Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.

60 APPLIED LIFE SCIENCES↗

MO-B-BRB-03: Systems Engineering Tools for Treatment Planning Process Optimization in Radiation Medicine

The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.

60 APPLIED LIFE SCIENCES↗

Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary

The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.

Klus, W. J.↗

Technology Thrust for Future Earth Science Applications

This paper presents NASA's recent direction to invest in the critical science instrument and platform technologies in order to realize more reliable, frequent and versatile missions for future Earth Science measurements. Traditionally, NASA's Earth Science Enterprise has developed and flown science missions that have been large in size, weight and volume. These missions have taken much longer implementation due to technology development time and have carried a large suite of instruments on a large-size spacecraft. NASA is also facing an era where the budget for the future years is more or less flat and the possibility for any major new start does not vividly appear on the horizon. Unfortunately, the scientific goals have not shrunk to commensurate with the budget constraints. In fact, the challenges and scientific appetite in search of answers to a score of outstanding questions have been gradually expanding. With these factors in mind, for the last three years NASA has been changing its focus to concentrate on how to take advantage of smaller missions by relying on industry, and minimizing the overall life cycle by infusing technologies that are being developed independently of any planned mission's implementation cycle. The major redirection of early investment in the critical technologies should have its rewards and significantly reduce the mission development period. Needless to say, in the long run this approach should save money, minimize risk, promote or encourage partnering, and allow for more frequent missions or earth science measurements to occur. This paper gives an overview of some of the identified crucial technologies and their intended applications for meeting the future Earth Science challenges.

Habib, Shahid↗

National Electric Vehicle Infrastructure Formula Program (ANNUAL REPORT | PLAN YEAR 2023–2024)

The 2021 Infrastructure Investment and Jobs Act, also known as the Bipartisan Infrastructure Law (BIL), invests $\$$7.5 billion to build out a national electric vehicle (EV) charging network and created the Joint Office of Energy and Transportation (Joint Office) to “study, plan, coordinate, and implement issues of joint concern between the two agencies.” The BIL represents a historic effort to electrify the U.S. transportation system, which has significant potential to reduce U.S. greenhouse gas emissions and help tackle the climate crisis. The U.S. transportation sector accounts for one-third of the nation’s greenhouse gas emissions—the largest share of all primary sectors, including electricity production, industry, commercial and residential, and agriculture. The National Electric Vehicle Infrastructure (NEVI) Formula Program, one of the BIL funding programs, was launched in February 2022, providing nearly $\$$5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of EV charging stations beginning with designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with an emphasis on the Interstate Highway System. The funding is made available to the states in allocations each year pending FHWA certification of the state’s annual deployment plan. The NEVI program is in its third year, so there's a lot to celebrate. As of July 2024, 39 states have released solicitations for their NEVI programs and eight states have opened their first NEVI-funded stations (61 ports in total), which have already powered thousands of charging sessions for EV drivers across America. Additional stations are in the pipeline with more than 2,500 additional ports having been awarded or conditionally awarded by the states. All states released their Fiscal Year (FY) 2024 deployment plan updates to reflect the new minimum requirements and guidance, and several states added newly designated EV AFCs in their FY 2024 deployment plan updates, bringing the total AFC network of EV corridors to more than 81,000 miles.

