximately 2,600 potential samples to be collected annually with analytical methods to be performed approximately 18,000 times annually. Based on Savannah River National Laboratory experience and discussions with WTP Analytical Laboratory personnel, these sample analyses will generate approximately 5,000 L of liquid secondary waste and approximately 1,300 m{sup 3} of solid secondary waste each year. Additional solid and liquid secondary wastes will be generated from sample collection. A preliminary evaluation indicates that employing real-time, in-line monitoring, mass balances, and periodic sampling could significantly reduce the number of samples collected, analytical methods performed, and secondary waste generated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of 2016 Occurrence Reports Involving Electrical Energy

The 04100 Center Director requested an analysis of 2016 occurrence reports (ORs) involving electrical energy be performed to facilitate learning through use of performance assurance methodologies. Preliminarily, 11 reportable events were identified for review; however, this population was updated to 12 during the review. Appendix 1 includes the analysis protocol and a listing of the ORs reviewed. The Team completed its review at the end of October 2016. At that time, causal analysis and associated corrective action information was available for eight events. Elements of this analysis included determining the following: common weaknesses that contributed to electrical events; the quality of causal analysis products with the goal of providing sustainable long-term corrective actions; and how learning from issues, causes, and corrective actions from prior similar events is incorporated into causal analyses for today’s events. As used in this report, the term “trends” was used as a catalyst to determine categories of events for deeper analysis. The content of ORs is important. The information in an OR for a past event can be useful in addressing today’s issues because it provides information on systemic issues that were found and past actions addressing those issues. The effectiveness of those actions as viewed from today’s vantage point is useful input to the determination of corrective actions for current problems. Additionally, as a means of communication to DOE and NNSA, ORs provide a measure of Sandia’s maturity in understanding problems and their solutions.

42 ENGINEERING↗

DESIGN AND DEVELOPMENT OF A HELIUM PURIFIER

Director: Sebastian Bawab. The helium purification system at Jefferson Lab is approaching the end of its design life. Its capacity no longer meets the facility's capacity requirements and consequently, a new system is needed. Several improvements were incorporated into the new purifier design to include extended cycle time, minimum space usage, and convenient placement of components from both safety and maintenance aspects. The purifier design has been completed and the resulting design documentation has been signed and submitted to the Jefferson Lab cryogenic fabrication group. In general, helium purification systems use both a molsieve bed and a carbon bed for purification process. Their function is to remove the contaminants, such as air (moisture, nitrogen, and oxygen) from the helium that enter the system process helium during operations. For continuous operation, usually two sets of purifiers are required, one on-line while the other is being regenerated. Each purification system also contains a nitrogen boiler and a heat exchanger to maintain the temperature of the carbon bed at 80 K (Kelvin) and to minimize liquid nitrogen (LN2) use. The helium purification system at Spallation Neutron Source (SNS) in Oak Ridge, TN, also designed by Jefferson Lab, served as a model for the new system at Jefferson Lab due to similar requirements. However, space restrictions at Jefferson Lab necessitated design modification and re-examination of the beds' capacity. When both the carbon and molsieve beds were the same size (for economical reasons), the life of the molsieve bed was calculated to be longer than the life of the carbon bed for the given contamination level. The design was centered on the limited space and also to make the valves and components easily accessible for the purifier operation. To reduce heat leak from the surroundings and to maintain the carbon bed temperatures at 80 K and to minimize the LN2 usage, a heat exchanger, nitrogen boiler, piping, and miscellaneous items were encased in a vacuum shell. To allow for the flexibility requirements of the piping for the various operating processes, the piping is designed with additional bends and/or length of piping or flex hoses as required. In addition flex hoses were also used to simplify the fabrication process. The beds were designed, fabricated, tested, and inspected to conform to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section VIII, Rules for Construction of Pressure Vessels. The piping system requirements for design, fabrication, testing and inspection were also made to conform to the ASME Code B31.3, Process Piping. All other design choices were based on sound engineering practices.

