Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

The Value of Successful MBSE Adoption

The value of successful adoption of Model Based System Engineering (MBSE) practices is hard to quantify. Most engineers and project managers look at the success in terms of cost. But there are other ways to quantify the value of MBSE and the steps necessary to achieve adoption. The Glenn Research Center (GRC) has been doing Model-Based Engineering (design, structural, etc.) for years, but the system engineering side has not. Since 2010, GRC has been moving from documents centric to MBSE/SysML. Project adoption of MBSE has been slow, but is steadily increasing in both MBSE usage and complexity of generated products. Sharing of knowledge of lessons learned in the implementation of MBSE/SysML is key for others who want to be successful. Along with GRC's implementation, NASA is working hard to increase the successful implementation of MBSE across all the other centers by developing guidelines, templates and libraries for projects to utilize. This presentation will provide insight into recent GRC and NASA adoption efforts, lessons learned and best practices.

MBSE↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AmeriFlux FLUXNET-1F US-xCL NEON LBJ National Grassland (CLBJ)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xCL NEON LBJ National Grassland (CLBJ). This is the FLUXNET version of the carbon flux data for the site US-xCL NEON LBJ National Grassland (CLBJ) produced by applying the standard ONEFlux (1F) software. Site Description - The LBJ Grasslands is 16,800 acres of land managed by the US Forest Service under the US Department of Agriculture. There is a rich legacy of land use, ranging back to the mid-19th century. Currently, LBJ Grasslands are used for recreation and hunting, livestock grazing, and fossil fuel extraction. Ongoing ecological monitoring is performed at the site, along with prescribed burning.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F US-Twt Twitchell Island

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Twt Twitchell Island. This is the FLUXNET version of the carbon flux data for the site US-Twt Twitchell Island produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Island site is a rice paddy that is owned by the state and managed by the California Department of Water Resources. While Bare Peat field was leveled for rice planting, the tower was installed on April 3, 2009. The rice paddy was converted from corn in 2007. In Summer 2009, Bispyribac-sodium and Pendimethalin herbicides were applied to the fields prior to rice planting and flooding, then pesticide and fertilizer application took place. Each year after rice is planted in the spring by drilling, the field is flooded. Then, the field is drained in early fall, rice is harvested, and the field site is moved.

Knox, Sara [University of California, Berkeley]↗

AmeriFlux FLUXNET-1F US-UTD UFLUX Dugout Ranch

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-UTD UFLUX Dugout Ranch. This is the FLUXNET version of the carbon flux data for the site US-UTD UFLUX Dugout Ranch produced by applying the standard ONEFlux (1F) software. Site Description - The station is located along a fence line between two fields that are managed indentically. The land manager plants an alfalfa mix crop and uses wheel line irrigation.

Inkenbrandt, Paul [Utah Geological Survey]↗

Mining Air for Fuels and Fine Chemicals

The Intergovernmental Panel on Climate Change’s 2021 report underscores that Direct Air Capture (DAC) is an essential component to limiting global warming to 2 °C, yet separating CO 2 from air and its subsequent concentration for conversion into carbon neutral fuels/chemicals or permanent storage remains energy intensive and costly. Further, most DAC technologies rely on repetitive capture and release cycles that reduces the amount of time the DAC materials are able to collect CO 2 and increases wear and tear. Moisture swing (MS) sorption within anion exchange materials utilizes differences in relative humidity to capture and concentrate CO 2 up to 500-fold with negligible energy inputs and low-cost sorbents. Molecular modeling predicts that membranes with a dry and wet side would actively transport CO 2 from its dry side to its wet side against a counter flow of H 2 O evaporating on the dry side, however, existing MS materials are too brittle to be processed into membranes to test this hypothesis. This project brought together experts in DAC materials and design, techno-economic analysis and project management at Arizona State University (ASU), polymer processing at University of Texas at Austin (UTA) and modeling gas transport and exchange at Norther Arizona University (NAU) to develop hollow fiber membranes that use energy from water evaporation to continuously pump CO 2 from air against a concentration gradient to the membranes interior and requiring significantly less energy than current DAC technologies. While this project did not meet its ultimate objectives of demonstrating an active CO 2 pumping membrane, a number of key accomplishments were made in developing low-cost, flexible anion exchange membranes (AEM) at 3.5 m 2 scale, characterizing the ionic and molecular transport within MS materials, and developing several analytical and mathematical models of the MS and pumping process leading to new fundamental knowledge about key rate limiting steps of CO 2 flux in anion exchange membranes at low water activity. Technoeconomic models show that if CO 2 fluxes ≥ 25 µmol CO 2 m -2 s -1 (membrane surface area) are achieved that cost ≤ $\$$100/tonne CO 2 captured, purified and compressed to pipeline quality is possible. The knowledge gained in this research will guide future research in developing new materials toward overcoming these rate limiting steps that in turn could enable transformative and disruptive DAC technologies needed for capturing gigatons of CO 2 per year needed to limiting global warming to 2 °C.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