33 ADVANCED PROPULSION SYSTEMS↗

A PI’s Guide to Analog Research

Congratulation on being awarded a grant to conduct research in a spaceflight analog! NASA funded research in a Human Research Program (HRP) managed analog environment is very different from research in a traditional laboratory. This presentation will provide a guide to help investigators successfully plan studies for integration and implementation in an HRP analog platform. There are many things to consider when planning a study for implementation in an analog facility and campaign or mission. How do you get from grant approval to data analysis? This is where HRP’s Research Operations and Integration (ROI) team comes in. The ROI team works with sponsoring HRP elements and PI teams to capture requirements and help the PI teams through the phases of research complement development, integration and implementation. A complement is comprised of a group of studies requiring a common platform and/or scenario that are able to be integrated on a noninterference basis for implementation. Properly defining and documenting requirements and study needs is crucial in successful integration and implementation. This presentation will outline and provide the information needed for PI teams to understand the integration process and the role of the ROI team in the successful integration and implementation of their study. Topics to be discussed will include but not be limited to science requirement definition and documentation, NASA IRB submissions, subject recruitment, screening and selection, study integration process, efficiency in data collection and data sharing, daily crew schedules, hardware and software shipping, receipt and checkout, biological sample collection, mission support, data management and receipt of data.

B. Caldwell↗

ARIM-1: The Atmospheric Refractive Index Measurements Sounding Rocket Mission

A conceptual design study of the ARIM-1 sounding rocket mission, whose goal is to study atmospheric turbulence in the tropopause region of the atmosphere, is presented. The study was conducted by an interdisciplinary team of students at the University of Alaska Fairbanks who were enrolled in a Space Systems Engineering course. The implementation of the ARIM-1 mission will be carried out by students participating in the Alaska Student Rocket Program (ASRP), with a projected launch date of August 1997. The ARIM-1 vehicle is a single stage sounding rocket with a 3:1 ogive nose cone, a payload diameter of 8 in., a motor diameter of 7.6 in., and an overall height of 17.0 ft including the four fins. Emphasis is placed on standardization of payload support systems. The thermosonde payload will measure the atmospheric turbulence by direct measurement of the temperature difference over a distance of one meter using two 3.45-micron 'hot-wire' probes. The recovery system consists of a 6 ft. diameter ribless guide surface drogue chute and a 33 ft. diameter main cross parachute designed to recover a payload of 31 pounds and slow its descent rate to 5 m/s through an altitude of 15 km. This document discusses the science objectives, mission analysis, payload mechanical configuration and structural design, recovery system, payload electronics, ground station, testing plans, and mission implementation.

Ruiz, B. Ian↗

Implementing the Mars Science Laboratory Terminal Descent Sensor Field Test Campaign

The Mars Science Laboratory (MSL) will deliver a 900 kg rover to the surface of Mars in August 2012. MSL will utilize a new pulse-Doppler landing radar, the Terminal Descent Sensor (TDS). The TDS employs six narrow-beam antennas to provide unprecedented slant range and velocity performance at Mars to enable soft touchdown of the MSL rover using a unique sky crane Entry, De-scent, and Landing (EDL) technique. Prior to use on MSL, the TDS was put through a rigorous verification and validation (V&V) process. A key element of this V&V was operating the TDS over a series of field tests, using flight-like profiles expected during the descent and landing of MSL over Mars-like terrain on Earth. Limits of TDS performance were characterized with additional testing meant to stress operational modes outside of the expected EDL flight profiles. The flight envelope over which the TDS must operate on Mars encompasses such a large range of altitudes and velocities that a variety of venues were neces-sary to cover the test space. These venues included an F/A-18 high performance aircraft, a Eurocopter AS350 AStar helicopter and 100-meter tall Echo Towers at the China Lake Naval Air Warfare Center. Testing was carried out over a five year period from July 2006 to June 2011. TDS performance was shown, in gen-eral, to be excellent over all venues. This paper describes the planning, design, and implementation of the field test campaign plus results and lessons learned.

