Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Status, Plans, and Initial Results for ARES 1 Crew Launch Vehicle Aerodynamics

Following the completion of NASA's Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Exploration Launch Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented.

Huebner, Lawrence D.↗

Status, Plans and Initial Results for Ares I Crew Launch Vehicle Aerodynamics

Following the completion of NASA s Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Ares Projects Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented. Keywords: Ares I Crew Launch Vehicle, aerodynamics, wind tunnel testing, computational fluid dynamics

Huebner, Lawrence D.↗

AmeriFlux FLUXNET-1F CA-DSM Delta Salt Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site CA-DSM Delta Salt Marsh. This is the FLUXNET version of the carbon flux data for the site CA-DSM Delta Salt Marsh produced by applying the standard ONEFlux (1F) software. Site Description - This site is a tidal salt marsh on the eastern side of the Boundary Bay Wildlife Management Area (WMA) in Delta, British Columbia, Canada. This area is located on the southern front of the Fraser River. The total area of the Boundary Bay WMA is 11,470 ha, and the eastern part surrounding the flux tower accounts for 39 ha. This area is surrounded by farms and dikes. The Provincial Government purchased this area in 1974 limiting public access and designated it as WMA in 1995. This area has a mixed semidiurnal tidal cycle. The dominant species is Saltgrass (Distichlis spicata) with a canopy height of ~40 cm. The tower is in a high marsh system and was installed to analyze energy, H2O, CO2, and CH4 fluxes on September 3, 2021.

Knox, Sara [The University of British Columbia]↗

AmeriFlux FLUXNET-1F CA-RBM Richmond Brackish Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site CA-RBM Richmond Brackish Marsh. This is the FLUXNET version of the carbon flux data for the site CA-RBM Richmond Brackish Marsh produced by applying the standard ONEFlux (1F) software. Site Description - This site is a tidal brackish marsh on the southern side of the Sturgeon Bank Wildlife Management Area (WMA) in Richmond, British Columbia, Canada. This area is situated within the estuary of the Fraser River. The total area of Sturgeon Bank WMA is 5,152 ha, of which the tidal marsh area is 205 ha. The southern of the WMA is characterized as a brackish marsh, which transitions to a salt marsh as you go north. Human development has influenced this area for almost 200 years. Human activities in this area began in the early 1800s, which included dredging, dyke and entrainment structures, agriculture, and other uses. The areas were designated as WMA in 1998. This area experiences a semidiurnal tidal cycle. The flux tower is located near the southern edge of the marsh, where the dominant species is cattail (Typha latifolia), with a canopy height of 160 cm. The tower is in a high marsh system and was installed to analyze energy, H2O, CO2, and CH4 fluxes on June 1, 2022.

Knox, Sara [The University of British Columbia]↗

Multi-Element Integrated Project Planning at Kennedy Space Center

This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

Mullon, Robert↗

AmeriFlux FLUXNET-1F US-Tw1 Twitchell Wetland West Pond

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Tw1 Twitchell Wetland West Pond. This is the FLUXNET version of the carbon flux data for the site US-Tw1 Twitchell Wetland West Pond produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Wetland site is a 7.4-acre restored wetland on Twitchell Island, that is managed by the California Department of Water Resources (DWR) and the U.S. Geological Survey (USGS). In the fall of 1997, the site was permanently flooded to a depth of approximately 25 cm. The wetland was almost completely covered by cattails and tules by the third growing season. A flux tower equipped to analyze energy, H2O, CO2, and CH4 fluxes was installed on May 17, 2012.

Valach, Alex↗

Development and demonstration of a telerobotic excavation system

Oak Ridge National Laboratory is developing remote excavation technologies for the Department of Energy's Office (DOE) of Technology Development, Robotics Technology Development Program, and also for the Department of Defense (DOD) Project Manager for Ammunition Logistics. This work is being done to meet the need for remote excavation and removal of radioactive and contaminated buried waste at several DOE sites and unexploded ordnance at DOD sites. System requirements are based on the need to uncover and remove waste from burial sites in a way that does not cause unnecessary personnel exposure or additional environmental contamination. Goals for the current project are to demonstrate dexterous control of a backhoe with force feedback and to implement robotic operations that will improve productivity. The Telerobotic Small Emplacement Excavator is a prototype system that incorporates the needed robotic and telerobotic capabilities on a commercially available platform. The ability to add remote dexterous teleoperation and robotic operating modes is intended to be adaptable to other commercially available excavator systems.