AmeriFlux FLUXNET-1F US-GLE GLEES

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-GLE GLEES. This is the FLUXNET version of the carbon flux data for the site US-GLE GLEES produced by applying the standard ONEFlux (1F) software. Site Description - The Glacier Lakes Ecosystem Experiments Site (GLEES) site is located on land owned by the U.S. government and managed by US Forest Service as part of the Medicine Bow National Forest. Many of the trees in the immediate vicinity of the site are older than 400 years, inter-dispersed among trees much younger in age. This widespread age distribution is most likely a derivation of one of two scenarios: 1) A widespread stand replacement about 400 years ago followed by a slow replacement; 2) Intermittent random disturbances over the past 400 years (Bradford et al. 2008). A decade long spruce beetle outbreak that peaked in 2008 resulted in the mortality of 85% of the forested basal area. There are a few private land holdings in the area, with scattered uncorked mining claims. Following the establishment of the National Forest, mining was banned and grazing was closed in the early 1990's in the upper portion of the GLEES site. Recreation in the winter, when snow can remain in patches into the summer months, snow mobiling and cross country skiing are popular. During the limited summer, hiking, camping and fishing are common activities. The site is accessible by vehicle only during the summer on Forest Road FDR 317, and in the winter, the tower is only reachable via snowmobile.

Frank, John↗

Greenbuilt Retrofit Test House Final Report

The Greenbuilt house, is an all-electric, 1980's era home in the eastern Sacramento suburb of Fair Oaks that was retrofit by Greenbuilt Construction as part of Sacramento Municipal Utility District's (SMUD) Energy Efficient Remodel Demonstration (EERD) Program. The project was a joint effort between the design-build team at Greenbuilt Construction, led by Jim Bayless, SMUD and their project manager Mike Keesee, and the National Renewable Energy Laboratory (NREL). The goal of the Energy Efficient Remodel Demonstration program is to work with local builders to renovate homes with cost-effective energy efficient retrofit measures. The homes remodeled under the EERD program are intended to showcase energy efficient retrofit options for homeowners and other builders. The Greenbuilt house is one of five EERD projects that NREL has supported. NREL's main role in these projects is to provide energy analysis and to monitor the home's performance after the retrofit to verify that the energy consumption is in line with the modeling predictions. NREL also performed detailed monitoring on the more innovative equipment included in these remodels, such as an add-on heat pump water heater.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Principle Findings from Development of a Recirculated Exhaust Gas Intake Sensor (REGIS) Enabling Cost-Effective Fuel Efficiency Improvement