Mars Science Laboratory (MSL)↗

Implementation of Human System Integration Workshop at NASA for Human Spaceflight

The human is a key element in the complex system of systems underlying space exploration missions. As a critical system, its operating bands and requirements need to be characterized and integrated with other systems. Optimal integration of the human system with hardware and software elements has an impact on multiple aspects of mission execution, including human health and performance, risk mitigation, effective design and functionality, enhanced safety, and reduced lifecycle costs. The field of Human Systems Integration (HSI) represents an interdisciplinary and comprehensive cross-cutting approach encompassing technical and management processes for integrating human as a system consideration and objective within and across all other system components and multiple domains. In addition to human activities, HSI covers training, operations and support dimensions. Moreover, HSI is an essential enabler to systems engineering practice, emphasizing human system aspects toward optimizing fully integrated system of systems performance while systematically infusing the needs of all users during the earliest stages of development. Consistent with the National Space Exploration Campaign, NASA is developing the Gateway, a lunar orbiting platform that will serve as astronaut habitat, support transit to deep space, validate new technologies and systems, and function as a science laboratory and communications hub, among other uses. It is an essential element of a phase that will extend human exploration into deep space through evolvable infrastructure and advanced technology, supporting assembly and logistics of other exploration architecture elements. In an effort to explore the current status and forward plan of HSI implementation in the mission (system of systems) lifecycle, the HSI Employee Resource Group conducted an HSI workshop using the Gateway Program as a case study. It revealed how different organizations at the Johnson Space Center incorporate HSI in their processes in preparation for the development and operation of the Gateway. The workshop focused on HSI methodology for implementation of the six NASA HSI domains: Human Factors Engineering, Operations Resources, Habitability and Environment, Maintainability and Supportability, Safety, and Training. Results from the workshop are reported on this paper, as well as some historical background of HSI at NASA, and the success in using an Employee Resource Group to promote technical knowledge. The authors hope that this information can be used to disseminate best practices for translational applications to other space exploration systems.

Silva-Martinez, Jackelynne↗

Implementation of Human System Integration Workshop at NASA for Human Spaceflight

The human is a key element in the complex system of systems underlying space exploration missions. As a critical system, its operating bands and requirements need to be characterized and integrated with other systems. Optimal integration of the human system with hardware and software elements has an impact on multiple aspects of mission execution, including human health and performance, risk mitigation, effective design and functionality, enhanced safety, and reduced lifecycle costs. The field of Human Systems Integration (HSI) represents an interdisciplinary and comprehensive cross-cutting approach encompassing technical and management processes for integrating human as a system consideration and objective within and across all other system components and multiple domains. In addition to human activities, HSI covers training, operations and support dimensions. Moreover, HSI is an essential enabler to systems engineering practice, emphasizing human system aspects toward optimizing fully integrated system of systems performance while systematically infusing the needs of all users during the earliest stages of development. Consistent with the National Space Exploration Campaign, NASA is developing the Gateway, a lunar orbiting platform that will serve as astronaut habitat, support transit to deep space, validate new technologies and systems, and function as a science laboratory and communications hub, among other uses. It is an essential element of a phase that will extend human exploration into deep space through evolvable infrastructure and advanced technology, supporting assembly and logistics of other exploration architecture elements. In an effort to explore the current status and forward plan of HSI implementation in the mission (system of systems) lifecycle, the HSI Employee Resource Group conducted an HSI workshop using the Gateway Program as a case study. It revealed how different organizations at the Johnson Space Center incorporate HSI in their processes in preparation for the development and operation of the Gateway. The workshop focused on HSI methodology for implementation of the six NASA HSI domains: Human Factors Engineering, Operations Resources, Habitability and Environment, Maintainability and Supportability, Safety, and Training. Results from the workshop are reported on this paper, as well as some historical background of HSI at NASA, and the success in using an Employee Resource Group to promote technical knowledge. The authors hope that this information can be used to disseminate best practices for translational applications to other space exploration systems.