Burks, Barry L.↗

The Integrated Medical Model: Outcomes from Independent Review

In 2016, the Integrated Medical Model (IMM) v4.0 underwent an extensive external review in preparation for transition to an operational status. In order to insure impartiality of the review process, the Exploration Medical Capabilities Element of NASA's Human Research Program convened the review through the Systems Review Office at NASA Goddard Space Flight Center (GSFC). The review board convened by GSFC consisted of persons from both NASA and academia with expertise in the fields of statistics, epidemiology, modeling, software development, aerospace medicine, and project management (see Figure 1). The board reviewed software and code standards, as well as evidence pedigree associated with both the input and outcomes information. The board also assesses the models verification, validation, sensitivity to parameters and ability to answer operational questions. This talk will discuss the processes for designing the review, how the review progressed and the findings from the board, as well as summarize the IMM project responses to those findings. Overall, the board found that the IMM is scientifically sound, represents a necessary, comprehensive approach to identifying medical and environmental risks facing astronauts in long duration missions and is an excellent tool for communication between engineers and physicians. The board also found IMM and its customer(s) should convene an additional review of the IMM data sources and to develop a sustainable approach to augment, peer review, and maintain the information utilized in the IMM. The board found this is critically important because medical knowledge continues to evolve. Delivery of IMM v4.0 to the Crew Health and Safety (CHS) Program will occur in the 2017. Once delivered for operational decision support, IMM v4.0 will provide CHS with additional quantitative capability in to assess astronaut medical risks and required medical capabilities to help drive down overall mission risks.

medical equipment↗

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AmeriFlux FLUXNET-1F US-xAE NEON Klemme Range Research Station (OAES)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xAE NEON Klemme Range Research Station (OAES). This is the FLUXNET version of the carbon flux data for the site US-xAE NEON Klemme Range Research Station (OAES) produced by applying the standard ONEFlux (1F) software. Site Description - The 1,560-acre Klemme Range Research Station is a grassland site managed for livestock grazing and pasture, located in the middle of the Rolling Red Plains Resource Area. The Rolling Red Plains extends from south of the Red River to north of the Oklahoma/Kansas border consisting of approximately 9.4 million acres, which occupies a significant portion of Western Oklahoma excluding the Oklahoma Panhandle.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F US-WPT Winous Point North Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-WPT Winous Point North Marsh. This is the FLUXNET version of the carbon flux data for the site US-WPT Winous Point North Marsh produced by applying the standard ONEFlux (1F) software. Site Description - The marsh site has been owned by the Winous Point Shooting Club since 1856 and has been managed by wildlife biologists since 1946. The hydrology of the marsh is relatively isolated by the surrounding dikes and drainages and only receives drainage from nearby croplands through three connecting ditches. Since 2001, the marsh has been managed to maintain year-round inundation with the lowest water levels in September. Within the 0–250 m fetch of the tower, the marsh comprises 42.9% of floating-leaved vegetation, 52.7% of emergent vegetation, and 4.4% of dike and upland during the growing season. Dominant emergent plants include narrow-leaved cattail (Typha angustifolia), rose mallow (Hibiscus moscheutos), and bur reed (Sparganium americanum). Common floating-leaved species are water lily (Nymphaea odorata) and American lotus (Nelumbo lutea) with foliage usually covering the water surface from late May to early October.

