Search NASA⌕ Search

SEARCH · Search NASA

Results for “Load Balancing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Controller Requirements for Managing Community Microgrids

Microgrid control systems are central to the functioning of a microgrid. They are responsible for managing distributed energy resources (DER) in both grid-connected and islanded modes of operation. Although microgrids are being developed and deployed by many utilities, several questions are being raised about the control system that manages them. This document provides the detailed list of requirements for a feeder-level microgrid controller to manage various islanded and grid-connected use cases. Functionally, the use cases include control scenarios that require the controller to maintain energy balance, prevent constraint violations, manage switching equipment, manage grid-forming (GFM) and grid-following (GFL) DER, manage critical/non-critical loads, and coordinate with peer systems to operate joined island areas. In addition to detailed requirements, the document includes interface and performance metrics for functional evaluation. These requirements can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; requirements also apply to third-party managed microgrid controllers that coordinate with the utility- and customer-owned equipment. The document can also be used by technology developers and project developers in industry to specify desired control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Improving the Understanding of Intake and Charge Effects for Increasing RCCI Engine Efficiency

The present experimental engine efficiency study explores the effects of intake pressure and temperature, and premixed and global equivalence ratios on gross thermal efficiency (GTE) using the reactivity controlled compression ignition (RCCI) combustion strategy. Experiments were conducted in a heavy-duty single-cylinder engine at constant net load (IMEPn) of 8.45 bar, 1300 rev/min engine speed, with 0% EGR, and a 50% mass fraction burned combustion phasing (CA50) of 0.5 CA ATDC. The engine was port fueled with E85 for the low reactivity fuel and direct injected with 3.5% 2-ethylhexyl nitrate (EHN) doped into 91 anti-knock index (AKI) gasoline for the high-reactivity fuel. The resulting reactivity of the enhanced fuel corresponds to an AKI of approximately 56 and a cetane number of approximately 28. The engine was operated with a wide range of intake pressures and temperatures, and the ratio of low- to high-reactivity fuel was adjusted to maintain a fixed speed-phasing-load condition. This allowed for the investigation of several combinations of intake temperature, intake pressure, and charge stratification at otherwise constant thermodynamic conditions. The results show that sources of engine inefficiency compete as functions of premixed and global equivalence ratios. Losses are minimized through proper balancing of intake pressure and temperature, such that the global equivalence ratio ( global) is as lean as possible without overly lean regions of the stratified charge causing an increase in incomplete combustion. The explored speed-load-phasing combination shows that losses are minimized at conditions where approximately 2/3 of the fuel is fully premixed. The results exhibit a pathway for achieving simultaneous increases in combustion and fuel efficiency through proper fuel reactivity and initial condition management.

Splitter, Derek A↗

IM3 + EPRI Data Center Load Projections

This dataset contains scenarios of hourly total electricity demand with and without projected loads from data centers over the period 2022-2040. The root projections without data center demands are identical to those documented in Burleyson et al. 2024. In short, those projections encompass hourly electricity demands for 54 Balancing Authorities (BAs) in the United States across a range of eight of weather and socioeconomic scenarios. Refer to the root dataset and accompanying publication, Burleyson et al. 2025, for information about how those projections were generated. For this derivative dataset we used the base loads from the following scenarios: rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 The root load projections did not reflect the drastic expansion of data centers that has occurred in the last several years to support artificial intelligence and cloud computing. To reflect growth in data center demand, a second set of load projections were created in which we layered in additional data center load projections based on the data center load growth scenarios described in a 2024 report by the Electric Power Research Institute (EPRI): "Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption". The EPRI projections from the report are included in this dataset (EPRI_2024_Projections.xlsx). That report contained annual state-level data center load projections for four year-over-year growth rates for data center demands: Low (3.71% annual growth) Moderate (5% annual growth) High (10% annual growth) Higher (15% annual growth) To homogenize the load projections with and without data centers we had to get them to a common scale. The first step was to take the EPRI annual state-level data center energy consumption values and convert them to 8760-hr loads for each year. We did that by assuming a flat (e.g., not weather- or time-sensitive) load profile and distributing the data center loads in each state evenly across all hours in a year. From there the loads were downscaled from the state-level to the county-level using 2019 county-level populations as weights. Finally, the county-level hourly data center loads were summed to the BA-level using the county-to-BA mapping underpinning the root load projections. The net result is 16 (4 weather and socioeconomic scenarios crossed with 4 data center load growth scenarios) unique load projections for the period 2022-2040. The file format follows that of the root dataset with a single additional column "Scaled_TELL_BA_Load_with_DC_MWh" that contains the hourly loads with the added data center loads for a given BA-year-scenario combination. Please refer to the readme file in the root dataset for more information on the file format.