Wright, Mathew↗

UAM Vision Concept of Operations (ConOps) UAM Maturity Level (UML) 4

This Vision ConOps is intended as a foundation to engage members of the UAM community and provide a consensus on the future vision of UAM operations. It provides a concept for more detailed discussion and a basis for the exploration of ideas using a common framework to inform the continued development and integration of UAM as part of the broader transportation system. Advanced Air Mobility (AAM) encompasses a range of innovative aviation technologies (small drones, electric aircraft, automated air traffic management, etc.) that are transforming aviation’s role in everyday life, including the movement of goods and people. Urban Air Mobility (UAM) represents one of the most exciting and complex AAM concepts with highly automated aircraft, providing commercial services to the public over densely populated cities. This concept has generated tremendous interest and industry investment. UAM envisages a future in which advanced technologies and new operational procedures enable practical, cost-effective air travel as an integral mode of transportation in metropolitan areas. It represents one of the most exciting and complex AAM concepts with highly automated aircraft providing commercial services to the public over densely populated cities. For this reason, the National Aeronautics and Space Administration (NASA) selected UAM as the initial goal of its AAM efforts and the focus of this Vision Concept of Operations (ConOps) document. UAM Community Vision ConOps: This Vision ConOps effort was led by experts from NASA’s Aeronautics Research Mission Directorate (ARMD) in collaboration with the Federal Aviation Administration (FAA) and Deloitte’s Ecosystem Advisory Group (a cohort of advisers with aviation, aerospace, and regulatory expertise). To develop this Vision ConOps, NASA, FAA, and Deloitte built upon the current body of aeronautical research and consulted with more than 100 stakeholder organizations. This UAM community includes entities ranging from legacy aviation leaders to innovators and new market entrants. Stakeholders consulted included the federal government, state and local government, aerospace original equipment manufacturers (OEMs), local transportation organizations, prospective UAM operators, academia, industry standards-setting bodies, airports, service suppliers, and others (as described in Appendix G). This input was captured through the following methods: • A series of more than two dozen interviews with industry experts, federal regulators, state and local governments, and industry trade groups provided insight into the challenges of UAM integration into the National Airspace System (NAS), as well as technology developments and a variety of perspectives as to how UAM systems will integrate. • A series of two-day community workshops enabling active, detailed engagement of nearly 100 industry, academic, federal, and state stakeholder individuals. These workshops, hosted by NASA and Deloitte, explored UAM concepts in detail, and stakeholders were invited to collaboratively analyze and propose solutions to some of the greatest conceptual challenges behind UAM at an intermediate state. • A review of more than 160 sources of UAM literature from across government, industry, and academia, which are listed in Appendix H. • The public sharing of workshop input and document drafts for review and input across the UAM community. Feedback in the form of more than 1,000 comments and inputs on the document was received from industry groups, individual companies, academia, and government (federal, state, and local), among others. Although effort was made to incorporate inputs from across the UAM stakeholder group, not all comments could ultimately be incorporated in this version. The team resolved conflicting comments or ideas while maintaining consistency with the known direction of regulators and ensuring the document was coherent and consistent. It is recognized that this is a rapidly evolving area and that concepts will likely change over time; as such, this Vision ConOps is a living document and is expected to evolve as concepts mature. The ConOps does, however, provide a vision of UAM concepts and solutions based on the broad insights from across the UAM stakeholder community at the time of its publication and is intended to serve as a UAM North Star for continued research and development of UAM. As a broad Vision ConOps, is not a detailed engineering document; rather, it focuses primarily on outlining a broad, high-level vision across all aspects of a UAM transportation system.