Silva-Martinez, Jackelynne↗

Modeling of Lead-210 Data Documents Benefits in Proactively Understanding TENORM Deposition - 18515

Radioactive decay of naturally occurring Radon-222 present in just-produced natural gas can lead to deposition of its radiogenic daughter, Lead-210, and subsequent radiogenic progeny within natural gas handling, treatment, and distribution facilities. Worker safety issues and disposal challenges arise when these accumulate to radiologically problematic activity levels. This is due to the 22.3-year half-life of Lead-210, allowing for multi-decade period of accumulation to occur and to persist, even after facility operations have ceased. Due to the far shorter half-lives of Lead-210 radiogenic progeny, especially that of Polonium-210, secular equilibrium within the Lead-210-Bismuth-210-Polonium-210 decay chain is quickly approached during facility operations and achieved after facility operations end. Lead-210 that accumulates in pipe scale can complicate any subsequent intrusive facility modifications, such as disassembly and dismantlement, potentially exposing workers to adverse radioactivity and impeding recycling and/or disposal of radiologically impacted equipment or other material. Experience has shown it is not strictly the presence of Lead-210 that is problematic but rather its 'unexpected' presence when this Technologically Enhanced Naturally Occurring Radioactive Material (TENORM) is discovered during intrusive work not incorporating radiological health and safety and material handling plans. Conversely, when implementing a program that proactively considers the potential for Lead-210, this form of TENORM simply becomes another 'special waste' that can be safely, efficiently, and effectively addressed during a decommissioning effort, without associated adverse worker exposures, project cost over-runs, and schedule delays. This paper will discuss how proactive radioactive scanning quickly and safely identified Lead-210 and its radiogenic progeny within a natural gas sweetening and compressor station located in northern Montana, a portion of which was undergoing decommissioning, aiding in safe and compliant material handling and recycling. The location of this operation necessitated that the decommissioning program be completed on schedule to prevent weather-related impacts due to the onset of adverse winter conditions. Further, the radioactive data acquired during this project will be shown to provide important insight into historic behavior of Lead-210 in terms of its disposition and its more recent decay. From these data, it became possible to back-model the average activity of Radon-222 within the natural gas being processed during the life of the operation, how the estimated Radon-222 activity within the processed natural gas conformed to measured Radon-222 at various other natural gas fields, and how this information can be leveraged in developing safe and successful plans for future intrusive work at this and companion site operations. This presentation will also note the apparent preferential accumulation of Lead-210 within both rubber-based materials, such as gaskets and seals, and grease-based products found within natural gas flow lines. Thoughts regarding processes that may lead to this finding will be explored. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gases and Aerosols over North America and the Atlantic: First results from INTEX-A

Intercontinental Chemical Transport Experiment (INTEX; http://cloud1.arc.nasa.gov) is an ongoing two-phase integrated atmospheric field experiment being performed over North America (NA). Its first phase (INTEX-A) was performed in the summer of 2004 and the second phase (INTEX-B) is planned for the early spring of 2006. The main goal is to characterize the sources and distribution of gases and aerosols over NA and to understand their transport and transformation on transcontinental/intercontinental scales in order to assess their impact on air quality and climate. Central to achieving this goal is the need to relate space-based observations with those from airborne and surface platforms. During JNTEX-A, NASA s DC-8 was joined by some dozen other aircraft from a large number of European (U. K., France, and Germany) and North American partners to explore the composition of the troposphere over NA and the Atlantic in a coordinated manner. Global and regional models along with satellite observations were extensively used to plan, coordinate, and implement this field mission. Aircraft were instrumented to measure a comprehensive suite of gases and aerosols utilizing in-situ and remote sensors. The NASA DC-8 alone was equipped with some 20 instruments capable of measuring species at concentrations as low as 10(exp -15) v/v. Measurements included major atmospheric gaseous constituents (O3, NO(x), HNO3, HNO4, PANS, SO2, VOC/OVOC, CO, and CO2), free radicals and precursors (OH, HO2, H2O2, HCHO), aerosols and radiation (microphysics, composition, optical depth, radiative flux), as well as multiple tracers of pollution. Validation of instruments aboard Terra, Aqua, and Envisat satellites was given high priority. Some of the highest pollution levels were present in the upper troposphere due to widespread deep convection. Although unexpected, frequent instances of Asian pollution over NA were encountered during these summer months. The soil uptake of CO2 over NA was characterized over large regions of NA helping to understand the continents CO2-sink potential. DC-8 sampling of smoke from Alaskan fires and formaldehyde over forested regions, and simultaneous satellite observations of these provided excellent opportunities for the interplay of these platforms. Outflow of pollution from NA was sampled again over the Atlantic after several days to assess its evolution during transport. Models of chemistry and radiation are presently being employed to help in the interpretation of JNTEX-A data. The planning for INTEX-B (spring 2006) is currently underway. First results from INTEX-A and plans for INTEX-B will be discussed