Burleyson, Casey [Pacific Northwest National Labor↗

Calculating Individual Resources Variability and Uncertainty Factors Based on Their Contributions to the Overall System Balancing Needs

The variability and uncertainty of wind power production requires increased flexibility in power systems, or more operational reserves to main a satisfactory level of reliability. The incremental increase in reserve requirement caused by wind power is often studied separately from the effects of loads. Accordingly, the cost in procuring reserves is allocated based on this simplification rather than a fair and transparent calculation of the different resources’ contribution to the reserve requirement. This work proposes a new allocation mechanism for intermittency and variability of resources regardless of their type. It is based on a new formula, called grid balancing metric (GBM). The proposed GBM has several distinct features: 1) it is directly linked to the control performance standard (CPS) scores and interconnection frequency performance, 2) it provides scientifically defined allocation factors for individual resources, 3) the sum of allocation factors within any group of resources is equal to the groups’ collective allocation factor (linearity), and 4) it distinguishes helpers and harmers. The paper illustrates and provides results of the new approach based on actual transmission system operator (TSO) data.

Makarov, Yuri V.↗

Benchmarking of three DWM-based wake models at below-rated wind speeds

Wind turbine wake models are essential tools for predicting power losses and structural loads in wind farms. Among these, the dynamic wake meandering (DWM) model, included as a recommended approach in the International Electrotechnical Commission design standard, is a widely used engineering-fidelity method that balances accuracy and computational cost. This study compares the performance of three DWM-based wake model implementations (from the Technical University of Denmark, the National Renewable Energy Laboratory, and the Institute for Energy Technology) under below-rated wind speed conditions. Model predictions of wake flow, power output, and structural loads for a four-turbine row are evaluated across different ambient turbulence levels and wind-direction misalignments and compared against high-fidelity large-eddy simulation results. All three models captured the overall wake evolution and mean turbine performance with reasonable accuracy; their predicted time-averaged thrust and power were typically within 5 %–10 % of the large-eddy simulation benchmark. However, notable differences emerged in wake structure and unsteady load predictions, with discrepancies increasing for turbines further downstream. These differences highlight the importance of modelling choices such as wake summation and turbulence treatment, which strongly influence power-deficit and fatigue-load predictions. Comparison with large-eddy simulations reveals each approach's strengths and weaknesses, indicating where improvements are needed. Overall, the findings point to specific refinements for DWM models to improve their fidelity, ultimately enabling more robust wake predictions for wind farm design and operation.

17 WIND ENERGY↗

Reduction of Systematic Errors in Diagnostic Receivers Through the Use of Balanced Dicke-Switching and Y-Factor Noise Calibrations

Receivers designed for diagnostic applications range from those having moderate sensitivity to those possessing large dynamic range. Digital receivers have a dynamic range which are a function of the number of bits represented by the ADC and subsequent processing. If some of this range is sacrificed for extreme sensitivity, noise power can then be used to perform two-point load calibrations. Since load temperatures can be precisely determined, the receiver can be quickly and accurately characterized; minute changes in system gain can then be detected, and systematic errors corrected. In addition, using receiver pairs in a balanced approach to measuring X+, X-, Y+, Y-, reduces systematic offset errors from non-identical system gains, and changes in system performance. This paper describes and demonstrates a balanced BPM-style diagnostic receiver, employing Dicke-switching to establish and maintain real-time system calibration. Benefits of such a receiver include wide bandwidth, solid absolute accuracy, improved position accuracy, and phase-sensitive measurements. System description, static and dynamic modelling, and measurement data are presented.

