Search NASA⌕ Search

SEARCH · Search NASA

Results for “FOCUS PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Research activities at the Loma Linda University and Proton Treatment Facility--an overview

The Loma Linda University (LLU) Radiobiology Program coordinates basic research and proton beam service activities for the university and extramural communities. The current focus of the program is on the biological and physical properties of protons and the operation of radiobiology facilities for NASA-sponsored projects. The current accelerator, supporting facilities and operations are described along with a brief review of extramural research projects supported by the program. These include space craft electronic parts and shielding testing as well as tumorigenesis and animal behavior experiments. An overview of research projects currently underway at LLU is also described. These include: 1) acute responses of the C57Bl/6 mouse immune system, 2) modulation of gene expression in the nematode C. elegans and rat thyroid cells, 3) quantitation of dose tolerance in rat CNS microvasculature, 4) behavioral screening of whole body proton and iron ion-irradiated C57Bl/6 mice, and 5) investigation of the role of cell integration into epithelial structures on responses to radiation.

Non-NASA Center↗

Infusing Stretch Goal Requirements into the Constellation Program

In 2004, the Vision for Space Exploration (VSE) was announced by the United States President's Administration in an effort to explore space and to extend a human presence across our solar system. Subsequently, the National Aeronautics and Space Administration (NASA) established the Exploration Systems Mission Directorate (ESMD) to develop a constellation of new capabilities, supporting technologies, and foundational research that allows for the sustained and affordable exploration of space. Then, ESMD specified the primary mission for the Constellation Program to carry out a series of human expeditions, ranging from Low Earth Orbit (LEO) to the surface of Moon, Mars, and beyond for the purposes of conducting human exploration of space. Thus, the Constellation Program was established at the Lyndon B. Johnson Space Center (JSC) to manage the development of the flight and ground infrastructure and systems that can enable continued and extended human access to space. Constellation Program's "Design Objectives" call for an early attention to the program's life cycle costs management through the Program's Need, Goals, and Objectives (NGO) document, which provides the vision, scope, and key areas of focus for the Program. One general policy of the Constellation Program, found in the Constellation Architecture Requirements Document (CARD), states: "A sustainable program hinges on how effectively total life cycle costs are managed. Developmental costs are a key consideration, but total life cycle costs related to the production, processing, and operation of the entire architecture must be accounted for in design decisions sufficiently to ensure future resources are available for ever more ambitious missions into the solar system....It is the intent of the Constellation Program to aggressively manage this aspect of the program using the design policies and simplicity." To respond to the Program's strong desire to manage the program life cycle costs, special efforts were established to identify operability requirements to influence flight vehicle and ground infrastructure design in order to impact the life cycle operations costs, and stretch goal requirements were introduced to the Program. This paper will describe how these stretch goal requirements were identified, developed, refined, matured, approved, and infused into the CARD. The paper will also document several challenges encountered when infusing the stretch goal requirements into the Constellation Program.

Operability↗

Education and Outreach at NASA's Goddard Space Flight Center

NASA?s Space Communications and Navigation (SCaN) Program Office maintains a year-round educational program for undergraduate and graduate students. Within NASA?s Goddard Space Flight Center, the Exploration and Space Communications Projects Division implements the SCaN intern program with a focus on space operations, including operations of orbiting spacecraft, space communications, ground activities and networking. The intern program enables students to work with various NASA projects in solving real-world problems inside the Exploration and Space Communications division. Goddard interns have been assigned to the NASA?s Near Earth Network facilities in Greenbelt, Maryland, and Wallops, Virginia. They have also been assigned to NASA?s Space Network facilities in Greenbelt, Maryland, and Las Cruces, New Mexico.