Urban Air Mobility↗

Author Contribution to the Pu Handbook II: Chapter 37 LLNL Integrated Sample Preparation Glovebox (TEM) Section

The development of our Integrated Actinide Sample Preparation Laboratory (IASPL) commenced in 1998 driven by the need to perform transmission electron microscopy studies on naturally aged plutonium and its alloys looking for the microstructural effects of the radiological decay process (1). Remodeling and construction of a laboratory within the Chemistry and Materials Science Directorate facilities at LLNL was required to turn a standard radiological laboratory into a Radiological Materials Area (RMA) and Radiological Buffer Area (RBA) containing type I, II and III workplaces. Two inert atmosphere dry-train glove boxes with antechambers and entry/exit fumehoods (Figure 1), having a baseline atmosphere of 1 ppm oxygen and 1 ppm water vapor, a utility fumehood and a portable, and a third double-walled enclosure have been installed and commissioned. These capabilities, along with highly trained technical staff, facilitate the safe operation of sample preparation processes and instrumentation, and sample handling while minimizing oxidation or corrosion of the plutonium. In addition, we are currently developing the capability to safely transfer small metallographically prepared samples to a mini-SEM for microstructural imaging and chemical analysis. The gloveboxes continue to be the most crucial element of the laboratory allowing nearly oxide-free sample preparation for a wide variety of LLNL-based characterization experiments, which includes transmission electron microscopy, electron energy loss spectroscopy, optical microscopy, electrical resistivity, ion implantation, X-ray diffraction and absorption, magnetometry, metrological surface measurements, high-pressure diamond anvil cell equation-of-state, phonon dispersion measurements, X-ray absorption and emission spectroscopy, and differential scanning calorimetry. The sample preparation and materials processing capabilities in the IASPL have also facilitated experimentation at world-class facilities such as the Advanced Photon Source at Argonne National Laboratory, the European Synchrotron Radiation Facility in Grenoble, France, the Stanford Synchrotron Radiation Facility, the National Synchrotron Light Source at Brookhaven National Laboratory, the Advanced Light Source at Lawrence Berkeley National Laboratory, and the Triumph Accelerator in Canada.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Toward Right-Fidelity Rotorcraft Conceptual Design

The aviation Advanced Design Office (ADO) of the US Army Aeroflightdynamics Directorate (AMRDEC) performs conceptual design of advanced Vertical Takeoff and Landing (VTOL) concepts in support of the Army's development and acquisition of new aviation systems. In particular, ADO engages in system synthesis to assess the impact of new technologies and their application to satisfy emerging warfighter needs and requirements. Fundamental to ADO being successful in accomplishing its role; is the ability to evaluate a wide array of proposed air vehicle concepts, and independently synthesize new concepts to inform Army and DoD decision makers about the tradespace in which decisions will be made (Figure 1). ADO utilizes a conceptual design (CD) process in the execution of its role. Benefiting from colocation with NASA rotorcraft researchers at the Ames Research Center, ADO and NASA have engaged in a survey of the current rotorcraft PD practices and begun the process of improving those capabilities to enable effective design and development of the next generation of VTOL systems. A unique aspect of CD in ADO is the fact that actual designs developed in-house are not intended to move forward in the development process. Rather, they are used as reference points in discussions about requirements development and technology impact. The ultimate products of ADO CD efforts are technology impact assessments and specifications which guide industry design activity. The fact that both the requirement and design are variables in the tradespace adds to the complexity of the CD process. A frequent need is ability to assess the relative "cost" of variations in requirement for a diverse set of VTOL configurations. Each of these configurations may have fundamentally different response characteristics to this requirement variation, and such insight into how different requirements drive different designs is a critical insight ADO attempts to provide decision makers. The processes and tools utilized are driven by the timeline in which questions must be answered. This can range from quick "back-of-the-envelope" assessments of a configuration made in an afternoon, to more detailed tradespace explorations that can take upwards of a year to complete. A variety of spreadsheet based tools and conceptual design codes are currently in use. The in-house developed conceptual sizing code RC (Rotorcraft) has been the preferred tool of choice for CD activity for a number of years. Figure 2 illustrates the long standing coupling between RC and solid modeling tools for layout, as well as a number of ad-hoc interfaces with external analyses. RC contains a sizing routine that is built around the use of momentum theory for rotors, classic finite wing theory, a referred parameter engine model, and semi-emperical weight estimation techniques. These methods lend themselves to rapid solutions, measured in seconds and minutes. The successful use of RC, however requires careful consideration of model input parameters and judicious comparison with existing aircraft to avoid unjustified extrapolation of results. RC is in fact a legacy of a series of codes whose development started in the early 1970s, and is best suited to the study of conventional helicopters and XV-15 style tiltrotors. Other concepts have been analyzed with RC, but typically it became necessary to modify the source code and methods for each unique configuration. Recent activity has lead to the development of a new code, NASA Design and Analysis of Rotorcraft (NDARC). NDARC uses a similar level of analytical fidelity as RC, but is built on a new framework intended to improve modularity and ability to rapidly model a wider array of concepts. Critical to achieving this capability is the decomposition of the aircraft system into a series of fundamental components which can then be assembled to form a wide-array of configurations. The paper will provide an overview of NDARC and its capabilities.