99 GENERAL AND MISCELLANEOUS↗

High Penetration of Photovoltaic Generation Study – Flagstaff Community Power (Final Technical Report, Results of Phases 2-5)

APS’s renewable energy portfolio, driven in part by Arizona’s Renewable Energy Standard (RES) currently includes more than 1100 MW of installed capacity, equating to roughly 3000 GWh of annual production. Overall renewable production is expected to grow to 6000 GWh by 2025. It is expected that distributed photovoltaics, driven primarily by lower cost, will contribute to much of this growth and that by 2025, distributed installations will account for half of all renewable production (3000GHW). As solar penetration increases, additional analysis may be required for routine utility processes to ensure continued safe and reliable operation of the electric distribution network. Such processes include residential or commercial interconnection requests and load shifting during normal feeder operations. Circuits with existing high solar penetration will also have to be studied and results will need to be evaluated for adherence to utility practices or strategy. Increased distributed PV penetration may offer benefits such as load offsetting, but it also has the potential to adversely impact distribution system operation. These effects may be exacerbated by the rapid variability of PV production. Detailed effects of these phenomena in distributed PV applications continue to be studied. Comprehensive, high-resolution electrical models of the distribution system were developed to analyze the impacts of PV on distribution circuit protection systems (including coordination and anti-islanding), predict voltage regulation and phase balance issues, and develop volt/VAr control schemes. Modeling methods were refined by validating against field measurements. To augment the field measurements, methods were developed to synthesize high resolution load and PV generation data to facilitate quasi-static time series simulations. The models were then extended to explore boundary conditions for PV hosting capability of the feeder and to simulate common utility practices such as feeder reconfiguration. The modeling and analysis methodology was implemented using open source tools and a process was developed to aid utility engineers in future interconnection requests. Methods to increase PV hosting capacity were also explored during the course of the study. A 700kVA grid-supportive inverter was deployed on the feeder and each grid support mode was demonstrated. Energy storage was explored through simulation and models were developed to calculate the optimum size and placement needed to increase PV hosting capacity. A tool was developed to aid planners in assigning relative costs and benefits to various strategies for increasing PV hosting capacity beyond current levels. Following the completion of the project, APS intends to use the tools and methods to improve the framework of future PV integration on its system. The tools and methods are also expected to aid other utilities to accelerate distributed PV deployment.

14 SOLAR ENERGY↗

Using Process Load Cell Information for IAEA Safeguards at Enrichment Plants

Uranium enrichment service providers are expanding existing enrichment plants and constructing new facilities to meet demands resulting from the shutdown of gaseous diffusion plants, the completion of the U.S.-Russia highly enriched uranium downblending program, and the projected global renaissance in nuclear power. The International Atomic Energy Agency (IAEA) conducts verification inspections at safeguarded facilities to provide assurance that signatory States comply with their treaty obligations to use nuclear materials only for peaceful purposes. Continuous, unattended monitoring of load cells in UF{sub 6} feed/withdrawal stations can provide safeguards-relevant process information to make existing safeguards approaches more efficient and effective and enable novel safeguards concepts such as information-driven inspections. The IAEA has indicated that process load cell monitoring will play a central role in future safeguards approaches for large-scale gas centrifuge enrichment plants. This presentation will discuss previous work and future plans related to continuous load cell monitoring, including: (1) algorithms for automated analysis of load cell data, including filtering methods to determine significant weights and eliminate irrelevant impulses; (2) development of metrics for declaration verification and off-normal operation detection ('cylinder counting,' near-real-time mass balancing, F/P/T ratios, etc.); (3) requirements to specify what potentially sensitive data is safeguards relevant, at what point the IAEA gains on-site custody of the data, and what portion of that data can be transmitted off-site; (4) authentication, secure on-site storage, and secure transmission of load cell data; (5) data processing and remote monitoring schemes to control access to sensitive and proprietary information; (6) integration of process load cell data in a layered safeguards approach with cross-check verification; (7) process mock-ups constructed to provide simulated load cell data; (8) hardware and software implementation for process load cell data collection; (9) costs associated with unattended monitoring of load cells (for both operator and inspector) weighed against the potential benefits of having access to such data; (10) results from field tests of load cell data collection systems in operating facilities; and (11) use of unattended load cell data to increase efficiency of on-site inspection schedules and activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Aggregated Residential Load Modeling Using Dynamic Bayesian Networks