Shaw, Harry C.↗

Transfers from TLI to Lunar Frozen Orbits with Applications to NASA’s CLPS & Artemis Programs

This paper will focus on trajectory transfers from trans-lunar injection (TLI) to lunar frozen orbits with applications to NASA’s Commercial Lunar Payload Services (CLPS) and Artemis Human Landing System (HLS) programs. For a CLPS application, the CS-3 mission is explored, which will deploy a communications relay satellite in lunar elliptical frozen orbit followed by landing a payload on the lunar farside during dawn. Given HLS will land a crew near the lunar south pole with lighting and timing requirements, the effect of varying the Earth-Moon transit duration to influence the approach direction upon landing will be explored.

lunar frozen orbits↗

Microbial biofilm formation and its consequences for the CELSS program

A major goal of the Controlled Ecology Life Support System (CELSS) program is to provide reliable and efficient life support systems for long-duration space flights. A principal focus of the program is on the growth of higher plants in growth chambers. These crops should be grown without the risk of damage from microbial contamination. While it is unlikely that plant pathogens will pose a risk, there are serious hazards associated with microorganisms carried in the nutrient delivery systems and in the atmosphere of the growth chamber. Our experience in surface microbiology showed that colonization of surfaces with microorganisms is extremely rapid even when the inoculum is small. After initial colonization extensive biofilms accumulate on moist surfaces. These microbial films metabolize actively and slough off continuously to the air and water. During plant growth in the CELSS program, microbial biofilms have the potential to foul sensors and to plug nutrient delivery systems. In addition both metabolic products of microbial growth and degradation products of materials being considered for use as nutrient reservoirs and for delivery are likely sources of chemicals known to adversly affect plant growth.

Mitchell, R.↗

High Efficiency Engine Technologies Program

Caterpillar's Product Development and Global Technology Division carried out a research program on waste heat recovery with support from DOE (Department of Energy) and the DOE National Energy Technology Laboratory. The objective of the program was to develop a new air management and exhaust energy recovery system that would demonstrate a minimum 10% improvement in thermal efficiency over a base heavy-duty on-highway diesel truck engine. The base engine for this program was a 2007 C15 15.2L series-turbocharged on-highway truck engine with a LPL (low-pressure loop) exhaust recirculation system. The focus of the program was on the development of high efficiency turbomachinery and a high efficiency turbocompound waste heat recovery system. The focus of each area of development was as follows: (1) For turbine stages, the focus was on investigation and development of technologies that would improve on-engine exhaust energy utilization compared to the conventional radial turbines in widespread use today. (2) For compressor stages, the focus was on investigating compressor wheel design parameters beyond the range typically utilized in production, to determine the potential efficiency benefits thereof. (3) For turbocompound, the focus was on the development of a robust bearing system that would provide higher bearing efficiencies compared to systems used in turbocompound power turbines in production. None of the turbocharger technologies investigated involved addition of moving parts, actuators, or exotic materials, thereby increasing the likelihood of a favorable cost-value tradeoff for each technology. And the turbocompound system requires less hardware addition than competing bottoming cycle technologies, making it a more attractive solution from a cost and packaging standpoint. Main outcomes of the program are as follows: (1) Two turbine technologies that demonstrated up to 6% improvement in turbine efficiency on gas stand and 1-3% improvement in thermal efficiency in on-engine testing. (2) A compressor technology that demonstrated 1.5% improvement in compressor efficiency on gas stand compared to production available compressors. (3) A power turbine with high efficiency bearing system that demonstrated excellent rotordynamic stability throughout the required speed range, up to 60,000 rpm. (4) A predicted improvement (using engine simulation) in engine thermal efficiency of 7% at the peak torque design point, when combining the technologies developed in this program.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Program Innovation Cluster for Equity and Health in Grid-Interactive Efficient Buildings (Final Technical Report)

The EPIC Buildings program was created to target Central New York’s (CNY) Energy Program Innovation Cluster, focused on developing energy hardware innovations for next-generation grid-interactive efficient buildings (GEB). The goals of the program were to establish and grow a sustainable regional innovation cluster for GEB in CNY and support the ambitious transition to achieve net-zero emissions by 2050.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A small missions program for investigation of near-earth asteroids

Current studies are examining the feasibility and possible content of the Discovery Program, a series of 'Explorer-class' missions to planetary targets. Organized as a multi-layer program with constant funding, the Discovery Program would support lower cost exploration opportunities that are missed in the new start procedure for larger missions. One approach to such a program is to focus on rendezvous missions to several near-Earth asteroids to characterize basic properties of this group of objects. A sample program is presented that visits six different targets over twelve years, using direct low energy trajectories; some of these are newly identified. Each flight in the program delivers a payload capable of addressing science objectives within the expected budget and programmatic constraints of small planetary missions. The key to satisfying the constraints is a disciplined program management philosophy, consistently applied over the entire program, that makes extensive use of hardware designs developed for other programs.