Sinsay, Jeffrey D.↗

Study of the integrity of pressurized LEH window assemblies at cryogenic temperatures for NIF targets

The National Ignition Facility (NIF) is a directorate of LLNL, a DOE Lab, and is home to the world’s largest laser. This laser shoots its 192 beams at a target about the size of a pencil eraser. Within the target are two main chambers; and depending on the type of shot, those chambers need to be pressurized to a certain point at a very low temperature (18 Kelvin). The component used for keeping the hohlraum at its designated pressure is a Laser Entrance Hole (LEH) window, made from a thin (0.5um) polyimide film and an aluminum washer attached with a miniscule amount of polymeric adhesive. One issue that has been known to happen is the chambers will leak, at very low rates (5.0E-7 mBar-liter/s and under). At higher pressures significantly larger leak rates have been observed.There are three proposed mechanisms by which the LEH windows are leaking. The first is that there is a small pinhole somewhere in the freestanding film. This is the most unlikely because before any film is shipped from Luxel, it must pass a 50-75 torr room temperature pressure test. The second is a tear in the film at the edge of the washer. This type of damage suggests that the film is under additional stress at this edge portion and/or the edge of the washer itself is what is doing the damage. Lastly, it has been hypothesized that there are small channels under the window that do not get completely filled by the glue and, if they connect to the edge of the freestanding portion of the film, then the pressure can escape through them. These channels were the mechanism being most directly tested over the course of the experiments.

42 ENGINEERING↗

Infusing Stretch Goal Requirements into the Constellation Program

In 2004, the Vision for Space Exploration (VSE) was announced by the United States President's Administration in an effort to explore space and to extend a human presence across our solar system. Subsequently, the National Aeronautics and Space Administration (NASA) established the Exploration Systems Mission Directorate (ESMD) to develop a constellation of new capabilities, supporting technologies, and foundational research that allows for the sustained and affordable exploration of space. Then, ESMD specified the primary mission for the Constellation Program to carry out a series of human expeditions, ranging from Low Earth Orbit (LEO) to the surface of Moon, Mars, and beyond for the purposes of conducting human exploration of space. Thus, the Constellation Program was established at the Lyndon B. Johnson Space Center (JSC) to manage the development of the flight and ground infrastructure and systems that can enable continued and extended human access to space. Constellation Program's "Design Objectives" call for an early attention to the program's life cycle costs management through the Program's Need, Goals, and Objectives (NGO) document, which provides the vision, scope, and key areas of focus for the Program. One general policy of the Constellation Program, found in the Constellation Architecture Requirements Document (CARD), states: "A sustainable program hinges on how effectively total life cycle costs are managed. Developmental costs are a key consideration, but total life cycle costs related to the production, processing, and operation of the entire architecture must be accounted for in design decisions sufficiently to ensure future resources are available for ever more ambitious missions into the solar system....It is the intent of the Constellation Program to aggressively manage this aspect of the program using the design policies and simplicity." To respond to the Program's strong desire to manage the program life cycle costs, special efforts were established to identify operability requirements to influence flight vehicle and ground infrastructure design in order to impact the life cycle operations costs, and stretch goal requirements were introduced to the Program. This paper will describe how these stretch goal requirements were identified, developed, refined, matured, approved, and infused into the CARD. The paper will also document several challenges encountered when infusing the stretch goal requirements into the Constellation Program.