Singh, Hanwant B.↗

International Space Station Medical Projects - Full Services to Mars

The International Space Station Medical Projects (ISSMP) Element provides planning, integration, and implementation services for HRP research studies for both spaceflight and flight analog research. Through the implementation of these two efforts, ISSMP offers an innovative way of guiding research decisions to meet the unique challenges of understanding the human risks to space exploration. Flight services provided by ISSMP include leading informed consent briefings, developing and validating in-flight crew procedures, providing ISS crew and ground-controller training, real-time experiment monitoring, on-orbit experiment and hardware operations and facilitating data transfer to investigators. For analog studies at the NASA Human Exploration Research Analog (HERA), the ISSMP team provides subject recruitment and screening, science requirements integration, data collection schedules, data sharing agreements, mission scenarios and facilities to support investigators. The ISSMP also serves as the HRP interface to external analog providers including the :envihab bed rest facility (Cologne, Germany), NEK isolation chamber (Moscow, Russia) and the Antarctica research stations. Investigators working in either spaceflight or analog environments requires a coordinated effort between NASA and the investigators. The interdisciplinary nature of both flight and analog research requires investigators to be aware of concurrent research studies and take into account potential confounding factors that may impact their research objectives. Investigators must define clear research requirements, participate in Investigator Working Group meetings, obtain human use approvals, and provide study-specific training, sample and data collection and procedures all while adhering to schedule deadlines. These science requirements define the technical, functional and performance operations to meet the research objectives. The ISSMP maintains an expert team of professionals with the knowledge and experience to guide investigators science through all aspects of mission planning, crew operations, and research integration. During this session, the ISSMP team will discuss best-practices approaches for successfully preparing and conducting studies in both the flight and analog environments. Critical tips and tricks will be shown to greatly improve your chances of successfully completing your research aboard the International Space Station and in Spaceflight Analogs.

Pietrzyk, R. A.↗

Measurement Capabilities of Single-Pulse Planar Doppler Velocimetry

Preliminary investigations are described of a method that is capable of measuring instantaneous, 3-D, velocity vectors everywhere in a light sheet generated by a pulsed laser. The technique, here called Planar Doppler Velocimetry (PDV), is a variation of a new concept for velocity measurements that was called Doppler Global Velocimetry (DGV) in its original disclosure. The concept relies on the use of a narrowband laser and measurements of the Doppler shift of scattered light from particles moving with a flow. The Doppler shift is recorded as a variation in transmission through a sharp-edged spectral filter provided by iodine vapor in a cell. Entire fields of velocity can be determined by using a solid-state camera to record the intensity variations throughout the field of view. However, the implementation of DGV has been centered principally on the use of high power, continuous-wave, ion lasers and measurement times that are determined by the 30-ms framing times of standard video cameras. Hence, they provide velocity fields that are averaged in time at least over that period. On the other hand, the PDV concept described in this presentation incorporates a high energy, repetitively pulsed, Nd-YAG laser that is injection-seeded to make it narrowband and then frequency-doubled to provide light at frequencies absorbed by the iodine vapor. The duration of each pulse is less than 10 nanoseconds. When used in combination with nonstandard, scientific quality, solid state cameras, a sequence of images can be obtained that provides instantaneous velocity vectors everywhere in the field of view. The investigations described in this paper include an accurate characterization of the iodine cell spectral behavior and its influence on the PDV measurements, a derivation of the PDV signal analysis requirements, and the unique aspects of the pulsed laser behavior related to this application. In addition, PDV measurements are to be demonstrated using data from a rotating wheel target and from the flow of a subsonic jet. Initially, single optical fiber light collection and photomultiplier detectors will be substituted for solid state cameras. Those results will allow the determination of the fundamental limitations of the PDV technique without the complications of image acquisition and processing. They will then be used to provide an analysis of the measurement capabilities of PDV both in small aerodynamic research wind tunnels and in large wind tunnels designed for production airframe and propulsion testing. Future plans include the implementation of solid state cameras and the development of the required image acquisition and processing software. Eventually, the PDV technique will be applied to an aerodynamic research program related to transonic wing flutter.