Chen, Jiquan↗

AmeriFlux FLUXNET-1F US-MN3 Morris: Corn-Soybean, Conventional Tillage

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-MN3 Morris: Corn-Soybean, Conventional Tillage. This is the FLUXNET version of the carbon flux data for the site US-MN3 Morris: Corn-Soybean, Conventional Tillage produced by applying the standard ONEFlux (1F) software. Site Description - Cropland, 2-year rotation (corn-soybean), conventional (deep rip) tillage, uniform nutrient management, uniform pest management, tile drainage

Helseth, Christina [USDA-ARS LTAR]↗

Model-Based Extracted Water Desalination System for Carbon Sequestration

Over the last 1.5 years, GE Global Research and Pennsylvania State University defined a model-based, scalable, and multi-stage extracted water desalination system that yields clean water, concentrated brine, and, optionally, salt. The team explored saline brines that ranged across the expected range for extracted water for carbon sequestration reservoirs (40,000 up to 220,000 ppm total dissolved solids, TDS). In addition, the validated the system performance at pilot scale with field-sourced water using GE’s pre-pilot and lab facilities. This project encompassed four principal tasks, in addition to Project Management and Planning: 1) identify a deep saline formation carbon sequestration site and a partner that are suitable for supplying extracted water; 2) conduct a techno-economic assessment and down-selection of pre-treatment and desalination technologies to identify a cost-effective system for extracted water recovery; 3) validate the downselected processes at the lab/pre-pilot scale; and 4) define the scope of the pilot desalination project. Highlights from each task are described below: Deep saline formation characterization The deep saline formations associated with the five DOE NETL 1260 Phase 1 projects were characterized with respect to their mineralogy and formation water composition. Sources of high TDS feed water other than extracted water were explored for high TDS desalination applications, including unconventional oil and gas and seawater reverse osmosis concentrate. Technoeconomic analysis of desalination technologies Techno-economic evaluations of alternate brine concentration technologies, including humidification-dehumidification (HDH), membrane distillation (MD), forward osmosis (FO), turboexpander-freeze, solvent extraction and high pressure reverse osmosis (HPRO), were conducted. These technologies were evaluated against conventional falling film-mechanical vapor recompression (FF-MVR) as a baseline desalination process. Furthermore, a quality function deployment (QFD) method was used to compare alternate high TDS desalination technologies to FF-MVR. High pressure reverse osmosis was found to a be a promising alternative desalination technology. A deep-dive technoeconomic analysis of HPRO was performed, including Capex and Opex estimates, for seawater RO (SWRO). Additionally, two additional cases were explored: 1) a comparison of a SWRO plus HPRO system to the option of doubling the size of a standard seawater RO system to achieve the same total pure water recovery rate; and 2) a flue gas desulfurization wastewater treatment zero-liquid discharge (ZLD) application, where preconcentration with RO (SWRO or SWRO + HPRO) before evaporation and crystallization was compared to FF-MVR and crystallization technologies without RO preconcentration. Pre-pilot process validation Pre-pilot-scale tests were conducted using field production water to validate key process steps for extracted water pretreatment. Approximately 5,000 gallons of field produced water was processed through, microfiltration, ultrafiltration, and steam regenerable sorbent operations. Smaller quantities were processed through microclarification. In addition, analytical methods (purge-and-trap gas chromatography and Hach TOC analytical methods) were validated. Lab-scale HPRO elements were constructed and tested at high pressures, to identify and mitigate technical risks of the technology. Lastly, improvements in RO membrane materials were identified as the necessary next step to achieve further improvement in element performance at high pressure. Scope of Field Pilot A field pilot for extracted water pretreatment was designed.

20 FOSSIL-FUELED POWER PLANTS↗

XTE Science Briefing from KSCNF

The X-ray Timing Explorer (XTE), launched on Dec. 30, 1995, is a Satellite that observes the fast-moving, high-energy worlds of black holes, neutron stars, x-ray pulsars and bursts of X-rays that light up the sky and then disappear forever. This videotape presents a pre-launch science briefing to the press by a few of the scientist and managers associated with the XTE satellite. The moderator for the press briefing is Jim Sahli, from the Public Affairs Office at Goddard Space Flight Center (GSFC). He introduces Alan Bunner, of the High Energy Astrophysics at NASA Headquarters; Fred Lamb, from the University of Illinois; Richard Mashotzky, X Ray Scientist at GSFC; Rick Rothschild, Principal Investigator from the University of California at San Diego; and Dale Schultz, the XTE project manager at GSFC. Dr. Bunner explains the electromagnetic spectrum, the placement of x-rays and the importance of the XTE observations to a better understanding of the Universe. Dr. Lamb, explains the difference between white dwarfs, neutron stars and black holes, and the type of observations that the XTE will give to a further understanding of these phenomena. Dr. Mashotzky expands the viewpoint to beyond the galaxy, and explains the interests of scientists who hope to use XTE to further study Quasars and Active Galactic Nuclei. Dr. Rothschild reviews some of the features of XTE, using a diagram to show the features of interest, such as the X ray Telescopes, and the collecting Proportional Counter Array (PCA.) Mr. Schultz presents a videotape tour of the XTE, in which he shows the scientific instruments and the other features of the satellite. In this tour, the source of each of the instruments is noted. Questions from the members of the press are then fielded. Many of the questions are about the cost of the XTE and any problems that are anticipated in regards to the launch.