Operability↗

ORNL Laboratory Directed Research and Development Program FY 2008 Annual Report

The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2008. The associated FY 2008 ORNL LDRD Self-Assessment (ORNL/PPA-2008/2) provides financial data and an internal evaluation of the program’s management process.

08 HYDROGEN↗

Human System Risk Management for Space Flight

This brief abstract reviews the development of the current day approach to human system risk management for space flight and the development of the critical components of this process over the past few years. The human system risk management process now provides a comprehensive assessment of each human system risk by design reference mission (DRM) and is evaluated not only for mission success but also for long‐term health impacts for the astronauts. The discipline of bioastronautics is the study of the biological and medical effects of space flight on humans. In 1997, the Space Life Sciences Directorate (SLSD) initiated the Bioastronautics Roadmap (Roadmap) as the "Critical Path Roadmap", and in 1998 participation in the roadmap was expanded to include the National Space Biomedical Research Institute (NSBRI) and the external community. A total of 55 risks and 250 questions were identified and prioritized and in 2000, the Roadmap was base-lined and put under configuration control. The Roadmap took into account several major advisory committee reviews including the Institute of Medicine (IOM) "Safe Passage: Astronaut care for Exploration Missions", 2001. Subsequently, three collaborating organizations at NASA HQ (Chief Health and Medical Officer, Office of Space Flight and Office of Biological & Physical Research), published the Bioastronautics Strategy in 2003, that identified the human as a "critical subsystem of space flight" and noted that "tolerance limits and safe operating bands must be established" to enable human space flight. These offices also requested a review by the IOM of the Roadmap and that review was published in October 2005 as "A Risk Reduction Strategy for Human Exploration of Space: A Review of NASA's Bioastronautics Roadmap", that noted several strengths and weaknesses of the Roadmap and made several recommendations. In parallel with the development of the Roadmap, the Office of the Chief Health and Medical Officer (OCHMO) began a process in 2004 of evaluating the tolerance limits and safe operating bands called for in the Bioastronautics Strategy. Over the next several years, the concept of the "operating bands" were turned into Space Flight Human System Standards (SFHSS), developed by the technical resources of the SLSD at the NASA Johnson Space Center (JSC). These standards were developed and reviewed at the SLSD and then presented to the OCHMO for acceptance. The first set of standards was published in 2007 as the NASA‐STD‐3001, Volume 1, Crew Health that elaborated standards for several physiological areas such as cardiovascular, musculoskeletal, radiation exposure and nutrition. Volume 2, Human Factors, Habitability and Human Health was published in 2011, along with development guidance in the Human Integration Design Handbook (HIDH). Taken together, the SFHSS Volumes 1 and 2, and the HIDH replaced the NASA‐STD‐3000 with new standards and revisions of the older document. Three other changes were also taking place that facilitated the development of the human system risk management approach. In 2005, the life sciences research and development portfolio underwent a comprehensive review through the Exploration Systems Architecture Study (ESAS) that resulted in the reformulation of the Bioastronautics Program into Human Research Program (HRP) that was focused on appropriate mitigation results for high priority human health risks. The baseline HRP budget was established in August 2005. In addition, the OCHMO formulated the Health and Medical Technical Authority (HMTA) in 2006 that established the position of the Chief Medical Officer (CMO) at the NASA JSC along with other key technical disciplines, and the OCHMO became the responsible office for the SFHSS as noted above. The final change was the establishment in 2008 of the Human System Risk Board (HSRB), chaired by the CMO with representation from the HRP, SLSD management and technical experts. The HSRB then began to review all human system risks, established a comprehensive risk management and configuration management plan and data sharing policy. These major developments of standards, the HRP, the HMTA and a forum for review of human system risks (HSRB) facilitated the integration of human research, medical operations, systems engineering and many other disciplines in the comprehensive review of human system risks. The HSRB began a comprehensive review of all potential inflight medical conditions and events and over the course of several reviews consolidated the number of human system risks to 30 where the greatest emphasis is placed for investing program dollars for risk mitigation. The HSRB considers all available evidence from human research, medical operations and occupational surveillance in assessing the risks for appropriate mitigation and future work. All applicable DRMs (low earth orbit 6 and 12 months, deep space sortie for 30 days and 1 year, a one year lunar mission, and a planetary mission for 3 years) are considered as human system risks are modified by the hazards associated with space flight such as microgravity, exposure to radiation, distance from the earth, isolation and a closed environment. Each risk has a summary assessment representing the state of knowledge/evidence base for that risk, the available risk mitigations, traceability to the SFHSS and program requirements, and future work required. These data then can drive coordinated budgets across the HRP, the International Space Station, Crew Health and Safety and Advanced Exploration System budgets. These risk assessments were completed for 6 DRMs in December of 2014 and serve as the baseline for which subsequent research and technology development and crew health care portfolios can be assessed. The HSRB will review each risk at least annually and especially when new information is available that must be considered for effective risk mitigation. The current status of each risk can be reported to program management for operations, budget reviews and general oversight of the human system risk management program.