McKenzie, Robert L.↗

Artificial Gravity as a Multi-System Countermeasure to Bed Rest Deconditioning: Pilot Study Overview

Efficient, effective, multi-system countermeasures will likely be required to protect the health, safety, and performance of crews aboard planned exploration-class space flight missions to Mars and beyond. To that end, NASA, DLR, and IMBP initiated a multi-center international project to begin systematically exploring the utility of artificial gravity (AG) as a multi-system countermeasure in ground based venues using test subjects deconditioned by bed rest. The goal of this project is to explore the efficacy of short-radius, intermittent AG as a countermeasure to bone, muscle, cardiovascular, and sensory-motor adaptations to hypogravity. This session reports the results from a pilot study commissioned to validate a standardized protocol to be used by all centers involved in the project. Subject selection criteria, medical monitoring requirements, medical care procedures, experiment control procedures, and standardized dependent measures were established jointly. Testing was performed on 15 rigorously screened male volunteers subjected to 21 days of 6deg HDT bed rest. (All provided written consent to volunteer after the nature of the study and its hazards were clearly explained to them.) Eight were treated with daily 1hr AG exposures (2.5g at the feet decreasing to 1.0g at the heart) aboard a short radius (3m) centrifuge, while the other seven served as controls. Multiple tests of multiple dependent measures were made in each of the primary physiological systems of interest during a 10 day acclimatization period prior to HDT bed rest and again during an 8 day recovery period after the bed rest period was complete. Analyses of these data (presented in other papers in this session) suggest the AG prescription had salutary effects on aspects of the bone, muscle, and cardiovascular systems, with no untoward effects on the vestibular system, the immune system, or cognitive function. Furthermore, treatment subjects were able to tolerate 153/160 centrifuge sessions over the 21 day deconditioning protocol, suggesting that tolerance was unaffected by deconditioning. These positive results set the stage for full implementation of the planned multi-center international AG project. Future work will be devoted to developing optimization techniques for AG prescriptions (likely supplemented by exercise) to provide maximum physiological protection across all systems subject to space flight deconditioning in both men and women with minimum time and/or side effects. While a continuous AG solution (rotating vehicle) would likely be more efficient, this study suggests that intermittent AG could be an effective multi-system countermeasure.

Paloski, William H.↗

Marshall Space Flight Center Propulsion Systems Department (PSD) KM Initiative

NASA Marshall Space Flight Center s Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities with in the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center Of Excellence (AISCE), Intergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KM implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to support the planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have been performed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural/KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level systems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

Marshall Space Flight Center Propulsion Systems Department (PSD) Knowledge Management (KM) Initiative

NASA Marshall Space Flight Center's Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities within the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center of Excellence (AISCE), lntergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KNI implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to suppo~th e planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have beon pedormed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural1KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level svstems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, - evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

Panel to review EOSDIS plans

Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current baseline architecture that was not previously available, due to procurement restrictions. This report presents the panel's findings and recommendations based on this additional information.

Source record↗