Stancati, M. L.↗

Return to the Moon: A New Strategic Evaluation

This paper reviews the value of a new lunar program, initially robotic and eventually manned, in the light of developments since the 1991 Synthesis Group study of the Space Exploration Initiative. The objective is to evaluate a return to the Moon in comparison to proposed Mars programs as a focus for American space exploration with humans in the next century. The Moon is demonstrably accessible, hospitable, useful, and interesting. Lunar programs are inherently faster and less risky from a programmatic viewpoint than comparable Mars programs such as Mars Direct. The dominant reason for a resumption of manned lunar missions, focussed on a single site such as Grimaldi, is to rebuild the infrastructure for missions beyond earth orbit, the last of which was in 1972. A transitional program, corresponding to the 10 Gemini missions that bridged the gap between Mercury and Apollo, was considered absolutely essential by the Synthesis Group. Further justification for a return to the Moon is the demonstrated feasibility of a robotic lunar observatory, concentrating on optical and infrared interferometry. Many unsolved scientific questions about the Moon itself remain, and could be investigated using telerobotic lunar rovers even before the return of humans. Mars is unquestionably more interesting scientifically and far more hospitable for long-term colonization. A new lunar program would be the most effective possible preparation for the human exploration, settlement, and eventually the terraforming of Mars. Lunar and Mars programs are complementary, not competitive. Both can be justified in the most fundamental terms as beginning the dispersal of the human species against uncontrollable natural disasters, cometary or asteroidal impacts in particular, to which mankind is vulnerable while confined to a single planet. Three specific programs are recommended for the 2001-2010 period: Ice Prospectors, to evaluate polar ice or hydrogen deposits; a robotic lunar observatory; and a manned lunar base and observatory.

Lowman, Paul D., Jr.↗

The Ohio River Valley CO2 Storage Project AEP Mountaineer Plant, West Virginia Numerical Simulation and Risk Assessment Report

A series of numerical simulations of carbon dioxide (CO{sub 2}) injection were conducted as part of a program to assess the potential for geologic sequestration in deep geologic reservoirs (the Rose Run and Copper Ridge formations), at the American Electric Power (AEP) Mountaineer Power Plant outside of New Haven, West Virginia. The simulations were executed using the H{sub 2}O-CO{sub 2}-NaCl operational mode of the Subsurface Transport Over Multiple Phases (STOMP) simulator (White and Oostrom, 2006). The objective of the Rose Run formation modeling was to predict CO{sub 2} injection rates using data from the core analysis conducted on the samples. A systematic screening procedure was applied to the Ohio River Valley CO{sub 2} storage site utilizing the Features, Elements, and Processes (FEP) database for geological storage of CO{sub 2} (Savage et al., 2004). The objective of the screening was to identify potential risk categories for the long-term geological storage of CO{sub 2} at the Mountaineer Power Plant in New Haven, West Virginia. Over 130 FEPs in seven main classes were assessed for the project based on site characterization information gathered in a geological background study, testing in a deep well drilled on the site, and general site conditions. In evaluating the database, it was apparent that many of the items were not applicable to the Mountaineer site based its geologic framework and environmental setting. Nine FEPs were identified for further consideration for the site. These FEPs generally fell into categories related to variations in subsurface geology, well completion materials, and the behavior of CO{sub 2} in the subsurface. Results from the screening were used to provide guidance on injection system design, developing a monitoring program, performing reservoir simulations, and other risk assessment efforts. Initial work indicates that the significant FEPs may be accounted for by focusing the storage program on these potential issues. The screening method was also useful in identifying unnecessary items that were not significant given the site-specific geology and proposed scale of the Ohio River Valley CO{sub 2} Storage Project. Overall, the FEP database approach provides a comprehensive methodology for assessing potential risk for a practical CO{sub 2} storage application. An integrated numerical fate and transport model was developed to enable risk and consequence assessment at field scale. Results show that such an integrated modeling effort would be helpful in meeting the project objectives (such as site characterization, engineering, permitting, monitoring and closure) during different stages. A reservoir-scale numerical model was extended further to develop an integrated assessment framework which can address the risk and consequence assessment, monitoring network design and permitting guidance needs. The method was used to simulate sequestration of CO{sub 2} in moderate quantities at the Mountaineer Power Plant. Results indicate that at the relatively low injection volumes planned for pilot scale demonstration at this site, the risks involved are minor to negligible, owing to a thick, low permeability caprock and overburden zones. Such integrated modeling approaches coupled with risk and consequence assessment modeling are valuable to project implementation, permitting, monitoring as well as site closure.