Davis, Jeffrey↗

COE Task Order 4. Final Report: Automated Threat Recognition

Lawrence Livermore National Laboratory (LLNL) was tasked by the Department of Homeland Security (DHS) Science and Technology Directorate (S&T) with developing an automated target recognition algorithm for finding objects of interest in checked baggage at airports. The project used x-ray computed tomography (CT) data collected on a medical scanner of various simulated checked bags. Target objects of interest include clay, rubber, and saline in various concentrations. The final results are 93.9% probability of detection (P D ) with 11.9% probability of false alarm (PFA) on all targets and 100% detection for pseudo target sheets. This result is achieved by using a three-stage algorithm made up of segmentation, post-processing, and feature extraction and object classification. The segmentation proved to be the most important stage and it involves merging two distinct segmentation results followed by a set of algorithms for cleaning up the merged segmentations. The first segmentation algorithm operates on planar 10x10 voxel slabs (two- dimensional segments) in the three spatial planes. The segmenter calculates a probability that each slab in the image is a part of a target, determines if the probability was above a threshold, and then merges all connected slabs together. The second segmentation algorithm is an ensemble segmenter, which generates a set of possible segmentations through random permutations and computes an average behavior. The distinct properties of these segmenters results in a merged segmentation with superior results than either segmenter alone. The merged segmentation is “cleaned up” using post processing techniques to achieve the final labeled images. The final classification stage made use of a random forest classifier algorithm to discriminate targets from non-targets based on a set of features of the segmented objects partially from the voxel slabs and partially from the individual voxels. Features include standard statistics such as mean, median, and standard deviations of the density, features capturing some aspects of texture, and some features about the surrounding bag structure. In addition to the detection and false alarm results above, we show how the algorithms can be trained to “overfit” to the limited data set provided and achieve near perfect results (P D =100% and P FA =0%). This over-training is not recommended for long-term operation, but instead is meant to demonstrate how test design is an important factor in aviation security. Possible improvements to the algorithm and the testing methodology (including blind testing) are also presented.

42 ENGINEERING↗