Abstract—It is already obvious that the future power grid will have to address higher demand for power and energy, and to incorporate renewable resources of different energy generation patterns. Demand response (DR) schemes could successfully be used to manage and balance power supply and demand under operating conditions of the future power grid. To achieve that, more advanced tools for DR management of operations and planning are necessary that can estimate the available capacity from DR resources. In this research, a Dynamic Bayesian Network (DBN) is derived, trained, and tested that can model aggregated load of Heating, Ventilation, and Air Conditioning (HVAC) systems. DBNs can provide flexible and powerful tools for both operations and planing, due to their unique analytical capabilities. The DBN model accuracy and flexibility of use is demonstrated by testing the model under different operational scenarios.

Bayesian↗

Technology Solutions Case Study: Steam System Balancing and Tuning for Multifamily Residential Buildings, Chicago, Illinois

Steam heated buildings often suffer from uneven heating as a result of poor control of the amount of steam entering each radiator. In order to satisfy the heating load to the coldest units, other units are overheated. As a result, some tenants complain of being too hot and open their windows in the middle of winter, while others complain of being too cold and are compelled to use supplemental heat sources.

Building America↗

Experimental validation of advanced regulations for superconducting magnet cooling undergoing periodic heat loads

Superconducting magnets used in tokamaks undergo periodic heat load caused by cycling plasma operations inducing AC losses, neutrons fluxes and eddy currents in magnet structures. In the cryogenic system of JT60-SA tokamak, the Auxiliary Cold Box (ACB) distributes helium from the refrigerator to the cryogenic users and in particular to the superconducting magnets. ACB comprises a saturated helium bath with immersed heat exchangers, extracting heat from independent cooling loops. The supercritical helium flow in each cooling loop is driven by a cold circulator. In order to safely operate the refrigerator during plasma pulses, the interface between the ACB and the refrigerator shall be as stable as possible, with well-balanced bath inlet and outlet mass flows during cycling operation. The solution presented in this paper relies on a combination of regulations to smooth pulsed heat loads and to keep a constant refrigeration power during all the cycle. Two smoothing strategies are presented, both regulating the outlet mass flow of the bath: the first one using the bath as a thermal buffer and the second one storing energy in the loop by varying the cold circulator speed. The bath outlet mass flow is also controlled by an immersed resistive heater which enables a constant evaporation rate in the bath when power coming from the loops is decreasing. The refrigeration power is controlled so that the compensating power remains within an acceptable margin. Experimental validation is achieved using the HELIOS facility. This facility running at CEA Grenoble since 2010 is a scaled down model of the ACB bath and Central Solenoid magnet cooling loop of the JT60-SA tokamak. Test results show performances and robustness of the regulations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessing the Value of Regulation Resources Based on Their Time Response Characteristics