20 FOSSIL-FUELED POWER PLANTS↗

Overview of the potential instrument payload for the EOS system

The Earth Observing System (EOS) is a key element of the U.S. Program in Global Change. It is NASA's initiative to provide the scientific means to observe the earth as a system. The EOS satellite system and accompanying Data and Information System (DIS) provide spacebased platforms and groundbased elements for scientific research and information extraction. The program recognizes the need for global coverage, long term observations, and multidisciplinary analyses in order to detect subtle changes in the environment's state. A multidisciplinary payload of active and passive sensors is proposed to accomplish the objectives of the program. International partners are an important element of the program. This paper focuses on the instrument complement for the EOS-A spacecraft since those decisions will occur this year. Significant programmatic constraints and program science decisions will impact the selection of the EOS-A payload.

Thompson, Leslie L.↗

Exploration Blueprint: Data Book

The material contained in this report was compiled to capture the work performed by the National Aeronautics and Space Administration's (NASA's) Exploration study team in the late 2002 timeframe. The "Exploration Blueprint Data Book" documents the analyses and findings of the 90-day Agency-wide study conducted from September - November 2002. During the summer of 2002, the NASA Deputy Administrator requested that a study be performed with the following objectives: - Develop the rationale for exploration beyond low-Earth orbit - Develop roadmaps for how to accomplish the first steps through humans to Mars - Develop design reference missions as a basis for the roadmaps - Make recommendations on what can be done now to effect this future This planning team, termed the Exploration Blueprint, performed architecture analyses to develop roadmaps for how to accomplish the first steps beyond LEO through the human exploration of Mars. The previous NASA Exploration Team activities laid the foundation and framework for development of NASA's Integrated Space Plan. The reference missions resulting from the analysis performed by the Exploration Blueprint team formed the basis for requirement definition, systems development, technology roadmapping, and risk assessments for future human exploration beyond low-Earth orbit. Emphasis was placed on developing recommendations on what could be done now to effect future exploration activities. The Exploration Blueprint team embraced the "Stepping Stone" approach to exploration where human and robotic activities are conducted through progressive expansion outward beyond low-Earth orbit. Results from this study produced a long-term strategy for exploration with near-term implementation plans, program recommendations, and technology investments. Specific results included the development of a common exploration crew vehicle concept, a unified space nuclear strategy, focused bioastronautics research objectives, and an integrated human and robotic exploration strategy. Recommendations from the Exploration Blueprint included the endorsement of the Nuclear Systems Initiative, augmentation of the bioastronautics research, a focused space transportation program including heavy-lift launch and a common exploration vehicle design for ISS and exploration missions, as well as an integrated human and robotic exploration strategy for Mars.