Kick-off of the Bosch scope of work for the REGIS project started in October 2012. The primary work-packages included in the Bosch scope of work were the following: overall project management, development of the EGR sensor (design of sensor element, design of protection tube, and design of mounting orientation), development of EGR system control strategy, build-up of prototype sensors, evaluation of system performance with the new sensor and the new control strategy, long-term durability testing, and development of a 2nd generation sensor concept for continued technology development after the REGIS project. The University of Clemson was a partner with Bosch in the REGIS project. The Clemson scope of work for the REGIS project started in June 2013. The primary work-packages included in the Clemson scope of work were the following: development of EGR system control strategy, and evaluation of system performance with the new sensor and new control strategy. This project was split into phase I, phase II and phase III. Phase I work was completed by the end of June 2014 and included the following primary work packages: development of sensor technical requirements, assembly of engine testbench at Clemson, design concept for sensor housing, connector, and mounting orientation, build-up of EGR flow test benches at Bosch, and build-up of first sensor prototypes. Phase II work was completed by the end of June 2015 and included the following primary work pack ages: development of an optimizing function and demonstration of robustness of sensor, system control strategy implementation and initial validation, completion of engine in the loop testing of developed control algorithm, completion of sensor testing including characteristic line, synthetic gas test stand, and pressure dependency characterization, demonstration of benefits of control w/o sensing via simulation, development of 2nd generation sensor concept. Notable technical achievements from phase II were the following: publication of two new technical papers by Clemson detailing the control strategies used for the EGR system control. The two papers was published in the 2016 SAE World Congress in April 2016. The titles of each paper are, “Physics-Based Exhaust Pressure and Temperature Estimation for Low Pressure EGR Control in Turbocharged Gasoline Engines,” by K. Siokos, and “A Control Algorithm for Low Pressure – EGR Systems using a Smith Predictor with Intake Oxygen Sensor Feedback”, by R. Koli. All phase III work packages have been completed. The primary work packages in phase III were the following: completion of long-term sensor durability testing, final demonstration of benefits of EGR control w/o sensing, final decision of the second generation sensor development path.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

AmeriFlux FLUXNET-1F US-Tw5 East Pond Wetland

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Tw5 East Pond Wetland. This is the FLUXNET version of the carbon flux data for the site US-Tw5 East Pond Wetland produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Wetland site is a 6.5 acre restored wetland on Twitchell Island, that is managed by the California Department of Water Resources (DWR) and the U.S. Geological Survey (USGS). In the fall of 1997, the site was permanently flooded to a depth of approximately 55 cm. The wetland remained fairly unvegetated in patches increasing in size towards the east. The site underwent a major disturbance in 2013 when the vegetation was removed to seed a nearby restored wetland. A flux tower equipped to analyze energy, H2O, CO2, and CH4 fluxes was installed on April 17, 2018.

Valach, Alex↗

Status, Plans, and Initial Results for ARES 1 Crew Launch Vehicle Aerodynamics

Following the completion of NASA's Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Exploration Launch Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented.

Huebner, Lawrence D.↗

Status, Plans and Initial Results for Ares I Crew Launch Vehicle Aerodynamics

Following the completion of NASA s Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Ares Projects Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented. Keywords: Ares I Crew Launch Vehicle, aerodynamics, wind tunnel testing, computational fluid dynamics

Huebner, Lawrence D.↗

AmeriFlux FLUXNET-1F CA-DSM Delta Salt Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site CA-DSM Delta Salt Marsh. This is the FLUXNET version of the carbon flux data for the site CA-DSM Delta Salt Marsh produced by applying the standard ONEFlux (1F) software. Site Description - This site is a tidal salt marsh on the eastern side of the Boundary Bay Wildlife Management Area (WMA) in Delta, British Columbia, Canada. This area is located on the southern front of the Fraser River. The total area of the Boundary Bay WMA is 11,470 ha, and the eastern part surrounding the flux tower accounts for 39 ha. This area is surrounded by farms and dikes. The Provincial Government purchased this area in 1974 limiting public access and designated it as WMA in 1995. This area has a mixed semidiurnal tidal cycle. The dominant species is Saltgrass (Distichlis spicata) with a canopy height of ~40 cm. The tower is in a high marsh system and was installed to analyze energy, H2O, CO2, and CH4 fluxes on September 3, 2021.