Fast responsive regulation resources are potentially more valuable as a power system regulation resource (more efficient) because they allow applying controls at the exact moment and in the exact amount as needed. Faster control is desirable because it facilitates more reliable compliance with the NERC Control Performance Standards at relatively lesser regulation capacity procurements. The current California ISO practices and markets do not provide a differentiation among the regulation resources based on their speed of response (with the exception of some minimum ramping capabilities). Some demand response technologies, including some generation and energy storage resources, can provide quicker control actions. California ISO practices and markets could be updated to welcome more fast regulation resources into the California ISO service area. The project work reported in this work was pursuing the following objectives: • Develop methodology to assess the relative value of generation resources used for regulation and load following California ISO functions • This assessment should be done based on physical characteristics including the ability to quickly change their output following California ISO signals • Evaluate what power is worth on different time scales • Analyze the benefits of new regulation resources to provide effective compliance with the mandatory NERC Control Performance Standards • Evaluate impacts of the newly proposed BAAL and FRR standards on the potential value of fast regulation and distributed regulation resources • Develop a scope for the follow-up projects to pave a road for the new efficient types of balancing resources in California. The work included the following studies: • Analysis of California ISO regulating units characteristics • California ISO automatic generation system (AGC) analysis • California ISO regulation procurement and market analysis • Fast regulation efficiency analysis • Projection of the California ISO load following and regulation requirements into the future • Value of fast responsive resources depending on their ramping capability • Potential impacts of the balancing authority area control error limit (BAAL), which is a part of the newly proposed NERC standard “Balancing Resources and Demand” • Potential impacts of the Western Electricity Coordinating Council (WECC) frequency responsive reserve (FRR) standard • Recommendations for the next phase of the project. The following main conclusions and suggestions for the future have been made: • The analysis of regulation ramping requirements shows that the regulation system should be able to provide ramps of at least 40-60 MW per minute for a period up to 6 minutes. • Evaluate if changes are needed in the California ISO AGC system to effectively accommodate new types of fast regulation resources and minimize the California ISO regulation procurement. • California ISO may consider creating better market opportunities for and incentives for fast responsive resources. • An additional study of low probability high ramp events can be recommended to the California ISO. • The California ISO may be willing to consider establishing a more relaxed target CPS2 compliance level. • A BAAL-related study can be recommended for the California ISO as soon as more clarity is achieved concerning the actual enforcement of the BAAL standard and its numerical values for the California ISO. The study may involve an assessment of advantages of the distributed frequency-based control for the California ISO system. The market-related issues that arise in this connection can be also investigated. • A FRR-related study can be recommended for the California ISO as soon as more clarity is achieved concerning the actual enforcement of the FRR standard and its numerical values for the California ISO.

24 POWER TRANSMISSION AND DISTRIBUTION↗

THE SINS/zC-SINF SURVEY of z {approx} 2 GALAXY KINEMATICS: OUTFLOW PROPERTIES

Using SINFONI H{alpha}, [N II], and [S II] AO data of 27 z {approx} 2 star-forming galaxies (SFGs) from the SINS and zC-SINF surveys, we explore the dependence of outflow strength (via the broad flux fraction) on various galaxy parameters. For galaxies that have evidence for strong outflows, we find that the broad emission is spatially extended to at least the half-light radius ({approx}a few kpc). Decomposition of the [S II] doublet into broad and narrow components suggests that this outflowing gas probably has a density of {approx}10-100 cm{sup -3}, less than that of the star-forming gas (600 cm{sup -3}). There is a strong correlation of the H{alpha} broad flux fraction with the star formation surface density of the galaxy, with an apparent threshold for strong outflows occurring at 1 M{sub Sun} yr{sup -1} kpc{sup -2}. Above this threshold, we find that SFGs with log m{sub *} > 10 have similar or perhaps greater wind mass-loading factors ({eta} = M-dot{sub out}/SFR) and faster outflow velocities than lower mass SFGs, suggesting that the majority of outflowing gas at z {approx} 2 may derive from high-mass SFGs. The mass-loading factor is also correlated with the star formation rate (SFR), galaxy size, and inclination, such that smaller, more star-forming, and face-on galaxies launch more powerful outflows. We propose that the observed threshold for strong outflows and the observed mass loading of these winds can be explained by a simple model wherein break-out of winds is governed by pressure balance in the disk.

79 ASTRONOMY AND ASTROPHYSICS↗

Gyrokinetic prediction of core tungsten peaking in a WEST plasma with nitrogen impurities

Tungsten peaking is predicted in the core of a WEST plasma with total-f gyrokinetic simulations, including both collisional and turbulent transport. This prediction is validated with a synthetic diagnostic of the bolometry. Although nitrogen impurities are shown to reduce the neoclassical peaking of tungsten on-axis, the overall tungsten peaking increases when nitrogen impurities are present, as they reduce the turbulence screening off-axis. This finding is important for the plasma current ramp-up phase of ITER, where light impurities seeding will be desirable to achieve low temperatures at the plasma-facing components and reduce tungsten sputtering. It provides further argument for applying early ECRH heating to maintain margins on the core power balance. The neoclassical peaking factor is cross-verified between XGC and FACIT. The heat flux at separatrix and the heat load width are modeled by XGC and compared to WEST data.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