Bret G Drake↗

Chapter 13: Assessing Persistence and Other Evaluation Issues Cross-Cutting Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

Addressing other evaluation issues that have been raised in the context of energy efficiency programs, this chapter focuses on methods used to address the persistence of energy savings, which is an important input to the benefit/cost analysis of energy efficiency programs and portfolios. In addition to discussing 'persistence' (which refers to the stream of benefits over time from an energy efficiency measure or program), this chapter provides a summary treatment of these issues -Synergies across programs -Rebound -Dual baselines -Errors in variables (the measurement and/or accuracy of input variables to the evaluation).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Center for Aerospace Research: A NASA Center of Excellence at North Carolina Agricultural and Technical State University

This report documents the efforts and outcomes of our research and educational programs at NASA-CORE in NCA&TSU. The goal of the center was to establish a quality aerospace research base and to develop an educational program to increase the participation of minority faculty and students in the areas of aerospace engineering. The major accomplishments of this center in the first year are summarized in terms of three different areas, namely, the center's research programs area, the center's educational programs area, and the center's management area. In the center's research programs area, we focus on developing capabilities needed to support the development of the aerospace plane and high speed civil transportation system technologies. In the educational programs area, we developed an aerospace engineering option program ready for university approval.

Lai, Steven H.-Y.↗

Environmentally-driven Materials Obsolescence: Material Replacements and Lessons Learned from NASA's Space Shuttle Program

The Space Shuttle Program was terminated in 2011 with the last flight of the Shuttle Endeavour. During the 30 years of its operating history, the number of domestic and international environmental regulations increased rapidly and resulted in materials obsolescence risks to the program. Initial replacement efforts focused on ozone depleting substances. As pressure from environmental regulations increased, Shuttle worked on the replacement of heavy metals. volatile organic compounds and hazardous air pollutants. Near the end of the program. Shuttle identified potential material obsolescence driven by international regulations and the potential for suppliers to reformulate materials. During the Shuttle Program a team focused on environmentally-driven materials obsolescence worked to identify and mitigate these risks. Lessons learned from the Shuttle experience can be applied to new NASA Programs as well as other high reliability applications.

Meinhold, Anne↗

Impact of Large Scale Energy Efficiency Programs On Consumer Tariffs and Utility Finances in India

Large-scale EE programs would modestly increase tariffs but reduce consumers' electricity bills significantly. However, the primary benefit of EE programs is a significant reduction in power shortages, which might make these programs politically acceptable even if tariffs increase. To increase political support, utilities could pursue programs that would result in minimal tariff increases. This can be achieved in four ways: (a) focus only on low-cost programs (such as replacing electric water heaters with gas water heaters); (b) sell power conserved through the EE program to the market at a price higher than the cost of peak power purchase; (c) focus on programs where a partial utility subsidy of incremental capital cost might work and (d) increase the number of participant consumers by offering a basket of EE programs to fit all consumer subcategories and tariff tiers. Large scale EE programs can result in consistently negative cash flows and significantly erode the utility's overall profitability. In case the utility is facing shortages, the cash flow is very sensitive to the marginal tariff of the unmet demand. This will have an important bearing on the choice of EE programs in Indian states where low-paying rural and agricultural consumers form the majority of the unmet demand. These findings clearly call for a flexible, sustainable solution to the cash-flow management issue. One option is to include a mechanism like FAC in the utility incentive mechanism. Another sustainable solution might be to have the net program cost and revenue loss built into utility's revenue requirement and thus into consumer tariffs up front. However, the latter approach requires institutionalization of EE as a resource. The utility incentive mechanisms would be able to address the utility disincentive of forgone long-run return but have a minor impact on consumer benefits. Fundamentally, providing incentives for EE programs to make them comparable to supply-side investments is a way of moving the electricity sector toward a model focused on providing energy services rather than providing electricity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Efficient Clothes Dryer with IR Heating and Electrostatic Precipitator