Source record↗

AmeriFlux FLUXNET-1F US-xTL NEON Toolik (TOOL)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xTL NEON Toolik (TOOL). This is the FLUXNET version of the carbon flux data for the site US-xTL NEON Toolik (TOOL) produced by applying the standard ONEFlux (1F) software. Site Description - The Toolik field site is located in a remote wilderness area at the Toolik Field Station which is on land managed by the Bureau of Land Management. The area is underlain by continuous permafrost, which exerts a major influence on hydrology and the distribution, structure, and function of terrestrial and aquatic ecosystems. Because of its location between the Brooks Range and the coastal plain, the vegetation and soils at TOOL are representative of much of the Alaskan foothills tundra. This terrestrial field site is collocated with NEON’s Toolik Lake aquatic site. The closest city, Fairbanks, Alaska is 400 miles away. The Dalton Highway (also known as the Haul Road or Pipeline Road), which traverses the middle of the state from Fairbanks to Prudhoe Bay, provides access to the area.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F US-HB4 Minim Creek Brackish Impoundment

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-HB4 Minim Creek Brackish Impoundment. This is the FLUXNET version of the carbon flux data for the site US-HB4 Minim Creek Brackish Impoundment produced by applying the standard ONEFlux (1F) software. Site Description - An impounded, brackish wetland that is a historic rice field and adjacent to a tidal creek that is managed for water level and vegetation for waterfowl habitat.

O'Halloran, Tom [Clemson University]↗

AmeriFlux FLUXNET-1F US-VT2 Vermillion Tributary Paired Cropland – Site 2 (Corn/Soy; Cover Crops)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-VT2 Vermillion Tributary Paired Cropland – Site 2 (Corn/Soy; Cover Crops). This is the FLUXNET version of the carbon flux data for the site US-VT2 Vermillion Tributary Paired Cropland – Site 2 (Corn/Soy; Cover Crops) produced by applying the standard ONEFlux (1F) software. Site Description - US-VT2 is located on flat, actively managed farmland operated by working farmers, following a conventional no-till corn–soybean rotation in the U.S. Midwest that uses cover crops. US-VT2 is one of two paired working farm sites on the same property; both are managed using similar conventional practices, with the key difference being that the paired site (US-VT1) does not incorporate cover crops into its rotation. This paired design enables direct site-to-site comparisons to assess the impacts of cover cropping on carbon, water, and energy fluxes.

Key, Kesondra [Indiana University - Bloomington]↗

Engineering the System and Technical Integration

Approximately 80% of the problems encountered in aerospace systems have been due to a breakdown in technical integration and/or systems engineering. One of the major challenges we face in designing, building, and operating space systems is: how is adequate integration achieved for the systems various functions, parts, and infrastructure? This Contractor Report (CR) deals with part of the problem of how we engineer the total system in order to achieve the best balanced design. We will discuss a key aspect of this question - the principle of Technical Integration and its components, along with management and decision making. The CR will first provide an introduction with a discussion of the Challenges in Space System Design and meeting the challenges. Next is an overview of Engineering the System including Technical Integration. Engineering the System is expanded to include key aspects of the Design Process, Lifecycle Considerations, etc. The basic information and figures used in this CR were presented in a NASA training program for Program and Project Managers Development (PPMD) in classes at Georgia Tech and at Marshall Space Flight Center (MSFC). Many of the principles and illustrations are extracted from the courses we teach for MSFC.

Blair, J. C.↗