Agnostic Modular Payloads for Multi-Int Collection Project: 22-114 - Year 1 of 2
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This is the final progress report for the Department of Energy (DOE) – X Energy, LLC cooperative agreement DENE0008472. This report provides a high-level summary of the work performed during the entire period of performance, running from July 1, 2016 – June 30, 2022. This span of time covers the original 5-year award and a one year no-cost extension. There were four tasks within this project: (1) project management, (2) reactor design furtherance, (3) fuel development, and (4) Nuclear Regulatory Commission (NRC) engagement. Detailed reporting during execution of the project was provided by a total of 23 quarterly reports, 42 X-energy technical reports, and voluntary monthly update presentations. Other technical work products include 2 white papers and 2 Topical Report submitted to the Nuclear Regulatory Commission, 15 Potential Inventions documented, 4 patents issued, 3 patents pending, 8 peer reviewed journal articles, and 2 Oak Ridge National Laboratory Technical Manuscripts. All the X Energy milestones/deliverables were met early or on time and are archived in the DOE Office of Nuclear Energy’s Program Information Control System: Nuclear Energy under Fiscal Year 2016, Work Breakdown Structure 2.07 – X-Energy. All other work products are available to DOE upon request.
Explore the source record for details and available documents.
A non-tracking solar sensor device and systems. The non-tracking solar sensor system includes a transparent hemispherical dome enclosure for receiving light. A diffuser is disposed with the enclosure for diffusing the light. A photodiode sensor array senses at least one discrete wavelength of the diffused light. A data acquisition module is configured to receive a sensor signal from the sensor array, the signal indicative of light quality at least one discrete wave band for processing via a processor module.
An inadvertent actuation block valve includes inlet and outlet orifices being in selective fluid communication via a chamber. A disc is disposed within the chamber and a bellows is configured to contract at a predetermined pressure differential between reactor fluid entering a reference pressure orifice and control fluid entering the inlet orifice. When the bellows contracts, the disc engages the outlet orifice and isolates fluid communication between the inlet and outlet orifices. The inadvertent actuation block valve prevents inadvertent opening of an emergency core cooling valve when a reactor is at operating pressure that is above the predetermined set pressure range. The inadvertent actuation block valve permits the emergency cooling valves to open and to remain open when reactor pressure is below the predetermined set pressure range. The inadvertent actuation block valve does not impede long term emergency cooling that occurs when the reactor is at low pressure.
The mission of the Department of Energy Office of Nuclear Energy (DOE-NE) is to advance nuclear power as a resource capable of meeting the nation’s energy, environmental, and national security needs by resolving technical, cost, safety, proliferation resistance, and security barriers through Research, Development, and Demonstration (RD&D). To assist in accomplishing this, DOE-NE has established the Gateway for Accelerated Innovation in Nuclear (GAIN) to provide the nuclear community with access to the technical, regulatory, and financial support necessary to move innovative nuclear energy technologies toward commercialization. As part of this program, a GAIN Voucher was awarded to the Columbia Basin Consulting Group (CBCG) to develop for the Lead-Bismuth Reactor (LBR): (1) a means of meeting Chapter 15 requirements and (2) to perform an assessment against a gap analysis developed by the U.S. Nuclear Regulatory Commission (NRC) for Chapter 15. These two assessments will determine to what extent the LBR can adapt to or meet the Chapter 15 Accident Analysis requirements, and determine gaps that may still exist and what additional information is needed in order to close them. The CBCG LBR design is being developed with a high level of passive safety. It has the advantages of the classical liquid metal reactor, i.e. small size and passive safety, while having the additional advantage of a chemically inert coolant. The CBCG and the Pacific Northwest National Laboratory (PNNL) collaborated to develop an initial licensing pathway for the CBCG Lead-Bismuth conceptual reactor design. It was found that the reactor is well along the licensing pathway and is licensable although some additional design information is needed to establish a complete licensing basis. The missing information is identified in this report and it is noted that much of the missing information can be obtained from the Fast Flux Test Facility (FFTF), a DOE liquid metal test reactor. It was also found that the traditional Chapter 15 requirements for assessing the response of a reactor to possible accident sequences can be adapted to the LBR concept. The Chapter 15 review examined several classes of initiating events and accidents that are normally covered in Chapter 15: reactivity initiated events, reduction in heat removal events, local fuel failure events, and events initiated on the steam supply side. Although some design information is lacking at present, the LBR can be expected to respond as required by Chapter 15 requirements to almost all of the first three events. For events initiated on the steam side, design information is lacking and so conclusions cannot be reached at present. On the other hand, it should be quite possible to develop the design information for the steam supply side and the impact of events initiated on this side can be assessed in a subsequent study.
Abstract not provided.
Abstract not provided.
Abstract not provided.
A base configured to be joined with other bases to form a substrate for an antenna array comprises a body, a plurality of male interconnecting features, and a plurality of female interconnecting features. The body includes a front surface and a rear surface and a plurality of edges positioned therebetween. The front surface or the rear surface is configured to retain an antenna. The male interconnecting features of a first base connect with the female interconnecting features of a second base when the first base is joined with the second base to form the substrate or a portion of the substrate.
The present disclosure relates to a membrane extraction apparatus for extracting a component from a first liquid. The apparatus may incorporate a housing comprised of first and second mating housing halves, with each housing half having an open faced channel formed therein such that the channels at least partially overlay one another when the two housing halves are secured together. A membrane filter is disposed between the two housing halves to overlay the open faced channels. The membrane filter extracts the component from the first liquid and transfers the component into the second liquid as the first and second liquids flow through the first and second housing halves.