The project goal was to develop a revolutionary energy saving technology for residential clothes drying. The team developed an IR (infrared) heating system and NESP (Nebulizer and Electro-Static Precipitator) for integration into a ventless clothes dryer. The proposed technology addresses two of the major inefficiencies in current electric vented dryers by providing effective energy transfer for the removal of the water and recapture of the vapor latent heat. The IR heaters operating in the mid wave (2.5-10um) are very efficient as they target the 3-micron peak absorption of the water molecule. This allows direct energy absorption, unlike conventional element heaters where heat is transferred by convection. The low power NESP removes water vapor from the exhausted stream and recaptures the latent heat in the ESP (Electro-Static Precipitator) exchanger section. This allows the warm dry air to be recirculated back into the drum for additional efficiency savings. The remaining majority of the dryer hardware stays the same. Summing the efficiency gain from the two subcomponents we anticipated the EF (Efficiency Factor) to exceed the goal of 4.04. EF is obtained by dividing the weight (lbs) of water removed by the energy (kWhr) used, where the test load size is 8.45 lbs of bone dry clothing wetted to 57.5% or 4.8lbs of water, and dried to a remaining moisture content of 2.5-5%. Additional benefits include not having to recondition (heat or cool) the large amounts of make-up air to replace the air exhausted by a vented dryer. It was anticipated that the NESP/heat exchanger would be the most challenging and highest risk element in the program. Therefore, the team focused their efforts during Phase 1 of the program on the design, construction, testing, and optimization of the NESP/heat exchanger. At the end Phase 1, the team compared the performance of the NESP/heat exchanger with the system level requirements and made a Go/No-Go decision on proceeding with the second portion of the program. Phase 2 of the program was structured to develop the IR heating system and then integrate it and the NESP/heat exchanger into a residential clothes dryer prototype for final testing. The proposed technology utilizes heat recovery which is known to have the biggest impact on dryer efficiency. The two current mainstream recovery approaches are air to air exchangers and heat pump condenser systems. Air to air exchanges can be very efficient but require large surface areas which are prone to fouling from uncaptured lint. Dryers based on heat pump condenser recovery systems have shown efficiency improvements of 20–60% and are commercially available. The issue with a heat pump condenser approach is the added cost, as typical prices are twice that of standard vented dryers and they are only available in small to medium capacities. The energy factor (EF) for these systems is 5.50 to 6.88 pounds/kWh compared to conventional dryers at 2.75 to 3.67 pounds/kWh. The efficiency improvements for the proposed technology come from the use of IR heating and the NESP. As the concept is in its infancy, and these improvements were difficult to predict without experimental data, assumptions were made based on available literature. IR radiant drying times, when compared to convection, are typically 30% less. This is a result of the fact that radiant energy heats directly and is absorbed at and below the surface, unlike convection heating, that must conduct the heat through the boundary film of air at the clothes surface and rely on wicking of the moisture to the surface. The second area of improvement comes from the NESP. The NESP operation is as follows: 1. Highly charged, micron sized, droplets of water are injected into the dryer exhaust by the Nebulizer. 2. These charged droplets attract water molecules and continue to grow in size, until losing their charge. During this process, latent heat is rejected back into the air stream. 3. The large droplets enter the ESP, where they are recharged and drawn to the ESP wall, to be extracted at the bottom of the ESP. The warm dry air is then recirculated back into the dryer. The proposed technology, at the time of the proposal submission was estimated to have an EF of 4.79. At program completion we have designed, built, tested, integrated and optimized the proposed technologies into a prototype “high efficiency” residential clothes dryer. Testing of the integrated prototype dryer provided insight into the technical effectiveness and economic feasibility of the proposed technologies. The program has the potential of greatly impacting energy savings. The predicted EF of the proposed technology is 4.79, yielding an energy savings of 42% when compared to conventional electric vented dryers. Given there are approximately 84 million dryers in the US consuming ~64 billion kWh per year, a net savings of 27 billion kWh per year or 0.092 quads could be realized. Since the dryer is not vented, make up air from the room is not needed, adding an additional savings of ~1kWh per load, or 23.8 billion kWh per year. In addition, it is envisioned that the proposed ESP, when successful, would potentially find applications in industrial and residential dehumidification.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The WSMR Timing System: Toward New Horizons

In 1991, White Sands Missile Range (WSMR) initiated a modernization program for its range timing system. The main focus of this modernization program was to develop a system that was highly accurate, easy to maintain, and portable. The logical decision at the time was to develop a system based solely on Global Positioning System (GPS) technology. Since that time, wsmr has changed its philosophy on how GPS would be utilized for the timing system. This paper will describe WSMR's initial modernization plans for its range timing system and how certain events have led to a modification of these plans.

Gilbert, William A.↗