Knox, Sara [The University of British Columbia]↗

AmeriFlux FLUXNET-1F CA-RBM Richmond Brackish Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site CA-RBM Richmond Brackish Marsh. This is the FLUXNET version of the carbon flux data for the site CA-RBM Richmond Brackish Marsh produced by applying the standard ONEFlux (1F) software. Site Description - This site is a tidal brackish marsh on the southern side of the Sturgeon Bank Wildlife Management Area (WMA) in Richmond, British Columbia, Canada. This area is situated within the estuary of the Fraser River. The total area of Sturgeon Bank WMA is 5,152 ha, of which the tidal marsh area is 205 ha. The southern of the WMA is characterized as a brackish marsh, which transitions to a salt marsh as you go north. Human development has influenced this area for almost 200 years. Human activities in this area began in the early 1800s, which included dredging, dyke and entrainment structures, agriculture, and other uses. The areas were designated as WMA in 1998. This area experiences a semidiurnal tidal cycle. The flux tower is located near the southern edge of the marsh, where the dominant species is cattail (Typha latifolia), with a canopy height of 160 cm. The tower is in a high marsh system and was installed to analyze energy, H2O, CO2, and CH4 fluxes on June 1, 2022.

Knox, Sara [The University of British Columbia]↗

Multi-Element Integrated Project Planning at Kennedy Space Center

This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

Mullon, Robert↗

AmeriFlux FLUXNET-1F US-Tw1 Twitchell Wetland West Pond

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Tw1 Twitchell Wetland West Pond. This is the FLUXNET version of the carbon flux data for the site US-Tw1 Twitchell Wetland West Pond produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Wetland site is a 7.4-acre restored wetland on Twitchell Island, that is managed by the California Department of Water Resources (DWR) and the U.S. Geological Survey (USGS). In the fall of 1997, the site was permanently flooded to a depth of approximately 25 cm. The wetland was almost completely covered by cattails and tules by the third growing season. A flux tower equipped to analyze energy, H2O, CO2, and CH4 fluxes was installed on May 17, 2012.

Valach, Alex↗

Development and demonstration of a telerobotic excavation system

Oak Ridge National Laboratory is developing remote excavation technologies for the Department of Energy's Office (DOE) of Technology Development, Robotics Technology Development Program, and also for the Department of Defense (DOD) Project Manager for Ammunition Logistics. This work is being done to meet the need for remote excavation and removal of radioactive and contaminated buried waste at several DOE sites and unexploded ordnance at DOD sites. System requirements are based on the need to uncover and remove waste from burial sites in a way that does not cause unnecessary personnel exposure or additional environmental contamination. Goals for the current project are to demonstrate dexterous control of a backhoe with force feedback and to implement robotic operations that will improve productivity. The Telerobotic Small Emplacement Excavator is a prototype system that incorporates the needed robotic and telerobotic capabilities on a commercially available platform. The ability to add remote dexterous teleoperation and robotic operating modes is intended to be adaptable to other commercially available excavator systems.

Burks, Barry L.↗

The Integrated Medical Model: Outcomes from Independent Review

In 2016, the Integrated Medical Model (IMM) v4.0 underwent an extensive external review in preparation for transition to an operational status. In order to insure impartiality of the review process, the Exploration Medical Capabilities Element of NASA's Human Research Program convened the review through the Systems Review Office at NASA Goddard Space Flight Center (GSFC). The review board convened by GSFC consisted of persons from both NASA and academia with expertise in the fields of statistics, epidemiology, modeling, software development, aerospace medicine, and project management (see Figure 1). The board reviewed software and code standards, as well as evidence pedigree associated with both the input and outcomes information. The board also assesses the models verification, validation, sensitivity to parameters and ability to answer operational questions. This talk will discuss the processes for designing the review, how the review progressed and the findings from the board, as well as summarize the IMM project responses to those findings. Overall, the board found that the IMM is scientifically sound, represents a necessary, comprehensive approach to identifying medical and environmental risks facing astronauts in long duration missions and is an excellent tool for communication between engineers and physicians. The board also found IMM and its customer(s) should convene an additional review of the IMM data sources and to develop a sustainable approach to augment, peer review, and maintain the information utilized in the IMM. The board found this is critically important because medical knowledge continues to evolve. Delivery of IMM v4.0 to the Crew Health and Safety (CHS) Program will occur in the 2017. Once delivered for operational decision support, IMM v4.0 will provide CHS with additional quantitative capability in to assess astronaut medical risks and required medical capabilities to help drive down overall mission risks.

medical equipment↗